← Back
Three families
1697 ST JOHNS PLACE
BROOKLYN · BIN 3392450
💬 Discuss this project
1992Year Built
3Stories
C0Building Class
R6Zoning
1,800 sfGross Floor Area
3Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Three families · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 2,819 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Cellar1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
N.Y.C. HOUSING AUTHORITY403/22/2026
NYC PACT PRESERVATION PARTNERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAGHER ENGINEERING PLLC203/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DUAL FUEL PLUBING & HTINGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803203/13/2025
Building Lifecycle
All (22)Filed (2)Permit Issued (2)Signed Off (1)Violation (10)Inspection (1)Special Inspection (6)
07/07/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B01021696-I1
12/22/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/28/2025
Permit issued — Boiler Equipment
B01021696-I1-BE
06/10/2025
Violation issued (HPD, closed)
A
03/13/2025
Filed — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B01021696-P1
03/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
03/13/2025
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
03/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/13/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
03/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
02/14/2025
Violation issued (HPD, open)
C
02/14/2025
Violation issued (HPD, open)
C
02/14/2025
Violation issued (HPD, open)
C
11/29/2024
Violation issued (HPD, closed)
I
08/08/2024
Permit issued — Boiler Equipment
B01021696-I1-BE
08/02/2024
Filed — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B01021696-I1
04/11/2024
Violation issued (HPD, closed)
A
03/26/2018
Violation issued (ECB, closed)
Boilers
03/26/2018
Violation issued (ECB, closed)
Boilers
10/02/2017
Violation issued (ECB, closed)
Boilers
10/02/2017
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING07/28/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING08/08/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/22/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/13/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/13/2025Heating SystemsSAMI HAJJAR P.Especial
03/13/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
03/13/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
03/13/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/13/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026B01021696-I1Request digital key ↗
08/24/2026B01021696-P1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026B01021696-I1Open ↗
08/24/2026B01021696-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026B01021696-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026B01021696-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026B01021696-P1Open ↗
08/24/2026B01021696-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026B01021696-P1Open ↗
08/13/2026B01021696-I1Open ↗