← Back
Legitimate theatre, sole use
Broadway Theatre
1681 BROADWAY · BIN 1080865
💬 Discuss this project
1924Year Built
5Stories
J4Building Class
C6-7Zoning
36,000 sfGross Floor Area
1Units
LL97 Covered2 Open Violations ▸
Legitimate theatre, sole use · 14,310 sf lot · 2.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Roof2p · 1 filing · 20 docs
Floor 116p · 3 filings · 20 docs
Cellar1p · 1 filing · 10 docs
Basement1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROADWAY 52 ASSOC103/22/2026
PARAMOUNT GRP INC103/21/2026
SHUBER303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
R SCOTT LEWIS PE PC206/06/2025
VINCENT J. LIOTTA P.E.206/17/2024
MITCHELL KURTZ ARCHITECT PC812/19/2023
MCLAREN ENGINEERING GROUP304/17/2023
JAMES BODNAR ARCHITECT101/24/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYCCODE2003/21/2026
D R BROWN403/21/2026
KAZAM CONSULTANTS403/21/2026
VINCENT J. LIOTTA P.E.103/21/2026
VINCENT J. LIOTTA P. E.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GG CRAFTWORK LLCGeneral Contractor407/08/2026
SIRINA FIRE PROTPlumbing303/22/2026
LINEAR ELECTRIC, INC.Electrical303/22/2026
AIR STREAM AIR CONDITIONINGGeneral Contractor203/21/2026
A.M.A. HOLDINGS INCGeneral Contractor207/08/2026
A M A HOLDINGSScaffold207/08/2026
DREW ROMANELLOElectrical203/21/2026
HOWARD ZAMKOFFElectrical203/21/2026
SIRINA FIRE PROT CORPFire Protection107/08/2026
INTEGRATED HVAC SYS & SVCGeneral Contractor107/08/2026
LANE REFRIGERATION CO.,INGeneral Contractor107/08/2026
JASON SAMUELSElectrical103/21/2026
ALBERT SAYERSElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHL ENGINEERING, P.C.6109106/06/2025
VINCENT J. LIOTTA P. E.1974206/17/2024
SGM ENGINEERING2366612/19/2023
SAG ENGINEERING & CONSULT608104/17/2023
Building Lifecycle
All (85)Filed (16)Permit Issued (10)Signed Off (10)Violation (9)Inspection (2)Objection (8)Special Inspection (30)
12/19/2025
Signed off — Alteration
Erect sign structure on wall for projecting sign. Sign filed on# M01195732. No change of use, egress or occupancy.
M01195735-I1
12/18/2025
Signed off — Alteration
Erect illuminatted(LED) D/F sign on wall. Structure filed under #M01195735 . No change of use, egress or occupancy.
M01226860-I1
06/11/2025
Permit issued — Structural
M01195735-I1-ST
06/06/2025
Filed — Alteration
Erect sign structure on wall for projecting sign. Sign filed on# M01195732. No change of use, egress or occupancy.
M01195735-I1
06/04/2025
Special inspection requirement — Sprayed fire-resistant materials
Joseph Bizarroque
05/21/2025
Permit issued — Sign
M01226860-I1-SG
05/17/2025
Filed — Alteration
Erect illuminatted(LED) D/F sign on wall. Structure filed under #M01195735 . No change of use, egress or occupancy.
M01226860-I1
05/15/2025
Special inspection requirement — Final
RENEE RAJAPPA
03/15/2025
Special inspection requirement — Structural Steel - Welding
Joseph Bizarroque
03/15/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Joseph Bizarroque
03/15/2025
Special inspection requirement — Structural Steel - Details
Joseph Bizarroque
03/15/2025
Special inspection requirement — Final
RENEE RAJAPPA
07/10/2024
Signed off — Alteration
REPLACEMENT OF 4 UNIT SPLIT SYSTEM ON FLOOR 001 AND THE ROOF WITH A TOTAL CAPACITY OF 28400 BTUs. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01066887-I1
06/17/2024
Filed — Alteration
REPLACEMENT OF 4 UNIT SPLIT SYSTEM ON FLOOR 001 AND THE ROOF WITH A TOTAL CAPACITY OF 28400 BTUs. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01066887-I1
06/17/2024
Permit issued — Mechanical Systems
M01066887-I1-MS
06/14/2024
Special inspection requirement — Maintenance information
Vincent Liotta
06/14/2024
Special inspection requirement — Final
Vincent Liotta
06/14/2024
Special inspection requirement — Mechanical Systems
Vincent Liotta
06/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
06/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
06/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
02/20/2024
Signed off — Alteration
Structural scope associated with the construction of temporary seating & performance platforms in connection with "Here Lies Love" TPA for the run of the Broadway show. No change of use, or occupancy.
