| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01467145 | 323 HUDSON STREET MANHATTAN | New Job Filing | Job in process | 09/29/2026 | 09/28/2026 | — | General wiring Roof - Equipment room - Electric Room - Panel and equipment feeders - Chillers & Circulator pumps |
| B01465867 | 44 PINEAPPLE STREET BROOKLYN | New Job Filing | Job in process | 09/25/2026 | 09/24/2026 | — | Installation of new equipment in basement, Switchgear Room, 800a Trans S Combo Cabinet, Two sets of 600 MCM Please note: This permit is… |
| M01462754 | 41 WEST 82 STREET MANHATTAN | New Job Filing | Job in process | 09/23/2026 | 09/23/2026 | — | Installation of 2 - 4"" Conduits from end line box to utility, as per Coned and an Endline Box |
| M01454215 | 125 COLUMBUS AVENUE MANHATTAN | New Job Filing | Job in process | 09/01/2026 | 09/09/2026 | — | Install feed from 6th fl electric closet to apartment 4D - utility to install new meter in existing meter pan |
| M01454271 | 125 COLUMBUS AVENUE MANHATTAN | New Job Filing | Job in process | 09/01/2026 | 09/03/2026 | — | Run new feed from Electric Closet 6th Floor to Apartment 4BC - utility to install new meter in existing meter socket |
| M01453861 | 171 EAST 84 STREET MANHATTAN | New Job Filing | Complete | 08/31/2026 | 09/01/2026 | — | Replace electric panel in apartment 30C |
| Name | Projects together | Most recent |
|---|---|---|
| Classic Realty Llc | 5 | — |
| Eleventh National Corp C/O First Service Residential | 3 | — |
| Douglas Elliman | 3 | — |
| Pr | 2 | — |
| Argo Real Estate | 2 | — |
| Nest Builders | 2 | — |
| First Service Residential | 2 | — |
| H&M Realty | 2 | — |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01467145 | 323 HUDSON STREET MANHATTAN | New Job Filing | Job in process | 09/29/2026 | 09/28/2026 | — | General wiring Roof - Equipment room - Electric Room - Panel and equipment feeders - Chillers & Circulator pumps |
| B01465867 | 44 PINEAPPLE STREET BROOKLYN | New Job Filing | Job in process | 09/25/2026 | 09/24/2026 | — | Installation of new equipment in basement, Switchgear Room, 800a Trans S Combo Cabinet, Two sets of 600 MCM Please note: This permit is… |
| M01462754 | 41 WEST 82 STREET MANHATTAN | New Job Filing | Job in process | 09/23/2026 | 09/23/2026 | — | Installation of 2 - 4"" Conduits from end line box to utility, as per Coned and an Endline Box |
| M01454215 | 125 COLUMBUS AVENUE MANHATTAN | New Job Filing | Job in process | 09/01/2026 | 09/09/2026 | — | Install feed from 6th fl electric closet to apartment 4D - utility to install new meter in existing meter pan |
| M01454271 | 125 COLUMBUS AVENUE MANHATTAN | New Job Filing | Job in process | 09/01/2026 | 09/03/2026 | — | Run new feed from Electric Closet 6th Floor to Apartment 4BC - utility to install new meter in existing meter socket |
| M01453861 | 171 EAST 84 STREET MANHATTAN | New Job Filing | Complete | 08/31/2026 | 09/01/2026 | — | Replace electric panel in apartment 30C |
| M01443167 | 35 WEST 54 STREET MANHATTAN | New Job Filing | Job in process | 08/09/2026 | 08/09/2026 | — | Facilitate the installation of an additional meter with the existing meter pan for the Fire Pump - work to include installation of a proper… |
| B01433766 | 44 PINEAPPLE STREET BROOKLYN | New Job Filing | Complete | 07/22/2026 | 07/21/2026 | — | Electrical panel replacement, Apartment 9D |
| M01434077 | 340 EAST 72 STREET MANHATTAN | New Job Filing | Job in process | 07/21/2026 | 07/21/2026 | — | General wiring - additional outlets - Apartment PH |
