RoofUnder Construction18p · 6 filings · 20 docs
ArchitectureEquipmentMechanical
Issued Permit Scope
Mechanical Systems
FILING FOR FACADE RESTORATION PURPOSES ONLY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Installation of chilled water air handling unit for the elevator machine room. No change in use egress and occupancy.
On file for this project
9 documents
FILING FOR FACADE RESTORATION PURPOSES ONLY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents · 10 drawing sheets
Latest 3 of 6 filings on this floor.
Penthouse4p · 1 filing · 11 docs
Architecture
FILING FOR FACADE RESTORATION PURPOSES ONLY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents · 4 drawing sheets
Floor 42Under Construction13p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Sprinklers
SPRINKLER WORK ON THE 42ND MARKETING FLOOR(41ST CONSTRUCTRION FLOOR) AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 3 drawing sheets
INSTALLATION OF NEW SPRINKLER HEADS ON THE 42ND FLOOR AS PER PLANS FILED HEREWITH. NOCHANGETO USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
PLUMBING WORK ON THE 42ND FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 415p · 2 filings · 20 docs
ArchitectureDMFire ProtectionPlumbingOther
PLUMBING WORK ON THE 41ST FLOOR(40TH CONSTRUCTION FLOOR) AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
20 documents · 4 drawing sheets
FILING FOR FACADE RESTORATION PURPOSES ONLY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents · 1 drawing sheet
Floor 405p · 2 filings · 20 docs
ArchitectureDMGeneralPlumbing
PLUMBING WORK ON THE 41ST FLOOR(40TH CONSTRUCTION FLOOR) AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
20 documents · 4 drawing sheets
NEW MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents · 1 drawing sheet
Floor 396p · 4 filings · 20 docs
ArchitectureDMPlumbing
INSTALLATION OF NEW SPRINKLER HEADS ON THE 39TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
PLUMBING WORK ON THE 39TH FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
FILED HEREWITH NEW PARTITIONS FOR OFFICE SPACE AS PER PLANS FILED ON THE 39TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 38Under Construction17p · 1 filing · 18 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Plumbing · Sprinklers
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
18 documents · 16 drawing sheets
Floor 37Under Construction20p · 1 filing · 12 docs
ArchitectureDMGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
MECHANICAL SYSTEMS WORK ON THE 37TH MARKETING FLOOR (36TH CONSTRUCTION FLOOR) AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 13 drawing sheets
Floor 3611p · 4 filings · 20 docs
DMFire ProtectionGeneralMechanicalPlumbing
Modification to existing Sprinkler system and Plumbing fixtures as per plans filed herewith (36th Marketing Floor - 35th Construction floor). No change in use, egress or occupancy under this application.
On file for this project
8 documents · 6 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 2 drawing sheets
HEREWITH FILING FOR INTERIOR DEMO SP WORK AS PER PLANS, NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 35
Floor 3410p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingOther
INSTALLATION OF NEW SPRINKLER HEADS ON THE 34TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGETO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
PLUMBING WORK ON THE 34TH FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
FILED HEREWITH NEW PARTITIONS FOR OFFICE SPACE AS PER PLANS FILED ON THE 34TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 33Under Construction8p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
SPRINKLER PIPING AND SPRINKLER HEADS LAYOUT TO BE UPDATED PER NEW ARCHITECTURAL AND MECHANICAL LAYOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
23 documents · 3 drawing sheets
Floor 32Under Construction5p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
SPRINKLER PIPING AND SPRINKLER HEADS LAYOUT TO BE UPDATED PER NEW ARCHITECTURAL AND MECHANICAL LAYOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
23 documents
Floor 317p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
FILING TO INSTALL NEW DUCTWORK AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
FILED HEREWITH NEW PARTITIONS FOR OFFICE SPACE AS PER PLANS FILED ON THE 31ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 1 drawing sheet
INSTALLATION OF NEW SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 30Under Construction13p · 1 filing · 19 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
HEREWITH FILING FOR INTERIOR PL DEMO WORK AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
19 documents · 6 drawing sheets
Floor 2915p · 9 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Structural modifications taking place on the 27th & 28th fl Construction / 28th & 29th Marketing floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
5 documents · 1 drawing sheet
FILING SPRINKLER WORK TO INSTALL NEW SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHAGNE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
NEW MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 287p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
General construction modifications taking place on the 27th & 28th fl Construction / 28th & 29th Marketing floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
5 documents · 1 drawing sheet
FILED HEREWITH REMOVAL & REPLACEMENT OF CEILINGS, FLOOR & WALL FINISHES AT THE MENS AND WOMANS BATHROOMS AS PER PLANS FILED ON THE 28TH & 29TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Installation of duct work and related fixtures.
