| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00643592 ↗ | 989 AVENUE OF THE AMERICAS MANHATTAN | New Building | Permit Issued | 12/15/2021 | 09/29/2026 | Design MG ENGINEERING D.P.C. Owner FY & SONS TIC LLC. Contractor VERTCON BUILDERS LLC | Propose Support of Excavation work for 68-story mix-used building filed in conjunction with NB # M00643592-I1 |
| Q01275800 ↗ | 35-30 STEINWAY STREET QUEENS | New Building | Permit Issued | 08/29/2025 | 09/08/2026 | Design EP ENGINEERING LLC Contractor CONGRESS BUILDERS LLC Filer DOMANI CONSULTING | TO FILE UNDERGROUND PLUMBING APPLICATION IN CONJUNCTION WITH NB Q01275800-I1 |
| M00542354 ↗ | 3RD AVENUE MANHATTAN | New Building | Permit Issued | 06/24/2021 | 08/26/2026 | Design TITAN ENGINEERS PC Owner KNG BUILDERS INC Contractor CITY BUILDERS NYC Filer EXPEDITING 4 U | SUBSEQUENT SOE APPLICATION FILED HEREWITH. |
| B00568816 ↗ | 251 CHESTER STREET BROOKLYN | New Building | Permit Issued | 11/09/2021 | 08/14/2026 | Design SLCE ARCHITECTS Contractor L & M BUILDERS GROUP LLC | TEMP STANDPIPE FILED IN CONJUNCTION WITH NB B00568816-I1 |
| X01169510 ↗ | 490 EAST TREMONT AVENUE BRONX | New Building | Permit Issued | 03/03/2025 | 06/03/2026 | Design STRATFORD ENGINEERING Contractor KDL CONSTRUCTION & DEVELO | SUPPORT OF EXCAVATION SCOPE OF WORK IN CONJUNCTION WITH NEW BUILDING. |
| B01155111 ↗ | 151 STARR STREET BROOKLYN | New Building | Permit Issued | 12/16/2024 | 06/01/2026 | Design NY BUILDING ASSOCIATES INC Owner Saul Development LLC Contractor H BUILDING MANAGEMENT INC | Structural work to be conducted to install reinforced CMU wall, steel beam and cfs joist with concrete slab on metal deck, and cfs load bear… |
| Name | Projects together | Most recent |
|---|---|---|
| MCNAMARA SALVIA | 7 | 07/10/2026 |
| KEY CIVIL ENGINEERING PC | 5 | 08/14/2026 |
| HILL WEST ARCHITECTS | 4 | 07/10/2026 |
| MG ENGINEERING D.P.C. | 4 | 07/10/2026 |
| DESIMONE CONSULTING ENGINEERS | 3 | 08/14/2026 |
| SKYLINE ENGINEERING, LLC | 3 | 09/18/2026 |
| AKRF, INC. | 2 | 07/10/2026 |
| GACE DPC | 2 | 09/18/2026 |
| MARK E. GINSBERG | 2 | 09/18/2026 |
| OSPINO ENGINEERING PLLC | 2 | 09/18/2026 |
| BELLUCCI ENGINEERING, PLLC | 1 | 08/01/2022 |
| BEYER BLINDER BELLE | 1 | 08/14/2026 |
| C3D ARCHITECTURE PLLC | 1 | 01/14/2026 |
| CANNONDESIGN | 1 | 06/05/2024 |
| CPENGINEERING PC | 1 | 11/13/2025 |
| DHD ARCHITECTURE DESIGN PLLC | 1 | 12/07/2023 |
| EP ENGINEERING LLC | 1 | 08/14/2026 |
| GKV ARCHITECTS | 1 | 11/13/2025 |
| Grid Drafting and Consulting LLC | 1 | 08/14/2026 |
| HIDAMARI ENGINEERING SERVICES, P.C. | 1 | 07/13/2026 |
| IMEG Consulting Corp. | 1 | 11/13/2025 |
| JAROS BAUM & BOLLES | 1 | 08/06/2026 |
| Jose Alcala Architect | 1 | 01/15/2026 |
| LANGAN ENGINEERING | 1 | 11/19/2025 |
| LORING CONSULTING ENGINEERS, INC. | 1 | 05/27/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| OMNIBUILD CONSTRUCTION IN | 6 | 01/14/2026 |
| MONCON INC | 4 | 09/29/2022 |
| BLETSAS PLBNG & HTG CORP | 3 | 09/18/2026 |
