17 WEST 54TH STREET · BIN 1080440
💬 Discuss this project
1937Year Built
12Stories
D4Building Class
C5-PZoning
200,000 sfGross Floor Area
211Units
LL97 CoveredRent Stabilized6 Active Violations 1 likely answered 1 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 17 24 Corp · 25,104 sf lot · 7.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Penthouse2p · 2 filings · 11 docs
Floor 10Sacks Real Estate Management CORP.1p · 1 filing · 9 docs
Floor 9Unit 9D5p · 2 filings · 13 docs
Floor 8
Floor 7
Floor 6
Floor 5Unit 5A, Unit 5D, Unit 5E14p · 2 filings · 20 docs
Floor 4
Floor 3
Floor 2Unit 1A, Unit 2D, Unit 2E +14p · 2 filings · 11 docs
Floor 12p · 1 filing · 11 docs
Cellar1 filing
Basement17 And 24 Corporation1p · 1 filing · 4 docs
Sub-Basement17 And 24 Corporation4p · 2 filings · 20 docs
Site & exteriorSacks Real Estate Management CORP.9p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
17 24 Corp4003/22/2026
17 24 Corporation Rockefeller AP403/21/2026
Grumley Haft403/21/2026
100 United Nations Plaza Condominiu303/22/2026
17 24 Owners203/21/2026
17 24Corporationc Oruddrealitymg203/21/2026
17 24 Corp -C O Gumley Haft203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A Expediting203/21/2026
Maryclare Nepogoda803/21/2026
J.A.M. Associates403/21/2026
Enigma Expediting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Amsterdam RestorationScaffold1407/08/2026
Liebhaber CompanyGeneral Contractor607/08/2026
A.M.NPlumbing407/08/2026
Hard SafariGeneral Contractor303/21/2026
Air Depot Commercial RefrigerationGeneral Contractor307/08/2026
The Metro Group ElectricElectrical203/22/2026
Bypass MechanicalPlumbing203/22/2026
King Rose of NYGeneral Contractor210/04/2026
Gem Air Conditioningspecialty_contractor107/08/2026
Honey Construction NYGeneral Contractor107/08/2026
M. Lapenna Refrigerationspecialty_contractor107/08/2026
Wilfrido & Sons ConstructionGeneral Contractor107/08/2026
Donato PlumbingPlumbing107/08/2026
Kwong Ming ElectricElectrical103/21/2026
S&H PlumbingPlumbing107/08/2026
Cedar Electrical ContractorsElectrical103/21/2026
Dudley JamalElectrical103/21/2026
Glendale Electl ContngElectrical103/22/2026
IP2 ElectricElectrical103/21/2026
Dudley & Associates Lic. ElectricElectrical103/21/2026
Marks ElectricElectrical103/22/2026
Elmac ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New Age Engineering7746110/20/2026
Jspecs9429110/15/2025
Sarah Gordon Drake Architects4744510/15/2025
Socotec Engineering4983405/03/2024
Vincent J. Liotta P. E1974105/03/2024
P.a.collins Inspections P2168307/26/2022
Applied HVAC Engineering7563104/21/2021
Rosini Engineering3282101/22/2021
Building Lifecycle
All (151)Filed (20)Permit Issued (25)Signed Off (10)Facade (FISP) (12)Violation (39)Inspection (12)Objection (6)Special Inspection (27)
10/20/2026
Filed — Alteration
M01466717-I1
09/23/2026
Permit issued — General Construction
M01303274-I1-GC
09/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/09/2025
Signed off — Alteration
M01130062-I1
11/14/2025
Permit issued — General Construction
M01303274-I1-GC
10/15/2025
Filed — Alteration
Application filed to repair or replace non structural components of the existing canopies. All work is repair + replacement of canopy fixtures, there will be no changes made to the canopy structures.