M08047601-S2
02/20/2024
Signed off — Alteration
Structural scope associated with the construction of temporary seating & performance platforms in connection with "Here Lies Love" TPA for the run of the Broadway show. No change of use, or occupancy.
M08047601-S3
02/07/2024
Signed off — Alteration
Structural scope associated with the construction of temporary seating & performance platforms in connection with "Here Lies Love" TPA for the run of the Broadway show. No change of use, or occupancy.
M08047601-I1
02/06/2024
Signed off — Alteration
Structural scope associated with the construction of temporary seating & performance platforms in connection with "Here Lies Love" TPA for the run of the Broadway show. No change of use, or occupancy.
M08047601-S1
12/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
12/20/2023
Special inspection requirement — Final
steven Giammona
12/20/2023
Special inspection requirement — Mechanical Systems
steven Giammona
12/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
12/20/2023
Special inspection requirement — Maintenance information
steven Giammona
12/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
12/19/2023
Filed — Alteration
Structural scope associated with the construction of temporary seating & performance platforms in connection with "Here Lies Love" TPA for the run of the Broadway show. No change of use, or occupancy.
M08047601-P2
12/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
12/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
12/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
steven Giammona
12/07/2023
Special inspection requirement — Final
steven Giammona
12/07/2023
Special inspection requirement — Maintenance information
steven Giammona
12/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
12/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
12/05/2023
Filed — Alteration
Structural scope associated with the construction of temporary seating & performance platforms in connection with "Here Lies Love" TPA for the run of the Broadway show. No change of use, or occupancy.
M08047601-P1
11/21/2023
Special inspection requirement — Final
steven Giammona
11/21/2023
Special inspection requirement — Mechanical Systems
steven Giammona
11/21/2023
Special inspection requirement — Final
steven Giammona
11/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
11/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
steven Giammona
08/07/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/27/2023
Signed off — Alteration
ERECT (2) ILLUMINATED LED SIGNS ON STRUCTURE ACCESSORY TO THE BROADWAY THEATRE. SIGNS DESIGNED FOR CHANGEABLE COPY
M00858924-I1
07/27/2023
Signed off — Alteration
M00858936-I1
07/25/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/19/2023
Permit issued — Structural
M08047601-S1-ST
07/19/2023
Permit issued — General Construction
M08047601-I1-GC
05/19/2023
Filed — No Work
M00819424-P1
05/08/2023
Permit issued — Mechanical Systems
M08047601-S2-MS
04/20/2023
Permit issued — Sprinklers
M08047601-S3-EW-SP
04/18/2023
Filed — Alteration
Structural scope associated with the construction of temporary seating & performance platforms in connection with "Here Lies Love" TPA for the run of the Broadway show. No change of use, or occupancy.
M08047601-S2
04/18/2023
Filed — Alteration
Structural scope associated with the construction of temporary seating & performance platforms in connection with "Here Lies Love" TPA for the run of the Broadway show. No change of use, or occupancy.
