← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Sohmer Piano Building Condominium
170 5TH AVENUE · BIN 1015538
💬 Discuss this project
1898Year Built
13Stories
RMBuilding Class
C6-4MZoning
36,827 sfGross Floor Area
13Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 3,480 sf lot · 10.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofLovett Realty4p · 2 filings · 7 docs
Floor 1Buck Mason40p · 6 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed18p · 5 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
170 Fifth Associates4107/08/2026
Andrews Organization1103/21/2026
The Lovett Company304/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kma Designs203/21/2026
Metropolis Group1003/21/2026
PS Engineers203/21/2026
Mary McKeown103/21/2026
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kings Group NYScaffold1007/08/2026
Everest ScaffoldingScaffold607/08/2026
JRM Construction ManagementGeneral Contractor507/08/2026
Accurate ElectricalElectrical303/21/2026
Two-Tone ContractingGeneral Contractor203/21/2026
Arco Plumbing and HeatingFire Protection107/08/2026
Borowide Elect'l ContractorsElectrical103/22/2026
E. C. Provini CoGeneral Contractor107/08/2026
Arco Plumbing and HeatingPlumbing107/08/2026
High Quality Electric ofElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Framework Engineering8217107/02/2024
AK Engineering678510/18/2023
Building Lifecycle
All (135)Filed (12)Permit Issued (17)Signed Off (11)Facade (FISP) (17)Violation (60)Inspection (5)Objection (2)Special Inspection (11)
09/11/2025
Signed off — Alteration
FACADE RESTORATION AS PER PLANS
M00994694-I1
08/06/2025
Signed off — Alteration
M01071269-I1
06/20/2025
Permit issued — Supported Scaffold
M01071269-I1-SF
06/18/2025
Permit issued — Supported Scaffold
M01071269-I1-SH
05/05/2025
Permit issued — Suspended Scaffold
M01213672-I1-SC
04/28/2025
Filed — Alteration
M01213672-I1
07/08/2024
Permit issued — General Construction
M00994694-I1-GC
07/02/2024
Filed — Alteration
FACADE RESTORATION AS PER PLANS
M00994694-I1
06/26/2024
Filed — Alteration
M01071269-I1
06/26/2024
Permit issued — Sidewalk Shed
M01071269-I1-SF
06/26/2024
Permit issued — Sidewalk Shed
M01071269-I1-SH
05/09/2024
Signed off — Alteration
M00929762-I1
05/09/2024
Signed off — Alteration
REPLACEMENT OF EXISTING TOILET AND LAVATORY WITH NEW PLUMBING FIXTURES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00929753-I1
05/09/2024
Signed off — Alteration
INTERIOR RENOVATION OF PARTITIONS, CEILINGS, DOORS AND FINISHES AS PER DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00929780-I1
05/09/2024
Signed off — Alteration
REMOVAL OF EXISTING AIR CURTAIN AND REPLACE WITH NEW AND INSTALLATION OF NEW DUCTWORK AS PER DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCYL
M00929752-I1
03/26/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/15/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/17/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/15/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/15/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/13/2023
Signed off — Alteration
M00929722-I1
10/24/2023
Permit issued — Sprinklers
M00929762-I1-EW-SP
10/19/2023
Permit issued — General Construction
M00929780-I1-GC
10/19/2023
Permit issued — Mechanical Systems
M00929752-I1-MS
10/18/2023
Filed — Alteration
M00929762-I1
10/17/2023
Permit issued — Plumbing
M00929753-I1-PL
10/06/2023
Filed — Alteration
REPLACEMENT OF EXISTING TOILET AND LAVATORY WITH NEW PLUMBING FIXTURES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00929753-I1
10/05/2023
Filed — Alteration
INTERIOR RENOVATION OF PARTITIONS, CEILINGS, DOORS AND FINISHES AS PER DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00929780-I1
10/05/2023
Filed — Alteration
REMOVAL OF EXISTING AIR CURTAIN AND REPLACE WITH NEW AND INSTALLATION OF NEW DUCTWORK AS PER DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCYL
M00929752-I1
10/05/2023
Special inspection requirement — Post-installed Anchors
Ari Kamo
10/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
09/28/2023
Permit issued — General Construction
M00929722-I1-GC
09/20/2023
Filed — Alteration
M00929722-I1
09/20/2023
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
09/20/2023
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
09/20/2023
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
09/12/2023
Special inspection requirement — Final
Joseph Tarella
09/06/2023
Special inspection requirement — Mechanical Systems
Ari Kamo
09/06/2023
Special inspection requirement — Final
Ari Kamo
07/07/2023
Violation issued (ECB, closed)
Boilers
07/07/2023
Violation issued (ECB, closed)
Boilers
07/05/2023
Violation issued (ECB, closed)
Boilers
03/15/2023
Violation issued (HPD, closed)
A
01/26/2023
Cycle 9 facade report signed — SWARMP
01/05/2023
Cycle 9 facade inspection completed
12/06/2022
Cycle 9 facade report submitted
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/09/2022
Signed off — Alteration
Renovation to existing retail space occupied by Tonal. Remove/install non load bearing partitions, flooring, finishes and fixtures as per plans filed herewith. No change in egress, use or occupancy.
