| Owner | Filings | Most Recent |
|---|---|---|
| 170 EAST END AVENUE | 97 | 03/21/2026 |
| 170 EAST END AVE CONDOMINIUM | 36 | 03/21/2026 |
| ALLIED PARTNERS | 18 | 09/13/2026 |
| RS 170 EEA | 16 | 07/08/2026 |
| DAUPHINE PROPERTIES | 15 | 09/29/2026 |
| ARPD | 9 | 03/21/2026 |
| ROCK 54 | 4 | 03/21/2026 |
| 170 EAST END CONDOMINIUM | 4 | 03/21/2026 |
| SKYLINE DEVELOPERS CONSTRUCTION | 3 | 07/08/2026 |
| BOTEROLLC C/O ALLIED PARTNERS RESIDENTIAL MANAGEMENT, LLC | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| WJE ENGINEERS & ARCHITECTS, PC | 2 | 07/31/2026 |
| CHARLES G. MICHEL ENGINEERING, PC. | 1 | 06/16/2026 |
| SCOTT MICHAEL STAPLETON, ARCH., PC | 1 | 05/29/2026 |
| RJD ENGINEERING LLC | 3 | 05/20/2026 |
| ANZ CONSULTING ENGINEERING, PLLC | 1 | 05/19/2026 |
| IDEA SPACE ARCHITECTURE + DESIGN | 2 | 04/16/2026 |
| AUTOMATED DESIGN ENGINEERING, PLLC | 2 | 01/17/2026 |
| DAVI ARCHITECTURE, PC | 2 | 01/06/2026 |
| SUCHITH JAYASENA | 1 | 08/25/2025 |
| P.A. COLLINS PE | 2 | 07/09/2025 |
| WEDDLE & GILMORE ARCHITECTS, PLLC | 1 | 07/07/2025 |
| RILDER MEJIA PE | 2 | 09/06/2024 |
| THE VILNITS GROUP | 2 | 06/27/2023 |
| ETHELIND COBLIN ARCHITECT, PC | 1 | 04/05/2023 |
| LL ENGINEERING PC | 5 | 09/13/2022 |
| MN ARCHITECTURE DPC | 2 | 07/27/2022 |
| ENTHINK ENGINEERS LLC | 1 | 06/30/2021 |
| PVE ENGINEERING | 1 | 05/17/2021 |
| TAN ENGINEERING PC | 1 | 12/13/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| NORTHEAST EXPEDITING | 6 | 03/21/2026 |
| LINE DESIGN | 2 | 03/21/2026 |
| MICHAEL ZENREICH ARCHITECT | 6 | 03/21/2026 |
| EFG CONSULTING | 4 | 03/21/2026 |
| ANTHONY MORALI ARCHITECT PLLC | 2 | 03/21/2026 |
| AGOUTI CONSTRUCTION CONSULTING | 2 | 03/21/2026 |
| BOYD CONSULTING | 2 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 14 | 03/21/2026 |
| O S ASSOCIATES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| LTB MECHANICAL CORP | General Contractor | 5 | 07/10/2026 |
| TIMELINE RENOVATIONS INC | General Contractor | 4 | 07/08/2026 |
| OFF THE WALLCOVERING INC | General Contractor | 3 | 03/21/2026 |
| HIGHLINE CONSTRUCTION GR | General Contractor | 3 | 09/29/2026 |
| KG SPRINKLER CORP | Fire Protection | 2 | 07/08/2026 |
| INTERIOR MANAGEMENT LLC | General Contractor | 2 | 07/08/2026 |
| DONATO PLUMBING, INC | Plumbing | 2 | 07/08/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 2 | 03/21/2026 |
| LAWRENCE EXTERIOR RESTORATION | General Contractor | 2 | 03/21/2026 |
| SMI CONSTRUCTION MANGEMENT | General Contractor | 2 | 08/22/2026 |
| CERTIFIED CONSTRUCTION | General Contractor | 2 | 07/08/2026 |
| TOKA HOME, LLC | General Contractor | 1 | 04/09/2026 |
| TOWER SERVICES INC | General Contractor | 1 | 09/13/2026 |
| ARCON PLBG SOLUTIONS | Plumbing | 1 | 07/10/2026 |
| DPH PLUMBING & HTG CORP | Plumbing | 1 | 07/08/2026 |
| M&G PLUMBING AND HEATING | Plumbing | 1 | 07/08/2026 |
| OTEC PLBNG & HTG SVCS INC | Plumbing | 1 | 07/08/2026 |
| A+ ELECTRIC OF GREATER NY | Electrical | 1 | 03/22/2026 |
| SKINNER PLUMBING & HEATING | Plumbing | 1 | 07/08/2026 |
| BENJAMIN DREBIN | Electrical | 1 | 03/21/2026 |
| SPICE ELECTRIC COMPANY | Electrical | 1 | 03/22/2026 |
| WARREN OSTROFF | Electrical | 1 | 03/21/2026 |
| AQUEDUCT MECHANICAL CORP | Fire Protection | 1 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 1 | 07/08/2026 |
| ENVIRONMENTAL APPRAISER & | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AK ENGINEERING PC | 678 | 2 | 07/31/2026 |
| QUALITY TESTING, LLC | 7344 | 1 | 05/29/2026 |
| ANZ CONSULTING ENGINEERIN | 3946 | 1 | 05/19/2026 |
| INTEGRITY CONSULTING SERV | 666 | 1 | 02/20/2026 |
| AUTOMATED DESIGN CONSULTA | 895 | 2 | 01/17/2026 |
| DAVI ARCHITECTURE, PC | 5168 | 2 | 01/06/2026 |
| O&S ASSOCIATES | 2753 | 1 | 08/25/2025 |
| P.A.COLLINS INSPECTIONS P | 2168 | 2 | 07/09/2025 |
| JOSE A SANTOS PE, PC | 3292 | 2 | 09/06/2024 |
| THE VILNITS GROUP LLC | 1223 | 2 | 06/27/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | HIGHLINE CONSTRUCTION GR | 09/28/2026 |
| DOB NOW | Structural | Permit Issued | TOWER SERVICES INC | 09/11/2026 |
| DOB NOW | General Construction | Permit Issued | SMI CONSTRUCTION MANGEMENT | 08/21/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | INNOVATIVE AIR SOLUT INC | 07/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | LTB MECHANICAL CORP | 07/09/2026 |
