| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01192392 ↗ | 140-35 255 STREET QUEENS | Alteration CO | Permit Issued | 04/29/2025 | 08/11/2026 | Design TURNIER ENGINEERING PC Contractor MOKEN HOME IMPROVEMENT | Provide new kitchen and 3pc bathroom in second floor. Provide new 3pc bathroom in cellar. Cooking stove to be electric. |
| M00932438 ↗ | 291 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 12/09/2024 | 07/23/2026 | Design TURNIER ENGINEERING PC Owner ABC REALTY Contractor GENET PLBG AND HTG CORP | REMOVE EXISTING CAST IRON BOILER AND EXISTING OIL FIRED BURNER. REMOVE OIL FUEL BURNER. INSTALL NEW CAST IRON WEIL-MCLAIN GAS FIRED STEAM BO… |
| Q01108401 ↗ | 56-44 142 STREET QUEENS | Alteration CO | Permit Issued | 11/22/2024 | 06/17/2026 | Design TURNIER ENGINEERING PC Contractor GENET PLUMBING AND HEATING | Provide new gas meter in cellar for second floor apartment cooking and provide waste and water lines for new kitchen on new second floor apa… |
| B00901997 ↗ | 81 WELDON STREET BROOKLYN | Alteration CO | Permit Issued | 09/07/2023 | 04/22/2026 | Design TURNIER ENGINEERING PC Contractor BLUE CITY CONSTRUCTION | New kitchen on 2nd floor and new bathroom on 3rd floor and cellar. |
| Q00803572 ↗ | 122-20 193 STREET QUEENS | Alteration CO | Permit Issued | 02/13/2023 | 02/09/2026 | Design TURNIER ENGINEERING PC Contractor MOKEN HOME IMPROVEMENT | remove existing attic and provide new second story to existing one story house with attic |
| Q00682852 ↗ | 191-06 WOODHULL AVENUE QUEENS | Alteration | Permit Issued | 02/28/2022 | 11/14/2025 | Design TURNIER ENGINEERING PC Contractor GENET PLBG AND HTG CORP | 2 boilers and 2 hot water heaters and legalization of 1 bathroom in cellar, 1st floor 1 new bathroom and 2nd floor 1 new kitchen and 1 new… |
| Name | Projects together | Most recent |
|---|---|---|
| GENET PLBG AND HTG CORP | 28 | 07/17/2026 |
| GENET PLUMBING AND HEATIN | 14 | 10/03/2025 |
| MOKEN HOME IMPROVEMENT | 4 | 03/20/2026 |
| MIDTOWN PLBG & HTNG CORP | 2 | 11/18/2025 |
| ADEPT IMPROVEMENTS INC | 1 | 06/06/2022 |
| BLUE CITY CONSTRUCTION | 1 | 03/20/2026 |
| GENET PLUMBING AND HEATING CORP | 1 | 01/22/2020 |
| KISHAN PLBG & HEATING INC | 1 | 09/23/2021 |
| KISHAN PLUMBING & HEATING | 1 | 09/20/2021 |
| MORELL BUILDERS INC | 1 | 01/08/2026 |
| TWO BROTHERS K CONST CORP | 1 | 11/21/2023 |
| VERDUGOS GENERAL CONTRACT | 1 | 07/21/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| 113-11 PARTNERS LLC | 3 | 09/06/2024 |
| 169 JAMAICA LLC | 2 | 06/24/2024 |
| GENET PLUMBING AND HEATING CORP. | 2 | 11/10/2020 |
| VERDUGOS GC CORP. | 2 | 06/11/2024 |
| AB INITIO LLC | 1 | 01/21/2025 |
| ABC REALTY | 1 | 07/17/2026 |
| CAPANI MANAGEMENT | 1 | 03/12/2021 |
| CHURCH OF LORD PENTECOSTAL CHURCH | 1 | 08/11/2022 |
| RQ REALTY MGMNT, LTD. | 1 | 11/18/2025 |
| SHELLY ESTATES GROUP, LLC | 1 | 03/03/2020 |
| ZEBA DRUGS INC | 1 | 01/09/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| CONSTRUCTION DEPOTE | 4 | 02/29/2024 |