M00547662-I1
02/03/2022
Permit issued — General Construction
M00547662-I1-GC
09/16/2021
Signed off — Alteration
INSTALLATION OF HEAVY-DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00135284-I1
09/16/2021
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00152468-I1
07/28/2021
Objection raised — Scope
07/28/2021
Objection resolved — Addressed
07/12/2021
Signed off — Alteration
M00383933-I1
07/02/2021
Filed — Alteration
Renovation to existing retail space occupied by Tonal. Remove/install non load bearing partitions, flooring, finishes and fixtures as per plans filed herewith. No change in egress, use or occupancy.
M00547662-I1
06/25/2021
Special inspection requirement — Final
TIMOTHY SHREMSHOCK
11/16/2020
Cycle 8 facade report signed — SAFE
10/22/2020
Cycle 8 facade report submitted
09/03/2020
Cycle 8 facade inspection completed
08/12/2020
Filed — Alteration
M00383933-I1
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offKings Group NY06/20/2025
DOB NOWSupported ScaffoldSigned-offKings Group NY06/18/2025
DOB NOWSuspended ScaffoldPermit IssuedTwo-Tone Contracting05/05/2025
DOB NOWGeneral ConstructionSigned-offTwo-Tone Contracting07/08/2024
DOB NOWSidewalk ShedSigned-offKings Group NY06/26/2024
DOB NOWSidewalk ShedSigned-offKings Group NY06/26/2024
DOB NOWSprinklersSigned-offArco Plumbing and Heating10/24/2023
DOB NOWGeneral ConstructionSigned-offJRM Construction Management10/19/2023
DOB NOWMechanical SystemsSigned-offJRM Construction Management10/19/2023
DOB NOWPlumbingSigned-offArco Plumbing and Heating10/17/2023
DOB NOWGeneral ConstructionSigned-offJRM Construction Management09/28/2023
DOB NOWGeneral ConstructionSigned-offE. C. Provini Co02/03/2022
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding08/12/2020
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding03/26/2020
DOB NOWSidewalk ShedSigned-offEverest Scaffolding02/26/2020
DOB NOWSupported ScaffoldSigned-offEverest Scaffolding04/18/2019
DOB NOWSidewalk ShedSigned-offEverest Scaffolding03/01/2019
BISSPISSUEDOrbit Sprinkler07/27/2021
BISPLISSUEDOrbit Plumbing & Heating07/27/2021
BISPLISSUEDOrbit Plumbing & Heating03/12/2020
BISSPISSUEDOrbit Sprinkler03/12/2020
BISOTISSUEDJepol Construction02/03/2020
BISMHISSUEDSilverstein & Assocaites11/19/2019
BISOTISSUEDSilverstein & Assocaites11/19/2019
BISOTISSUEDSilverstein & Assocaites11/19/2019
BISPLISSUEDOrbit Plumbing & Heating02/12/2019
BISSPISSUEDOrbit Sprinkler02/12/2019
BISOTISSUEDSilverstein & Assocaites02/07/2019
BISMHISSUEDSilverstein & Assocaites02/07/2019
BISOTISSUEDSilverstein & Assocaites02/07/2019
BISSPISSUEDDemar Plumbing06/15/2017
BISPLISSUEDOrbit Plumbing & Heating05/24/2017
BISOTISSUEDZale Contracting05/08/2017
BISMHISSUEDZale Contracting05/08/2017
BISEQISSUEDParsons Construction11/01/2016
BISPLISSUEDDemar Plumbing10/11/2016
BISMHISSUEDSchimenti Construction Co10/06/2016
BISOTISSUEDSchimenti Construction Co10/06/2016
BISSPISSUEDVip Fire Sprinkler09/26/2016
BISPLISSUEDOrbit Plumbing & Heating05/16/2016
+ 27 more permits on file
5 projects · most recent 07/26/2024
General Wiring
FiledStatusContractorScope
07/26/2024CompleteHigh Quality Electric of—
09/27/2023CompleteV Electric NYGeneral Wiring
05/26/2021CompleteSRM Electrical Services—
04/07/2019CompletePower Full ElectricGeneral Wiring
02/28/2019CompleteBorowide Elect'l Contractors—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/15/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/17/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/15/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
10/05/2023Post-installed AnchorsAri Kamospecial
10/05/2023Fire-Resistant Penetrations and JointsAri Kamospecial
09/20/2023Tenant Protection Plan ComplianceAri Kamospecial
09/20/2023Tenant Protection Plan ComplianceAri Kamospecial
09/20/2023Tenant Protection Plan ComplianceAri Kamospecial
09/12/2023FinalJoseph Tarellaprogress
09/06/2023Mechanical SystemsAri Kamospecial
09/06/2023FinalAri Kamoprogress
06/25/2021FinalTIMOTHY SHREMSHOCKprogress
04/09/2019FinalJULIO SALCEDO-FERNANDEZprogress
02/26/2019FinalJULIO SALCEDO-FERNANDEZprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Buck MasonRetailFloor 1
Project M00929752 Alteration · LOC Issued · 10/05/2023
Project M00929780 Alteration · LOC Issued · 10/05/2023
Project M00929722 Alteration · LOC Issued · 09/20/2023
Project M00929762 Alteration · LOC Issued · 10/18/2023
Project M00929753 Alteration · LOC Issued · 10/06/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 380 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch9
08/29/2026M00929722-I1Request digital key ↗
08/29/2026M00929752-I1Request digital key ↗