| DOB NOW | Plumbing | Permit Issued | ARCON PLBG SOLUTIONS | 07/08/2026 |
| DOB NOW | General Construction | Permit Issued | SMI CONSTRUCTION MANGEMENT | 06/16/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TIMELINE RENOVATIONS INC | 06/11/2026 |
| DOB NOW | General Construction | Permit Issued | TIMELINE RENOVATIONS INC | 06/11/2026 |
| DOB NOW | General Construction | Permit Issued | MURRAY CRAFT BULD CORP | 05/28/2026 |
| DOB NOW | Plumbing | Permit Issued | M&G PLUMBING AND HEATING | 03/30/2026 |
| DOB NOW | General Construction | Permit Issued | TOKA HOME, LLC | 03/11/2026 |
| DOB NOW | Sprinklers | Permit Issued | AQUEDUCT MECHANICAL CORP | 01/28/2026 |
| DOB NOW | Plumbing | Permit Issued | OTEC PLBNG & HTG SVCS INC | 01/28/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TIMELINE RENOVATIONS INC | 01/26/2026 |
| DOB NOW | General Construction | Permit Issued | TIMELINE RENOVATIONS INC | 01/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | LTB MECHANICAL | 01/07/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | LTB MECHANICAL | 10/06/2025 |
| DOB NOW | General Construction | Permit Issued | INFRASTRUCTURE REPAIR SER | 09/30/2025 |
| DOB NOW | General Construction | Permit Issued | HIGHLINE CONSTRUCTION GR | 09/30/2025 |
| DOB NOW | Plumbing | Permit Issued | SKINNER PLUMBING & HEATIN | 09/23/2025 |
| DOB NOW | Plumbing | Signed-off | DPH PLUMBING & HTG CORP | 09/23/2025 |
| DOB NOW | General Construction | Permit Issued | HIGHLINE CONSTRUCTION GR | 09/19/2025 |
| DOB NOW | General Construction | Signed-off | ENVIRONMENTAL APPRAISER & | 12/13/2024 |
| DOB NOW | General Construction | Signed-off | CERTIFIED CONSTRUCTION | 01/25/2024 |
| DOB NOW | General Construction | Signed-off | CERTIFIED CONSTRUCTION | 07/12/2023 |
| DOB NOW | General Construction | Signed-off | OFF THE WALLCOVERING INC | 05/21/2023 |
| DOB NOW | Sprinklers | Signed-off | H M SPRINKLER INC | 08/30/2022 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 07/20/2022 |
| DOB NOW | General Construction | Signed-off | INTERIOR MANAGEMENT LLC | 03/23/2022 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 09/20/2021 |
| DOB NOW | General Construction | Signed-off | LAWRENCE EXTERIOR RESTORA | 08/25/2021 |
| DOB NOW | Sprinklers | Signed-off | H M SPRINKLER INC | 08/24/2021 |
| DOB NOW | Mechanical Systems | Signed-off | LTB MECHANICAL | 07/22/2021 |
| DOB NOW | General Construction | Signed-off | INTERIOR MANAGEMENT LLC | 07/08/2021 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 07/08/2021 |
| DOB NOW | Sidewalk Shed | Signed-off | EVEREST SCAFFOLDING INC | 06/30/2021 |
| DOB NOW | Mechanical Systems | Signed-off | J C MECHANICAL | 01/24/2020 |
| BIS | OT | ISSUED | ALIGN INTERIORS CORP | 06/24/2020 |
| BIS | OT | ISSUED | ALIGN INTERIORS CORP | 01/06/2020 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 01/17/2026 | Permit Issued | TIMELINE RENOVATIONS INC | Ventilation Systems | Ventilation Wolf VCX-36 600 CFM · Kitchen Exhaust ×1 |
| 07/09/2025 | Permit Issued | HIGHLINE CONSTRUCTION GR | Heating and Air Conditioning Systems | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/17/2026 | Permit Issued | AQUEDUCT MECHANICAL CORP | 38 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/16/2026 | Permit Issued | ARCON PLBG SOLUTIONS | Gas, Water/Sanitary |
| 05/20/2026 | Permit Issued | M&G PLUMBING AND HEATING | Gas, Water/Sanitary |
| 01/17/2026 | Permit Issued | OTEC PLBNG & HTG SVCS INC | Gas, Water/Sanitary |
| 07/09/2025 | Permit Issued | SKINNER PLUMBING & HEATIN | Gas, Water/Sanitary |
| 06/27/2023 | — | — | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/22/2026 | Permit Issued | ACCURATE ELEC'L CORP. | 98 meters, 1 new_meters |
| 06/10/2026 | Permit Issued | MONFORTE ELECTIRC CORP | General Wiring |
| 06/05/2026 | Permit Issued | A2K ELECTRIC CORP | General Wiring |
| 04/08/2026 | Permit Issued | BP ELECTRIC & COOLING INC | General Wiring |
| 01/18/2026 | Permit Issued | ACCURATE ELEC'L CORP. | General Wiring |
| 12/17/2025 | Permit Issued | WARREN OSTROFF ELEC., INC | General Wiring |
