← Back
Factory, light manufacturing
165-35 145 DRIVE
QUEENS · BIN 4285071
💬 Discuss this project
1968Year Built
2Stories
F5Building Class
M1-1Zoning
14,300 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Factory, light manufacturing · Owner of record: SEAGIS JFK LLC · 17,100 sf lot · 0.84 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof30p · 3 filings · 20 docs
Floor 131p · 3 filings · 20 docs
Cellar29p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INDUSTRIAL ASSOCIATES JFK403/22/2026
AERO PROP ASSOC303/22/2026
AREO PROP ASSOC103/22/2026
INDUSTRIAL INVESTORS303/21/2026
INDUSTRIAL ASSOC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MG ENGINEERING D.P.C.705/30/2024
ART OF FORM, ARCHITECTS304/18/2023
JEFFREY N. BEEDEN208/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ART OF FORM ARCHITECTS2003/21/2026
OEF CONSULTANTS LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A N G CONTRACTING INCGeneral Contractor507/08/2026
SPEEDWAY PLUMBING CORPPlumbing207/08/2026
FREDERICK LEEElectrical103/21/2026
SPEEDWAY PLUMBING CORPFire Protection107/08/2026
GOOD-WILL MECHANICAL CORP.General Contractor104/09/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TAN ENGINEERING, P.C.1291505/30/2024
MG ENGINEERING D.P.C.8546205/08/2024
C.M. TESTING LABORATORY,1352104/18/2023
DNA CONTROLLED INSPECTION554108/19/2019
SOCOTEC ENGINEERING4983108/14/2019
Building Lifecycle
All (123)Filed (12)Permit Issued (8)Signed Off (5)Violation (60)Inspection (6)Objection (2)Special Inspection (30)
12/03/2025
Signed off — Alteration
This subsequent filed for sprinkler related work, all as shown on drawings herewith submitted. REVISED DRAWINGS REFLECTING REVISED SPKLER HEADS.
Q00842236-S1
10/24/2025
Signed off — Alteration
This subsequent filed for sprinkler related work, all as shown on drawings herewith submitted. REVISED DRAWINGS REFLECTING REVISED SPKLER HEADS.
Q00842236-S4
08/18/2025
Permit issued — Plumbing
Q00842236-S2-PL
12/12/2024
Violation issued (FDNY_NOV, closed)
09/16/2024
Signed off — Alteration
This subsequent filed for sprinkler related work, all as shown on drawings herewith submitted. REVISED DRAWINGS REFLECTING REVISED SPKLER HEADS.
Q00842236-S3
07/18/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/31/2024
Special inspection requirement — Interior lighting power
Roger Tan
05/31/2024
Special inspection requirement — Mechanical Systems
Roger Tan
05/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
05/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
05/31/2024
Special inspection requirement — Final
Roger Tan
05/31/2024
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
05/31/2024
Special inspection requirement — Lighting controls
Roger Tan
05/31/2024
Special inspection requirement — Maintenance information
Roger Tan
05/31/2024
Special inspection requirement — Duct leakage testing, insulation and design
Roger Tan
05/31/2024
Special inspection requirement — Ventilation and air distribution system
Roger Tan
05/31/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
05/31/2024
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
05/30/2024
Filed — Alteration
This subsequent filed for sprinkler related work, all as shown on drawings herewith submitted. REVISED DRAWINGS REFLECTING REVISED SPKLER HEADS.
Q00842236-P4
05/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
05/21/2024
Special inspection requirement — Ventilation and air distribution system
Roger Tan
05/21/2024
Special inspection requirement — Lighting controls
Roger Tan
05/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
05/21/2024
Special inspection requirement — Mechanical Systems
Roger Tan
05/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
05/21/2024
Special inspection requirement — Final
Roger Tan
05/21/2024
Special inspection requirement — Duct leakage testing, insulation and design
Roger Tan
05/21/2024
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
05/21/2024
Special inspection requirement — Maintenance information
Roger Tan
05/21/2024
Special inspection requirement — Interior lighting power
Roger Tan
05/15/2024
Violation issued (FDNY_NOV, closed)
05/08/2024
Filed — Alteration
This subsequent filed for sprinkler related work, all as shown on drawings herewith submitted. REVISED DRAWINGS REFLECTING REVISED SPKLER HEADS.
Q00842236-P3
05/08/2024
Special inspection requirement — Sprinkler Systems
Roger Tan
05/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
05/08/2024
Special inspection requirement — Post-installed Anchors
Peter Gerazounis
03/01/2024
Violation issued (FDNY_NOV, closed)
01/25/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/19/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
01/19/2024
Special inspection requirement — Post-installed Anchors
Peter Gerazounis
01/19/2024
Special inspection requirement — Sprinkler Systems
Roger Tan
01/11/2024
Filed — Alteration
This subsequent filed for sprinkler related work, all as shown on drawings herewith submitted. REVISED DRAWINGS REFLECTING REVISED SPKLER HEADS.