| WSCONSULTANT & EXPEDITING SERVICES | 3 | 01/08/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01192392 ↗ | 140-35 255 STREET QUEENS | Alteration CO | Permit Issued | 04/29/2025 | 08/11/2026 | Design TURNIER ENGINEERING PC Contractor MOKEN HOME IMPROVEMENT | Provide new kitchen and 3pc bathroom in second floor. Provide new 3pc bathroom in cellar. Cooking stove to be electric. |
| M00932438 ↗ | 291 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 12/09/2024 | 07/23/2026 | Design TURNIER ENGINEERING PC Owner ABC REALTY Contractor GENET PLBG AND HTG CORP | REMOVE EXISTING CAST IRON BOILER AND EXISTING OIL FIRED BURNER. REMOVE OIL FUEL BURNER. INSTALL NEW CAST IRON WEIL-MCLAIN GAS FIRED STEAM BO… |
| Q01108401 ↗ | 56-44 142 STREET QUEENS | Alteration CO | Permit Issued | 11/22/2024 | 06/17/2026 | Design TURNIER ENGINEERING PC Contractor GENET PLUMBING AND HEATING | Provide new gas meter in cellar for second floor apartment cooking and provide waste and water lines for new kitchen on new second floor apa… |
| B00901997 ↗ | 81 WELDON STREET BROOKLYN | Alteration CO | Permit Issued | 09/07/2023 | 04/22/2026 | Design TURNIER ENGINEERING PC Contractor BLUE CITY CONSTRUCTION | New kitchen on 2nd floor and new bathroom on 3rd floor and cellar. |
| Q00803572 ↗ | 122-20 193 STREET QUEENS | Alteration CO | Permit Issued | 02/13/2023 | 02/09/2026 | Design TURNIER ENGINEERING PC Contractor MOKEN HOME IMPROVEMENT | remove existing attic and provide new second story to existing one story house with attic |
| Q00682852 ↗ | 191-06 WOODHULL AVENUE QUEENS | Alteration | Permit Issued | 02/28/2022 | 11/14/2025 | Design TURNIER ENGINEERING PC Contractor GENET PLBG AND HTG CORP | 2 boilers and 2 hot water heaters and legalization of 1 bathroom in cellar, 1st floor 1 new bathroom and 2nd floor 1 new kitchen and 1 new… |
| M00666537 ↗ | 728 WEST 181 STREET MANHATTAN | Alteration | Signed-off | 03/04/2022 | 11/10/2025 | Design TURNIER ENGINEERING PC Owner RQ REALTY MGMNT, LTD. Contractor MIDTOWN PLBG & HTNG CORP | remove existing oil fired burner, steel fire tube, boiler. provide new cast iron steam boiler and dual fuel burner connect to existing chimn… |
| B01295504 ↗ | 1665 LINCOLN PLACE BROOKLYN | Alteration | Signed-off | 10/03/2025 | 10/15/2025 | Design TURNIER ENGINEERING PC Contractor GENET PLUMBING AND HEATIN | To show new boiler room layout and location of laundry space. This filing is in conjunction with previously filed job # B01091796. |
| Q00572457 ↗ | 221-17 JAMAICA AVENUE QUEENS | Alteration | Permit Issued | 09/07/2021 | 10/06/2025 | Design TURNIER ENGINEERING PC Owner 113-11 PARTNERS LLC Contractor GENET PLUMBING AND HEATIN | Job filed in conjunction with alt1 application #420059901. Install 2 compressors on 2nd floor roof. Install (2) air handling units in ceilin… |
| B00427511 ↗ | 614 LIBERTY AVENUE BROOKLYN | Alteration | Permit Issued | 01/25/2021 | 09/26/2025 | Design TURNIER ENGINEERING PC Owner VERDUGOS GC CORP. Contractor GENET PLBG AND HTG CORP | Legalize existing 3pc bathroom in the cellar. Remove and cap water and waste line for 3pc bathroom and gas line in the attic. |