M01303274-I1
10/15/2025
Special inspection requirement — Final
Sarah Drake
10/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jeffrey Stones
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sarah Drake
08/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2025
Violation issued (HPD, closed)
A
01/22/2025
Permit issued — General Construction
M01130062-I1-GC
11/08/2024
Filed — Alteration
M01130062-I1
10/21/2024
Special inspection requirement — Final
Vitaly Sonkin
10/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Vitaly Sonkin
10/21/2024
Special inspection requirement — Interior lighting power
Vitaly Sonkin
10/21/2024
Special inspection requirement — Lighting controls
Vitaly Sonkin
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/12/2024
Signed off — Alteration
INSTALLATION OF 3 TON CAPACITY SPLIT SYSTEM ON THE BASEMENT LEVEL. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01036156-I1
05/20/2024
Permit issued — Mechanical Systems
M01036156-I1-MS
05/03/2024
Filed — Alteration
INSTALLATION OF 3 TON CAPACITY SPLIT SYSTEM ON THE BASEMENT LEVEL. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01036156-I1
01/31/2024
Signed off — Alteration
Application being filed for a basement renovation of an existing Doctor's office. Work to include removal and installation of non-load bearing partitions, removal of medical equipment, and renovation of 2 bathrooms. No change in use, egress, or occupancy.
M00902640-S1
01/31/2024
Signed off — Alteration
Application being filed for a basement renovation of an existing Doctor's office. Work to include removal and installation of non-load bearing partitions, removal of medical equipment, and renovation of 2 bathrooms. No change in use, egress, or occupancy.
M00902640-I1
01/24/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/24/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/15/2023
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
12/15/2023
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
12/15/2023
Special inspection requirement — Lighting in dwelling units
ALEXIS SCHLESSINGERMAN
12/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
12/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
12/12/2023
Filed — Alteration
Application being filed for a basement renovation of an existing Doctor's office. Work to include removal and installation of non-load bearing partitions, removal of medical equipment, and renovation of 2 bathrooms. No change in use, egress, or occupancy.
M00902640-P1
12/08/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/13/2023
Permit issued — Plumbing
M00902640-S1-PL
10/11/2023
Permit issued — General Construction
M00902640-I1-GC
09/08/2023
Objection raised — Accessibility
09/08/2023
Objection resolved — Addressed
09/08/2023
Objection raised — Scope
09/08/2023
Objection resolved — Addressed
09/05/2023
Filed — Alteration
Application being filed for a basement renovation of an existing Doctor's office. Work to include removal and installation of non-load bearing partitions, removal of medical equipment, and renovation of 2 bathrooms. No change in use, egress, or occupancy.
M00902640-S1
09/01/2023
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
08/30/2023
Filed — Alteration
Application being filed for a basement renovation of an existing Doctor's office. Work to include removal and installation of non-load bearing partitions, removal of medical equipment, and renovation of 2 bathrooms. No change in use, egress, or occupancy.
M00902640-I1
04/21/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/20/2023
Filed — Alteration
herewith file plumbing plans to relocated and replace plumbing fixtures.
M00506576-P3
04/18/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/15/2023
Signed off — Alteration
Apt. 2D: add a split HVAC system. No change to use, egress or occupancy.
M00773675-I1
02/09/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/02/2023
Permit issued — General Construction
M00506576-S1-GC
02/01/2023
Permit issued — Mechanical Systems
M00506576-I1-MS
09/08/2022
Signed off — Alteration
M00473215-I1
08/26/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/21/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/20/2022
Permit issued — Mechanical Systems
M00773675-I1-MS
08/12/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/26/2022
Filed — Alteration
Apt. 2D: add a split HVAC system. No change to use, egress or occupancy.
M00773675-I1
07/21/2022
Permit issued — Plumbing
M00506576-S2-PL
06/02/2022
Cycle 9 facade report signed — SAFE
04/01/2022
Permit issued — Mechanical Systems
M00473215-I1-MS
03/25/2022
Filed — Alteration
herewith file plumbing plans to relocated and replace plumbing fixtures.
