← Back
BuildNYC
Elevator apt, semi-fireproof with stores
Ruby Square
166-20 90TH AVENUE · Jamaica · BIN 4209632
💬 Discuss this project
2022Year Built
12Stories
D7Building Class
C4-4DZoning
712,849 sfGross Floor Area
617Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 90Ninety · 99,500 sf lot · 7.16 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsBrp Development CORPUnder Construction10 filings
RoofBrp Development CORP4p · 2 filings · 20 docs
Floor 1Brp Development CORPUnder Construction8p · 3 filings · 20 docs
CellarBrp Development CORP2p · 1 filing · 20 docs
Site & exteriorBrp Development CORP5 filings · 20 docs
Filed — no permit issuedBrp Development CORP6 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRP Development10810/13/2026
90Ninety Developer1703/21/2026
90Ninety103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/27/2018$20.5M—JAMAICA FIRST PARKING, LLC → 90NINETY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Design Group in H&K1209/14/2026
Youn Design808/03/2026
Dagher Engineering1305/26/2026
Patuxent Engineering1005/24/2024
Skyline Rigging101/03/2024
Paul Perdek, Prof. Engineering309/08/2023
Lombardo Professional Engineering203/06/2023
McNamara Salvia108/25/2021
Sullivan Group Design102/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design Group in H K1403/21/2026
Patuxent Engineering2003/21/2026
A1 Expediting Service603/21/2026
William Vitacco Associates1303/21/2026
Lombardo Building Consultants203/21/2026
Lombardo Professional Engineering103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold2507/08/2026
Pace PlumbingFire Protection1107/08/2026
Skycore BuildersGeneral Contractor607/08/2026
M. Early Plumbing & HeatingPlumbing508/16/2026
HD HVAC of NYspecialty_contractor403/21/2026
Aircraft Air ConditioningGeneral Contractor407/08/2026
RNC IndustriesScaffold403/21/2026
YS NY ConstructionGeneral Contractor307/08/2026
JMD Contracting of NYScaffold207/08/2026
Aircraft Air ConditioningScaffold203/21/2026
Neptune Signs & AwningsSign hanger207/22/2026
C.R.U. Mechan & HeatingPlumbing206/28/2026
C.R.U. Mechan & HeatingFire Protection106/28/2026
Agir Electrical Ltd D/B/AElectrical103/22/2026
Metflow Fire ControlFire Protection107/08/2026
Solas ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Design Group in H&K13631109/14/2026
20/20 Inspections14711605/26/2026
Skyline Rigging7880101/03/2024
JZN Engineering363108/25/2021
McNamara/Salvia of New YO4970108/25/2021
Building Lifecycle
All (249)Filed (51)Permit Issued (53)Signed Off (16)Violation (21)Inspection (17)Objection (58)Special Inspection (30)Tax Incentive (3)
06/14/2031
421-a(16) construction completed
10/14/2026
Signed off — Alteration
Q00384197-I1
09/16/2026
Signed off — Alteration
NEW TENANT FIT-OUT AT 1ST FLOOR SUPERMARKET (UG 6). WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD BEARING PARTITIONS, DISPLAY SHELVES, NEW CEILING & LIGHTING, AND MISC. FINISH WORK AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Q01226393-I1
09/14/2026
Filed — Alteration
NEW TENANT FIT-OUT AT 1ST FLOOR SUPERMARKET (UG 6). WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD BEARING PARTITIONS, DISPLAY SHELVES, NEW CEILING & LIGHTING, AND MISC. FINISH WORK AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Q01226393-P7
09/14/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/09/2026
Signed off — Alteration
PAA filed herewith to indicate interconnecting standpipe moved to the street level. TEMP STANDPIPE FILED IN CONJUNCTION WITH NB #421133151