| CRISTINA MICHAELS CONS MN | 3 | 09/18/2026 |
| L & M BUILDERS GROUP LLC | 3 | 09/18/2026 |
| LRC CONSTRUCTION LLC | 3 | 07/23/2021 |
| VIK XS SERVICES INC | 3 | 09/18/2026 |
| ABINGDON CAPITAL LLC | 2 | 08/15/2024 |
| AURA PLUMBING INC | 2 | 09/18/2026 |
| CITY BUILDERS NYC LLC | 2 | 08/14/2026 |
| LRC MAINTANENCE LLC | 2 | 07/09/2021 |
| PANILI PLUMBING & HTG LLC | 2 | 09/18/2026 |
| 4 BROTHERS & SONS FENCE | 1 | 08/14/2026 |
| ALL BOROUGH GROUP SVC INC | 1 | 03/24/2025 |
| ALLIANCE PLUMBING CORP | 1 | 06/05/2024 |
| AMERICAN STANDARD P&H COR | 1 | 12/07/2023 |
| ATLAS CONSTRUCTION LLC | 1 | 11/13/2025 |
| BEDROCK PLBG. & HTG., INC | 1 | 10/26/2023 |
| CARDOZA PLUMBING CORP | 1 | 06/05/2024 |
| CCM DESIGN & CONSULTING * | 1 | 09/19/2023 |
| CHAMPION COMBUSTION CORP | 1 | 01/15/2026 |
| CONGRESS BUILDERS LLC | 1 | 08/14/2026 |
| CTI CONSTRUCTION INC | 1 | 12/07/2023 |
| DEMAR MECHANICAL INC | 1 | 08/06/2026 |
| DEMAR PLUMBING CORP | 1 | 08/06/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| MADISON REALTY CAPITAL | 10 | 07/10/2026 |
| HARMONY ROCKAWAY LLC | 2 | 08/15/2024 |
| KNG BUILDERS INC | 2 | 08/14/2026 |
| VIK XS SERVICES INC | 2 | 09/18/2026 |
| 5202 3RD AVE CORP. | 1 | 11/13/2025 |
| AMG ATLANTIC REALTY II LLC | 1 | 01/30/2020 |
| BLDG MANAGEMENT CO., INC. | 1 | 08/06/2026 |
| BRP DEVELOPMENT CORP | 1 | 08/25/2021 |
| FY & SONS TIC LLC. | 1 | 01/14/2026 |
| HOLY CROSS HIGH SCHOOL | 1 | 10/26/2023 |
| HTH Construction | 1 | 12/07/2023 |
| JRJ METRO REALTY LTD | 1 | 11/19/2025 |
| PIONEER BUILDERS GROUP LLC | 1 | 05/27/2026 |
| Palladium Palladium Group | 1 | 07/13/2026 |
| RXR | 1 | 07/23/2021 |
| ST JOHNS UNIVERSITY | 1 | 06/05/2024 |
| Saul Development LLC | 1 | 03/24/2025 |
| VERIZON | 1 | 01/15/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| PINE NY | 10 | 07/10/2026 |
| WILLIAM VITACCO ASSOCIATES | 6 | 09/18/2026 |
| JAM CONSULTANTS, INC. | 3 | 08/06/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 3 | 05/27/2026 |
| AO CONSULTING AND DRAFTING | 2 | 09/18/2026 |
| A1 EXPEDITING SERVICE CORP. | 1 | 10/26/2023 |
| BMB BUILDING CONSULTING INC. | 1 | 01/14/2026 |
| BROMARK CONSULTING SERVICES | 1 | 01/15/2026 |
| DOMANI CONSULTING | 1 | 08/14/2026 |
| EAST COAST EXPEDITING | 1 | 12/07/2023 |
| EXPEDITING 4 U | 1 | 07/13/2026 |
| JM ZONING, LLC. | 1 | 06/05/2024 |
| METROPOLIS GROUP INC | 1 | 11/13/2025 |
| MISTER EXPEDITER | 1 | 08/14/2026 |
| RSL NY Conulting | 1 | 08/14/2026 |
| Rigid Structural Design, LLC | 1 | 08/14/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00643592 ↗ | 989 AVENUE OF THE AMERICAS MANHATTAN | New Building | Permit Issued | 12/15/2021 | 09/29/2026 | Design MG ENGINEERING D.P.C. Owner FY & SONS TIC LLC. Contractor VERTCON BUILDERS LLC | Propose Support of Excavation work for 68-story mix-used building filed in conjunction with NB # M00643592-I1 |
| Q01275800 ↗ | 35-30 STEINWAY STREET QUEENS | New Building | Permit Issued | 08/29/2025 | 09/08/2026 | Design EP ENGINEERING LLC Contractor CONGRESS BUILDERS LLC Filer DOMANI CONSULTING | TO FILE UNDERGROUND PLUMBING APPLICATION IN CONJUNCTION WITH NB Q01275800-I1 |