| B00772381 ↗ | 608 LIBERTY AVENUE BROOKLYN | Alteration | Permit Issued | 07/21/2022 | 09/25/2025 | Design TURNIER ENGINEERING PC Contractor VERDUGOS GENERAL CONTRACT | outside of the house, excavate about 15ft of foundation wall to provide water proofing to the exterior of the foundation wall. |
| Q00368846 ↗ | 130-39 229 STREET QUEENS | Alteration | Permit Issued | 08/14/2020 | 09/22/2025 | Design TURNIER ENGINEERING PC Contractor GENET PLBG AND HTG CORP | Provide new bathroom and new laundry area in cellar. Replace exact kitchen fixtures on 1st and bathroom fixtures on 2nd floor. |
| B01116264 ↗ | 454 EAST 25 STREET BROOKLYN | Alteration | Permit Issued | 10/14/2024 | 06/27/2025 | Design TURNIER ENGINEERING PC Contractor GENET PLUMBING AND HEATIN | Provide new 2pc bathroom in cellar on existing roughing and turn cellar into accessory use for building. new laundry area in cellar. Plumbi… |
| B01124031 ↗ | 1653 NOSTRAND AVENUE BROOKLYN | Alteration | Permit Issued | 10/15/2024 | 01/17/2025 | Design TURNIER ENGINEERING PC Owner AB INITIO LLC Contractor GENET PLBG AND HTG CORP | Provide two new gas fired wall mounted condensing combo-boiler in cellar for domestic hot water and hydronic space heating. |
| B01091796 ↗ | 1665 LINCOLN PLACE BROOKLYN | Alteration | Signed-off | 09/13/2024 | 12/19/2024 | Design TURNIER ENGINEERING PC Contractor GENET PLUMBING AND HEATIN | REMOVE EXISTING BATHROOM AND KITCHEN IN CELLAR AND CAP ALL PIPES. PROVIDE NEW THREE PIECE BATHROOM IN CELLAR. TURN CELLAR INTO ACCESSORY USE… |
| B01111850 ↗ | 946 EAST 78 STREET BROOKLYN | Alteration | Signed-off | 09/20/2024 | 10/22/2024 | Design TURNIER ENGINEERING PC Contractor GENET PLUMBING AND HEATIN | Repair fire damaged 2nd floor apartment. Replace entrance and all interior doors. Provide new insulation and drywall. |
| Q01077476 ↗ | 231-01 LINDEN BOULEVARD QUEENS | Alteration | Permit Issued | 07/18/2024 | 09/23/2024 | Design TURNIER ENGINEERING PC Contractor GENET PLUMBING AND HEATIN | Replace existing with new, 6 burner gas range with 24 raised griddle, 2 big pot gas range, deep fryer and hot water heater. Replace existing… |
| Q01028506 ↗ | 182-05 JAMAICA AVENUE QUEENS | Alteration | Signed-off | 04/02/2024 | 07/09/2024 | Design TURNIER ENGINEERING PC Owner 169 JAMAICA LLC Contractor GENET PLBG AND HTG CORP | Repair existing gas steam boile & install 1 new gas hot water boiler. Install 2 new gas hot water heaters. Provide 2 new gas meter bars. Pro… |
| Q00618377 ↗ | 253-23 148 AVENUE QUEENS | Alteration | Permit Issued | 11/04/2021 | 05/17/2024 | Design TURNIER ENGINEERING PC Contractor GENET PLBG AND HTG CORP Filer CONSTRUCTION DEPOTE | legalize 3pc bathroom in cellar and fire proof boiler room and provide new drain at bottom of new outdoor staircase. |
