← Back
BuildNYC
City university
Medgar Evers College
1650 BEDFORD AVENUE · BIN 3034075
💬 Discuss this project
1987Year Built
2Stories
W5Building Class
R6Zoning
147,950 sfGross Floor Area
2Units
LL97 Covered4 Active Violations 16 likely answered 10 old, status unconfirmed ▸FDNY Report ↗
City university · Owner of record: Dormitory Authority of the State of New York · 183,400 sf lot · 0.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMedgar Evers College43p · 5 filings · 15 docs
Floor 4Medgar Evers College1 filing · 4 docs
Floor 3Medgar Evers College1 filing · 4 docs
Floor 2Medgar Evers College45p · 5 filings · 15 docs
Floor 1Medgar Evers College47p · 8 filings · 15 docs
CellarMedgar Evers College1 filing · 13 docs
Sub-BasementMedgar Evers College1p · 3 filings · 15 docs
Site & exteriorMedgar Evers College4p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Dasny5007/08/2026
Dormitory Authority of the State of New York4303/22/2026
CUNY1503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ikon.5 Architects402/10/2026
Associates102/04/2026
IMEG301/20/2026
O'Brien and Gere Engineers504/28/2023
Ysrael A. Seinuk202/23/2022
Keri Engineering403/26/2021
AK Consulting Services107/06/2020
Heritage Architecture107/03/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services1003/21/2026
Dennis Kim403/21/2026
AK Consulting Services203/21/2026
Heritage Architecture103/21/2026
Outsource Consultants1003/21/2026
Noel Building Consulting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Michael Anthony ContractingGeneral Contractor1507/08/2026
Cardoza PlumbingPlumbing607/08/2026
A.B.C.D. ConstructionScaffold403/21/2026
Sirina Fire ProtectionFire Protection207/08/2026
Star-Delta ElectricElectrical103/21/2026
Mac Fhionnghaile & SonsElectrical103/22/2026
L J Electrical ServiceElectrical103/21/2026
Alliance PlumbingPlumbing107/08/2026
Jimenez LuisElectrical103/21/2026
AL Foy ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Future Tech Consultants O589804/21/2023
Building Lifecycle
All (165)Filed (21)Permit Issued (20)Violation (60)Inspection (7)Objection (27)Special Inspection (30)
02/25/2026
Objection resolved — Addressed
02/11/2026
Objection raised — Inspections
02/10/2026
Filed — Alteration
Herewith Filing Plumbing Work in connection with courtyard renovations, work proposed is part of the irrigation system as per plans filed herewith.
B01306112-S4
02/05/2026
Filed — Alteration
Herewith Filing Plumbing Work in connection with courtyard renovations, work proposed is part of the irrigation system as per plans filed herewith.
B01306112-S2
02/04/2026
Filed — Alteration
Herewith Filing Plumbing Work in connection with courtyard renovations, work proposed is part of the irrigation system as per plans filed herewith.
B01306112-S3
01/28/2026
Filed — Alteration
Herewith Filing Plumbing Work in connection with courtyard renovations, work proposed is part of the irrigation system as per plans filed herewith.
B01306112-S1
01/22/2026
Filed — Alteration
Herewith Filing Plumbing Work in connection with courtyard renovations, work proposed is part of the irrigation system as per plans filed herewith.
