← Back
Two family brick
169 PUTNAM AVENUE
BROOKLYN · BIN 3057227
💬 Discuss this project
1905Year Built
3Stories
B1Building Class
R6BZoning
1,920 sfGross Floor Area
2Units
5 Open Violations ▸FDNY Report ↗
Two family brick · 1,667 sf lot · 1.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingOther
Roof3p · 1 filing · 4 docs
Floor 312p · 1 filing · 20 docs
Floor 211p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Basement3p · 2 filings · 20 docs
Sub-Basement11p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC112/01/2025
HAYNES ARCHITECTURE PC508/21/2023
TSF ENGINEERING, PC204/26/2023
ANTHONY GENNARO, PE106/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THOMAS E. HAYNES, ARCHITECT603/21/2026
BROOKLYN SOLARWORKS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DAD & SON CONTRACTING INCGeneral Contractor407/08/2026
ALADDIN PLUMBING CORPPlumbing307/08/2026
ROGER DE ELECTRIC CO.Electrical103/22/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244112/01/2025
THOMAS E. HAYNES ARCHITEC3775508/21/2023
TSF ENGINEERING, PC1274204/26/2023
QUALITY TESTING, LLC7344106/02/2021
Building Lifecycle
All (67)Filed (9)Permit Issued (6)Signed Off (3)Violation (8)Inspection (3)Objection (10)Special Inspection (28)
01/21/2026
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01324861-I1
12/03/2025
Permit issued — Solar
B01324861-I1-SL
12/01/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01324861-I1
10/11/2023
Signed off — Alteration
PROPOSED RELOCATION OF AND INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY
B00443255-I1
08/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
thomas haynes
08/22/2023
Special inspection requirement — HVAC insulation and sealing
thomas haynes
08/21/2023
Filed — Alteration
PROPOSED RELOCATION OF AND INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY
B00443255-P4
08/21/2023
Special inspection requirement — HVAC insulation and sealing
thomas haynes
08/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
thomas haynes
08/16/2023
Objection raised — Scope
08/16/2023
Objection resolved — Addressed
08/15/2023
Filed — Alteration
PROPOSED RELOCATION OF AND INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY
B00443255-P3
08/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
thomas haynes
08/15/2023
Special inspection requirement — HVAC insulation and sealing
thomas haynes
06/21/2023
Filed — Alteration
PROPOSED RELOCATION OF AND INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY
B00443255-P2
06/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
thomas haynes
06/21/2023
Special inspection requirement — HVAC insulation and sealing
thomas haynes
05/17/2023
Permit issued — Plumbing
B00443255-I1-PL
05/04/2023
Signed off — Alteration
B00529818-I1
05/04/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tucci
05/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
05/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas Tucci
05/01/2023
Special inspection requirement — Heating Systems
Nicholas Tucci
05/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tucci
05/01/2023
Special inspection requirement — Mechanical Systems
Nicholas Tucci
05/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
05/01/2023
Special inspection requirement — Final
Nicholas Tucci
05/01/2023
Special inspection requirement — Shutoff dampers
Nicholas Tucci
05/01/2023
Special inspection requirement — Maintenance information
Nicholas Tucci
04/29/2023
Objection resolved — Addressed
04/29/2023
Objection resolved — Addressed
04/27/2023
Objection raised — Plumbing
04/27/2023
Objection raised — Scope
04/27/2023
Objection resolved — Addressed
04/27/2023
Objection raised — Scope
04/27/2023
Objection resolved — Addressed
04/27/2023
Objection raised — Plumbing
04/26/2023
Filed — Alteration
proposed hvac system including boilers, split system and exhaust fans as per plans filed herewith. No change to use, egress or occupancy.
B00529816-P1
04/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tucci
04/26/2023
Special inspection requirement — Heating Systems
Nicholas Tucci
04/26/2023
Special inspection requirement — Mechanical Systems
Nicholas Tucci
04/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tucci
04/26/2023
Special inspection requirement — Final
Nicholas Tucci
04/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tucci
04/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tucci
04/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas Tucci
04/26/2023
Special inspection requirement — Shutoff dampers
Nicholas Tucci
04/26/2023
Special inspection requirement — Maintenance information
Nicholas Tucci
04/25/2023
Filed — Alteration
PROPOSED RELOCATION OF AND INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY
B00443255-P1
06/23/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/08/2022
Permit issued — Plumbing
B00443255-I1-PL
11/08/2021
Permit issued — Structural
B00529818-I1-ST
11/05/2021
Permit issued — Mechanical Systems
B00529816-I1-MS
06/02/2021
Filed — Alteration
B00529818-I1
06/01/2021
Filed — Alteration
proposed hvac system including boilers, split system and exhaust fans as per plans filed herewith. No change to use, egress or occupancy.
