← Back
Elevator cooperative
17 FT GEORGE HILL
MANHATTAN · Washington Heights (North) · BIN 1064067
💬 Discuss this project
1961Year Built
21Stories
D4Building Class
R7-2Zoning
222,714 sfGross Floor Area
204Units
LL97 CoveredRent Stabilized53 Open Violations 51 unresolved · 2 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: INWOOD HEIGHTS INC · 71,350 sf lot · 3.12 FAR built · Flood zone X
Locations of Work
Equipment
Roof1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CENTRAL CONSTRUCTION MANAGEMENT1807/08/2026
FIRSTSERVICE RESIDENTIAL503/22/2026
INWOOD HEIGHT INC2003/22/2026
INWOOD HEIGHTS INC CENTUR203/22/2026
INWOOD HEIGHTS INC FIRSTS303/22/2026
METRO MANAGEMENT303/22/2026
METRO MANAGEMENT DEVELOPM203/22/2026
C O FIRST SERVICE RESIDENTIAL403/21/2026
CENTURY MANAGEMENT SERVICES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
O&S ASSOCIATES301/25/2024
NICHOLAS J. DEFELICE, P.E.208/07/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS303/21/2026
CENTRAL CONSTRUCTION MGMT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTRAL CONSTRUCTION MANAGEMENTGeneral Contractor707/08/2026
CANIDO BASONAS CONST SVCGeneral Contractor303/21/2026
WYNNE PLBG & HEATING CORPPlumbing203/22/2026
SAUBERMAN, ALVINElectrical103/21/2026
KONARZEWSKI, TADEUSZElectrical103/21/2026
ROBERT CHIMENTIElectrical103/21/2026
DJM NYC, LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
O&S ASSOCIATES2753301/25/2024
Building Lifecycle
All (103)Filed (5)Permit Issued (6)Signed Off (2)Facade (FISP) (17)Violation (60)Objection (13)
06/03/2025
Violation issued (HPD, open)
C
06/03/2025
Violation issued (HPD, open)
C
12/14/2024
Violation issued (HPD, open)
B
12/14/2024
Violation issued (HPD, open)
B
12/11/2024
Violation issued (HPD, open)
B
12/11/2024
Violation issued (HPD, open)
A
12/11/2024
Violation issued (HPD, open)
C
12/11/2024
Violation issued (HPD, open)
A
12/11/2024
Violation issued (HPD, open)
B
12/11/2024
Violation issued (HPD, open)
B
09/30/2024
Violation issued (HPD, open)
C
09/30/2024
Violation issued (HPD, open)
C
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/09/2024
Signed off — Alteration
GARAGE REPAIRS AS PER PLANS. WORK INCLUDES PATIAL DEPTH CONCRETE SLAB REMOVAL & REPLACEMENT, CONCRETE COLUMN REPAIR, FLOOR DRAIN REPLACEMENT, TRAFFIC COATING REPLACEMENT, & FULL DEPTH SLAB REMOVAL & REPLACEMENT. NO CHANGE TO USE, EGRESS, OCCUPANCY.
M07997172-S1
01/25/2024
Filed — Alteration
GARAGE REPAIRS AS PER PLANS. WORK INCLUDES PATIAL DEPTH CONCRETE SLAB REMOVAL & REPLACEMENT, CONCRETE COLUMN REPAIR, FLOOR DRAIN REPLACEMENT, TRAFFIC COATING REPLACEMENT, & FULL DEPTH SLAB REMOVAL & REPLACEMENT. NO CHANGE TO USE, EGRESS, OCCUPANCY.