Q00842236-P2
01/08/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/10/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/10/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2023
Signed off — Alteration
This subsequent filed for sprinkler related work, all as shown on drawings herewith submitted. REVISED DRAWINGS REFLECTING REVISED SPKLER HEADS.
Q00842236-I1
07/11/2023
Filed — Alteration
This subsequent filed for sprinkler related work, all as shown on drawings herewith submitted. REVISED DRAWINGS REFLECTING REVISED SPKLER HEADS.
Q00842236-P1
06/28/2023
Permit issued — Sprinklers
Q00842236-S3-EW-SP
06/22/2023
Permit issued — Structural
Q00842236-S4-ST
05/16/2023
Signed off — Alteration
Q08049445-I1
05/16/2023
Permit issued — Mechanical Systems
Q00842236-S1-MS
05/05/2023
Permit issued — General Construction
Q00842236-I1-GC
04/26/2023
Permit issued — Plumbing
Q00842236-S2-PL
04/24/2023
Filed — Alteration
This subsequent filed for sprinkler related work, all as shown on drawings herewith submitted. REVISED DRAWINGS REFLECTING REVISED SPKLER HEADS.
Q00842236-S1
04/24/2023
Filed — Alteration
This subsequent filed for sprinkler related work, all as shown on drawings herewith submitted. REVISED DRAWINGS REFLECTING REVISED SPKLER HEADS.
Q00842236-S3
04/24/2023
Filed — Alteration
This subsequent filed for sprinkler related work, all as shown on drawings herewith submitted. REVISED DRAWINGS REFLECTING REVISED SPKLER HEADS.
Q00842236-S2
04/18/2023
Filed — Alteration
This subsequent filed for sprinkler related work, all as shown on drawings herewith submitted. REVISED DRAWINGS REFLECTING REVISED SPKLER HEADS.
Q00842236-S4
04/11/2023
Special inspection requirement — Structural Cold-Formed Steel
JOHN SEMIOLI
04/04/2023
Filed — Alteration
This subsequent filed for sprinkler related work, all as shown on drawings herewith submitted. REVISED DRAWINGS REFLECTING REVISED SPKLER HEADS.
Q00842236-I1
01/10/2023
Permit issued — General Construction
Q08049445-I1-GC
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSPEEDWAY PLUMBING CORP08/18/2025
DOB NOWSprinklersSigned-offSPEEDWAY PLUMBING CORP06/28/2023
DOB NOWStructuralSigned-offA N G CONTRACTING INC06/22/2023
DOB NOWMechanical SystemsSigned-offGOODWILL MECHANICAL05/16/2023
DOB NOWGeneral ConstructionSigned-offA N G CONTRACTING INC05/05/2023
DOB NOWPlumbingPermit IssuedSPEEDWAY PLUMBING CORP04/26/2023
DOB NOWGeneral ConstructionSigned-offA N G CONTRACTING INC01/10/2023
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC09/19/2019
BISOTISSUEDVRHCONSTRUCTION CORP08/29/2019
BISOTISSUEDWJ CONTRACTING CORP10/29/2009
BISFPISSUEDMEGA FIRE KITCHEN VENT IN01/29/2009
BISPLISSUEDS & J INDUSTRIAL CORP04/29/2008
BISBLISSUEDS & J INDUSTRIAL CORP04/29/2008
BISFPISSUEDFIREMASTERS06/20/2006
BISFPISSUEDIDEAL FIRE SYSTEMS_INC.01/24/2003
BISOTISSUEDHALLAM ENGINEERING CONT09/11/2000
BISFPISSUEDINC04/21/1997
BISSPISSUEDCAPITOL FIRE SPKL CO,INC04/11/1997
BISPLISSUEDHIRBRO PL INC12/03/1996
BISOTISSUEDGIRANDOLA SHUTKIND CORP11/29/1996
BISOTISSUEDLARRY E. TYREE05/29/1996
BISFSISSUEDFENLEY & NICOL CO INC05/09/1991
BISFSISSUEDFENLEY & NICOL CO INC12/07/1990
BISOTISSUEDJOHN A. GRAMMAS & ASSOCIATES02/16/1990
2 projects · most recent 05/30/2024
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/30/2024Signed-offA N G CONTRACTING INCAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Bohn BCH0030MCACZA0000 3 tons · Condensing Unit ×4
BCH0045MCACZA0000 3 tons · Condensing Unit ×2
BCH0061LCACDA0000 3 tons · Condensing Unit ×3
Heat / Cool
Captiveaire A3-D500-24D-MPU 15 tons · Makeup Air ×9
08/14/2019——Ventilation Systems
Ventilation
Price ASCD 930 CFM ×22
Halton KVE 3,035 CFM · Kitchen Exhaust ×3
Loren Cook 225V11D 6,025 CFM · Kitchen Exhaust ×1
225VX11D 1,810 CFM · Kitchen Exhaust ×1
Greenheck DGX-P125-H32 6,635 CFM · Makeup Air ×1
1 project · most recent 05/30/2024
FiledStatusContractorScope
05/30/2024Signed-offSPEEDWAY PLUMBING CORP85 heads
1 project · most recent 05/30/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/30/2024Permit IssuedSPEEDWAY PLUMBING CORPGas, Water/Sanitary
2 projects · most recent 10/24/2025
General Wiring
FiledStatusContractorScope
10/24/2025CompleteAGIR ELEC'L LTD. D/B/AGeneral Wiring
06/04/2020CompleteSCHLESINGER ELECT'L CONTRGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/18/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
01/25/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/19/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/10/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
05/31/2024Interior lighting powerRoger Tanenergy_progress
05/31/2024Mechanical SystemsRoger Tanspecial
05/31/2024Fire-Resistant Penetrations and JointsRoger Tanspecial
05/31/2024Energy Code Compliance InspectionsRoger Tanprogress