M00506576-S2
Latest 60 of 151 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKing Rose of NY09/23/2026
DOB NOWGeneral ConstructionPermit IssuedKing Rose of NY11/14/2025
DOB NOWGeneral ConstructionSigned-offHoney Construction NY01/22/2025
DOB NOWMechanical SystemsSigned-offGem Air Conditioning05/20/2024
DOB NOWPlumbingSigned-offS&H Plumbing10/13/2023
DOB NOWGeneral ConstructionSigned-offWilfrido & Sons Construction10/11/2023
DOB NOWGeneral ConstructionPermit IssuedLiebhaber Company02/02/2023
DOB NOWMechanical SystemsPermit IssuedLiebhaber Company02/01/2023
DOB NOWMechanical SystemsSigned-offAir Depot Commercial Refrigeration08/20/2022
DOB NOWPlumbingSigned-offDonato Plumbing07/21/2022
DOB NOWMechanical SystemsSigned-offAir Depot Commercial Refrigeration04/01/2022
DOB NOWMechanical SystemsPermit IssuedLiebhaber Company12/07/2021
DOB NOWGeneral ConstructionPermit IssuedLiebhaber Company12/01/2021
DOB NOWPlumbingSigned-offA.M.N10/29/2021
DOB NOWConstruction FenceSigned-offAmsterdam Restoration06/11/2021
DOB NOWMechanical SystemsSigned-offM. Lapenna Refrigeration05/28/2021
DOB NOWPlumbingSigned-offA.M.N05/05/2021
DOB NOWMechanical SystemsSigned-offHard Safari02/11/2021
DOB NOWSidewalk ShedSigned-offAmsterdam Restoration02/08/2021
DOB NOWSupported ScaffoldSigned-offAmsterdam Restoration02/08/2021
DOB NOWPlumbingSigned-offA.M.N01/26/2021
DOB NOWConstruction FenceSigned-offAmsterdam Restoration07/29/2020
DOB NOWPlumbingSigned-offA.M.N02/28/2020
DOB NOWSupported ScaffoldSigned-offAmsterdam Restoration02/20/2020
DOB NOWSupported ScaffoldSigned-offAmsterdam Restoration02/20/2020
BISPLISSUEDDynamic Plumbing & Sprinkler10/30/2024
BISOTISSUEDDartom Construction08/11/2021
BISMHISSUEDDartom Construction08/11/2021
BISOTISSUEDHard Safari08/04/2021
BISOTISSUEDAmsterdam Restoration02/05/2021
BISOTISSUEDDartom Construction08/03/2020
BISMHISSUEDDartom Construction08/03/2020
BISOTISSUEDLiebhaber Company06/24/2020
BISOTISSUEDHard Safari06/15/2020
BISOTISSUEDDartom Construction06/05/2020
BISMHISSUEDDartom Construction06/05/2020
BISOTISSUEDAmsterdam Restoration06/04/2020
BISOTISSUEDHard Safari05/11/2020
BISOTISSUEDAmsterdam Restoration03/06/2020
BISOTISSUEDHard Safari02/28/2020
+ 35 more permits on file
2 projects · most recent 04/20/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/20/2023Permit IssuedLiebhaber CompanyAir Conditioning Systems
Cooling
First Company #30HXO 22,850 BTU · Ahu ×2
Task TGC021TWEC-30K 25,942 BTU · Condensing Unit ×2
04/21/2021Signed-offM. Lapenna RefrigerationAir Conditioning Systems
Cooling
Ice Air 8CHPW13 400 CFM · Heat Pump Outdoor ×2
1 project · most recent 04/20/2023
Gas Water/Sanitary
FiledStatusContractorScope
04/20/2023Signed-offDonato PlumbingGas, Water/Sanitary
25 projects · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026CompleteIP2 ElectricGeneral Wiring
05/21/2025CompleteIP2 ElectricGeneral Wiring
10/06/2024CompleteAccurate Electrical—
09/06/2024CompleteThe Metro Group ElectricGeneral Wiring
07/15/2024CompleteMarks ElectricGeneral Wiring
04/10/2024CompleteThe Metro Group ElectricGeneral Wiring
10/11/2023CompleteTactical ElectricGeneral Wiring
09/14/2023CompleteAvalon ElectricGeneral Wiring
09/11/2023CompleteThe Metro Group ElectricGeneral Wiring
05/15/2023Permit IssuedThe Metro Group ElectricGeneral Wiring
05/15/2023Permit IssuedThe Metro Group ElectricGeneral Wiring
05/15/2023Permit IssuedThe Metro Group ElectricGeneral Wiring
05/12/2023Permit IssuedThe Metro Group ElectricGeneral Wiring
05/12/2023Permit IssuedThe Metro Group ElectricGeneral Wiring
05/12/2023Permit IssuedThe Metro Group ElectricGeneral Wiring
1 project · most recent 10/15/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
10/15/2025Permit IssuedKing Rose of NYTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
09/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/24/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/09/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/26/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/12/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