| Q00885414 ↗ | 221-17 JAMAICA AVENUE QUEENS | Alteration | Signed-off | 06/13/2023 | 04/29/2024 | Design TURNIER ENGINEERING PC Owner 113-11 PARTNERS LLC Contractor GENET PLBG AND HTG CORP | install 2 hot water boilers for 2nd floor apartments, each boiler for each apartment |
| Q00962378 ↗ | 58-56 FRESH POND ROAD QUEENS | Alteration | Permit Issued | 12/22/2023 | 01/17/2024 | Design TURNIER ENGINEERING PC Owner ZEBA DRUGS INC Contractor GENET PLUMBING AND HEATIN | Provide new hot water heater and boiler in cellar. |
| Q08032180 ↗ | 111-15 148 STREET QUEENS | Alteration | Permit Issued | 12/23/2022 | 01/12/2024 | Design TURNIER ENGINEERING PC Contractor MOKEN HOME IMPROVEMENT | Provide horizontal and vertical enlargement of existing 2 story family house. Provide new foundation for 1st floor extension, cellar not ext… |
| Q00948385 ↗ | 210-23 JAMAICA AVENUE QUEENS | Alteration | Permit Issued | 10/26/2023 | 01/02/2024 | Design TURNIER ENGINEERING PC Contractor GENET PLBG AND HTG CORP | modify existing piping to feed new commercial cooking on 1st floor for a take out restuarnt, and bakery oven. install 2inch ansul valve |
| Q00738619 ↗ | 145-07 ROCKAWAY BOULEVARD QUEENS | Alteration | Permit Issued | 07/19/2022 | 12/26/2023 | Design TURNIER ENGINEERING PC Contractor GENET PLBG AND HTG CORP | provide new gas piping to ceiling mounted furnace on 1st floor. new piping to be provided off existing gas piping for commercial cooking on … |
| B00217620 ↗ | 72 MAC DOUGAL STREET BROOKLYN | Alteration | Permit Issued | 09/17/2019 | 11/08/2023 | Design TURNIER ENGINEERING PC Contractor GENET PLBG AND HTG CORP | Provide new gas lines from meters to boiler room and connect each meter with respective boiler and cooking stove for each apartment. Provide… |
| Q00805830 ↗ | 198-05 JAMAICA AVENUE QUEENS | Alteration | Signed-off | 01/03/2023 | 03/17/2023 | Design TURNIER ENGINEERING PC Owner 169 JAMAICA LLC Contractor GENET PLBG AND HTG CORP | remove existing steam boiler and provide new gas fired boiler. |
| Q00618348 ↗ | 253-23 148 AVENUE QUEENS | Alteration | Permit Issued | 11/04/2021 | 03/16/2023 | Design TURNIER ENGINEERING PC Contractor GENET PLUMBING AND HEATIN Filer CONSTRUCTION DEPOTE | legalize 3pc bathroom in cellar, create new laundry area and fire proof boiler room and new exist from cellar to back yard. |
| Q00687922 ↗ | 176-08 130 AVENUE QUEENS | Alteration | Signed-off | 12/19/2022 | 02/22/2023 | Design TURNIER ENGINEERING PC Contractor MIDTOWN PLBG & HTNG CORP | vertical and horizontal extension to existing 2famail house, kitchen to be relocated on the 2nd floor. |
| Q00571483 ↗ | 176-08 130 AVENUE QUEENS | Alteration | Permit Issued | 10/01/2021 | 02/02/2023 | Design TURNIER ENGINEERING PC Contractor MORELL BUILDERS INC | REMOVE AND REPLACE 1ST FLOOR ROOF IN FRONT OF THE BUILDING. PROVIDE enlargement to the side and rear of the house cellar, 1ST & 2ND FLOOR. |
| Q00786188 ↗ | 161-08 137 AVENUE QUEENS | Alteration | Permit Issued | 08/08/2022 | 10/06/2022 | Design TURNIER ENGINEERING PC Contractor GENET PLBG AND HTG CORP | legalize 3pc bathroom, bar sink, service sink and washing machine in cellar. |