05/31/2024FinalRoger Tanprogress
05/31/2024HVAC-R and service water heating equipmentRoger Tanenergy_progress
05/31/2024Lighting controlsRoger Tanenergy_progress
05/31/2024Maintenance informationRoger Tanenergy_progress
05/31/2024Duct leakage testing, insulation and designRoger Tanenergy_progress
05/31/2024Ventilation and air distribution systemRoger Tanenergy_progress
05/31/2024HVAC-R and service water piping design and insulationRoger Tanenergy_progress
05/31/2024HVAC-R and service water heating system controlsRoger Tanenergy_progress
05/21/2024HVAC-R and service water piping design and insulationRoger Tanenergy_progress
05/21/2024Ventilation and air distribution systemRoger Tanenergy_progress
05/21/2024Lighting controlsRoger Tanenergy_progress
05/21/2024Fire-Resistant Penetrations and JointsRoger Tanspecial
05/21/2024Mechanical SystemsRoger Tanspecial
05/21/2024Energy Code Compliance InspectionsRoger Tanprogress
05/21/2024FinalRoger Tanprogress
05/21/2024Duct leakage testing, insulation and designRoger Tanenergy_progress
05/21/2024HVAC-R and service water heating equipmentRoger Tanenergy_progress
05/21/2024Maintenance informationRoger Tanenergy_progress
05/21/2024Interior lighting powerRoger Tanenergy_progress
05/08/2024Sprinkler SystemsRoger Tanspecial
05/08/2024Fire-Resistant Penetrations and JointsRoger Tanspecial
Latest 25 of 35.
▾Documents — 118 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch11
08/25/2026Q08049445-I1Request digital key ↗
08/24/2026Q00842236-S2Request digital key ↗
08/24/2026Q00842236-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026Q00198513-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00191241-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION7
08/28/2019421737696Open ↗
07/29/2019421737696Open ↗
07/01/2009420045089Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION6
09/03/2019421737696Open ↗
11/04/2009420045089Open ↗
10/29/2009420045089Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWState DEC Permit1
08/13/2026Q00191241-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026Q00198513-I1Open ↗
08/13/2026Q00842236-P1Open ↗
08/13/2026Q00842236-P5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026Q00842236-S1Open ↗
09/01/2026Q00842236-S1Open ↗
09/01/2026Q00842236-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/30/2026Q00842236-S3Open ↗
09/30/2026Q00842236-S3Open ↗
09/02/2026Q00842236-P3Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
09/03/2019421737696Open ↗
09/03/2019421737696Open ↗
07/29/2019421737696Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/24/2008410103533Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/24/2008410103533Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT6
06/27/2008410103533Open ↗
06/13/2008410103533Open ↗
06/13/2008410103533Open ↗
Showing 3 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
10/20/2009420045089Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
07/31/2008410103533Open ↗
▸BISSCHEDULE B - PLUMBING1
04/24/2008410103533Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
07/29/2019421737696Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/15/2026Q00198513-I1Open ↗
08/13/2026Q00842236-S1Open ↗
08/13/2026Q00842236-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
07/01/2009420045089Open ↗
04/24/2008410103533Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/29/2019421737696Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/20/2009410216403Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/03/2019421737696Open ↗
07/29/2019421737696Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
06/29/2020421737696Open ↗
▸BISINTERIOR LIGHTING POWER1
06/29/2020421737696Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/29/2020421737696Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/29/2020421737696Open ↗
▸BISLIGHTING CONTROLS1
06/29/2020421737696Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00842236-S1Open ↗
▸Inspections & Test Reports2
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/29/2020421737696Open ↗
▸BISMECHANICAL SYSTEMS1
06/29/2020421737696Open ↗
▸Approvals, Objections & Sign-offs5
▸BISADMINISTRATIVE OBJECTIONS3
07/01/2009420045089Open ↗
01/20/2009410216403Open ↗
04/24/2008410103533Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/04/2009420045089Open ↗
▸BISFINAL1
06/29/2020421737696Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT5
07/29/2019421737696Open ↗
07/01/2009420045089Open ↗
01/20/2009410216403Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/29/2020421737696Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
07/29/2019421737696Open ↗
07/01/2009420045089Open ↗
01/20/2009410216403Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸BISMAINTENANCE INFORMATION1
06/29/2020421737696Open ↗