M08047601-S3
04/18/2023
Permit issued — Sign
M00858924-I1-SG
04/18/2023
Permit issued — Structural
M00858936-I1-ST
04/17/2023
Filed — Alteration
ERECT (2) ILLUMINATED LED SIGNS ON STRUCTURE ACCESSORY TO THE BROADWAY THEATRE. SIGNS DESIGNED FOR CHANGEABLE COPY
M00858924-I1
04/17/2023
Filed — Alteration
M00858936-I1
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offAMA HOLDINGS06/11/2025
DOB NOWSignSigned-offA.M.A HOLDINGS INC05/21/2025
DOB NOWMechanical SystemsSigned-offLANE REFRIGERATION CO.,IN06/17/2024
DOB NOWStructuralSigned-offGG CRAFTWORK LLC07/19/2023
DOB NOWGeneral ConstructionSigned-offGG CRAFTWORK LLC07/19/2023
DOB NOWMechanical SystemsSigned-offAIR STREAM AIR CONDITIONI05/08/2023
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP04/20/2023
DOB NOWSignSigned-offA.M.A HOLDINGS INC04/18/2023
DOB NOWStructuralSigned-offAMA HOLDINGS04/18/2023
DOB NOWMechanical SystemsSigned-offINTEGRATED HVAC SYS SVC09/18/2020
BISMHISSUEDTHE SHUBERT ORGANIZATION03/15/2019
BISOTISSUEDKING KONG BROADWAY LLC09/21/2018
BISOTISSUEDTHE SHUBERT ORGANIZATION06/20/2017
BISOTISSUEDAMERICAN DREAM 2017, LLC04/26/2017
BISOTISSUEDAMERICAN DREAM 2017, LLC04/21/2017
BISOTISSUEDAMERICAN DREAM 2017, LLC03/09/2017
BISEQISSUEDROCKLEDGE SCAFFOLD CORP11/09/2016
BISEQISSUEDCS BRIDGE CORP10/25/2016
BISMHISSUEDTHE SHUBERT ORGANIZATION11/10/2015
BISOTISSUEDTHE SHUBERT ORGANIZATION11/09/2015
BISOTISSUEDPRODUCTION RESOURCE GROUP04/14/2015
BISOTISSUEDSISTER ACT BROADWAY, LP08/15/2012
BISOTISSUEDSISTER ACT BROADWAY, LP03/28/2011
BISOTISSUEDTHE SHUBERT ORGANIZATION11/30/2005
BISSPISSUEDLAB PLUMBING & HEATING CO. INC.05/19/2005
BISOTISSUEDBOMBAY DREAMS NY,LLC10/26/2004
BIS—ISSUEDSIGNS CAD CORP06/14/2004
BIS—ISSUEDINTERBORO SIGN AND MAINTENANCE11/12/2002
BISOTISSUEDTHE SHUBERT ORGANIZATION03/31/2000
BISOTISSUEDM.PALADINO ,INC.03/01/1993
BIS—ISSUEDARKRAFT STRUASS SIGN CORP03/01/1993
BISSPISSUEDLAB PLBG & HTG CO INC04/30/1991
BISSPISSUEDLAB PLBG & HTG CO INC03/25/1991
BIS—ISSUEDTHE SUBERT ORGANIZATION02/06/1991
14 projects · most recent 05/24/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
05/24/2025CompleteA.M.A HOLDINGS INC.D/B/A—
03/05/2024Permit IssuedLINEAR ELECTRIC, INC.—
08/09/2023CompleteROMCON ELECTRIC, INCHVAC Wiring
06/07/2023CompleteLINEAR ELECTRIC, INC.—
05/01/2023CompleteAB ELEC & CONTROLS CORP—
04/17/2023CompleteH. & L. ELECTRIC INCGeneral Wiring
04/07/2023CompleteROMCON ELECTRIC, INC—
03/24/2023CompleteROMCON ELECTRIC, INC—
03/18/2022CompleteLINEAR ELECTRIC, INC.—
11/30/2019CompleteLINEAR ELECTRIC, INC.—
06/27/2018CompleteLINEAR ELECTRIC, INC.—
04/27/2018CompleteH & L ELECTRIC INC.General Wiring
04/26/2018CompleteVERDE ELECTRIC CORP.General Wiring
03/16/2018CompleteERBACH ELEC'L CONTRG LLC—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/07/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/25/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
06/04/2025Sprayed fire-resistant materialsJoseph Bizarroquespecial
05/15/2025FinalRENEE RAJAPPAprogress
03/15/2025Structural Steel - WeldingJoseph Bizarroquespecial
03/15/2025Structural Steel - High Strength BoltingJoseph Bizarroquespecial
03/15/2025Structural Steel - DetailsJoseph Bizarroquespecial
03/15/2025FinalRENEE RAJAPPAprogress
06/14/2024Maintenance informationVincent Liottaenergy_progress
06/14/2024FinalVincent Liottaprogress
06/14/2024Mechanical SystemsVincent Liottaspecial
06/14/2024HVAC-R and service water heating equipmentVincent Liottaenergy_progress
06/14/2024HVAC-R and service water heating system controlsVincent Liottaenergy_progress
06/14/2024HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
12/20/2023HVAC-R and service water piping design and insulationsteven Giammonaenergy_progress
12/20/2023Finalsteven Giammonaprogress
12/20/2023Mechanical Systemssteven Giammonaspecial
12/20/2023HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
12/20/2023Maintenance informationsteven Giammonaenergy_progress
12/20/2023HVAC-R and service water heating system controlssteven Giammonaenergy_progress
12/07/2023HVAC-R and service water heating system controlssteven Giammonaenergy_progress
12/07/2023Fire-Resistant Penetrations and Jointssteven Giammonaspecial
12/07/2023Fire-Resistance Rated Constructionsteven Giammonaprogress
12/07/2023Finalsteven Giammonaprogress
