💬 Discuss this project
1970Year Built
2Stories
W2Building Class
R7-1Zoning
20,000 sfGross Floor Area
1Units
1 Active Violation ▸FDNY Report ↗
Parochial school, yeshiva · Owner of record: Yeshiva and Mesifta Arugath Habosem · 14,576 sf lot · 1.37 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofYeshiva Mesivta Arugath Habosem84p · 1 filing · 19 docs
BulkheadYeshiva Mesivta Arugath Habosem3p · 1 filing · 19 docs
Floor 2Yeshiva Mesivta Arugath Habosem1 filing · 7 docs
Floor 1Yeshiva Mesivta Arugath Habosem86p · 2 filings · 19 docs
CellarYeshiva Mesivta Arugath Habosem86p · 1 filing · 19 docs
Site & exteriorYeshiva Mesivta Arugath Habosem82p · 1 filing · 19 docs
Filed — no permit issuedYeshiva Mesivta Arugath Habosem30p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Yeshiva and Mesifta Arugath Habosem2803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mohammad Ahead, PE106/17/2026
Cityscape511/07/2024
Associates211/09/2023
Charles Mallea Architect211/01/2023
Adroit Engineering209/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Speedy Expediting1803/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519611/10/2023
Adroit Engineering8885108/16/2023
Building Lifecycle
All (77)Filed (12)Violation (4)Objection (38)Special Inspection (23)
07/22/2026
Objection resolved — Resolved
07/20/2026
Objection resolved — Resolved
07/10/2026
Objection raised — Other
07/10/2026
Objection raised — Other
06/17/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO VERTICALLY AND HORIZONTALLY ENLARGE AN EXISTING 1 STORY BUILDING TO A FOUR-STORY SCHOOL BUILDING
B01396888-I1
05/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/01/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/13/2025
Violation issued (ECB, closed)
Construction
11/07/2024
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-P1
11/06/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
01/23/2024
Violation issued (FDNY_NOV, closed)
01/17/2024
Objection resolved — Addressed
01/09/2024
Objection resolved — Addressed
12/05/2023
Objection resolved — Addressed
11/22/2023
Objection raised — Other
11/20/2023
Objection resolved — Addressed
11/20/2023
Objection resolved — Addressed
11/20/2023
Objection resolved — Addressed
11/20/2023
Objection resolved — Addressed
11/20/2023
Objection resolved — Addressed
11/20/2023
Objection resolved — Addressed
11/20/2023
Objection resolved — Addressed
11/16/2023
Objection raised — Other
11/15/2023
Objection raised — Structural
11/15/2023
Objection raised — Other
11/15/2023
Objection raised — Structural
11/15/2023
Objection raised — Admin
11/15/2023
Objection raised — Other
11/15/2023
Objection raised — Other
11/15/2023
Objection raised — Structural
11/10/2023
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-S4
11/10/2023
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-S9
11/09/2023
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-S3
11/09/2023
Objection resolved — Addressed
11/08/2023
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-S7
11/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
11/08/2023
Special inspection requirement — Final
NAVEEN KUMAR
11/08/2023
Special inspection requirement — Footing and Foundation
Younes Abouyaala
11/01/2023
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-S8
10/19/2023
Objection resolved — Addressed
10/18/2023
Objection resolved — Addressed
10/18/2023
Objection resolved — Addressed
10/16/2023
Objection raised — Other
10/16/2023
Objection raised — Other
10/16/2023
Objection raised — Other
10/12/2023
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-S6
10/12/2023
Filed — New Building
Installation of dry Temporary Air Pressurized Standpipe System during construction. Filed in conjunction with new building B00932188-I1.
B00932188-S5
10/12/2023
Special inspection requirement — Masonry
Younes Abouyaala
10/12/2023
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
10/12/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
10/12/2023
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
10/12/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
10/12/2023
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
10/12/2023
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
10/12/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Younes Abouyaala
10/12/2023
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
09/26/2023
Objection raised — Other
09/26/2023
Objection raised — Other
09/26/2023
Objection raised — Other
09/26/2023
Objection raised — Other
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISFPISSUEDIdeal Fire Systems06/26/2003
1 project · most recent 11/07/2024
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/07/2024——Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUY-A12NKA7 12,000 BTU · Heat Pump Outdoor ×2
Heat / Cool
Daikin RXSQ24TAVJU 24,000 BTU · Vrf Outdoor ×51
RXTQ36TAVJ9 36,000 BTU · Vrf Outdoor ×17
RXYQ120TATJU 114,000 BTU · Vrf Outdoor ×1
RXYQ216TATJU 206,000 BTU · Vrf Outdoor ×1
Trane YH210G3H 214,800 BTU · Chiller ×4
Heating
Qmark CSH-07A 7,680 BTU · Baseboard ×29
Ventilation
Greenheck SQ-160-VG 910 CFM · Exhaust Fan ×3
SQ-70-VG 1,289 CFM · Exhaust Fan ×3
G-098-VG 530 CFM · Exhaust Fan ×2
SQ-100-VG 670 CFM · Exhaust Fan ×2
SQ-120-VG 410 CFM · Exhaust Fan ×2
SQ-90-VG 360 CFM · Exhaust Fan ×2
G-100-VG 610 CFM · Exhaust Fan ×1
