← Back
Contractor
CHARRIS CONSTRUCTION CORP
General Contractor
BROOKLYN · 2QUEENS · 2BRONX · 1
5 buildings
16
Total Filings
5
Projects on File
5
Buildings Worked
0
Projects w/ Open Permits
General Contractor
Primary Trade
Activity
Projects by first filing month5 projects all-time
0112Jun '20 · 1Nov '22 · 1Mar '23 · 1Sep '23 · 1Nov '23 · 1202120222023
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Signed off5100%
By project type
Alteration5
Most active buildings
All buildings →
1701 ADEE AVENUEBRONX · latest 05/20/2024
1 projects
1606 EAST 17 STREETBROOKLYN · latest 12/12/2024
1 projects
54 DIVISION PLACEBROOKLYN · latest 05/17/2021
1 projects
80-11 NORTHERN BOULEVARDQUEENS · latest 03/21/2024
1 projects
59-14 MAIN STREETQUEENS · latest 02/16/2024
1 projects
Key relationships
Everyone →
Filing representatives
Contractors
Owners
1 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B00936829 ↗1606 EAST 17 STREET
BROOKLYN
AlterationSigned-off09/21/202312/12/2024Cellar Install a 1/2 bath , washer- dryer, 1 hot water heaters (elec). First floor: (1) bathroom w/ tub+lav+toil, (1) 1/2 bathrm w/ lav+ toi…
X08041444 ↗1701 ADEE AVENUE
BRONX
AlterationSigned-off11/19/202205/20/2024Replacement of gyp bd on walls & ceilings throughout due to vandalism. Installation of blown in closed cell insulation in all exterior walls…
Q00830126 ↗80-11 NORTHERN BOULEVARD
QUEENS
AlterationSigned-off03/02/202303/21/2024INTERIOR RENOVATION OF EXISTING OLD CODE COMMERCIAL SPACE AT FIRST FLOOR (GROUND FL).
Q00960918 ↗59-14 MAIN STREET
QUEENS
AlterationSigned-off11/14/202302/16/2024REPAIR REAR PORTION OF ROOF AND REAR PORTION OF FIRST FLOOR DUE TO FIRE DAMAGE (DOB VIOLATION #23-02806).
B00354850 ↗54 DIVISION PLACE
BROOKLYN
AlterationSigned-off06/16/202005/17/2021REPLACE ONE (1) ROOFTOP HVAC UNIT WITH NEW ON EXISTING STEEL DUNNAGE. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Counts cover all 5 projects (5 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BRENT M. PORTER, ARCHITECT, AND ASS103/18/2025
CHIEN HAN ARCHITECT P. C.111/14/2023
JIS CONSULTING103/02/2023
RONALD VARGO ARCHITECT112/16/2024
SEBASTIAN M D'ALESSANDRO106/16/2020
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
XH&RC PLBG AND HTG INC103/18/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BARI & SON, LLC112/16/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
SECOND FLOOR STUDIOS103/18/2025
5 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 5Signed off 5
5 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B00936829 ↗1606 EAST 17 STREET
BROOKLYN
AlterationSigned-off09/21/202312/12/2024Cellar Install a 1/2 bath , washer- dryer, 1 hot water heaters (elec). First floor: (1) bathroom w/ tub+lav+toil, (1) 1/2 bathrm w/ lav+ toi…
X08041444 ↗1701 ADEE AVENUE
BRONX
AlterationSigned-off11/19/202205/20/2024Replacement of gyp bd on walls & ceilings throughout due to vandalism. Installation of blown in closed cell insulation in all exterior walls…
Q00830126 ↗80-11 NORTHERN BOULEVARD
QUEENS
AlterationSigned-off03/02/202303/21/2024INTERIOR RENOVATION OF EXISTING OLD CODE COMMERCIAL SPACE AT FIRST FLOOR (GROUND FL).
Q00960918 ↗59-14 MAIN STREET
QUEENS
AlterationSigned-off11/14/202302/16/2024REPAIR REAR PORTION OF ROOF AND REAR PORTION OF FIRST FLOOR DUE TO FIRE DAMAGE (DOB VIOLATION #23-02806).
B00354850 ↗54 DIVISION PLACE
BROOKLYN
AlterationSigned-off06/16/202005/17/2021REPLACE ONE (1) ROOFTOP HVAC UNIT WITH NEW ON EXISTING STEEL DUNNAGE. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
54 DIVISION PLACE ↗107/08/2026
80-11 NORTHERN BOULEVARD ↗603/21/2026
1606 EAST 17 STREET ↗303/21/2026
59-14 MAIN STREET ↗303/21/2026
1701 ADEE AVENUE ↗303/21/2026
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00936829-I1 · 1606 EAST 17 STREETOpen ↗
09/01/2026B00936829-I1 · 1606 EAST 17 STREETOpen ↗
08/29/2026Q00960918-I1 · 59-14 MAIN STREETOpen ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026B00936829-P3 · 1606 EAST 17 STREETOpen ↗
08/26/2026B00936829-P2 · 1606 EAST 17 STREETOpen ↗
08/26/2026B00936829-P1 · 1606 EAST 17 STREETOpen ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00936829-I1 · 1606 EAST 17 STREETOpen ↗
08/28/2026Q00830126-I1 · 80-11 NORTHERN BOULEVARDOpen ↗
08/23/2026X08041444-P1 · 1701 ADEE AVENUEOpen ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026B00936829-P4 · 1606 EAST 17 STREETOpen ↗
08/15/2026X08041444-I1 · 1701 ADEE AVENUEOpen ↗
08/13/2026B00354850-I1 · 54 DIVISION PLACEOpen ↗
Showing 3 of 6 on file for this type