| B01396168 | 44 PINEAPPLE STREET BROOKLYN | New Job Filing | Job in process | 05/01/2026 | 05/02/2026 | — | Work in Basement Switchgear Room - Installation of new equipment -Transformer - Disconnects - Sub-meter |
| Q01389181 | 269 GRAND CENTRAL PKWY QUEENS | New Job Filing | Job in process | 04/17/2026 | 04/21/2026 | — | Emergency lighting and exit Signs located in stairwells Replace and or add additional Emergency Signs, Emergency Lights, and Combo Units as … |
| M01387152 | 2 SUTTON PLACE SOUTH MANHATTAN | New Job Filing | Complete | 04/14/2026 | 04/14/2026 | — | Electrical Panel upgrade - Apartment 14FThis application is to replace a prior filing with the incorrect address Job #M01324030 - Address en… |
| M01379015 | 103 AVENUE A MANHATTAN | New Job Filing | Complete | 03/26/2026 | 03/31/2026 | — | General wiring for retail store , Ground Floor - A/c condenser |
| M01375209 | 29 EAST 64 STREET MANHATTAN | New Job Filing | Job in process | 03/19/2026 | 03/19/2026 | — | Replace circuit breaker panel : Apartment 11B |
| B01354687 | 9425 SHORE ROAD BROOKLYN | New Job Filing | Job in process | 02/03/2026 | 02/03/2026 | — | Power to Elevator Room, Elevator Power and Disconnect - New Feed and panel for associated elevator equipment (Lights outlets etc.) |
| B01354690 | 9437 SHORE ROAD BROOKLYN | New Job Filing | Job in process | 02/03/2026 | 02/03/2026 | — | Power to Elevator Room, Elevator Power and Disconnect - New Feed and panel for associated elevator equipment (Lights outlets etc.) |
| M01354680 | 332 WEST 43 STREET MANHATTAN | New Job Filing | Complete | 02/02/2026 | 02/03/2026 | — | Install new dedicated outlets and circuits Ground Floor |
| M01355019 | 115 NORFOLK STREET MANHATTAN | New Job Filing | Job in process | 02/03/2026 | 02/03/2026 | — | Install new 200a 3p meter pan disconnect, 3 EV Charger lines and Dedicated GFI outlets in bycycle room |
| M01353944 | 639 WEST 59 STREET MANHATTAN | New Job Filing | Job in process | 01/31/2026 | 02/02/2026 | — | Recertify existing meter equipment to facilitate installation of Meter by Utility |
| M01354000 | 2 SUTTON PLACE SOUTH MANHATTAN | New Job Filing | Complete | 02/01/2026 | 02/02/2026 | — | Replace circuit breaker panel, Apartment 14E |
| M01349894 | 400 EAST 70 STREET MANHATTAN | New Job Filing | Complete | 01/22/2026 | 01/27/2026 | — | Replace existing electrical panel Apartment 2001 |
| B01342984 | 234 UNION AVENUE BROOKLYN | New Job Filing | Job in process | 01/22/2026 | 01/24/2026 | — | recertify service equipment to facilitate Utility meter installation, in existing meter equipment for unit 6 |
| M01334063 | 14 EAST 4 STREET MANHATTAN | New Job Filing | Complete | 12/15/2025 | 12/15/2025 | — | General wiring Apartment 504 |
| M01326677 | 28 EAST 10 STREET MANHATTAN | New Job Filing | Complete | 12/03/2025 | 12/03/2025 | — | Apartment 9EThe scope of work is to correct the violations 35021265X and 35039237Y - All Inspections were conducted and passed under M00909… |
| M01326627 | 53 WEST 53 STREET MANHATTAN | New Job Filing | Job in process | 12/01/2025 | 12/02/2025 | — | Installation of Fixture Outlets, Fixture installation &Switch Circuit, Apartment 57A |
| Q01324256 | 47-39 40 STREET QUEENS | New Job Filing | Complete | 11/24/2025 | 11/26/2025 | — | Electrical installation Apartment 2G Outlets & Panel Upgrade |
| M01324030 | 4 SUTTON PLACE SOUTH MANHATTAN | New Job Filing | Job in process | 11/24/2025 | 11/25/2025 | — | Electrical Panel upgrade Apartment 14F |