| M00542354 ↗ | 3RD AVENUE MANHATTAN | New Building | Permit Issued | 06/24/2021 | 08/26/2026 | Design TITAN ENGINEERS PC Owner KNG BUILDERS INC Contractor CITY BUILDERS NYC Filer EXPEDITING 4 U | SUBSEQUENT SOE APPLICATION FILED HEREWITH. |
| B00568816 ↗ | 251 CHESTER STREET BROOKLYN | New Building | Permit Issued | 11/09/2021 | 08/14/2026 | Design SLCE ARCHITECTS Contractor L & M BUILDERS GROUP LLC | TEMP STANDPIPE FILED IN CONJUNCTION WITH NB B00568816-I1 |
| X01169510 ↗ | 490 EAST TREMONT AVENUE BRONX | New Building | Permit Issued | 03/03/2025 | 06/03/2026 | Design STRATFORD ENGINEERING Contractor KDL CONSTRUCTION & DEVELO | SUPPORT OF EXCAVATION SCOPE OF WORK IN CONJUNCTION WITH NEW BUILDING. |
| B01155111 ↗ | 151 STARR STREET BROOKLYN | New Building | Permit Issued | 12/16/2024 | 06/01/2026 | Design NY BUILDING ASSOCIATES INC Owner Saul Development LLC Contractor H BUILDING MANAGEMENT INC | Structural work to be conducted to install reinforced CMU wall, steel beam and cfs joist with concrete slab on metal deck, and cfs load bear… |
| M01376335 ↗ | 3RD AVENUE MANHATTAN | Alteration | Permit Issued | 03/25/2026 | 03/30/2026 | Owner KNG BUILDERS INC Contractor CITY BUILDERS NYC Filer RSL NY Conulting | Cut and grout piles as per plans. No change to use, egress, or occupancy. Filed in conjunction with NB# M00542354-I1. |
| Q00541049 ↗ | 42-02 ORCHARD STREET QUEENS | New Building | Permit Issued | 07/07/2021 | 02/03/2026 | Design JAROS BAUM & BOLLES Owner BLDG MANAGEMENT Contractor TRITON CONSTRUCTION CO., Filer JAM CONSULTANTS, INC. | SOE work in conjunction with NB Construction |
| B00560420 ↗ | 366 BRISTOL ST BROOKLYN | New Building | Permit Issued | 08/05/2021 | 01/14/2026 | Design MARK E. GINSBERG Owner VIK XS SERVICES INC Contractor L & M BUILDERS GROUP LLC | Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy |
| B00560232 ↗ | 380 CHESTER STREET BROOKLYN | New Building | Permit Issued | 08/05/2021 | 01/12/2026 | Design MARK E. GINSBERG Owner VIK XS SERVICES INC Contractor L & M BUILDERS GROUP LLC | Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy |
| S00662741 ↗ | 8 STUYVESANT PLACE STATEN ISLAND | Alteration | Permit Issued | 03/18/2022 | 09/22/2025 | Design JZN ENGINEERING, PC. Owner MADISON REALTY CAPITAL Contractor OMNIBUILD CONSTRUCTION IN Filer PINE NY | SOE in conjunction with NB #S00661600 |
| S00662742 ↗ | 172 RICHMOND TERRACE STATEN ISLAND | Alteration | Permit Issued | 03/18/2022 | 09/22/2025 | Design JZN ENGINEERING, PC. Contractor OMNIBUILD CONSTRUCTION IN | SOE filed in conjunction with NB # S00661661 |
| S00662743 ↗ | 178 RICHMOND TERRACE STATEN ISLAND | Alteration | Permit Issued | 03/18/2022 | 09/22/2025 | Design JZN ENGINEERING, PC. Owner MADISON REALTY CAPITAL Contractor OMNIBUILD CONSTRUCTION IN Filer PINE NY | SOE filed in conjunction with NB # S00661663 |