B01306112-I1
01/22/2026
Special inspection requirement — Lighting controls
01/20/2026
Filed — Alteration
INSTALLATION OF FUEL STORAGE FOR EMERGENCY GENERATOR. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01274916-I1
01/20/2026
Filed — Alteration
INSTALLATION OF STRUCTURAL WORK FOR EMERGENCY GENERATOR. SEE PLANS FOR DETAIL. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01274898-I1
01/20/2026
Filed — Alteration
INSTALLATION OF FUEL STORAGE FOR EMERGENCY GENERATOR. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01274916-S1
01/08/2026
Special inspection requirement — Exterior lighting power
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/21/2025
Special inspection requirement — Structural Steel - Welding
10/21/2025
Special inspection requirement — Structural Steel - Details
10/21/2025
Special inspection requirement — Final
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/21/2025
Special inspection requirement — Final
10/21/2025
Special inspection requirement — Footing and Foundation
10/21/2025
Special inspection requirement — Final
10/21/2025
Special inspection requirement — Deep Foundation Elements
10/21/2025
Special inspection requirement — Concrete - Cast-In-Place
10/21/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
10/21/2025
Special inspection requirement — Subgrade Inspections
10/02/2025
Violation issued (FDNY_NOV, closed)
10/02/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
10/02/2025
Special inspection requirement — Post-installed Anchors
10/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/02/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
10/02/2025
Special inspection requirement — Structural Steel - Details
10/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
08/20/2025
Special inspection requirement — Mechanical Systems
08/20/2025
Special inspection requirement — Final
08/20/2025
Special inspection requirement — Final
07/31/2025
Violation issued (FDNY_NOV, closed)
07/21/2025
Violation issued (FDNY_ORDER, closed)
07/21/2025
Violation issued (FDNY_ORDER, closed)
07/21/2025
Violation issued (FDNY_ORDER, closed)
07/21/2025
Violation issued (FDNY_ORDER, closed)
02/05/2025
Inspection — Pass-Final Boiler Equipment Withdrawal Inspection
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/10/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/10/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/07/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/31/2024
Permit issued — Foundation
B00479661-I1-GC-CX
05/31/2024
Permit issued — Mechanical Systems
B00322876-I1-MS
05/13/2024
Violation issued (FDNY_NOV, closed)
01/29/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
12/06/2023
Permit issued — Plumbing
B00322838-I1-PL
12/05/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/01/2023
Permit issued — Boiler Equipment
B00665408-I1-BE
07/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
07/24/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
MARISA HARTE
07/21/2023
Objection resolved — Addressed
07/20/2023
Objection resolved — Addressed
07/18/2023
Objection resolved — Addressed
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 165 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedMichael Anthony Contracting05/31/2024
DOB NOWMechanical SystemsPermit IssuedMichael Anthony Contracting05/31/2024
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe12/06/2023
DOB NOWBoiler EquipmentSigned-offService Tech Mechanical & Plumbing09/01/2023
DOB NOWStructuralPermit IssuedMichael Anthony Contracting06/13/2023
DOB NOWMechanical SystemsPermit IssuedMichael Anthony Contracting06/01/2023
DOB NOWPlumbingSigned-offCardoza Plumbing03/17/2023
DOB NOWPlumbingPermit IssuedCardoza Plumbing03/17/2023
DOB NOWSprinklersPermit IssuedSirina Fire Protection01/31/2023
DOB NOWSprinklersPermit IssuedSirina Fire Protection01/10/2023
DOB NOWPlumbingSigned-offCardoza Plumbing06/14/2022
DOB NOWPlumbingPermit IssuedCardoza Plumbing06/14/2022
DOB NOWGeneral ConstructionPermit IssuedMichael Anthony Contracting06/14/2022
DOB NOWMechanical SystemsPermit IssuedMichael Anthony Contracting06/02/2022
DOB NOWMechanical SystemsPermit IssuedMichael Anthony Contracting12/14/2021
DOB NOWGeneral ConstructionPermit IssuedMichael Anthony Contracting11/30/2021
DOB NOWPlumbingSigned-offCardoza Plumbing09/09/2021
DOB NOWPlumbingPermit IssuedCardoza Plumbing09/07/2021
DOB NOWConstruction FencePermit IssuedA.B.C.D. Construction02/23/2021
DOB NOWConstruction FencePermit IssuedA.B.C.D. Construction07/08/2020
BISOTISSUEDMichael Anthony Contracting03/25/2024
BISOTISSUEDMichael Anthony Contracting03/27/2023
BISOTISSUEDMichael Anthony Contracting08/01/2022
BISOTISSUEDMichael Anthony Contracting10/13/2021
BISOTISSUEDA.B.C.D. Construction02/05/2021
BISOTISSUEDA.B.C.D. Construction12/09/2020
BISOTISSUEDA.B.C.D. Construction06/29/2020
BISOTISSUEDInfinity Contracting Service11/09/2017