| Q01324048 | 47-39 40 STREET QUEENS | New Job Filing | Complete | 11/24/2025 | 11/25/2025 | — | General wiring Apartment 1B, Upgrade Electrical panel installation of attached outlets |
| M01318587 | 180 RIVERSIDE DRIVE MANHATTAN | New Job Filing | Job in process | 11/14/2025 | 11/14/2025 | — | Upgrade electrical panel Apartment 5C |
| M01309400 | 345 EAST 81 STREET MANHATTAN | New Job Filing | Job in process | 10/27/2025 | 10/29/2025 | — | F&I 2 Switches, 2 Outlets, and 2 Light Fixtures Apartment 17C |
| M01309403 | 310 EAST 70 STREET MANHATTAN | New Job Filing | Job in process | 10/27/2025 | 10/29/2025 | — | Replace Panels in the proceeding apartment - 2J, 2F, 1M, 1E, 5A, 5H, 5L, 7A, 8A |
| B01306622 | 236 LIVINGSTON STREET BROOKLYN | New Job Filing | Job in process | 10/21/2025 | 10/22/2025 | — | INSTALL 30 240V CIRCUIT FROM MAIN SWITCH GEAR ROOM TO CONDESER 1ST FLOOR GARAGE |
| M01305819 | 17 WEST 67 STREET MANHATTAN | New Job Filing | Job in process | 10/21/2025 | 10/22/2025 | — | Install 40 amp dryer line and outlet Penthouse |
| M01284305 | 334 LEXINGTON AVENUE MANHATTAN | New Job Filing | Complete | 09/09/2025 | 09/09/2025 | — | Correction of Violation ECB# 39006135H Removal of temporary wiring for Temporary Water HeatersWork is in conjunction with PERMIT m01279… |
| M01279920 | 334 LEXINGTON AVENUE MANHATTAN | New Job Filing | Complete | 08/30/2025 | 08/30/2025 | — | REMOVE TEMPORARY WIRINNG - FROM BASEMENT HALLWAY PANEL TO TEMPORARY WATER HEATERS IN BOILER ROOM |
| M01272090 | 333 EAST 46 STREET MANHATTAN | New Job Filing | Job in process | 08/14/2025 | 08/15/2025 | — | Electrical panel upgrade Apt 2-F |
| M01251357 | 2211 BROADWAY MANHATTAN | New Job Filing | Job in process | 07/03/2025 | 07/07/2025 | — | General Wiring Laundry Room |
| M01249235 | 407 LENOX AVENUE MANHATTAN | New Job Filing | Job in process | 06/30/2025 | 07/01/2025 | — | General Wiring Run new feeder to new panel & circuits laundry area - No Change in Egress No concrete work |
| M01236899 | 170 EAST END AVENUE MANHATTAN | New Job Filing | Job in process | 06/05/2025 | 06/06/2025 | — | General electrical wiring ( fixture outlets and switching)Apartment 1L |
| M01204306 | 421 EAST 80 STREET MANHATTAN | New Job Filing | Job in process | 04/02/2025 | 04/04/2025 | — | remove one meter - increase capacity to one meter from 40 to 80amps - combine feeds to Apartments 3A & 4AUse of Meter 4A To be Discontinued… |
| B01185858 | 145 STATE STREET BROOKLYN | New Job Filing | Job in process | 02/24/2025 | 02/24/2025 | — | Temporary Emergency Repair - Provide Temp Feed from: Main Disconnect to Meter Bank 3-250 MCM Conductors and 1-#2 Ground in Greenfield _ To … |
| M01154659 | 631 HUDSON STREET MANHATTAN | New Job Filing | Job in process | 12/11/2024 | 12/12/2024 | — | Electrical panel upgrade Apartment 4BNo changes in egress - No concrete work |
| M01121926 | 332 WEST 85 STREET MANHATTAN | New Job Filing | Job in process | 10/04/2024 | 11/12/2024 | — | Upgrade wire size to apt 1D, 2D, 3DNO change in egress No concrete work |
| M01134454 | 14 EAST 34 STREET MANHATTAN | New Job Filing | Job in process | 10/30/2024 | 10/31/2024 | — | Con Ed work, Conduit to outside splice box - End Line box as well as disconnect switch and feeders from End line box |
| M01134417 | 120 RIVERSIDE BOULEVARD MANHATTAN | New Job Filing | Job in process | 10/29/2024 | 10/30/2024 | — | General electrical work Apartment 12M - No concrete - No changes in egressWork to include Line for electric stove 40 amp 3 wire |