| B01169586 ↗ | 269 53 STREET BROOKLYN | New Building | Permit Issued | 02/10/2025 | 08/07/2025 | Design IMEG Consulting Corp. Owner 5202 3RD AVE CORP. Contractor ATLAS CONSTRUCTION LLC Filer METROPOLIS GROUP INC | HEREWITH FILING SUPPORT OF EXCAVATION IN CONJUNCTION WITH NEW PARKING LOT RECEIVING AREA PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UN… |
| S00741710 ↗ | 8 STUYVESANT PLACE STATEN ISLAND | Alteration | Permit Issued | 05/23/2022 | 04/24/2025 | Design MCNAMARA SALVIA Owner MADISON REALTY CAPITAL Contractor MONCON INC Filer PINE NY | Limited foundation as per plans, filed in-conjunction with NB S00661600. |
| S00741753 ↗ | 172 RICHMOND TERRACE STATEN ISLAND | Alteration | Permit Issued | 05/23/2022 | 04/24/2025 | Design MCNAMARA SALVIA Owner MADISON REALTY CAPITAL Contractor MONCON INC Filer PINE NY | Limited foundation as per plans, filed in-conjunction with NB S00661661. |
| S00741771 ↗ | 178 RICHMOND TERRACE STATEN ISLAND | Alteration | Permit Issued | 05/23/2022 | 04/24/2025 | Design MCNAMARA SALVIA Owner MADISON REALTY CAPITAL Contractor MONCON INC Filer PINE NY | Limited foundation as per plans, filed in-conjunction with NB S00661663. |
| Q00830720 ↗ | 350 BEACH 79 STREET QUEENS | Alteration | Signed-off | 05/18/2023 | 02/25/2025 | Design JZN ENGINEERING, PC. Owner HARMONY ROCKAWAY LLC Contractor ABINGDON CAPITAL LLC | SUPPORT OF EXCAVATION (SOE) WORK IN CONJUNCTION WITH NB #420667647 AS PER THE PLANS FILED HEREWITH. |
| B00538098 ↗ | 488 STATE STREET BROOKLYN | Alteration | Signed-off | 06/11/2021 | 02/13/2025 | Design READ ARCHITECTURE DESIGN DPC Contractor CCM DESIGN & CONSULTING * | REPLACEMENT OF JOIST, EXCAVATION AT CELLAR, NEW SKYLIGHT, AND DUNNAGE FOR MH EQUIPMENT ON THE ROOF AS SHOWN ON PLANS. NO CHANGE OF USE, EGRE… |
| M00816950 ↗ | 620 JOE DIMAGGIO HIGHWAY MANHATTAN | New Building | Permit Issued | 02/09/2023 | 02/05/2025 | Owner VERIZON Contractor PAVARINI MCGOVERN LLC Filer JAM CONSULTANTS, INC. | Structural work in conjunction with NB application (M00816950-I1) for 6 story concrete parking structure |
| Q00452158 ↗ | 27-40 170 STREET QUEENS | Alteration | Signed-off | 02/10/2021 | 10/01/2024 | Design KEY CIVIL ENGINEERING PC Owner HOLY CROSS HIGH SCHOOL Contractor BEDROCK PLBG. & HTG., INC | INSTALLATION OF DRYWELLS AND CATCH BASINS WITH ASSOCIATED PIPING FOR PROPOSED 2- STORY SCHOOL BUILDING.ALL WORK TO BE IN COMPLIANCE WITH 201… |
| Q00767636 ↗ | 350 BEACH 79 STREET QUEENS | Alteration | Signed-off | 08/01/2022 | 02/29/2024 | Design BELLUCCI ENGINEERING, PLLC Owner HARMONY ROCKAWAY LLC Contractor ABINGDON CAPITAL LLC | EXCAVATION OF OFF-SITE DISPOSAL OF CONTAMINATED SOIL PER NYSDEC APPROVED REMEDIAL ACTON WORK PLAN (BCP SITE C241207). |
| Q00678476 ↗ | 8150A UTOPIA PARKWAY QUEENS | New Building | Permit Issued | 02/23/2022 | 02/01/2024 | Design CANNONDESIGN Owner ST JOHNS UNIVERSITY Contractor SHAWMUT WOODWORKING & SUPPLY Filer JM ZONING, LLC. | SF/ ST JOHNS HEALTH SCIENCES CENTER, SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD) … |