| B00452122 ↗ | 33 LAFAYETTE AVENUE BROOKLYN | Alteration | Permit Issued | 01/28/2021 | 09/27/2022 | Design TURNIER ENGINEERING PC Contractor GENET PLBG AND HTG CORP | To install 3 new plumbing fixtures to existing kitchen. |
| Q00702584 ↗ | 219-05 HEMPSTEAD AVENUE QUEENS | Alteration | Permit Issued | 04/21/2022 | 08/02/2022 | Design TURNIER ENGINEERING PC Contractor GENET PLUMBING AND HEATIN | install 2 compressors in the back yard and 2 heat and AC on the 1st floor. |
| Q00739057 ↗ | 100-16 201 STREET QUEENS | Alteration | Signed-off | 06/06/2022 | 06/24/2022 | Design TURNIER ENGINEERING PC Contractor ADEPT IMPROVEMENTS INC | redo 1st floor roof extension damaged by fallen tree |
| Q00590802 ↗ | 87-30 75 STREET QUEENS | Alteration | Signed-off | 09/20/2021 | 01/28/2022 | Design TURNIER ENGINEERING PC Contractor KISHAN PLUMBING & HEATING Filer CONSTRUCTION DEPOTE | provide bathroom in cellar. provide bathroom in 1st floor. provide fire rated boiler room in cellar, interior renovation in cellar to create… |
| Q00589725 ↗ | 87-30 75 STREET QUEENS | Alteration | Signed-off | 09/23/2021 | 01/27/2022 | Design TURNIER ENGINEERING PC Contractor BT'S PLUMBING AND HEATING Filer CONSTRUCTION DEPOTE | Provide new 3pc bathroom and fire rate boiler room in cellar. Provide on 1st floor new 3pc bathroom. |
| Q00605875 ↗ | 85-01 79 STREET QUEENS | ALT-CO - New Building with Existing Elements to Remain | Filed — no permit on record | 11/05/2021 | — | Design TURNIER ENGINEERING PC Owner VERDUGOS GC CORP. | — |
| Q00351418 ↗ | 221-26 108 AVENUE QUEENS | Alteration | Permit Issued | 06/02/2020 | 07/13/2021 | Design TURNIER ENGINEERING PC Contractor GENET PLBG AND HTG CORP | Provide new gas riser diagram. Cap and remove gas line for stove in cellar. Test gas line to all legal appliances (hot water heater, gas dry… |
| Q00237175 ↗ | 115-01 FARMERS BOULEVARD QUEENS | Alteration | Permit Issued | 10/03/2019 | 05/23/2021 | Design TURNIER ENGINEERING PC Contractor GENET PLBG AND HTG CORP | Installing 3 new boilers in cellar. |
| B00197476 ↗ | 249 EAST 37 STREET BROOKLYN | Alteration | Signed-off | 07/24/2019 | 03/23/2021 | Design TURNIER ENGINEERING PC Owner CAPANI MANAGEMENT Contractor GENET PLBG AND HTG CORP | Install 2 medium temperature sprinkler heads(165 F) to cover dryers in laundry room in cellar. |
| Q00428030 ↗ | 113-09 JAMAICA AVENUE QUEENS | Alteration | Signed-off | 11/17/2020 | 02/01/2021 | Design TURNIER ENGINEERING PC Owner 113-11 PARTNERS LLC Contractor GENET PLBG AND HTG CORP | Provide new gas line for each apartment (4). From meter bar to boiler room; boiler and hot water heater and cooking stove for each apartment… |
| Q00319268 ↗ | 114-66 FRANCIS LEWIS BLVD QUEENS | Alteration | Signed-off | 04/16/2020 | 06/11/2020 | Design TURNIER ENGINEERING PC Contractor GENET PLBG AND HTG CORP | Legalize existing 2 pc bathroom in cellar. Remove and cap gas line in cellar for kitchen. |
