0 Year Built
— Stories
V0 Building Class
R7-1 Zoning
0 sf Gross Floor Area
0 Units
3 Open Violations 1 unresolved · 2 paperwork only ▸
ECB 08/13/2026 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT. AS NOTED: AT TIME OF INSPECTION AT A JOBSITE OF A PROPOSED 8 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL. OBSERVED AT THE 1ST FLOOR EXPOSURE 2 $2K due
ECB 06/23/2026 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT. AS NOTED: AT TIME OF INSPECTION AT A JOBSITE OF A PROPOSED 8 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL. OBSERVED FROM THE BULKHEAD TO THE CEHearing held — result not yet published $2K proposed
ECB 06/23/2026 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. AS NOTED: AT TIME OF INSPECTION AT A JOBSITE OF A PROPOSED 8 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL. OBSERVED THAT THERE WERE NO MEANS OF PROPER EGRESS FROHearing held — result not yet published $2K proposed
Zoned residential, not Manhattan · Owner of record: 160 VAN CORTLANDT PARK SOUTH HOUSING DEV ELOPMENT · 56,048 sf lot · 0 FAR built · Flood zone X
Floor Stack 5 People & Firms 28 Timeline 0 Permits & Filings 0 Scope of Work 0 Inspections 114 Documents 0
Locations of Work
Architecture Electrical
Permit Issued — active, not yet Signed-off
Roof Under Construction 2p · 1 filing · 2 docs
Electrical
Issued Permit Scope
Solar
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
On file for this project
2 documents
Floor 3 Under Construction 1 filing · 20 docs
Architecture
Issued Permit Scope
General Construction
New eight (8) story residential building.
On file for this project
70 documents
Floor 2 Under Construction 1 filing · 20 docs
Architecture
Issued Permit Scope
General Construction
New eight (8) story residential building.
On file for this project
70 documents
Floor 1 Under Construction 1 filing · 20 docs
Architecture
Issued Permit Scope
General Construction
New eight (8) story residential building.
On file for this project
70 documents
Cellar Under Construction 2p · 2 filings · 20 docs
Architecture
Issued Permit Scope
General Construction
New eight (8) story residential building.
On file for this project
70 documents
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
On file for this project
2 documents · 2 drawing sheets
Ownership & Sales 10 Design Consultants 7 Filing Representatives 3 Contractors 6 Special Inspectors 2
▾ Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
▾ Sales History (ACRIS)
Date Price Unit Seller → Buyer $/sf 12/18/2024 $6.4M — — → — — not available 08/16/2022 $20.6M — — → — — not available
▾ Design Consultants (Architect / Engineer of Record)
▾ Filing Representatives (Expediters)
▾ Contractors (License-Anchored)
▾ Special Inspection Agencies
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
▾ Special Inspection Requirements (DOB NOW) — 114
Date Requirement Inspector Role 08/18/2026 Exterior Insulation and Finish Systems (EIFS) JUAN GOMEZ special 08/18/2026 Fire-Resistant Penetrations and Joints JUAN GOMEZ special 08/18/2026 Mastic and Intumescent Fire-resistant Coatings JUAN GOMEZ special 08/18/2026 Sprayed fire-resistant materials JUAN GOMEZ special 08/18/2026 Energy Code Compliance Inspections JUAN GOMEZ progress 08/18/2026 Fire-Resistance Rated Construction JUAN GOMEZ progress 08/18/2026 Interior lighting power EDWIN HOPKINS energy_progress 08/18/2026 Lighting in dwelling units EDWIN HOPKINS energy_progress 08/18/2026 Fenestration air leakage EDWIN HOPKINS energy_progress 08/18/2026 Fenestration and door U-factor and product ratings EDWIN HOPKINS energy_progress 08/18/2026 Insulation placement and R values JUAN GOMEZ energy_progress 08/18/2026 HVAC-R and service water heating equipment EDWIN HOPKINS energy_progress 08/18/2026 Vestibules EDWIN HOPKINS energy_progress 08/18/2026 Fenestration areas JUAN GOMEZ energy_progress 08/18/2026 Maintenance information EDWIN HOPKINS energy_progress 08/18/2026 Permanent certificate EDWIN HOPKINS energy_progress 08/18/2026 Protection of exposed foundation insulation JUAN GOMEZ energy_progress 08/18/2026 Electrical motors and elevators JUAN GOMEZ energy_progress 08/18/2026 Metering JUAN GOMEZ energy_progress 08/18/2026 Air barrier - visual inspection JUAN GOMEZ energy_progress 08/18/2026 Lighting controls EDWIN HOPKINS energy_progress 08/18/2026 Duct leakage testing, insulation and design EDWIN HOPKINS energy_progress 08/18/2026 Exterior lighting power EDWIN HOPKINS energy_progress 08/18/2026 HVAC-R and service water heating system controls EDWIN HOPKINS energy_progress 08/18/2026 HVAC-R and service water piping design and insulation JUAN GOMEZ energy_progress
Latest 25 of 114.
Nothing on file for this building.