G-180-VG 2,150 CFM · Exhaust Fan ×1
Renewaire HE2XINH 1,400 CFM · Erv ×5
HE2XRT 1,050 CFM · Erv ×2
HE3XINH 1,280 CFM · Erv ×1
HE3XRT 2,100 CFM · Erv ×1
HE4XINH 2,140 CFM · Exhaust Fan ×1
— HE2XINH 1,400 CFM · Erv ×1
1 project · most recent 11/07/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/07/2024——Gas, Storm, Water/Sanitary
1 project · most recent 09/21/2018
General Wiring
FiledStatusContractorScope
09/21/2018Permit IssuedBLZ ElectricGeneral Wiring
1 project · most recent 11/07/2024
Steel Concrete
FiledStatusContractorScope
11/07/2024——Steel, Concrete
1 project · most recent 11/07/2024
Fence
FiledStatusContractorScope
11/07/2024——Fence
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
05/05/2026Structural Stability – Alterations of existing buildings—special
11/06/2024Excavations - Sheeting, Shoring, and Bracing—special
11/08/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
11/08/2023FinalNAVEEN KUMARprogress
11/08/2023Footing and FoundationYounes Abouyaalaprogress
10/12/2023MasonryYounes Abouyaalaspecial
10/12/2023Structural Steel - DetailsYounes Abouyaalaspecial
10/12/2023Structural Steel - High Strength BoltingYounes Abouyaalaspecial
10/12/2023Structural Steel - WeldingYounes Abouyaalaspecial
10/12/2023Subsurface Investigations (Borings/Test Pits)—special
10/12/2023Concrete - Cast-In-PlaceYounes Abouyaalaspecial
10/12/2023Subgrade InspectionsYounes Abouyaalaspecial
10/12/2023Subsurface Conditions – Fill Placement & In-Place DensityYounes Abouyaalaspecial
10/12/2023Concrete - Cast-In-PlaceYounes Abouyaalaspecial
09/26/2023Standpipe SystemsYounes Abouyaalaspecial
09/19/2023FinalNAVEEN KUMARprogress
09/19/2023FinalNAVEEN KUMARprogress
09/19/2023Footing and FoundationYounes Abouyaalaprogress
09/18/2023Standpipe SystemsYounes Abouyaalaspecial
09/18/2023Sprinkler SystemsYounes Abouyaalaspecial
08/16/2023DemolitionDUY HOANGspecial
08/16/2023Structural Stability – Alterations of existing BuildingsDUY HOANGspecial
08/16/2023Construction Operations Influencing Adjacent StructuresDUY HOANGspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Yeshiva Mesivta Arugath HabosemEducationCellar, Floors 1, 2, 4, Roof
Project B01396888 ALT-CO - New Building with Existing Elements to Remain · Objections · 06/17/2026
Project B00932188 New Building · Permit Entire · 09/22/2023
Project B00918185 Full Demolition · Approved · 08/16/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/27/2026B00918185-S1Request digital key ↗
08/27/2026B00918185-I1Request digital key ↗
08/26/2026B00932188-S5Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
12/29/2011320276651Open ↗
03/04/2011320276651Open ↗
▸Zoning, Tax Lot & Property Records11
▸BISADDRESS - NEW HOUSE NUMBER APPROVED2
01/11/2012320276651Open ↗
02/28/2024321601824Open ↗
▸BISZONING EXHIBIT I- CERTIFICATION2
01/11/2012320276651Open ↗
02/28/2024321601824Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026B01396888-I1Open ↗
08/13/2026B00932188-I1Open ↗
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
01/11/2012320276651Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/28/2024321601824Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/28/2024321601824Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026B01396888-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B00932188-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026B00932188-S3Open ↗
08/26/2026B00932188-S6Open ↗
08/26/2026B00932188-S5Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/02/2026B00932188-S7Open ↗
09/01/2026B00932188-S6Open ↗
08/30/2026B00932188-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B00932188-S6Open ↗
09/01/2026B00932188-S6Open ↗
08/28/2026B00932188-S9Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/04/2011320276651Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/08/2023340903785Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWStandpipe Alarms Drawings1
08/14/2026B00932188-I1—
▸Safety & Tenant Protection3
▸BISBPP: STREET TREES SITE PLAN1
02/12/2024340903785Open ↗
▸BISSTREET TREE CHECKLIST1
02/12/2024340903785Open ↗
▸DOB NOWStreet Tree Checklist1
08/14/2026B00932188-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY1
03/04/2011320276651Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026B00932188-S6Open ↗
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/26/2026B00932188-S2Open ↗
08/26/2026B00932188-S1Open ↗
08/26/2026B00932188-S5Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
03/04/2011320276651Open ↗
12/29/2011320276651Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/04/2011320276651Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/04/2011320276651Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
03/04/2011320276651Open ↗
▸BISEFILING COVER SHEET1
03/04/2011320276651Open ↗
▸Other Documents11
▸BISBPP - SUPPORTING DOCUMENTATION2
02/12/2024340903785Open ↗
12/08/2023340903785Open ↗
▸BISPlot Diagram2
01/11/2012320276651Open ↗
08/17/2012320276651Open ↗
▸DOB NOWSite Survey: Initial2
08/16/2026B01396888-I1Open ↗
08/13/2026B00932188-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/14/2026B00932188-I1Open ↗
08/13/2026B00918185-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00932188-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00932188-S4Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B00918185-I1Open ↗