On file for this project
7 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 273p · 3 filings · 15 docs
ArchitectureFire ProtectionPlumbing
plumbing modifications taking place on the 27th Construction / 28th Marketing floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
3 documents · 1 drawing sheet
Sprinkler modifications taking place on the 27th & 28th fl Construction / 28th & 29th Marketing floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
7 documents · 1 drawing sheet
General construction modifications taking place on the 27th & 28th fl Construction / 28th & 29th Marketing floors as per plans filed herewith. No change in use, egress or occupancy
On file for this project
5 documents · 1 drawing sheet
Floor 26Under Construction33p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
PLUMBING WORK AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 6 drawing sheets
Floor 25
Floor 24Under Construction13p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Sprinkler modifications as per plans filed herewith. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents · 9 drawing sheets
FILING SPRINKLER WORK TO INSTALL NEW SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHAGNE TO USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 4 drawing sheets
FILING PLUMBING WORK TO INSTALL NEW FIXTURES AS PER PLANS FILED HEREWITH. NO CHAGNE TO USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 23Under Construction43p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
PLUMBING WORK AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 4 drawing sheets
HEREWITH FILING FOR INTERIOR PL DEMO WORK AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
19 documents · 5 drawing sheets
Removal of duct work and associated fixtures.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 2212p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingOther
INSTALLATION OF NEW SPRINKLER HEADS ON THE 22ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 2 drawing sheets
PLUMBING WORK ON THE 22ND FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
FILED HEREWITH NEW PARTITIONS FOR OFFICE SPACE AS PER PLANS FILED ON THE 22ND FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 4 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 21
Floor 2014p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingOther
FILED HEREWITH NEW PARTITIONS FOR OFFICE SPACE AS PER PLANS FILED ON THE 16TH, 17TH & 20TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 6 drawing sheets
FILING SPRINKLER WORK TO INSTALL NEW SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHAGNE TO USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
FILING PLUMBING WORK TO INSTALL NEW FIXTURES AS PER PLANS FILED HEREWITH. NO CHAGNE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 19
Floor 18
Floor 1710p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingOther
FILED HEREWITH NEW PARTITIONS FOR OFFICE SPACE AS PER PLANS FILED ON THE 16TH, 17TH & 20TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 3 drawing sheets
FILING SPRINKLER WORK TO INSTALL NEW SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHAGNE TO USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 4 drawing sheets
FILING PLUMBING WORK TO INSTALL NEW FIXTURES AS PER PLANS FILED HEREWITH. NO CHAGNE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 169p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
FILED HEREWITH NEW PARTITIONS FOR OFFICE SPACE AS PER PLANS FILED ON THE 16TH, 17TH & 20TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 3 drawing sheets
FILING SPRINKLER WORK TO INSTALL NEW SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHAGNE TO USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 3 drawing sheets
FILING PLUMBING WORK TO INSTALL NEW FIXTURES AS PER PLANS FILED HEREWITH. NO CHAGNE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 15
Floor 14
Floor 13
Floor 121p · 1 filing · 9 docs
Mechanical
Installation of chilled water air handling unit for the elevator machine room. No change in use egress and occupancy.
On file for this project
9 documents · 1 drawing sheet
Floor 11
Floor 10
Floor 9
Floor 81p · 1 filing · 5 docs
Electrical
No filed description on record for this project.
On file for this project
5 documents · 1 drawing sheet
Floor 7
Floor 68p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
On file for this project
6 documents
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
10 documents · 3 drawing sheets
No filed description on record for this project.
On file for this project
4 documents · 1 drawing sheet
Floor 59p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanical
Issued Permit Scope
Mechanical Systems
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
On file for this project
6 documents
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
10 documents · 3 drawing sheets
No filed description on record for this project.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 49p · 3 filings · 12 docs
Fire ProtectionGeneralMechanical
Issued Permit Scope
Mechanical Systems
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
No filed description on record for this project.
On file for this project
4 documents · 2 drawing sheets
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 36p · 3 filings · 12 docs
Fire ProtectionGeneralMechanical
Issued Permit Scope
Mechanical Systems
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
On file for this project
6 documents
No filed description on record for this project.
On file for this project
4 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 28p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
On file for this project
6 documents
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
10 documents · 3 drawing sheets
No filed description on record for this project.
On file for this project
4 documents · 1 drawing sheet
Floor 117p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Removal and installation of walls, floor finishes and ceilings as per plan. No change to use, egress or occupancy.
On file for this project
8 documents · 5 drawing sheets
FILING SPRINKLER WORK TO INSTALL NEW SPRINKLER HEADS AS PER PLANS FILED HEREWITH. NO CHAGNE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
FILING INTERIOR WORK ONLY. MINOR PARTITION WORK, PLUMBING AND MILL WORK. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Mezzanine1p · 1 filing · 8 docs
Fire Protection
INSTALLATION OF NEW SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Cellar3p · 1 filing · 8 docs
Fire Protection
INSTALLATION OF NEW SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 3 drawing sheets
Sub-Cellar2p · 1 filing · 8 docs
Fire Protection
INSTALLATION OF NEW SPRINKLER HEADS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 2 drawing sheets
Basement3p · 2 filings · 10 docs
ArchitectureMechanical
INSTALLATION OF 3 UNIT SPLIT SYSTEM IN THE BASEMENT AND OUTSIDE SPACE WITH A TOTAL CAPACITY OF 3 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
NEW PARTITIONS, FLOORING AND LIGHTING FIXTURES ASSOCIATED WITH AUTOMATIC TRANSFER SWITCH ROOM BUILDOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets