← Back
Two family brick
1701 ADEE AVENUE
BRONX · BIN 2062074
💬 Discuss this project
1955Year Built
3Stories
B1Building Class
R4Zoning
2,500 sfGross Floor Area
2Units
0 Open Violations
Two family brick · 3,069 sf lot · 0.81 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 21p · 1 filing · 9 docs
Floor 1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/10/2024$940K—— → —$376/sf building
12/23/2019$325K—— → —$130/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RONALD VARGO ARCHITECT212/16/2024
GEE2000 ARCHITECT P.C.204/24/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHARRIS CONSTRUCTION CORPGeneral Contractor303/21/2026
CAPE PLUMBING INCPlumbing107/08/2026
GSB PLUMBING & HEATING COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RONALD VARGO ARCHITECT848212/16/2024
Building Lifecycle
All (30)Filed (4)Permit Issued (3)Signed Off (2)Violation (1)Inspection (2)Objection (12)Special Inspection (6)
12/23/2024
Signed off — Alteration
Replacement of gyp bd on walls & ceilings throughout due to vandalism. Installation of blown in closed cell insulation in all exterior walls , 2nd fl ceiling, and where noted, removal & installation of minor non load bearing walls. in existing 2 fam house
X08041444-I1
12/16/2024
Filed — Alteration
Replacement of gyp bd on walls & ceilings throughout due to vandalism. Installation of blown in closed cell insulation in all exterior walls , 2nd fl ceiling, and where noted, removal & installation of minor non load bearing walls. in existing 2 fam house
X08041444-P1
12/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ronald Vargo
12/03/2024
Special inspection requirement — Final
Ronald Vargo
12/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ronald Vargo
09/04/2024
Signed off — Alteration
Plumbing work is filed in conjunction with DOB NOW # X08041444
X00844798-I1
05/20/2024
Permit issued — General Construction
X08041444-I1-GC
05/09/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/09/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/07/2024
Permit issued — Plumbing
X00844798-I1-PL
04/24/2024
Filed — Alteration
Plumbing work is filed in conjunction with DOB NOW # X08041444
X00844798-P1
04/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PETER GEE
04/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
PETER GEE
04/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
PETER GEE
04/05/2023
Permit issued — Plumbing
X00844798-I1-PL
03/21/2023
Filed — Alteration
Plumbing work is filed in conjunction with DOB NOW # X08041444
X00844798-I1
12/08/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/30/2022
Objection raised — Other
11/30/2022
Objection resolved — Addressed
11/30/2022
Objection raised — Fire_Protection
11/30/2022
Objection resolved — Addressed
11/30/2022
Objection raised — Scope
11/30/2022
Objection resolved — Addressed
11/30/2022
Objection raised — Other
11/30/2022
Objection resolved — Addressed
11/30/2022
Objection raised — Other
11/30/2022
Objection resolved — Addressed
11/30/2022
Objection raised — Fire_Protection
11/30/2022
Objection resolved — Addressed
11/19/2022
Filed — Alteration
Replacement of gyp bd on walls & ceilings throughout due to vandalism. Installation of blown in closed cell insulation in all exterior walls , 2nd fl ceiling, and where noted, removal & installation of minor non load bearing walls. in existing 2 fam house
X08041444-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCHARRIS CONSTRUCTION CORP05/20/2024
DOB NOWPlumbingSigned-offGSB PLUMBING & HEATING CO05/07/2024
DOB NOWPlumbingSigned-offCAPE PLUMBING INC04/05/2023
3 projects · most recent 10/07/2024
General Wiring
FiledStatusContractorScope
10/07/2024CompleteTRIPLE D ELECTRIC INCGeneral Wiring
02/15/2024CompleteTRIPLE D ELECTRIC INC3 meters, 3 new_meters
12/10/2022CompleteFOSTER ELEC'L SVC., INC.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/03/2024Fire-Resistant Penetrations and JointsRonald Vargospecial
12/03/2024FinalRonald Vargoprogress
12/03/2024Fire-Resistance Rated ConstructionRonald Vargoprogress
04/11/2024HVAC-R and service water piping design and insulationPETER GEEenergy_progress
04/11/2024HVAC-R and service water heating system controlsPETER GEEenergy_progress
04/11/2024HVAC-R and service water heating equipmentPETER GEEenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/23/2026X00844798-P1Request digital key ↗
08/23/2026X00844798-I1Request digital key ↗
08/15/2026X08041444-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026X00844798-P1Open ↗
08/29/2026X00844798-P1Open ↗
08/29/2026X00844798-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/23/2026X00844798-P1Open ↗
08/23/2026X00844798-I1Open ↗
08/20/2026X08041444-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026X08041444-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/23/2026X00844798-P1Open ↗
08/23/2026X00844798-I1Open ↗
08/15/2026X08041444-I1Open ↗