| M00641512 ↗ | 303 WEST 113 STREET MANHATTAN | New Building | Permit Issued | 12/14/2021 | 11/01/2023 | Design DHD ARCHITECTURE DESIGN PLLC Owner HTH Construction Contractor CTI CONSTRUCTION INC Filer EAST COAST EXPEDITING | Support of excavation work associated with new building construction. |
| B00630109 ↗ | 65 DUPONT STREET BROOKLYN | Alteration | Signed-off | 12/15/2021 | 06/22/2023 | Design JZN ENGINEERING, PC. Owner MADISON REALTY CAPITAL Contractor OMNIBUILD CONSTRUCTION IN Filer PINE NY | Support of Excavation in conjunction with New Building |
| Q00455586 ↗ | 166-20 90 AVENUE QUEENS | Alteration | Signed-off | 08/25/2021 | 12/22/2022 | Design MCNAMARA SALVIA Owner BRP DEVELOPMENT CORP Contractor SKYCORE BUILDERS, INC | superstructure work in conjunction to the NB # 421133151 |
| B00630111 ↗ | 75 DUPONT STREET BROOKLYN | Alteration | Signed-off | 12/15/2021 | 11/11/2022 | Design JZN ENGINEERING, PC. Owner MADISON REALTY CAPITAL Contractor MONCON INC Filer PINE NY | Support of Excavation in conjunction with New Building # 321805855 |
| X00521884 ↗ | 2413 THIRD AVENUE BRONX | Alteration | Signed-off | 05/17/2021 | 11/09/2022 | Design JZN ENGINEERING, PC. Owner RXR Contractor LRC CONSTRUCTION LLC Filer JAM CONSULTANTS, INC. | Support of Excavation work in conjunction with soil remediation. |
| Q00702943 ↗ | 3-15 26 AVENUE QUEENS | New Building | Filed — no permit on record | 11/01/2022 | — | Design HILL WEST ARCHITECTS Owner JRJ METRO REALTY LTD | — |
| S00661600 ↗ | 8 STUYVESANT PLACE STATEN ISLAND | New Building | Filed — no permit on record | 02/01/2022 | — | Design MG ENGINEERING D.P.C. Owner MADISON REALTY CAPITAL Filer PINE NY | — |
| S00661661 ↗ | 172 RICHMOND TERRACE STATEN ISLAND | New Building | Filed — no permit on record | 02/01/2022 | — | Design HILL WEST ARCHITECTS Owner MADISON REALTY CAPITAL Filer PINE NY | — |
| S00661663 ↗ | 178 RICHMOND TERRACE STATEN ISLAND | New Building | Filed — no permit on record | 02/01/2022 | — | Design HILL WEST ARCHITECTS Owner MADISON REALTY CAPITAL Filer PINE NY | — |
| B00547133 ↗ | 1515 SURF AVENUE BROOKLYN | Alteration | Signed-off | 07/08/2021 | 11/15/2021 | Design JZN ENGINEERING, PC. Contractor LRC CONSTRUCTION LLC | Support of Excavation for NB# 321599178 |
| B00547153 ↗ | 1515 SURF AVENUE BROOKLYN | Alteration | Signed-off | 07/09/2021 | 11/15/2021 | Design JZN ENGINEERING, PC. Contractor LRC CONSTRUCTION LLC | Support of Excavation for NB# 321599141 |
| M00500640 ↗ | 122 5TH AVENUE MANHATTAN | Alteration | Signed-off | 05/27/2021 | 10/15/2021 | Design JZN ENGINEERING, PC. Contractor OMNIBUILD CONSTRUCTION IN | Support of Excavation (SOE) work as shown on plans in conjunction with Alt 1 # 121208870. Associated FO work filed under DOBNOW # M00500631. |
| Q00285351 ↗ | 94-20 VAN WYCK EXPRESSWAY QUEENS | Alteration | Signed-off | 01/30/2020 | 06/25/2020 | Design KEY CIVIL ENGINEERING PC Contractor J. ROYCE ASSOCIATES, LLC Filer PEROTTO CONSULTING MGT | 8234- Installation of one catch basin , one Drywell and associated storm piping to control storm water runoff. Professional Certification R… |