BISMHISSUEDInfinity Contracting Service11/09/2017
BISOTISSUEDInfinity Contracting Service11/09/2017
BISPLISSUEDPar Plumbing Co03/20/2017
BISMHISSUEDInfinity Contracting Service11/14/2016
BISOTISSUEDInfinity Contracting Service11/14/2016
BISOTISSUEDInfinity Contracting Service11/14/2016
BISOTISSUEDPetk11/10/2016
BISOTISSUEDInfinity Contracting Service11/09/2016
BISMHISSUEDInfinity Contracting Service11/09/2016
BISOTISSUEDInfinity Contracting Service11/09/2016
BISMHISSUEDManhattan Business Interiors05/13/2015
BISOTISSUEDManhattan Business Interiors05/13/2015
+ 30 more permits on file
1 project · most recent 01/20/2026
Generators
FiledStatusContractorScopeMake / Model / Capacity
01/20/2026——Generators
Generators
Cummins DQCB 750 kW · Generator ×1
1 project · most recent 02/10/2026
Water/Sanitary
FiledStatusContractorScope
02/10/2026——Water/Sanitary
3 projects · most recent 10/27/2021
General Wiring Lighting
FiledStatusContractorScope
10/27/2021CompleteEgg ElectricGeneral Wiring, Lighting
10/20/2021CompleteMac Fhionnghaile & SonsGeneral Wiring
04/18/2019CompleteJ.H. Electric of New YorkGeneral Wiring
2 projects · most recent 01/20/2026
Steel Concrete
FiledStatusContractorScope
01/20/2026——Steel, Concrete
02/23/2022Permit IssuedMichael Anthony ContractingSteel, Concrete
1 project · most recent 04/28/2023
Fence
FiledStatusContractorScope
04/28/2023Signed-offService Tech Mechanical & PlumbingFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/05/2025Pass-Final Boiler Equipment Withdrawal InspectionPassView ↗
06/10/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/07/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/29/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
12/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/05/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
01/22/2026Lighting controls—energy_progress
01/08/2026Exterior lighting power—energy_progress
10/21/2025Structural Steel - Welding—special
10/21/2025Structural Steel - Details—special
10/21/2025Final—progress
10/21/2025Fire-Resistant Penetrations and Joints—special
10/21/2025Final—progress
10/21/2025Footing and Foundation—progress
10/21/2025Final—progress
10/21/2025Deep Foundation Elements—special
10/21/2025Concrete - Cast-In-Place—special
10/21/2025Subsurface Conditions – Fill Placement & In-Place Density—special
10/21/2025Subgrade Inspections—special
10/02/2025Fuel-Oil Storage and Fuel-Oil Piping Systems—special
10/02/2025Post-installed Anchors—special
10/02/2025Fire-Resistant Penetrations and Joints—special
10/02/2025Emergency and Standby Power Systems (Generator)—special
10/02/2025Structural Steel - Details—special
10/02/2025Fire-Resistance Rated Construction—progress
08/20/2025Mechanical Systems—special
08/20/2025Final—progress
08/20/2025Final—progress
07/24/2023Fire-Resistant Penetrations and JointsMARISA HARTEspecial
07/24/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsMARISA HARTEspecial
04/13/2023Final—progress
Latest 25 of 48.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Medgar Evers CollegeEducationEntire building
Project B01306112 Alteration · Approved · 01/22/2026
Project B01274898 Alteration · Approved · 01/20/2026
Project B01274916 Alteration · Approved · 01/20/2026
Project B00665408 Alteration · Filing Withdrawn · 02/24/2022
Project B00479661 Alteration · Permit Entire · 07/14/2021
Project B00322849 Alteration · Permit Issued · 03/26/2021
Project B00322838 Alteration · Permit Entire · 03/19/2021
Project B00322876 Alteration · Permit Entire · 03/19/2021
Project B00323469 Alteration · Permit Entire · 03/19/2021
Project B00365278 Alteration · Permit Entire · 07/06/2020
Project B00180227 No Work · Approved · 07/03/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 574 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch15
08/31/2026B00479661-P1Request digital key ↗
08/31/2026B00479661-I1Request digital key ↗
08/31/2026B00665408-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/01/2026B00323469-I1Request digital key ↗
09/01/2026B00322849-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00322838-I1Request digital key ↗
09/01/2026B00322849-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
09/02/2026B00180227-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00365278-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/01/2026B00322876-I1Request digital key ↗
▸Applications & Permits108
▸BISPLAN / WORK APPROVAL APPLICATION72
03/18/2024340762534Open ↗
02/05/2024340762534Open ↗
09/01/2021340762534Open ↗
Showing 3 of 72 on file for this type
▸BISWORK PERMIT APPLICATION35
10/13/2021340762534Open ↗
06/29/2020340723195Open ↗
11/13/2017321393782Open ↗
Showing 3 of 35 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/26/2019321393782Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM2
08/31/2021340762534Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications128
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION76