M07997172-P1
07/26/2023
Violation issued (ECB, closed)
Boilers
07/26/2023
Violation issued (ECB, closed)
Boilers
07/12/2023
Signed off — Alteration
PAA to revise the following: EQ-100.01 ADDED NEW SECTIONS MARKERS AND MODIFIED SIDEWALK SHED LAY-OUT, EQ-105.00 ADDED NEW SECTION SHOWING OPENING AT GARAGE ENTRANCE, EQ-106.00 ADDED NEW SECTIONS SHOWING OPENING AND INSTALLATION DETAIL AT MAIN
M00263254-I1
04/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/20/2023
Cycle 9 facade report submitted
03/17/2023
Cycle 9 facade report signed — SAFE
03/15/2023
Cycle 9 facade inspection completed
03/15/2023
Violation issued (HPD, closed)
A
02/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/20/2023
Permit issued — Structural
M07997172-S1-ST
11/02/2022
Objection raised — Other
11/02/2022
Objection resolved — Addressed
10/27/2022
Filed — Alteration
GARAGE REPAIRS AS PER PLANS. WORK INCLUDES PATIAL DEPTH CONCRETE SLAB REMOVAL & REPLACEMENT, CONCRETE COLUMN REPAIR, FLOOR DRAIN REPLACEMENT, TRAFFIC COATING REPLACEMENT, & FULL DEPTH SLAB REMOVAL & REPLACEMENT. NO CHANGE TO USE, EGRESS, OCCUPANCY.
M07997172-S1
09/20/2022
Objection raised — Scope
09/20/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Scope
09/20/2022
Objection raised — Inspections
09/20/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Energy
09/20/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Inspections
09/20/2022
Objection resolved — Addressed
09/20/2022
Objection raised — Admin
09/20/2022
Objection resolved — Resolved
09/16/2022
Filed — Alteration
GARAGE REPAIRS AS PER PLANS. WORK INCLUDES PATIAL DEPTH CONCRETE SLAB REMOVAL & REPLACEMENT, CONCRETE COLUMN REPAIR, FLOOR DRAIN REPLACEMENT, TRAFFIC COATING REPLACEMENT, & FULL DEPTH SLAB REMOVAL & REPLACEMENT. NO CHANGE TO USE, EGRESS, OCCUPANCY.
M07997172-I1
09/16/2022
Violation issued (ECB, closed)
Construction
08/16/2022
Cycle 8 facade report submitted
08/04/2022
Violation issued (ECB, closed)
Construction
08/03/2022
Cycle 8 facade inspection completed
08/03/2022
Cycle 8 facade report signed — SAFE
05/05/2022
Violation issued (ECB, closed)
Construction
01/12/2022
Permit issued — Sidewalk Shed
M00263254-I1-SH
01/11/2021
Permit issued — Sidewalk Shed
M00263254-I1-SH
10/19/2020
Permit issued — Sidewalk Shed
M00263254-I1-SH
08/20/2020
Permit issued — Sidewalk Shed
M00263254-I1-SH
08/07/2020
Filed — Alteration
PAA to revise the following: EQ-100.01 ADDED NEW SECTIONS MARKERS AND MODIFIED SIDEWALK SHED LAY-OUT, EQ-105.00 ADDED NEW SECTION SHOWING OPENING AT GARAGE ENTRANCE, EQ-106.00 ADDED NEW SECTIONS SHOWING OPENING AND INSTALLATION DETAIL AT MAIN
M00263254-P1
02/28/2020
Violation issued (ECB, closed)
Construction
02/05/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/05/2019
Cycle 8 facade report submitted
12/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/28/2019
Cycle 8 facade report signed — UNSAFE
11/26/2019
Cycle 8 facade inspection completed
11/12/2019
Filed — Alteration
PAA to revise the following: EQ-100.01 ADDED NEW SECTIONS MARKERS AND MODIFIED SIDEWALK SHED LAY-OUT, EQ-105.00 ADDED NEW SECTION SHOWING OPENING AT GARAGE ENTRANCE, EQ-106.00 ADDED NEW SECTIONS SHOWING OPENING AND INSTALLATION DETAIL AT MAIN
M00263254-I1
11/12/2019
Permit issued — Sidewalk Shed
M00263254-I1-SH
10/30/2019
Violation issued (ECB, closed)
Construction
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offCANIDO BASONAS CONST SVC01/20/2023
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT01/12/2022
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT01/11/2021
DOB NOWSidewalk ShedSigned-offDJM NYC, LLC10/19/2020
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT08/20/2020
DOB NOWSidewalk ShedSigned-offCENTRAL CONSTRUCTION MANAGEMENT11/12/2019
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT03/10/2022
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT10/04/2021