10/15/2025FinalSarah Drakeprogress
10/15/2025Tenant Protection Plan ComplianceJeffrey Stonesspecial
10/15/2025Fire-Resistant Penetrations and JointsSarah Drakespecial
10/21/2024FinalVitaly Sonkinprogress
10/21/2024Energy Code Compliance InspectionsVitaly Sonkinprogress
10/21/2024Interior lighting powerVitaly Sonkinenergy_progress
10/21/2024Lighting controlsVitaly Sonkinenergy_progress
12/15/2023Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
12/15/2023FinalALEXIS SCHLESSINGERMANprogress
12/15/2023Lighting in dwelling unitsALEXIS SCHLESSINGERMANenergy_progress
12/15/2023Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
12/15/2023Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
09/01/2023Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/16/2021HVAC-R and service water heating equipmentAlexandra Herreraenergy_progress
04/16/2021Mechanical SystemsAlexandra Herreraspecial
04/16/2021Fire-Resistant Penetrations and JointsAlexandra Herreraspecial
04/16/2021FinalAlexandra Herreraprogress
04/16/2021HVAC-R and service water heating system controlsAlexandra Herreraenergy_progress
04/16/2021Maintenance informationAlexandra Herreraenergy_progress
04/16/2021Duct leakage testing, insulation and designAlexandra Herreraenergy_progress
01/20/2021Maintenance informationELIZABETH REXRODEenergy_progress
01/20/2021HVAC-R and service water heating system controlsELIZABETH REXRODEenergy_progress
01/20/2021HVAC-R and service water piping design and insulationELIZABETH REXRODEenergy_progress
01/20/2021HVAC-R and service water heating equipmentELIZABETH REXRODEenergy_progress
01/06/2021Mechanical SystemsDavid Rosinispecial
Latest 25 of 27.
▾Documents — 765 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch12
09/03/2026M00504893-I1Request digital key ↗
09/03/2026M00506576-I1Request digital key ↗
09/03/2026M00506576-S1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00448116-I1Request digital key ↗
09/04/2026M00473215-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/04/2026M00358275-I1Request digital key ↗
08/15/2026M00358275-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00293691-I1Request digital key ↗
08/15/2026M00293691-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00293691-I1Request digital key ↗
08/15/2026M00293691-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026M00298193-I1Request digital key ↗
▸Applications & Permits152
▸BISWORK PERMIT APPLICATION70
10/30/2024110421115Open ↗
06/24/2020123787517Open ↗
03/11/2020123853892Open ↗
Showing 3 of 70 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION67
02/17/2026102008685Open ↗
01/21/2025102008685Open ↗
10/16/2024110421115Open ↗
Showing 3 of 67 on file for this type
▸DOB NOWLPC Approval/Permit15
09/03/2026M00504893-I1Open ↗
08/13/2026M00298193-I1Open ↗
08/13/2026M01130062-I1Open ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING EXHIBIT I: CERTIFICATION1
07/16/2019123781176Open ↗
▸Seals & Professional Certifications150
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION71
03/13/2020123555438Open ↗
03/13/2020123555438Open ↗
03/13/2020123555438Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/04/2026M00358275-P1Open ↗
09/04/2026M00358275-I1Open ↗
09/04/2026M00473215-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
10/03/2026M00504893-I1Open ↗
10/03/2026M00504893-I1Open ↗
10/03/2026M00504893-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
10/03/2026M00504893-I1Open ↗
10/03/2026M00504893-I1Open ↗
10/02/2026M00902640-S1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment46
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
01/21/2020123555438Open ↗
04/24/2019123195201Open ↗
Showing 2 of 14 on file for this type
▸BISEQUIPMENT USE PERMITS10
05/02/2024123597241Open ↗
05/02/2024123597241Open ↗
05/02/2024123597241Open ↗
Showing 3 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING8
02/01/2024123597241Open ↗