| M01119744 | 2421 BROADWAY MANHATTAN | New Job Filing | Job in process | 10/03/2024 | 10/03/2024 | — | Replace deteriorated service conduit & conductors - Removed abandoned electrical equipment No changes in egress - No concrete work |
| M01084592 | 13 EAST 11 STREET MANHATTAN | New Job Filing | Job in process | 07/23/2024 | 07/24/2024 | — | INSTALL METER PAN & DISCONNECT TO APT 6Q - Existing line to apt will be used - All work performed in basement |
| M01081719 | 446 EAST 118 STREET MANHATTAN | New Job Filing | Job in process | 07/17/2024 | 07/17/2024 | — | Supply & install 4 Replacement electrical panels - basement, 1ST floor, 2nd floor, and 3rd floor - replace feedersNo concrete work - No cha… |
| B01077288 | 451 CLINTON AVENUE BROOKLYN | New Job Filing | Complete | 07/08/2024 | 07/09/2024 | — | Demolition ; To remove a 20 amp 120v feeder from the main building to the unattached parking garage to eliminate all power to garage |
| M01056851 | 50 EAST 79 STREET MANHATTAN | New Job Filing | Complete | 05/24/2024 | 05/28/2024 | — | General wiring - Replace FPE circuit breaker panel - Apartment 9E |
| M01050703 | 381 2 AVENUE MANHATTAN | New Job Filing | Complete | 05/13/2024 | 05/15/2024 | — | Panel upgrade Apartment 10cNO concrete work No change in egress |
| B01049605 | 6925 4 AVENUE BROOKLYN | New Job Filing | Complete | 05/10/2024 | 05/11/2024 | — | Risers and new circuit breaker panel for apartmentstie in existing circuits from existing fuse box - ( fuse box now used as junction box)No … |
| M01038368 | 779 RIVERSIDE DRIVE MANHATTAN | New Job Filing | Job in process | 04/19/2024 | 04/22/2024 | — | Temporary wiring to facilitate replacement of ConEd, End Line Box |
| B01035181 | 187 HICKS STREET BROOKLYN | New Job Filing | Complete | 04/12/2024 | 04/15/2024 | — | Panel upgrades - Basement & Lobby |
| B01030955 | 6925 4 AVENUE BROOKLYN | New Job Filing | Complete | 04/04/2024 | 04/05/2024 | — | This application supersedes Permit #B00304669-I1EL filed by previous licensee ( Donald Garland License #012610)Service Basement - No cha… |
| M01017671 | 631 HUDSON STREET MANHATTAN | New Job Filing | Complete | 03/10/2024 | 03/11/2024 | — | Apartment 7L - General wiring - No Co9ncrete Work - No Changes in Egress |
| M01013649 | 50 EAST 79 STREET MANHATTAN | New Job Filing | Job in process | 03/01/2024 | 03/04/2024 | — | General wiring - NO change in egress - No concrete work - Apartment 5E |
| M01013687 | 233 WEST 99 STREET MANHATTAN | New Job Filing | Complete | 03/01/2024 | 03/04/2024 | — | Panel upgrade - no concrete work - No changes in egress - Apartment 4BC |
| X01000610 | 691 EAST 137 STREET BRONX | New Job Filing | Job in process | 02/05/2024 | 02/08/2024 | — | General WiringReplace Meter Pan and Disconnect due to deteriorated conditionNo change in egress No concrete work |
| M01000512 | 43 EAST 25 STREET MANHATTAN | New Job Filing | Job in process | 02/05/2024 | 02/06/2024 | — | General wiring - Install power for 23 dryers No changes in egress No concrete work Floors 9, 10, 12, 14, 16, 17, 19, 20, 22, 23, 24,26, 27,… |
| M00971916 | 631 HUDSON STREET MANHATTAN | New Job Filing | Job in process | 12/05/2023 | 12/22/2023 | — | General wiring - No concrete work - No changes in egress |
| M00963994 | 309 WEST 86 STREET MANHATTAN | New Job Filing | Complete | 11/16/2023 | 11/20/2023 | — | Upgrade electrical panel in apart 10BNo Concrete work - No Changes in egress |