Q00455583-I1
09/09/2026
Signed off — Alteration
superstructure work in conjunction to the NB # 421133151
Q00455586-I1
09/04/2026
Signed off — Alteration
NEW TENANT FIT-OUT AT 1ST FLOOR SUPERMARKET (UG 6). WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD BEARING PARTITIONS, DISPLAY SHELVES, NEW CEILING & LIGHTING, AND MISC. FINISH WORK AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Q01226393-S1
08/20/2026
Signed off — Alteration
NEW TENANT FIT-OUT AT 1ST FLOOR SUPERMARKET (UG 6). WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD BEARING PARTITIONS, DISPLAY SHELVES, NEW CEILING & LIGHTING, AND MISC. FINISH WORK AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Q01226393-S2
08/14/2026
Permit issued — Plumbing
Q00455585-I1-PL
08/03/2026
Filed — Alteration
INSTALLATION OF NEW BUSINESS ACCESSORY AWNING AT OSP AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01392689-I1
08/03/2026
Filed — Alteration
INSTALLATION OF NEW BUSINESS ACCESSORY AWNING AT OSP AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01392702-I1
07/21/2026
Permit issued — Sign
Q01385744-I1-SG
07/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
SUKHWAN KIM
07/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
SUKHWAN KIM
07/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SUKHWAN KIM
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUKHWAN KIM
07/08/2026
Special inspection requirement — Final
SUKHWAN KIM
07/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
SUKHWAN KIM
07/08/2026
Special inspection requirement — Mechanical Systems
SUKHWAN KIM
07/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
SUKHWAN KIM
07/08/2026
Special inspection requirement — Energy Code Compliance Inspections
SUKHWAN KIM
07/07/2026
Filed — Alteration
NEW TENANT FIT-OUT AT 1ST FLOOR SUPERMARKET (UG 6). WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD BEARING PARTITIONS, DISPLAY SHELVES, NEW CEILING & LIGHTING, AND MISC. FINISH WORK AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Q01226393-P5
07/06/2026
Permit issued — Mechanical Systems
Q01226393-S2-MS
06/23/2026
Permit issued — Sign
Q01385736-I1-SG
06/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
SUKHWAN KIM
06/22/2026
Special inspection requirement — Sprinkler Systems
SUKHWAN KIM
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUKHWAN KIM
06/19/2026
Filed — Alteration
NEW TENANT FIT-OUT AT 1ST FLOOR SUPERMARKET (UG 6). WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD BEARING PARTITIONS, DISPLAY SHELVES, NEW CEILING & LIGHTING, AND MISC. FINISH WORK AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Q01226393-P6
06/12/2026
Filed — Alteration
NEW TENANT FIT-OUT AT 1ST FLOOR SUPERMARKET (UG 6). WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD BEARING PARTITIONS, DISPLAY SHELVES, NEW CEILING & LIGHTING, AND MISC. FINISH WORK AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Q01226393-P4
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
SUKHWAN KIM
06/12/2026
Special inspection requirement — Final
SUKHWAN KIM
06/12/2026
Special inspection requirement — Interior lighting power
SUKHWAN KIM
06/12/2026
Special inspection requirement — Lighting controls
SUKHWAN KIM
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUKHWAN KIM
06/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/09/2026
Permit issued — Mechanical Systems
Q00455584-S2-MS
