| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00997959 ↗ | 159 EAST 78 STREET MANHATTAN | Alteration | Permit Issued | 01/30/2024 | 08/06/2026 | Design Haynes Architecture PC Contractor VECTRA CONSTRUCTION CORP | PROPOSED PLUMBING ON FLOORS 001 THRU 003. REMOVAL, RELOCATION AND NEW PLUMBING FIXTURES PROPOSED AS PER PLANS FILED HEREWITH. NO CHANGE TO U… |
| M00933714 ↗ | 143 EAST 62 STREET MANHATTAN | Alteration | Permit Issued | 09/16/2023 | 12/28/2023 | Design Haynes Architecture PC Contractor VECTRA CONSTRUCTION CORP | Proposed lintel over 1st floor front exterior door openings and proposed header to sister exsitign stair trimmer @ 3rd floor stair opening. … |
| B00818380 ↗ | 636 20 STREET BROOKLYN | Alteration | Signed-off | 02/03/2023 | 06/21/2023 | Design THINK DESIGN ARCHITECTURE Contractor FIGURE GROUND INC | THIS WORK INVOLVES THE INSTALLATION OF NEW STEEL DUNNAGE TO SUPPORT ROOF UNITS. REINFORCING THE 2ND FLOOR AND ROOF JOISTS. NO CHANGE TO USE,… |
| B00478448 ↗ | 551 4 STREET BROOKLYN | Alteration | Signed-off | 05/24/2021 | 02/09/2023 | Design TSF ENGINEERING, PC Contractor IGUANA SERVICES INC | INSTALL NEW SPLIT A/C SYSTEM TO SERVE APT 1L, INCLUDING ROOFTOP CONDENSER UNIT. INSTALL TOILET, LAUNDRY & KITCHEN EXHAUST. FILED IN CONJUNCT… |
| B00529816 ↗ | 169 PUTNAM AVENUE BROOKLYN | Alteration | Permit Issued | 06/01/2021 | 11/05/2021 | Design TSF ENGINEERING, PC Contractor DAD & SONS CONTRACTING IN | proposed hvac system including boilers, split system and exhaust fans as per plans filed herewith. No change to use, egress or occupancy. |
| M00536700 ↗ | 200 EAST 27 STREET MANHATTAN | Alteration | Signed-off | 06/17/2021 | 10/04/2021 | Design TSF ENGINEERING, PC Contractor ORBIT PLBG & HTG INC | proposed cap/remove plumbing fixtures, replacement and relocation of plumbing fixtures as per plans filed herewith. no change to use, egress… |
| Person | Filings | Most recent |
|---|---|---|
| thomas haynes | 10 | 03/10/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| TSF ENGINEERING, PC | 4 | 07/25/2023 |
| BARRY STRUCTURAL ENGINEERING, PLLC | 2 | 03/14/2025 |
| A DEGREE OF FREEDOM STRUCTURAL ENGI | 1 | 09/06/2023 |
| THINK DESIGN ARCHITECTURE | 1 | 09/06/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| VECTRA CONSTRUCTION CORP | 2 | 03/14/2025 |
| A&H EXPRESS PLBG&HTG CORP | 1 | 09/06/2023 |
| DAD & SON CONTRACTING INC | 1 | 04/26/2023 |
| DWIP CORP | 1 | 07/25/2023 |
| FIGURE GROUND INC | 1 | 09/06/2023 |
| IGUANA SERVICES INC | 1 | 07/25/2023 |
| ORBIT PLBG & HTG INC | 1 | 09/13/2022 |
| P.S.I. MECHANICAL | 1 | 03/14/2025 |
| RADISA MLADENOVIC | 1 | 03/14/2025 |
| TESTERMAN PLBG & HTG INC | 1 | 06/02/2021 |
| TRI-COUNTY MECHANICAL LLC | 1 | 03/14/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| 133 MULBERRY STREET CONDO | 1 | 06/02/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00997959 ↗ | 159 EAST 78 STREET MANHATTAN | Alteration | Permit Issued | 01/30/2024 | 08/06/2026 | Design Haynes Architecture PC Contractor VECTRA CONSTRUCTION CORP | PROPOSED PLUMBING ON FLOORS 001 THRU 003. REMOVAL, RELOCATION AND NEW PLUMBING FIXTURES PROPOSED AS PER PLANS FILED HEREWITH. NO CHANGE TO U… |
| M00933714 ↗ | 143 EAST 62 STREET MANHATTAN | Alteration | Permit Issued | 09/16/2023 | 12/28/2023 | Design Haynes Architecture PC Contractor VECTRA CONSTRUCTION CORP | Proposed lintel over 1st floor front exterior door openings and proposed header to sister exsitign stair trimmer @ 3rd floor stair opening. … |
| B00818380 ↗ | 636 20 STREET BROOKLYN | Alteration | Signed-off | 02/03/2023 | 06/21/2023 | Design THINK DESIGN ARCHITECTURE Contractor FIGURE GROUND INC | THIS WORK INVOLVES THE INSTALLATION OF NEW STEEL DUNNAGE TO SUPPORT ROOF UNITS. REINFORCING THE 2ND FLOOR AND ROOF JOISTS. NO CHANGE TO USE,… |
| B00478448 ↗ | 551 4 STREET BROOKLYN | Alteration | Signed-off | 05/24/2021 | 02/09/2023 | Design TSF ENGINEERING, PC Contractor IGUANA SERVICES INC | INSTALL NEW SPLIT A/C SYSTEM TO SERVE APT 1L, INCLUDING ROOFTOP CONDENSER UNIT. INSTALL TOILET, LAUNDRY & KITCHEN EXHAUST. FILED IN CONJUNCT… |
| B00529816 ↗ | 169 PUTNAM AVENUE BROOKLYN | Alteration | Permit Issued | 06/01/2021 | 11/05/2021 | Design TSF ENGINEERING, PC Contractor DAD & SONS CONTRACTING IN | proposed hvac system including boilers, split system and exhaust fans as per plans filed herewith. No change to use, egress or occupancy. |
| M00536700 ↗ | 200 EAST 27 STREET MANHATTAN | Alteration | Signed-off | 06/17/2021 | 10/04/2021 | Design TSF ENGINEERING, PC Contractor ORBIT PLBG & HTG INC | proposed cap/remove plumbing fixtures, replacement and relocation of plumbing fixtures as per plans filed herewith. no change to use, egress… |
| M00512067 ↗ | 133 MULBERRY STREET MANHATTAN | Alteration | Signed-off | 06/02/2021 | 07/15/2021 | Design TSF ENGINEERING, PC Contractor TESTERMAN PLBG & HTG INC | PROPOSED PLUMBING WORK AS PER PLANS FILED HEREWITH. REMOVAL OF (1) FLOOR DRAIN AND (1) WASHER. REPLACEMENT OF (2) WATER CLOSETS. INSTALLATIO… |
| Building | Filings | Most Recent |
|---|---|---|
| 159 EAST 78 STREET ↗ | 1 | 03/10/2025 |
| 143 EAST 62 STREET ↗ | 1 | 12/08/2023 |
| 636 20 STREET ↗ | 1 | 05/18/2023 |
| 169 PUTNAM AVENUE ↗ | 2 | 04/26/2023 |
| 200 EAST 27 STREET ↗ | 3 | 09/08/2022 |
| 133 MULBERRY STREET ↗ | 1 | 04/28/2021 |
| 551 4 STREET ↗ | 1 | 03/01/2021 |