| 09/19/2025 | Permit Issued | WARREN OSTROFF ELEC., INC | — |
| 06/05/2025 | Permit Issued | A+ ELECTRIC OF GREATER NY | General Wiring |
| 05/28/2025 | Permit Issued | SPICE ELECTRIC COMPANY | General Wiring |
| 04/30/2025 | Permit Issued | CAT DEL-V ELECTRIC CORP | General Wiring |
| 05/23/2024 | Complete | AE ELECTRIC INC | — |
| 06/28/2023 | Complete | A.C. MORGAN ELECTRIC | General Wiring |
| 01/30/2023 | Complete | POLYPHASE ELECTRIC INC. | — |
| 07/18/2021 | Complete | JOSEPH SGROI & SONS, INC. | — |
| 06/29/2021 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/31/2026 | Permit Issued | TOWER SERVICES INC | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/17/2026 | Permit Issued | TIMELINE RENOVATIONS INC | Tenant Protection Plan 72 Hour |
| 01/17/2026 | Permit Issued | TIMELINE RENOVATIONS INC | Tenant Protection Plan 72 Hour |
| 07/09/2025 | Permit Issued | HIGHLINE CONSTRUCTION GR | Tenant Protection Plan 72 Hour |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/21/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/21/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/17/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/03/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 06/03/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/03/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/13/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/28/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/14/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/31/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/31/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/26/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/13/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 10/24/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 10/24/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/24/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 10/22/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/13/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/06/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 10/06/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 09/02/2022 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/31/2022 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/22/2022 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/20/2026 | Post-installed Anchors | Ari Kamo | special |
| 08/20/2026 | Structural Stability – Alterations of existing buildings | Ari Kamo | special |
| 08/20/2026 | Structural Steel - High Strength Bolting | Ari Kamo | special |
| 08/20/2026 | Structural Steel - Details | Ari Kamo | special |
| 08/20/2026 | Final | Ari Kamo | progress |
| 08/20/2026 | Tenant Protection Plan Compliance | Ari Kamo | special |
| 07/31/2026 | Structural Steel - High Strength Bolting | Ari Kamo | special |
| 07/23/2026 | Structural Stability – Alterations of existing buildings | Ari Kamo | special |
| 07/23/2026 | Tenant Protection Plan Compliance | Ari Kamo | special |
| 07/23/2026 | Final | Ari Kamo | progress |
| 07/23/2026 | Structural Steel - Details | Ari Kamo | special |
| 07/23/2026 | Post-installed Anchors | Ari Kamo | special |
| 06/05/2026 | HVAC-R and service water piping design and insulation | TOMER TAL | energy_progress |
| 06/05/2026 | Energy Code Compliance Inspections | TOMER TAL | progress |
| 06/04/2026 | HVAC-R and service water piping design and insulation | KEVIN SNEDEKER | energy_progress |
| 06/04/2026 | Energy Code Compliance Inspections | KEVIN SNEDEKER | progress |
| 05/28/2026 | Fire-Resistant Penetrations and Joints | KEVIN SNEDEKER | special |
| 05/28/2026 | Interior lighting power | KEVIN SNEDEKER | energy_progress |
| 05/28/2026 | Lighting controls | KEVIN SNEDEKER | energy_progress |
| 05/28/2026 | Lighting in dwelling units | KEVIN SNEDEKER | energy_progress |
| 05/28/2026 | Final | KEVIN SNEDEKER | progress |
| 05/28/2026 | Post-installed Anchors | KEVIN SNEDEKER | special |
| 05/20/2026 | Energy Code Compliance Inspections | TOMER TAL | progress |
| 05/20/2026 | HVAC-R and service water piping design and insulation | TOMER TAL | energy_progress |
| 04/16/2026 | Post-installed Anchors | ALBERT ZIRINO | special |