06/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
SUKHWAN KIM
06/09/2026
Special inspection requirement — Sprinkler Systems
SUKHWAN KIM
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUKHWAN KIM
06/01/2026
Special inspection requirement — Final
JACOB HAAS
06/01/2026
Special inspection requirement — Mechanical Systems
JACOB HAAS
05/31/2026
Special inspection requirement — Shutoff dampers
JACOB HAAS
05/31/2026
Special inspection requirement — Energy Code Compliance Inspections
JACOB HAAS
05/31/2026
Special inspection requirement — Ventilation and air distribution system
05/31/2026
Special inspection requirement — Lighting controls
JACOB HAAS
05/31/2026
Special inspection requirement — Exterior lighting power
JACOB HAAS
05/31/2026
Special inspection requirement — Final
JACOB HAAS
05/31/2026
Special inspection requirement — Interior lighting power
JACOB HAAS
05/28/2026
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01385736-I1
05/27/2026
Filed — Alteration
Q01385744-I1
05/27/2026
Filed — Alteration
Q01385727-I1
05/27/2026
Filed — Alteration
Q01385725-I1
05/27/2026
Filed — Alteration
Q01385719-I1
05/27/2026
Filed — Alteration
Q01385752-I1
05/26/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH NB # 421133151 (DOCUMENT FILED TO ADD ADDITIONAL MECHANICAL UNITS TO THE SCOPE OF WORK)
Q00455584-P3
05/26/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH NB # 421133151 (DOCUMENT FILED TO ADD ADDITIONAL MECHANICAL UNITS TO THE SCOPE OF WORK)
Q00455584-P4
05/11/2026
Violation issued (HPD, closed)
A
04/28/2026
Signed off — Alteration
NEW TENANT FIT-OUT AT 1ST FLOOR SUPERMARKET (UG 6). WORK INCLUDES REMOVAL/INSTALLATION OF NON-LOAD BEARING PARTITIONS, DISPLAY SHELVES, NEW CEILING & LIGHTING, AND MISC. FINISH WORK AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
Q01226393-S3
04/14/2026
Violation issued (HPD, closed)
A
Latest 60 of 249 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedM. Early Plumbing & Heating08/14/2026
DOB NOWSignPermit IssuedNeptune Signs & Awnings07/21/2026
DOB NOWMechanical SystemsSigned-offYS NY Construction07/06/2026
DOB NOWSignPermit IssuedNeptune Signs & Awnings06/23/2026
DOB NOWMechanical SystemsPermit IssuedAircraft Air Conditioning06/09/2026
DOB NOWCurb CutPermit IssuedYS NY Construction04/02/2026
DOB NOWStructuralSigned-offYS NY Construction03/06/2026
DOB NOWPlumbingSigned-offC.R.U. Mechan & Heating02/05/2026
DOB NOWGeneral ConstructionSigned-offHD HVAC of NY01/06/2026
DOB NOWSprinklersSigned-offC.R.U. Mechan & Heating11/25/2025
DOB NOWPlumbingSigned-offC.R.U. Mechan & Heating11/17/2025
DOB NOWPlumbingPermit IssuedM. Early Plumbing & Heating08/04/2025
DOB NOWGeneral ConstructionSigned-offHD HVAC of NY06/30/2025
DOB NOWCurb CutSigned-offSkycore Builders02/07/2025
DOB NOWConstruction FenceSigned-offCore Scaffold Systems12/20/2024
DOB NOWSprinklersSigned-offManengeering Bureau12/19/2024
DOB NOWStandpipeSigned-offManengeering Bureau12/19/2024
DOB NOWSprinklersSigned-offManengeering Bureau10/22/2024
DOB NOWStandpipeSigned-offManengeering Bureau10/17/2024
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems08/30/2024
DOB NOWPlumbingPermit IssuedM. Early Plumbing & Heating07/09/2024
DOB NOWMechanical SystemsPermit IssuedAircraft Air Cond03/29/2024
DOB NOWStandpipeSigned-offManengeering Bureau03/26/2024
DOB NOWSuspended ScaffoldPermit IssuedDoria01/03/2024
DOB NOWMechanical SystemsPermit IssuedAircraft Air Cond12/28/2023