08/30/2021340762534Open ↗
08/23/2019321393782Open ↗
08/23/2019321393782Open ↗
Showing 3 of 76 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/31/2026B00479661-I1Open ↗
08/31/2026B00479661-P1Open ↗
08/31/2026B00665408-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
08/31/2021340762534Open ↗
08/30/2021340762534Open ↗
03/19/2015321089399Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026B00479661-P1Open ↗
08/26/2026B00479661-P1Open ↗
08/26/2026B00479661-P1Open ↗
Showing 3 of 6 on file for this type
▸BISProfessional and Owner Certification (POC3)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B00665408-I1Open ↗
08/26/2026B00479661-P1Open ↗
08/24/2026B00479661-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/12/2021340762534Open ↗
03/19/2015321089399Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
04/29/2020340723195Open ↗
03/06/2015340220754Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/12/2021340762534Open ↗
▸Trade Schedules & Equipment36
▸BISSCHEDULE B - PLUMBING20
03/06/2015340220754Open ↗
10/17/2014320419695Open ↗
10/07/2014320759611Open ↗
Showing 3 of 20 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
08/11/2015320759611Open ↗
09/24/2014320759611Open ↗
09/17/2014320419695Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
07/10/2017321615132Open ↗
06/02/2016321393782Open ↗
Showing 2 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
12/21/2018320881006Open ↗
10/11/2014320420077Open ↗
09/20/2014320571467Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/16/2015320419695Open ↗
▸BISEQUIPMENT USE PERMITS1
07/16/2015320419695Open ↗
▸Environmental & Asbestos43
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
08/30/2021340762534Open ↗
09/13/2019321393782Open ↗
08/23/2019321393782Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/31/2026B00479661-I1Open ↗
08/31/2026B00479661-P1Open ↗
08/31/2026B00665408-I1Open ↗
Showing 3 of 11 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
08/31/2021340762534Open ↗
07/18/2020340723195Open ↗
Showing 2 of 3 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
06/29/2020340723195Open ↗
▸BISASBESTOS-WORK UNDET 1000 SQ FT (DEP ACP7)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0651BX201
11/15/2022340723195Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
08/30/2021340762534Open ↗
12/07/2017321615132Open ↗
09/07/2017321615132Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
12/02/2022340723195Open ↗
11/14/2022340723195Open ↗
09/29/2021340762534Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/14/2022340723195Open ↗
08/23/2019321393782Open ↗
07/16/2015320419695Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY7
12/02/2022340723195Open ↗
11/14/2022340723195Open ↗
09/29/2021340762534Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
11/09/2016321393782Open ↗
11/07/2014320419695Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION4
07/16/2015320419695Open ↗
11/07/2014320419695Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
11/09/2016321393782Open ↗
Showing 1 of 3 on file for this type
▸BISHYDRO FLOW TEST LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRESTOP, DRAFTSTOP, AND FIREBLOCKSYSTEM1
05/21/2015340220754Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs67
▸BISADMINISTRATIVE OBJECTIONS21
03/19/2015321089399Open ↗
Showing 1 of 21 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
08/31/2026B00479661-I1Open ↗
08/31/2026B00479661-P1Open ↗
08/31/2026B00665408-S1Open ↗
Showing 3 of 21 on file for this type
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST14
01/06/2015320420077Open ↗
01/06/2015320759611Open ↗
10/17/2014320759611Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
07/16/2015320419695Open ↗
10/17/2014320759611Open ↗
10/17/2014320759611Open ↗
Showing 3 of 11 on file for this type
▸Cost, Insurance & Ownership61
▸BISCOST AFFIDAVIT56
11/14/2022340723195Open ↗
01/12/2021340762534Open ↗
04/29/2020340723195Open ↗
Showing 3 of 56 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE (PGLI)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
10/06/2021340762534Open ↗
Showing 1 of 2 on file for this type
▸Filing & Intake Forms58
▸BISEFILING COVER SHEET39
07/10/2017321615132Open ↗
07/10/2017321615132Open ↗
07/10/2017321615132Open ↗
Showing 3 of 39 on file for this type
▸BISADDITIONAL INFORMATION12
03/18/2024340762534Open ↗
09/30/2021340762534Open ↗
05/21/2020340723195Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
01/12/2021340762534Open ↗
04/29/2020340723195Open ↗
03/06/2015340220754Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
04/03/2020321615132Open ↗
09/14/2019321393782Open ↗
08/23/2019321393782Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM4
08/31/2021340762534Open ↗
08/30/2021340762534Open ↗
Showing 2 of 4 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM1
09/29/2021340762534Open ↗
▸DOB NOWWaiver Document1
08/15/2026B00665408-S2Open ↗