| Building | Filings | Most Recent |
|---|---|---|
| 3RD AVENUE ↗ | 8 | 08/14/2026 |
| 35-30 STEINWAY STREET ↗ | 4 | 06/24/2026 |
| 3-15 26 AVENUE ↗ | 3 | 11/19/2025 |
| 269 53 STREET ↗ | 1 | 06/24/2025 |
| 490 EAST TREMONT AVENUE ↗ | 3 | 05/20/2025 |
| 151 STARR STREET ↗ | 2 | 03/20/2025 |
| 989 AVENUE OF THE AMERICAS ↗ | 5 | 12/02/2024 |
| 350 BEACH 79 STREET ↗ | 3 | 08/15/2024 |
| 251 CHESTER STREET ↗ | 3 | 05/15/2024 |
| 620 JOE DIMAGGIO HIGHWAY ↗ | 5 | 05/13/2024 |
| 178 RICHMOND TERRACE ↗ | 6 | 01/04/2024 |
| 8 STUYVESANT PLACE ↗ | 6 | 10/27/2023 |
| 65 DUPONT STREET ↗ | 2 | 03/23/2023 |
| 42-02 ORCHARD STREET ↗ | 1 | 12/06/2022 |
| 75 DUPONT STREET ↗ | 2 | 09/29/2022 |
| 172 RICHMOND TERRACE ↗ | 4 | 07/01/2022 |
| 366 BRISTOL ST ↗ | 2 | 06/21/2022 |
| 380 CHESTER STREET ↗ | 2 | 06/21/2022 |
| 8150A UTOPIA PARKWAY ↗ | 1 | 03/17/2022 |
| 488 STATE STREET ↗ | 1 | 02/18/2022 |
| 303 WEST 113 STREET ↗ | 2 | 01/21/2022 |
| 122 5TH AVENUE ↗ | 2 | 11/17/2021 |
| 166-20 90 AVENUE ↗ | 1 | 08/25/2021 |
| 2413 THIRD AVENUE ↗ | 2 | 07/23/2021 |
| 1515 SURF AVENUE ↗ | 1 | 07/09/2021 |
| 1515 SURF AVENUE ↗ | 1 | 07/08/2021 |
| 27-40 170 STREET ↗ | 1 | 02/10/2021 |
| 94-20 VAN WYCK EXPRESSWAY ↗ | 1 | 01/30/2020 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/06/2026 | Underpinning and alternate methods of support of buildings and adjacent property | 3RD AVENUE | Nejm Jundi | special |
| 08/06/2026 | Subsurface Conditions – Fill Placement & In-Place Density | 3RD AVENUE | Nejm Jundi | special |
| 08/06/2026 | Construction Operations Influencing Adjacent Structures | 3RD AVENUE | Nejm Jundi | special |
| 08/06/2026 | Concrete - Cast-In-Place | 3RD AVENUE | SOORJBALLY HARILALL | special |
| 08/06/2026 | Excavations - Sheeting, Shoring, and Bracing | 3RD AVENUE | Nejm Jundi | special |
| 08/06/2026 | Final | 3RD AVENUE | Nejm Jundi | progress |
| 08/06/2026 | Footing and Foundation | 3RD AVENUE | Nejm Jundi | progress |
| 07/23/2026 | Footing and Foundation | 3RD AVENUE | SOORJBALLY HARILALL | progress |
| 07/23/2026 | Final | 3RD AVENUE | SOORJBALLY HARILALL | progress |
| 07/23/2026 | Construction Operations Influencing Adjacent Structures | 3RD AVENUE | Nejm Jundi | special |
| 07/23/2026 | Concrete - Cast-In-Place | 3RD AVENUE | SOORJBALLY HARILALL | special |
| 07/08/2026 | Footing and Foundation | 3RD AVENUE | SOORJBALLY HARILALL | progress |
| 07/08/2026 | Final | 3RD AVENUE | SOORJBALLY HARILALL | progress |
| 07/08/2026 | Construction Operations Influencing Adjacent Structures | 3RD AVENUE | Nejm Jundi | special |
| 07/08/2026 | Concrete - Cast-In-Place | 3RD AVENUE | SOORJBALLY HARILALL | special |
| 07/06/2026 | Footing and Foundation | 3RD AVENUE | Nejm Jundi | progress |
| 07/06/2026 | Final | 3RD AVENUE | Nejm Jundi | progress |
| 07/06/2026 | Underpinning and alternate methods of support of buildings and adjacent property | 3RD AVENUE | Nejm Jundi | special |