12/07/2023Maintenance informationsteven Giammonaenergy_progress
12/07/2023HVAC-R and service water piping design and insulationsteven Giammonaenergy_progress
12/07/2023HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
Latest 25 of 43.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Here Lies LoveOtherSub-basement, Basement, Floor 1, Roof
Project M08047601 Alteration · LOC Issued · 04/07/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 244 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch11
08/31/2026M00858924-I1Request digital key ↗
08/31/2026M00858936-I1Request digital key ↗
08/31/2026M08047601-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly4
09/05/2026M00301733-I1Request digital key ↗
08/31/2026M00819424-P1Request digital key ↗
08/15/2026M00819424-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00351850-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION15
12/16/2019123864158Open ↗
03/14/2019123683086Open ↗
09/24/2018123124546Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION14
12/16/2019123864158Open ↗
03/15/2019123683086Open ↗
09/24/2018123124546Open ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications116
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION30
12/16/2019123864158Open ↗
12/16/2019123864158Open ↗
10/21/2019123124546Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
08/31/2026M08047601-S2Open ↗
08/31/2026M08047601-S2Open ↗
08/31/2026M08047601-S2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/01/2026M08028669-I1Open ↗
08/31/2026M00819424-I1Open ↗
08/31/2026M00858924-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
08/31/2026M08047601-S2Open ↗
08/31/2026M08047601-S1Open ↗
08/31/2026M08047601-S1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
12/16/2019123864158Open ↗
03/14/2019123683086Open ↗
09/24/2018123124546Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
12/16/2019123864158Open ↗
03/14/2019123683086Open ↗
09/24/2018123124546Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
04/14/2011120642849Open ↗
11/03/2010120513952Open ↗
06/29/2009120089894Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/20/2016140565591Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/20/2016140565591Open ↗
▸Trade Schedules & Equipment4
▸BISEQUIPMENT USE PERMITS2
03/20/2019123683086Open ↗
05/09/2017122545255Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
03/20/2019123683086Open ↗
05/09/2017122545255Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
12/16/2019123864158Open ↗
03/14/2019123683086Open ↗
09/24/2018123124546Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026M01195735-I1Open ↗
08/13/2026M01066887-I1Open ↗
08/13/2026M00351850-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/14/2011120642849Open ↗
06/29/2009120089894Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/03/2010120513952Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
12/16/2019123864158Open ↗
03/20/2019123683086Open ↗
03/14/2019123683086Open ↗
Showing 3 of 7 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/20/2016140565591Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/20/2019123683086Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/09/2021123864158Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00351850-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/09/2021123864158Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/20/2019123683086Open ↗
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
12/10/2021123864158Open ↗
10/21/2019123124546Open ↗
10/21/2019123039470Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
04/14/2011120642849Open ↗
11/03/2010120513952Open ↗
06/29/2009120089894Open ↗
▸BISSUPERSEDING LETTER1
05/23/2017123039470Open ↗
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT18
12/16/2019123864158Open ↗
10/21/2019123124546Open ↗
10/21/2019123039470Open ↗
Showing 3 of 18 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/09/2021123864158Open ↗
▸Filing & Intake Forms18
▸BISEFILING COVER SHEET12
12/16/2019123864158Open ↗
03/14/2019123683086Open ↗
09/24/2018123124546Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM5
10/21/2019123124546Open ↗
10/21/2019123039470Open ↗
03/20/2019123683086Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/20/2016140565591Open ↗