← Back
Primarily 2 family with 1 store or office
1653 NOSTRAND AVENUE
BROOKLYN · BIN 3110407
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6Zoning
3,300 sfGross Floor Area
3Units
72 Open Violations 69 unresolved · 3 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: AB INITIO LLC · 2,000 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
PlumbingFire Protection
Bulkhead1p · 1 filing · 2 docs
Floor 34p · 2 filings · 18 docs
Floor 23p · 1 filing · 16 docs
Floor 1
Cellar5p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AB INITIO LLC1903/22/2026
THE OWNER OF103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/28/2022$880K—— → —$267/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TURNIER ENGINEERING PC401/21/2025
METRO STRUCTURES305/29/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PINNACLE BUILDING CON303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GENET PLBG AND HTG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TURNIER ENGINEERING PC6900401/21/2025
Building Lifecycle
All (128)Filed (7)Permit Issued (2)Violation (60)Inspection (4)Objection (39)Special Inspection (16)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/23/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/21/2025
Filed — Alteration
Provide two new gas fired wall mounted condensing combo-boiler in cellar for domestic hot water and hydronic space heating.
B01124031-P2
01/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE TURNIER
01/21/2025
Special inspection requirement — Heating Systems
EUGENE TURNIER
01/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE TURNIER
01/21/2025
Special inspection requirement — Heating Systems
EUGENE TURNIER
01/17/2025
Permit issued — Boiler Equipment
B01124031-S1-BE
01/16/2025
Filed — Alteration
Provide two new gas fired wall mounted condensing combo-boiler in cellar for domestic hot water and hydronic space heating.
B01124031-S1
01/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE TURNIER
12/27/2024
Objection resolved — Addressed
12/27/2024
Objection resolved — Addressed
12/24/2024
Objection raised — Other
12/24/2024
Objection raised — Scope
12/17/2024
Filed — Alteration
Provide two new gas fired wall mounted condensing combo-boiler in cellar for domestic hot water and hydronic space heating.
B01124031-P1
12/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE TURNIER
12/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/04/2024
Permit issued — Plumbing
B01124031-I1-PL
11/25/2024
Objection resolved — Addressed
11/13/2024
Objection raised — Admin
11/05/2024
Objection resolved — Addressed
11/05/2024
Objection resolved — Addressed
11/05/2024
Objection resolved — Addressed
10/29/2024
Objection resolved — Addressed
10/21/2024
Objection raised — Scope
10/21/2024
Objection raised — Scope
10/21/2024
Objection raised — Fire_Protection
10/21/2024
Objection raised — Other
10/15/2024
Filed — Alteration
Provide two new gas fired wall mounted condensing combo-boiler in cellar for domestic hot water and hydronic space heating.
B01124031-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/05/2023
Objection raised — Structural
06/05/2023
Objection raised — Structural
05/29/2023
Filed — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM AT BUILDING, FOR CONVERSION OF BUILDING TO TRADE SCHOOL, AS PER PLANS SUBMITTED.
B00865994-I1
04/27/2023
Special inspection requirement — Sprinkler Systems
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/23/2023
Objection raised — Other
03/23/2023
Objection raised — Structural
03/23/2023
Objection raised — Fire_Protection
03/23/2023
Objection raised — Fire_Protection
03/23/2023
Objection raised — Accessibility
03/23/2023
Objection raised — Admin
03/23/2023
Objection raised — Scope
03/23/2023
Objection raised — Cost
03/23/2023
Objection raised — Admin
03/23/2023
Objection raised — Scope
03/23/2023
Objection raised — Zoning
03/23/2023
Objection raised — Structural
03/23/2023
Objection raised — Fire_Protection
03/23/2023
Objection raised — Admin
03/23/2023
Objection raised — Zoning
03/23/2023
Objection raised — Structural
03/23/2023
Objection raised — Inspections
03/21/2023
Objection raised — Admin
03/21/2023
Objection resolved — Addressed
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offGENET PLBG AND HTG CORP01/17/2025
DOB NOWPlumbingPermit IssuedGENET PLBG AND HTG CORP12/04/2024
1 project · most recent 05/29/2023
FiledStatusContractorScope
05/29/2023——39 heads
2 projects · most recent 01/21/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/21/2025Signed-offGENET PLBG AND HTG CORPGas
03/16/2023——Gas, Water/Sanitary
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2025Pass-Final Boiler Equipment InspectionPassView ↗
01/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
01/21/2025Fire-Resistant Penetrations and JointsEUGENE TURNIERspecial
01/21/2025Heating SystemsEUGENE TURNIERspecial
01/21/2025Fire-Resistant Penetrations and JointsEUGENE TURNIERspecial
01/21/2025Heating SystemsEUGENE TURNIERspecial
01/03/2025Fire-Resistant Penetrations and JointsEUGENE TURNIERspecial
12/17/2024Fire-Resistant Penetrations and JointsEUGENE TURNIERspecial
04/27/2023Sprinkler Systems—special
03/16/2023Lighting controls—energy_progress
03/16/2023Interior lighting power—energy_progress
03/16/2023Fenestration and door U-factor and product ratings—energy_progress
03/16/2023Fenestration areas—energy_progress
03/16/2023Insulation placement and R values—energy_progress
03/16/2023Fenestration air leakage—energy_progress
03/12/2023Energy Code Compliance Inspections—progress
03/12/2023Fire-Resistance Rated Construction—progress
03/12/2023Energy Code Compliance Inspections—progress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026B01124031-S1Request digital key ↗
08/23/2026B01124031-P1Request digital key ↗
08/23/2026B01124031-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026B00842646-I1Open ↗
08/23/2026B01124031-P1Open ↗
08/23/2026B01124031-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/15/2026B01124031-S1Open ↗
09/01/2026B01124031-P1Open ↗
08/25/2026B01124031-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B00842645-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B01124031-P1Open ↗
08/23/2026B01124031-I1Open ↗
08/23/2026B01124031-P2Open ↗
Showing 3 of 4 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026B00842645-I1Open ↗