| M00965017 | 300 RIVERSIDE DRIVE MANHATTAN | New Job Filing | Complete | 11/20/2023 | 11/20/2023 | — | general wiring Apartment #14ANo Changes in egress - No concrete work |
| M00946157 | 201 EAST 25 STREET MANHATTAN | New Job Filing | Job in process | 10/10/2023 | 10/11/2023 | — | Ev charger project Garage - Basement No changes in egress - No concrete work work performed as per EPR #MN02589 |
| M00928648 | 45 CHRISTOPHER STREET MANHATTAN | New Job Filing | Job in process | 09/15/2023 | 09/16/2023 | — | general wiring - no changes in egress - no concrete work - Location elevator room basement - Wiring to Elevator room - Connection to elev… |
| M00928116 | 554 EAST 82 STREET MANHATTAN | New Job Filing | Job in process | 08/31/2023 | 09/01/2023 | — | Temporary installation of power for (2) Hot water heaters located in basement |
| X00924390 | 5620 SYLVAN AVENUE BRONX | New Job Filing | Complete | 08/24/2023 | 08/25/2023 | — | General wiring Basement No changes in concrete - No changes in egress |
| M00921792 | 259 WEST 90 STREET MANHATTAN | New Job Filing | Complete | 08/18/2023 | 08/18/2023 | — | Temporary wiring for electric hot water heater and removal of same - This application is to supersesd or take over from Permit# M008558… |
| M00909735 | 28 EAST 10 STREET MANHATTAN | New Job Filing | Complete | 07/25/2023 | 07/27/2023 | — | General wiring in Apartment 9ENo concrete work - NO changes in egress |
| M00892190 | 718 BROADWAY MANHATTAN | New Job Filing | Job in process | 06/17/2023 | 06/19/2023 | — | General Wiring , Apartment 2BNO change in egress , no concrete work |
| M00881847 | 44 WEST 62 STREET MANHATTAN | New Job Filing | Job in process | 05/30/2023 | 06/08/2023 | — | General Wiring - No change in egress - No concrete workApartment 4EF |
| M00885554 | 60 SUTTON PLACE SOUTH MANHATTAN | New Job Filing | Complete | 06/05/2023 | 06/07/2023 | — | General Wiring - No changes in egress- No concrete work- Apartment 5CS |
| M00881424 | 2849 BROADWAY MANHATTAN | New Job Filing | Complete | 05/26/2023 | 05/30/2023 | — | General Wiring - No changes in egress - No concrete work - Basement Ground FloorProperty address AKA: 2853 Broadway |
| M00880999 | 2849 BROADWAY MANHATTAN | New Job Filing | Job in process | 05/25/2023 | 05/26/2023 | — | General Wiring - No changes in egress - No concrete work In Basement / Ground |
| B00853796 | 187 HICKS STREET BROOKLYN | New Job Filing | Complete | 04/02/2023 | 04/05/2023 | — | general wiring basementNo changes in egress \ No concrete work |
| M00853792 | 2849 BROADWAY MANHATTAN | New Job Filing | Job in process | 04/02/2023 | 04/05/2023 | — | General Wiring Basement \ Ground No changes to Egress \ No concrete work |
| M00853798 | 105 WOOSTER STREET MANHATTAN | New Job Filing | Job in process | 04/02/2023 | 04/05/2023 | — | General Wiring BasementNo changes in egress \ No concrete work |
| M00837647 | 345 EAST 57 STREET MANHATTAN | New Job Filing | Cancelled | 03/02/2023 | 03/03/2023 | — | general wiring in apt 1BNo changes in egress - No concrete work |
| B00825157 | 132 FT GREENE PLACE BROOKLYN | New Job Filing | Complete | 02/07/2023 | 02/08/2023 | — | General wiring - Correct Objections Issued App# B389737 Tamper proof outlets Article 406.11 -& GFIs not provided Article 210.52no co… |
| M00824038 | 631 HUDSON STREET MANHATTAN | New Job Filing | Complete | 02/05/2023 | 02/07/2023 | — | General wiring in Apartment 5KNo change in concrete No change in egress |