DOB NOWConstruction FenceSigned-offCore Scaffold Systems12/06/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems12/04/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems12/04/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems10/11/2023
DOB NOWStandpipeSigned-offManengeering Bureau10/11/2023
DOB NOWSprinklersSigned-offManengeering Bureau10/10/2023
DOB NOWMechanical SystemsPermit IssuedAircraft Air Cond10/06/2023
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems08/30/2023
DOB NOWSupported ScaffoldSigned-offJMD Contracting of NY08/08/2023
DOB NOWPlumbingPermit IssuedM. Early Plumbing & Heating07/13/2023
DOB NOWSupported ScaffoldSigned-offJMD Contracting of NY05/02/2023
DOB NOWProtection and Mechanical MethodsSigned-offRNC Industries04/03/2023
DOB NOWStandpipeSigned-offManengeering Bureau03/30/2023
DOB NOWStructuralSigned-offSkycore Builders12/22/2022
DOB NOWConstruction FenceSigned-offCore Scaffold Systems12/16/2022
+ 21 more permits on file
2 projects · most recent 09/14/2026
Heating and Air Conditioning Systems Ventilation Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
09/14/2026Signed-offYS NY ConstructionHeating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Heat / Cool
Lg ARNU243TAA4 27,300 BTU · Vrf Indoor ×72
ARNU363TAA4 40,600 BTU · Vrf Indoor ×32
ARUM096BTE5 96,000 BTU · Vrf Outdoor ×28
Ventilation
Lg ARVU093ZFA2 880 CFM · Vrf Indoor ×3,520
Delhi GSQ180-D-EC 4,200 CFM · Makeup Air ×4
Ventilation Direct VXD240 5,000 CFM · Kitchen Exhaust ×4
Refrigeration
Trillium TSDC-XXX-12.4 2,509,500 BTU · Refrigeration Unit ×7
TSDC-XXX-9.6 924,675 BTU · Condensing Unit ×1
Hussmann CS0207TDK 2,509,500 BTU · Refrigeration Unit ×3
HWV06TM 2,509,500 BTU · Condensing Unit ×2
Kysor/Warren TD400-035-DC-4-NHC-C 4,000,000 BTU · Condensing Unit ×1
05/26/2026Permit IssuedAircraft Air CondHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric FTX36 36,000 BTU · Fan Coil Indoor ×10
RX36NMVJUA 36,000 BTU · Vrf Outdoor ×10
FTX36N 36,000 BTU · Fan Coil Indoor ×6
FAQ18T 18,000 BTU · Vrf Indoor ×4
RX36N 36,000 BTU · Condensing Unit ×4
RXS12L 12,000 BTU · Condensing Unit ×4
FDMX12R 12,000 BTU · Vrf Indoor ×2
FSQ30P 30,000 BTU · Vrf Indoor ×2
FTXF12L 12,000 BTU · Fan Coil Indoor ×2
FTXS12 12,000 BTU · Fan Coil Indoor ×2
FTXS12LVJU 24,000 BTU · Fan Coil Indoor ×2
R2Q18T 18,000 BTU · Condensing Unit ×2
Daikin REYQ120 120,000 BTU · Vrf Outdoor ×6
REYQ144 120,000 BTU · Vrf Outdoor ×4
REYQ168 144,000 BTU · Vrf Outdoor ×2
REYQ72 72,000 BTU · Vrf Outdoor ×2
FXSQ048 48,000 BTU · Vrf Indoor ×4
BSF8Q54TVJ 1 CFM · Controls ×2
FXAQ09 8,000 BTU · Vrf Indoor ×2
FXAQ24 24,000 BTU · Vrf Indoor ×2
FXSQ18T 18,000 BTU · Vrf Indoor ×2
FXSQ24 24,000 BTU · Vrf Indoor ×2
FXSQ36 36,000 BTU · Vrf Indoor ×2
FXTQ54T 54,000 BTU · Vrf Indoor ×2
BSF4Q 1 CFM · Controls ×1
BSF6Q54T 1 CFM · Controls ×1
BSF8Q54 1 CFM · Controls ×1
FAQ18T 18,000 BTU · Vrf Indoor ×1
RXYQ120XAYDA 120,000 BTU · Vrf Outdoor ×22
RXYQ72XAYDA 192,000 BTU · Vrf Outdoor ×13
RXYQ144XAYDA 144,000 BTU · Vrf Outdoor ×5
RXYQ96XAYDA 216,000 BTU · Vrf Outdoor ×3
Addison PROA060 63,470 BTU · Rooftop Unit ×4
PROA120 128,600 BTU · Rooftop Unit ×2
Ventilation
Renewaire HE1.5IN 1,000 CFM · Erv ×6
HE2XIN 1,200 CFM · Erv ×6
HEX1XIN 800 CFM · Erv ×4
EV450RT 250 CFM · Erv ×2
Loren Cook 0803206 AIH 80AI-3206-15 12,500 CFM ×4
1234006 AIH 123AI-4006-20V 45,000 CFM ×2
165 SQN 165SQN17D VF 3,000 CFM · Exhaust Fan ×2
0411504 JS S 41JS-1504-28 6,000 CFM ×1
2 projects · most recent 09/14/2026
Sprinkler System