08/29/2026M00929780-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00152468-I1Request digital key ↗
09/04/2026M00383933-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00135284-I1Request digital key ↗
▸Applications & Permits87
▸BISWORK PERMIT APPLICATION41
11/19/2019123258205Open ↗
11/19/2019123258205Open ↗
11/19/2019123258205Open ↗
Showing 3 of 41 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION40
05/31/2019123687153Open ↗
05/14/2019123258205Open ↗
11/13/2017123258205Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWLPC Approval/Permit6
08/13/2026M00994694-I1Open ↗
08/13/2026M00929722-I1Open ↗
08/13/2026M00929753-I1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications85
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION45
05/31/2019123687153Open ↗
02/07/2019123258205Open ↗
02/07/2019123258205Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/04/2026M00383933-I1Open ↗
08/29/2026M00929722-I1Open ↗
08/29/2026M00929752-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
05/31/2019123687153Open ↗
06/19/2017123103284Open ↗
10/04/2016122896973Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
05/31/2019123687153Open ↗
06/19/2017123103284Open ↗
10/31/2016140568847Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026M00929752-I1Open ↗
08/31/2026M00547662-I1Open ↗
08/25/2026M00929780-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026M00929752-I1Open ↗
08/25/2026M00929780-I1Open ↗
08/23/2026M00929753-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/31/2016140568847Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/31/2016140568847Open ↗
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
05/14/2019123258205Open ↗
11/13/2017123258205Open ↗
10/17/2016122712314Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
09/23/2015120865670Open ↗
08/18/2015120865670Open ↗
07/17/2015122197149Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
06/04/2015120865670Open ↗
Showing 1 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/18/2015120865670Open ↗
08/10/2015122197149Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes5
10/04/2016122896973Open ↗
06/09/2016122730955Open ↗
05/16/2016122712314Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00383933-I1Open ↗
▸Environmental & Asbestos25
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
05/31/2019123687153Open ↗
02/07/2019123258205Open ↗
06/15/2017123103284Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/29/2026M00929722-I1Open ↗
08/29/2026M00929752-I1Open ↗
08/29/2026M00929780-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
05/31/2019123687153Open ↗
04/18/2018122712314Open ↗
04/18/2018122712314Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
04/18/2018122712314Open ↗
08/10/2015122197149Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/12/2021123687153Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
12/08/2021123258205Open ↗
10/04/2021123258205Open ↗
10/04/2021123258205Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs39
▸BISLANDMARKS APPROVAL16
02/12/2021123687153Open ↗
05/31/2019123687153Open ↗
02/08/2018123258205Open ↗
Showing 3 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
02/11/2022123258205Open ↗
02/12/2021123687153Open ↗
04/18/2018122712314Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
08/09/2017123103284Open ↗
10/04/2016122730955Open ↗
08/10/2015122197149Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF1
10/04/2021123258205Open ↗
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPRVD FAB CERT-INTENT1
10/29/2015122447557Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT26
02/12/2021123687153Open ↗
05/31/2019123687153Open ↗
04/18/2018122712314Open ↗
Showing 3 of 26 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/05/2021123258205Open ↗
▸Filing & Intake Forms44
▸BISADDITIONAL INFORMATION21
06/17/2019123258205Open ↗
06/17/2019123258205Open ↗
11/15/2018123258205Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING COVER SHEET19
05/31/2019123687153Open ↗
11/13/2017123258205Open ↗
11/13/2017123258205Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM3
05/14/2019123258205Open ↗
04/18/2018122712314Open ↗
10/18/2017122896973Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/31/2016140568847Open ↗
▸Other Documents10
▸DOB NOWProof of Historic Building4
08/13/2026M00929753-I1Open ↗
08/13/2026M00929780-I1Open ↗
08/13/2026M00929752-I1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/31/2019123687153Open ↗
08/12/2016122730955Open ↗
▸BISSupporting Document: Fee Exempt2
08/26/2015122447557Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01213672-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01213672-I1Open ↗