| M08045217 | 299 WEST 12 STREET MANHATTAN | New Job Filing | Job in process | 11/23/2022 | 11/24/2022 | — | GENERAL WIRING IN APT 1ABNO CONCRETE WORK - NO CHANGE IN EGRESS |
| M08045223 | 105 WOOSTER STREET MANHATTAN | New Job Filing | Job in process | 11/23/2022 | 11/24/2022 | — | GENERAL WIRING - BASEMNENTNO CHANGE IN CONCRETE -- NO CHANGE IN EGRESS |
| M08032803 | 1185 PARK AVENUE MANHATTAN | New Job Filing | Job in process | 11/02/2022 | 11/04/2022 | — | GENERAL WIRING IN APT 8LNO CHANGE IN EGRESS - NO CONCRETE WORK |
| M08032428 | 969 PARK AVENUE MANHATTAN | New Job Filing | Job in process | 11/02/2022 | 11/03/2022 | — | General wiring in apt 1HNo change of egress - No concrete |
| M08002258 | 43 EAST 25 STREET MANHATTAN | New Job Filing | Complete | 09/12/2022 | 09/13/2022 | — | General wiring in apt 23ANo changes in egress - No concrete work |
| M08000931 | 28 EAST 10 STREET MANHATTAN | New Job Filing | Complete | 09/08/2022 | 09/09/2022 | — | upgrade electrical panel apt 2cno concrete no change in egress |
| M07996224 | 400 CENTRAL PARK WEST MANHATTAN | New Job Filing | Complete | 08/30/2022 | 09/06/2022 | — | Electrical panel upgrade Apartment 9XNO concrete - No change in egress |
| M07996213 | 28 EAST 10 STREET MANHATTAN | New Job Filing | Job in process | 08/30/2022 | 09/02/2022 | — | Electrical panel upgrade and outlets installationNo concrete - No change in egressApt 9E |
| M07996217 | 400 CENTRAL PARK WEST MANHATTAN | PAA | Job in process | 08/30/2022 | 09/02/2022 | — | Electrical panel upgrade apartment 5WNo Concrete - No Change in Egress |
| M07996202 | 28 EAST 10 STREET MANHATTAN | New Job Filing | Job in process | 08/30/2022 | 09/01/2022 | — | Electrical panel upgrade, Lighting fixture installationNo concrete, no change in egressApartment 6E |
| M07995193 | 371 BROADWAY MANHATTAN | New Job Filing | Complete | 08/29/2022 | 08/30/2022 | — | Relocate elevator transfer switch on roofNoconcrete - no change in egress |
| M00789802 | 205 WEST 57 STREET MANHATTAN | New Job Filing | Job in process | 08/09/2022 | 08/10/2022 | — | general wiring ofn floor 11no concreate, |
| M00769929 | 306 EAST 49 STREET MANHATTAN | New Job Filing | Job in process | 07/27/2022 | 07/28/2022 | — | to facilitate reconnect of meter disconected by con-ed No concrete - no change in egress |
| M00769164 | 66 LEONARD STREET MANHATTAN | New Job Filing | Complete | 07/07/2022 | 07/08/2022 | — | General Wiring in Apt 2CNo changes in egress, No concrete |
| M00755663 | 5 WEST END AVENUE MANHATTAN | New Job Filing | Complete | 06/10/2022 | 06/15/2022 | — | General Wiring. The electrical panel is for the line side feed only.No concrete. No change of egress |
| M00718762 | 930 PARK AVENUE MANHATTAN | New Job Filing | Job in process | 04/14/2022 | 04/14/2022 | — | GENERAL WIRINGNO CHANGES TO EGRESS OR CONCRETE |
| M00710838 | 329 WEST 108 STREET MANHATTAN | New Job Filing | Job in process | 04/01/2022 | 04/05/2022 | — | General wiring in apt PHA No change in egress, no concrete |
| M00710798 | 165 WEST END AVENUE MANHATTAN | New Job Filing | Job in process | 04/01/2022 | 04/02/2022 | — | GENERAL WIRING APT 26FNO CONCRET OR EGRESS CHANGES |
| Q00694295 | 42-14 CRESCENT STREET QUEENS | New Job Filing | Complete | 03/09/2022 | 03/17/2022 | — | GENERAL WIRING NO CHANGE OF EGRESS - NO CONCRETE- UTILITY/ELECTRICAL INVESTIGATION - |
| M00695739 | 140 WEST 86 STREET MANHATTAN | New Job Filing | Job in process | 03/10/2022 | 03/11/2022 | — | General wiringNo Changes to egress , no concrete |