FiledStatusContractorScope
09/14/2026Signed-offC.R.U. Mechan & HeatingSprinkler System
10/28/2024Signed-offManengeering Bureau7,205 heads, 1 outlets
2 projects · most recent 09/14/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
09/14/2026Signed-offC.R.U. Mechan & HeatingGas, Water/Sanitary
11/01/2024Permit IssuedM. Early Plumbing & HeatingGas, Storm, Water/Sanitary
16 projects · most recent 08/26/2026
General Wiring
FiledStatusContractorScope
08/26/2026Permit IssuedRainbow Electric Co1 meters, 1 new_meters
05/27/2026Permit IssuedRainbow Electric CoGeneral Wiring
03/26/2026CompleteJong Hyun Kim—
01/29/2026Permit IssuedPower Surge ElectricGeneral Wiring
10/29/2025CompleteLive Wire Electric 1General Wiring
06/05/2025CompleteAgir Electrical Ltd D/B/AGeneral Wiring
06/19/2023CompleteAgir Electrical Ltd D/B/A—
02/16/2023CancelledAgir Electrical Ltd D/B/AGeneral Wiring
02/15/2023CompleteAgir Electrical Ltd D/B/A—
12/06/2022CompleteSolas Electrical—
11/17/2022CompleteTuxedo Electrical Contracting—
11/17/2022CompleteTuxedo Electrical Contracting—
11/17/2022CompleteTuxedo Electrical Contracting—
10/03/2022CompleteAgir Electrical Ltd D/B/A1 meters, 1 new_meters
10/03/2022CompleteAgir Electrical Ltd D/B/A—
1 project · most recent 08/25/2021
Concrete Masonry
FiledStatusContractorScope
08/25/2021Signed-offSkycore BuildersConcrete, Masonry
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
09/14/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
02/20/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
12/09/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/09/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/27/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
11/27/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
11/18/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/07/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/14/2022Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
12/14/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
07/28/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 125
DateRequirementInspectorRole
07/08/2026Tenant Protection Plan ComplianceSUKHWAN KIMspecial
07/08/2026Fire-Resistant Penetrations and JointsSUKHWAN KIMspecial
07/08/2026Energy Code Compliance InspectionsSUKHWAN KIMprogress
07/08/2026FinalSUKHWAN KIMprogress
07/08/2026HVAC-R and service water heating system controlsSUKHWAN KIMenergy_progress
07/08/2026Duct leakage testing, insulation and designSUKHWAN KIMenergy_progress
07/08/2026HVAC-R and service water heating equipmentSUKHWAN KIMenergy_progress
07/08/2026HVAC-R and service water piping design and insulationSUKHWAN KIMenergy_progress
07/08/2026Mechanical SystemsSUKHWAN KIMspecial
06/22/2026Tenant Protection Plan ComplianceSUKHWAN KIMspecial
06/22/2026Fire-Resistant Penetrations and JointsSUKHWAN KIMspecial
06/22/2026Sprinkler SystemsSUKHWAN KIMspecial
06/12/2026Tenant Protection Plan Compliance—special
06/12/2026Fire-Resistant Penetrations and JointsSUKHWAN KIMspecial
06/12/2026Lighting controlsSUKHWAN KIMenergy_progress
06/12/2026Interior lighting powerSUKHWAN KIMenergy_progress
06/12/2026FinalSUKHWAN KIMprogress
06/12/2026Energy Code Compliance InspectionsSUKHWAN KIMprogress
06/09/2026Fire-Resistant Penetrations and JointsSUKHWAN KIMspecial
06/09/2026Tenant Protection Plan ComplianceSUKHWAN KIMspecial
06/09/2026Sprinkler SystemsSUKHWAN KIMspecial
06/01/2026FinalJACOB HAASprogress
06/01/2026Mechanical SystemsJACOB HAASspecial