| Q00318192 ↗ | 175-35 HILLSIDE AVENUE QUEENS | Alteration | Signed-off | 03/03/2020 | 03/12/2020 | Design TURNIER ENGINEERING PC Contractor GENET PLUMBING AND HEATIN | Remove compressor from roof and install same compressor on new dunnage. |
| Q00290584 ↗ | 175-35 HILLSIDE AVENUE QUEENS | Alteration | Signed-off | 01/22/2020 | 01/24/2020 | Design TURNIER ENGINEERING PC Contractor GENET PLUMBING AND HEATING CORP | This application is filed to document make and model number of installed roof top mounted compressor-condenser unit. The unit that was liste… |
| B00250922 ↗ | 4619 AVENUE J BROOKLYN | Alteration | Filed — no permit on record | 12/09/2019 | — | Design TURNIER ENGINEERING PC | — |
| Q00242591 ↗ | 115-01 FARMERS BOULEVARD QUEENS | Alteration | Signed-off | 10/09/2019 | 10/23/2019 | Design TURNIER ENGINEERING PC Contractor GENET PLBG AND HTG CORP | Installing 2 sinks to be used in commercial store. |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 06/09/2026 | Exterior Insulation and Finish Systems (EIFS) | 81 WELDON STREET | EUGENE TURNIER | special |
| 06/09/2026 | Structural Stability – Alterations of existing buildings | 81 WELDON STREET | EUGENE TURNIER | special |
| 06/09/2026 | Fire-Resistant Penetrations and Joints | 81 WELDON STREET | EUGENE TURNIER | special |
| 06/09/2026 | Chimneys and vents | 81 WELDON STREET | EUGENE TURNIER | special |
| 06/09/2026 | Energy Code Compliance Inspections | 81 WELDON STREET | EUGENE TURNIER | progress |
| 06/09/2026 | Interior lighting power | 81 WELDON STREET | EUGENE TURNIER | energy_progress |
| 06/09/2026 | Lighting in dwelling units | 81 WELDON STREET | EUGENE TURNIER | energy_progress |
| 06/09/2026 | Exterior lighting power | 81 WELDON STREET | EUGENE TURNIER | energy_progress |
| 03/10/2026 | Chimneys and vents | 81 WELDON STREET | EUGENE TURNIER | special |
| 03/10/2026 | Exterior Insulation and Finish Systems (EIFS) | 81 WELDON STREET | EUGENE TURNIER | special |
| 03/10/2026 | Fire-Resistant Penetrations and Joints | 81 WELDON STREET | EUGENE TURNIER | special |
| 03/10/2026 | Structural Stability – Alterations of existing buildings | 81 WELDON STREET | EUGENE TURNIER | special |
| 03/10/2026 | Energy Code Compliance Inspections | 81 WELDON STREET | EUGENE TURNIER | progress |
| 03/10/2026 | Interior lighting power | 81 WELDON STREET | EUGENE TURNIER | energy_progress |
| 03/10/2026 | Exterior lighting power | 81 WELDON STREET | EUGENE TURNIER | energy_progress |
| 03/10/2026 | Lighting in dwelling units | 81 WELDON STREET | EUGENE TURNIER | energy_progress |
| 01/22/2026 | Lighting in dwelling units | 176-08 130 AVENUE | EUGENE TURNIER | energy_progress |
| 01/22/2026 | Interior lighting power | 176-08 130 AVENUE | EUGENE TURNIER | energy_progress |
| 01/22/2026 | Exterior lighting power | 176-08 130 AVENUE | EUGENE TURNIER | energy_progress |
| 01/22/2026 | Fire-Resistance Rated Construction | 176-08 130 AVENUE | EUGENE TURNIER | progress |