Showing 1 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT5
05/02/2024123597241Open ↗
11/29/2021123686788Open ↗
11/19/2021123686788Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection23
▸BISTenant Protection Plan and Notes18
02/27/2020123787517Open ↗
02/11/2020123858646Open ↗
07/16/2019123781176Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026M00293691-I1Open ↗
08/13/2026M00293691-P1Open ↗
08/13/2026M00298193-I1Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos53
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
02/11/2020123858646Open ↗
06/26/2019123686788Open ↗
Showing 2 of 17 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/04/2026M00473215-I1Open ↗
09/03/2026M00504893-I1Open ↗
09/03/2026M00506576-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM6
08/11/2021123787517Open ↗
08/11/2021123787517Open ↗
08/11/2021123787517Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/28/2026M00902640-S1Open ↗
08/14/2026M00902640-I1Open ↗
08/13/2026M01036156-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0203MN201
05/24/2021123853892Open ↗
▸BISDEP ASBESTOS PROJECT CONDITIONAL COMPLETION FORM1
06/13/2020123787517Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
03/11/2020123853892Open ↗
▸Energy Compliance62
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS30
03/11/2020123853892Open ↗
02/27/2020123787517Open ↗
02/11/2020123858646Open ↗
Showing 3 of 30 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
11/19/2021123686788Open ↗
11/18/2021123195201Open ↗
08/09/2021123787517Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
11/19/2021123686788Open ↗
11/19/2021123686788Open ↗
11/19/2021123195201Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00448116-I1Open ↗
08/13/2026M00473215-I1Open ↗
08/13/2026M00773675-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/10/2022123858646Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINTERIOR LIGHTING POWER1
03/10/2022123858646Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/10/2022123858646Open ↗
▸BISLIGHTING CONTROLS1
03/10/2022123858646Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00773675-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY18
10/15/2024110421115Open ↗
10/15/2024110421115Open ↗
11/22/2021123686788Open ↗
Showing 3 of 18 on file for this type
▸Approvals, Objections & Sign-offs99
▸BISLANDMARKS APPROVAL41
03/11/2020123787517Open ↗
03/11/2020123787517Open ↗
02/28/2020123858646Open ↗
Showing 3 of 41 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
11/21/2024110421115Open ↗
04/29/2024123597241Open ↗
03/11/2022123858646Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
03/11/2020123853892Open ↗
03/11/2020123853892Open ↗
06/25/2019123515605Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS SIGNOFF5
03/11/2022123858646Open ↗
11/24/2021123686788Open ↗
01/04/2021121034647Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL3
10/15/2024110421115Open ↗
03/11/2022123858646Open ↗
03/11/2022123858646Open ↗
▸BISSUPERSEDING LETTER2
10/30/2024110421115Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership59
▸BISCOST AFFIDAVIT55
10/15/2024110421115Open ↗
11/19/2021123686788Open ↗
11/18/2021123195201Open ↗
Showing 3 of 55 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
10/15/2024110421115Open ↗
03/10/2022123858646Open ↗
▸Filing & Intake Forms76
▸BISEFILING COVER SHEET37
02/27/2020123787517Open ↗
02/11/2020123858646Open ↗
07/16/2019123781176Open ↗
Showing 3 of 37 on file for this type
▸BISADDITIONAL INFORMATION20
03/11/2024123597241Open ↗
05/24/2021123853892Open ↗
05/03/2021123853892Open ↗
Showing 3 of 20 on file for this type
▸BISBOROUGH INTAKE FORM16
10/30/2024110421115Open ↗
06/24/2020123787517Open ↗
03/13/2020123555438Open ↗
Showing 3 of 16 on file for this type
▸BISeFiling Job Application Cover Sheet3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
06/25/2019123515605Open ↗
Showing 1 of 3 on file for this type
▸BISMonitoring Report-1 (MR-1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type