05/31/2026MeteringJACOB HAASenergy_progress
05/31/2026Mechanical SystemsJACOB HAASspecial
Latest 25 of 125.
▾Documents — 485 on file (BIS + DOB NOW)
▸Plans & Drawings54
▸DOB NOWPlans/Sketch38
08/26/2026Q00648218-I1Request digital key ↗
08/25/2026Q00799213-P4Request digital key ↗
08/25/2026Q00799213-P6Request digital key ↗
Showing 3 of 38 on file for this type
▸DOB NOWPlans/Sketch - Standpipe5
08/27/2026Q00432910-P3Request digital key ↗
08/27/2026Q00432910-I1Request digital key ↗
08/27/2026Q00432910-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/16/2026Q00455584-P3Request digital key ↗
08/16/2026Q00455584-P1Request digital key ↗
08/14/2026Q00455584-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
08/21/2026Q00455585-P2Request digital key ↗
08/21/2026Q00455585-P1Request digital key ↗
08/15/2026Q00455585-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
08/27/2026Q00432910-P1Request digital key ↗
08/27/2026Q00432910-P3Request digital key ↗
08/27/2026Q00432910-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026Q00455586-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/27/2026Q00384197-I1Request digital key ↗
▸Applications & Permits64
▸BISPLAN / WORK APPROVAL APPLICATION48
02/19/2026421133151Open ↗
02/11/2026421133151Open ↗
06/23/2025421133151Open ↗
Showing 3 of 48 on file for this type
▸BISWORK PERMIT APPLICATION12
08/10/2023421133151Open ↗
03/29/2023421133151Open ↗
03/28/2023421133151Open ↗
Showing 3 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
08/28/2024440657040Open ↗
06/01/2022440657040Open ↗
▸BISHPD: PERMIT NOTICE1
06/09/2023421133151Open ↗
▸BISDEP STORMWATER CONSTRUCTION PERMIT1
02/07/2022421133151Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
06/09/2023421133151Open ↗
02/07/2022421133151Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
10/20/2023421133151Open ↗
▸BISVERIFY TAX LOT1
06/05/2025421133151Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/07/2025421133151Open ↗
▸Seals & Professional Certifications144
▸DOB NOWProgress Inspector Seal & Signature59
09/01/2026Q00455586-I1Open ↗
09/01/2026Q01226393-S2Open ↗
09/01/2026Q01226393-S2Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature51
08/27/2026Q00432910-P3Open ↗
08/27/2026Q00432910-I1Open ↗
08/27/2026Q00432910-P1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/19/2026Q00455583-I1Open ↗
09/01/2026Q00455586-I1Open ↗
09/01/2026Q00455586-I1Open ↗
Showing 3 of 30 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
06/13/2022421133151Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment8
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL2
02/09/2023421133151Open ↗
Showing 1 of 2 on file for this type
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
02/05/2025421133151Open ↗
02/09/2023421133151Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
06/04/2025421133151Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
02/09/2023421133151Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
11/20/2024421133151Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
12/19/2024421133151Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST4
06/09/2023421133151Open ↗
02/07/2022421133151Open ↗
01/05/2022421133151Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES SITE PLAN2
05/23/2022440657040Open ↗
02/07/2022421133151Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos24
▸DOB NOWOER: Notice to Proceed15
08/17/2026Q01226393-I1Open ↗
08/17/2026Q01226393-P4Open ↗