B00529816-I1
05/21/2021
Permit issued — Plumbing
B00443255-I1-PL
12/22/2020
Filed — Alteration
PROPOSED RELOCATION OF AND INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY
B00443255-I1
09/06/2012
Violation issued (HPD, open)
C
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC12/03/2025
DOB NOWPlumbingSigned-offALADDIN PLUMBING CORP05/17/2023
DOB NOWPlumbingSigned-offALADDIN PLUMBING CORP06/08/2022
DOB NOWStructuralSigned-offDAD & SONS CONTRACTING IN11/08/2021
DOB NOWMechanical SystemsPermit IssuedDAD & SONS CONTRACTING IN11/05/2021
DOB NOWPlumbingSigned-offALADDIN PLUMBING CORP05/21/2021
BISOTISSUEDDAD & SON CONTRACTING INC11/02/2022
BISOTISSUEDDAD & SON CONTRACTING INC11/04/2021
BISOTISSUEDFPA CONSTRUCTION INC05/06/2013
1 project · most recent 04/26/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/26/2023Permit IssuedDAD & SON CONTRACTING INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin RXTQ36TAVJU 3 tons · Vrf Outdoor ×2
2 projects · most recent 11/25/2025
General Wiring
FiledStatusContractorScope
11/25/2025CompleteBROOKYLN SOLARWORKS, LLC—
01/03/2025CompleteROGER DE ELECTRIC CO.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/04/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/23/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
08/22/2023Fire-Resistant Penetrations and Jointsthomas haynesspecial
08/22/2023HVAC insulation and sealing thomas haynesenergy_progress
08/21/2023HVAC insulation and sealing thomas haynesenergy_progress
08/21/2023Fire-Resistant Penetrations and Jointsthomas haynesspecial
08/15/2023Fire-Resistant Penetrations and Jointsthomas haynesspecial
08/15/2023HVAC insulation and sealing thomas haynesenergy_progress
06/21/2023Fire-Resistant Penetrations and Jointsthomas haynesspecial
06/21/2023HVAC insulation and sealing thomas haynesenergy_progress
05/01/2023HVAC-R and service water heating equipmentNicholas Tuccienergy_progress
05/01/2023HVAC-R and service water piping design and insulationNicholas Tuccienergy_progress
05/01/2023HVAC-R and service water heating system controlsNicholas Tuccienergy_progress
05/01/2023Heating SystemsNicholas Tuccispecial
05/01/2023Fire-Resistant Penetrations and JointsNicholas Tuccispecial
05/01/2023Mechanical SystemsNicholas Tuccispecial
05/01/2023Energy Code Compliance InspectionsNicholas Tucciprogress
05/01/2023FinalNicholas Tucciprogress
05/01/2023Shutoff dampersNicholas Tuccienergy_progress
05/01/2023Maintenance informationNicholas Tuccienergy_progress
04/26/2023Fire-Resistant Penetrations and JointsNicholas Tuccispecial
04/26/2023Heating SystemsNicholas Tuccispecial
04/26/2023Mechanical SystemsNicholas Tuccispecial
04/26/2023Energy Code Compliance InspectionsNicholas Tucciprogress
04/26/2023FinalNicholas Tucciprogress
04/26/2023HVAC-R and service water heating equipmentNicholas Tuccienergy_progress
04/26/2023HVAC-R and service water piping design and insulationNicholas Tuccienergy_progress
Latest 25 of 28.
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Plumbing5
09/02/2026B00443255-I1Request digital key ↗
09/02/2026B00443255-P4Request digital key ↗
09/02/2026B00443255-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch4
09/01/2026B00529818-I1Request digital key ↗
08/27/2026B00529816-P1Request digital key ↗
08/27/2026B00529816-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
05/14/2021340797613Open ↗
05/08/2013320741382Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/11/2013320741382Open ↗
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature18
09/20/2026B00529816-P1Open ↗
09/20/2026B00529816-P1Open ↗
09/20/2026B00529816-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/20/2026B00529816-P1Open ↗
09/20/2026B00529816-P1Open ↗
09/20/2026B00529816-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/02/2026B00443255-P2Open ↗
09/02/2026B00443255-P4Open ↗
09/02/2026B00443255-P3Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/08/2013320741382Open ↗
04/11/2013320741382Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/23/2020340797613Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
04/11/2013320741382Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
04/11/2013320741382Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/02/2026B00443255-P1Open ↗
09/02/2026B00443255-P4Open ↗
09/02/2026B00443255-P2Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/23/2020340797613Open ↗
04/11/2013320741382Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
04/24/2013320741382Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/13/2023340797613Open ↗
10/12/2023340797613Open ↗
05/14/2021340797613Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
10/11/2023340797613Open ↗
10/11/2023340797613Open ↗
10/11/2023340797613Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/08/2013320741382Open ↗
04/11/2013320741382Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00529816-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/11/2023340797613Open ↗
05/14/2021340797613Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
04/11/2013320741382Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01324861-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
11/22/2021340797613Open ↗
12/23/2020340797613Open ↗
04/11/2013320741382Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/11/2023340797613Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
12/23/2020340797613Open ↗
12/23/2020340797613Open ↗
▸BISEFILING COVER SHEET1
04/11/2013320741382Open ↗