| 07/06/2026 | Subsurface Conditions – Fill Placement & In-Place Density | 3RD AVENUE | Nejm Jundi | special |
| 07/06/2026 | Excavations - Sheeting, Shoring, and Bracing | 3RD AVENUE | Nejm Jundi | special |
| 07/06/2026 | Construction Operations Influencing Adjacent Structures | 3RD AVENUE | Nejm Jundi | special |
| 07/06/2026 | Concrete - Cast-In-Place | 3RD AVENUE | SOORJBALLY HARILALL | special |
| 06/26/2026 | Structural Steel - Details | 35-30 STEINWAY STREET | CONNIE PISANI | special |
| 06/26/2026 | Excavations - Sheeting, Shoring, and Bracing | 35-30 STEINWAY STREET | Nejm Jundi | special |
| 06/26/2026 | Structural Stability – Alterations of existing buildings | 35-30 STEINWAY STREET | Nejm Jundi | special |
| 06/23/2026 | Excavations - Sheeting, Shoring, and Bracing | 35-30 STEINWAY STREET | Nejm Jundi | special |
| 06/23/2026 | Structural Stability – Alterations of existing buildings | 35-30 STEINWAY STREET | Nejm Jundi | special |
| 06/23/2026 | Structural Steel - Details | 35-30 STEINWAY STREET | CONNIE PISANI | special |
| 05/11/2026 | Structural Steel - Details | 35-30 STEINWAY STREET | CONNIE PISANI | special |
| 05/11/2026 | Structural Stability – Alterations of existing buildings | 35-30 STEINWAY STREET | Nejm Jundi | special |
| 05/11/2026 | Excavations - Sheeting, Shoring, and Bracing | 35-30 STEINWAY STREET | Nejm Jundi | special |
| 05/07/2026 | Footing and Foundation | 3RD AVENUE | SOORJBALLY HARILALL | progress |
| 05/07/2026 | Final | 3RD AVENUE | SOORJBALLY HARILALL | progress |
| 05/07/2026 | Construction Operations Influencing Adjacent Structures | 3RD AVENUE | Nejm Jundi | special |
| 05/07/2026 | Concrete - Cast-In-Place | 3RD AVENUE | SOORJBALLY HARILALL | special |
| 04/21/2026 | Subsurface Conditions – Fill Placement & In-Place Density | 35-30 STEINWAY STREET | Nejm Jundi | special |
| 11/21/2025 | Concrete - Cast-In-Place | 3-15 26 AVENUE | Borys Hayda | special |
| 11/21/2025 | Subsurface Investigations (Borings/Test Pits) | 3-15 26 AVENUE | Nejm Jundi | special |
| 11/21/2025 | Subgrade Inspections | 3-15 26 AVENUE | Nejm Jundi | special |
| 11/21/2025 | Deep Foundation Elements | 3-15 26 AVENUE | Nejm Jundi | special |
| 11/21/2025 | Final | 3-15 26 AVENUE | Borys Hayda | progress |
| 11/21/2025 | Footing and Foundation | 3-15 26 AVENUE | Borys Hayda | progress |
| 11/11/2025 | Concrete - Cast-In-Place | 3-15 26 AVENUE | Borys Hayda | special |
| 11/11/2025 | Deep Foundation Elements | 3-15 26 AVENUE | Nejm Jundi | special |
| 11/11/2025 | Subgrade Inspections | 3-15 26 AVENUE | Nejm Jundi | special |
| 11/11/2025 | Subsurface Investigations (Borings/Test Pits) | 3-15 26 AVENUE | Nejm Jundi | special |
| 11/11/2025 | Final | 3-15 26 AVENUE | Borys Hayda | progress |
| 11/11/2025 | Footing and Foundation | 3-15 26 AVENUE | Borys Hayda | progress |
| 10/31/2025 | Deep Foundation Elements | 35-30 STEINWAY STREET | Nejm Jundi | special |
| 10/01/2025 | Subgrade Inspections | 35-30 STEINWAY STREET | Nejm Jundi | special |