08/16/2026Q00455584-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/17/2026Q01226393-I1Open ↗
08/17/2026Q01226393-P4Open ↗
08/13/2026Q01226393-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
05/23/2022440657040Open ↗
Showing 1 of 3 on file for this type
▸BISOER NNO1
03/05/2025421133151Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
05/28/2025421133151Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/28/2025421133151Open ↗
05/22/2023421133151Open ↗
02/07/2022421133151Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRIC MOTORS2
04/07/2025421133151Open ↗
04/07/2025421133151Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/19/2024421133151Open ↗
▸BISFENESTRATION AREAS1
12/19/2024421133151Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/19/2024421133151Open ↗
▸BISLIGHTING IN DWELLING UNITS1
04/07/2025421133151Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/07/2025421133151Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/17/2026Q01226393-S2Open ↗
▸Inspections & Test Reports32
▸BISTECHNICAL REPORT: RESPONSIBILITY10
11/12/2024421133151Open ↗
11/07/2024421133151Open ↗
05/22/2023421133151Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX8
10/31/2022421133151Open ↗
10/31/2022421133151Open ↗
10/31/2022421133151Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER8
03/05/2025421133151Open ↗
03/05/2025421133151Open ↗
03/05/2025421133151Open ↗
Showing 3 of 8 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
04/20/2022421133151Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/09/2025421133151Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/03/2025421133151Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/20/2024421133151Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
12/19/2024421133151Open ↗
▸Approvals, Objections & Sign-offs43
▸BISSCHEDULE A - OCCUPANCY / USE31
02/19/2026421133151Open ↗
02/11/2026421133151Open ↗
06/23/2025421133151Open ↗
Showing 3 of 31 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
03/29/2023421133151Open ↗
03/13/2023421133151Open ↗
02/27/2023421133151Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP-UTILITY APPROVAL TO RELOCATE POLE1
05/23/2022440657040Open ↗
▸BISTAP LETTER - FIRE SVC : DEP-FIRE1
11/20/2024421133151Open ↗
▸BISBPP-UTILITY APPROVAL FOR VAULTS1
05/23/2022440657040Open ↗
▸Cost, Insurance & Ownership8
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE3
03/29/2023421133151Open ↗
02/27/2023421133151Open ↗
11/15/2022421133151Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE3
08/10/2023421133151Open ↗
03/28/2023421133151Open ↗
06/13/2022421133151Open ↗
▸BISCOST AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms34
▸BISADDITIONAL INFORMATION21
06/27/2025421133151Open ↗
02/10/2025421133151Open ↗
11/13/2024421133151Open ↗
Showing 3 of 21 on file for this type
▸BISBOROUGH INTAKE FORM10
08/10/2023421133151Open ↗
03/29/2023421133151Open ↗
03/29/2023421133151Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
02/09/2023421133151Open ↗
02/02/2023421133151Open ↗
02/07/2022421133151Open ↗
Showing 3 of 7 on file for this type
▸BISPLOT DIAGRAM2
05/22/2023421133151Open ↗
Showing 1 of 2 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
12/19/2024421133151Open ↗
▸BISTRASH COMPACTOR REQUIREMENTS1
02/07/2022421133151Open ↗
▸BISVESTIBULES1
12/19/2024421133151Open ↗
▸DOB NOWCalculations1
08/13/2026Q00984011-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q00984011-I1Open ↗