| 01/22/2026 | Energy Code Compliance Inspections | 176-08 130 AVENUE | EUGENE TURNIER | progress |
| 01/22/2026 | Final | 176-08 130 AVENUE | EUGENE TURNIER | progress |
| 01/22/2026 | Fire-Resistant Penetrations and Joints | 176-08 130 AVENUE | EUGENE TURNIER | special |
| 01/22/2026 | Structural Stability – Alterations of existing buildings | 176-08 130 AVENUE | EUGENE TURNIER | special |
| 01/22/2026 | Masonry | 176-08 130 AVENUE | CHRISTIAN LOZADA | special |
| 01/22/2026 | Subgrade Inspections | 176-08 130 AVENUE | CHRISTIAN LOZADA | special |
| 01/22/2026 | Chimneys and vents | 176-08 130 AVENUE | EUGENE TURNIER | special |
| 01/02/2026 | Heating Systems | 728 WEST 181 STREET | EUGENE TURNIER | special |
| 01/02/2026 | HVAC-R and service water heating system controls | 728 WEST 181 STREET | EUGENE TURNIER | energy_progress |
| 01/02/2026 | Fire-Resistant Penetrations and Joints | 728 WEST 181 STREET | EUGENE TURNIER | special |
| 01/02/2026 | Fuel-Oil Storage and Fuel-Oil Piping Systems | 728 WEST 181 STREET | EUGENE TURNIER | special |
| 01/02/2026 | HVAC-R and service water piping design and insulation | 728 WEST 181 STREET | EUGENE TURNIER | energy_progress |
| 01/02/2026 | HVAC-R and service water heating equipment | 728 WEST 181 STREET | EUGENE TURNIER | energy_progress |
| 12/22/2025 | Fire-Resistant Penetrations and Joints | 140-35 255 STREET | EUGENE TURNIER | special |
| 12/22/2025 | Chimneys and vents | 140-35 255 STREET | EUGENE TURNIER | special |
| 12/22/2025 | Masonry | 140-35 255 STREET | CHRISTIAN LOZADA | special |
| 12/22/2025 | Structural Stability – Alterations of existing buildings | 140-35 255 STREET | EUGENE TURNIER | special |
| 12/22/2025 | Subgrade Inspections | 140-35 255 STREET | CHRISTIAN LOZADA | special |
| 12/22/2025 | Insulation placement and R values | 140-35 255 STREET | EUGENE TURNIER | energy_progress |
| 12/22/2025 | Fenestration air leakage | 140-35 255 STREET | EUGENE TURNIER | energy_progress |
| 12/22/2025 | Fenestration areas | 140-35 255 STREET | EUGENE TURNIER | energy_progress |
| 12/22/2025 | Metering | 140-35 255 STREET | EUGENE TURNIER | energy_progress |
| 12/22/2025 | Fenestration and door U-factor and product ratings | 140-35 255 STREET | EUGENE TURNIER | energy_progress |
| 12/22/2025 | Interior lighting power | 140-35 255 STREET | EUGENE TURNIER | energy_progress |
| 12/22/2025 | Maintenance information | 140-35 255 STREET | EUGENE TURNIER | energy_progress |
| 12/22/2025 | Electric vehicle service equipment requirements | 140-35 255 STREET | EUGENE TURNIER | energy_progress |
| 12/22/2025 | Air barrier - visual inspection | 140-35 255 STREET | EUGENE TURNIER | energy_progress |
| 12/22/2025 | Permanent certificate | 140-35 255 STREET | EUGENE TURNIER | energy_progress |
| 11/17/2025 | HVAC-R and service water piping design and insulation | 728 WEST 181 STREET | — | energy_progress |
| 11/17/2025 | HVAC-R and service water heating system controls | 728 WEST 181 STREET | — | energy_progress |