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT08/19/2020
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT02/04/2020
BISOTISSUEDA P A RESTORATION CORP04/18/2011
BISOTISSUEDA P A RESTORATION CORP05/24/2010
BISOTISSUEDA P A RESTORATION CORP11/04/2009
BISEQISSUEDOUTDOOR INSTALLATIONS LLC11/25/2008
BISEQISSUEDOUTDOOR INSTALLATIONS LLC12/04/2007
BISEQISSUEDOUTDOOR INSTALLATIONS LLC02/09/2007
BISEQRE-ISSUEDALL SAFE HIEHGT CONSTRACTING COR10/19/1998
BISSDISSUEDALLSTATE SPR. CO.05/29/1996
BISFSISSUEDC C CONTROLLED COMBUSTION10/19/1994
3 projects · most recent 03/30/2023
General Wiring
FiledStatusContractorScope
03/30/2023Permit IssuedROBERT CHIMENTI6 meters, 1 new_meters
06/09/2022CompleteE-J ELEC. INSTALLATION COGeneral Wiring
05/16/2019Permit IssuedL J ELEC'L SERV. INC.General Wiring
1 project · most recent 01/25/2024
Concrete
FiledStatusContractorScope
01/25/2024Signed-offCANIDO BASONAS CONST SVCConcrete
Nothing on file for this building.
▾Documents — 66 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/28/2026M07997172-P1Request digital key ↗
08/15/2026M07997172-S1Request digital key ↗
08/14/2026M07997172-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00263254-P1Request digital key ↗
09/04/2026M00263254-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION8
02/08/2023140875792Open ↗
05/27/2022140875792Open ↗
05/06/2022140875792Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION6
10/04/2021140875792Open ↗
09/28/2021140875792Open ↗
02/04/2020140875792Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/04/2026M00263254-P1Open ↗
09/04/2026M00263254-I1Open ↗
08/28/2026M07997172-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/16/2020140883765Open ↗
11/15/2019140875792Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/16/2020140883765Open ↗
11/15/2019140875792Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/16/2020140883765Open ↗
11/15/2019140875792Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION2
05/20/2011120189483Open ↗
10/27/2009120189483Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/27/2009120189483Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/27/2009120189483Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES2
01/16/2020140883765Open ↗
11/15/2019140875792Open ↗
▸DOB NOWTenant Protection Plan2
09/04/2026M00263254-I1Open ↗
09/04/2026M00263254-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026M07997172-P1Open ↗
08/15/2026M07997172-S1Open ↗
08/14/2026M07997172-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/27/2009120189483Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/15/2019140875792Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/15/2019140875792Open ↗
▸BISNYCECC ANALYSIS1
11/15/2019140875792Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/08/2023140875792Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/08/2023140875792Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/15/2019140875792Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/15/2019140875792Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/08/2023140875792Open ↗
▸BISMASONRY1
02/08/2023140875792Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST2
05/20/2011120189483Open ↗
03/08/2023140875792Open ↗
▸BISFINAL1
02/08/2023140875792Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/27/2009120189483Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/20/2011120189483Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
01/16/2020140883765Open ↗
11/15/2019140875792Open ↗
05/20/2011120189483Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/08/2023140875792Open ↗
▸Filing & Intake Forms5
▸BISEFILING JOB APPLICATION COVER SHEET2
01/16/2020140883765Open ↗
11/15/2019140875792Open ↗
▸BISADDITIONAL INFORMATION2
02/08/2023140875792Open ↗
01/21/2022140883765Open ↗
▸BISEFILING COVER SHEET1
10/27/2009120189483Open ↗