← Back
Zoned residential, not Manhattan
171 WEST 239TH STREET
BRONX · Kingsbridge-Marble Hill · BIN 2016216
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R7-1Zoning
0 sfGross Floor Area
0Units
3 Open Violations 1 unresolved · 2 paperwork only ▸
Zoned residential, not Manhattan · Owner of record: 160 VAN CORTLANDT PARK SOUTH HOUSING DEV ELOPMENT · 56,048 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 2 docs
Floor 3Under Construction30p · 1 filing · 20 docs
Floor 2Under Construction29p · 1 filing · 20 docs
Floor 1Under Construction33p · 2 filings · 20 docs
CellarUnder Construction32p · 2 filings · 20 docs
Site & exteriorUnder Construction72p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP2409/13/2026
TISHMAN SPEYER1609/24/2026
Cristina Michaels Construction Mana507/08/2026
VISITATION SCHOOL303/21/2026
VISITATION CHURCH203/21/2026
160 VAN CORTLAND PARK SOUTH OWNE103/21/2026
160VANCORTLANDTPAR SOUTHOWNERLLC103/21/2026
TISHMAN SPEYER PROPERTIES103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2024$6.4M—— → —— not available
08/16/2022$20.6M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION603/21/2026
Rigid Structural Design, LLC2203/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLINE SCAFFOLDING GROUPGeneral Contractor1409/02/2026
TITAN INDUSTRIAL SVC CORPGeneral Contractor707/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor307/08/2026
EMES SOLAR INCGeneral Contractor108/21/2026
TJRE LLCGeneral Contractor107/08/2026
URBAN ATELIER GROUP LLCGeneral Contractor109/24/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT6864608/20/2026
HERTZ ENGINEERING, PLLC9414108/17/2026
Building Lifecycle
All (90)Filed (27)Permit Issued (25)Signed Off (3)Violation (3)Objection (2)Special Inspection (30)
09/23/2026
Permit issued — General Construction
X00757318-I1-GC
09/01/2026
Permit issued — Sidewalk Shed
X01222032-I1-SH
08/20/2026
Filed — New Building
New eight (8) story residential building.
X00757318-P5
08/20/2026
Permit issued — Solar
X01443395-I1-SL
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
08/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
JUAN GOMEZ
08/18/2026
Special inspection requirement — Sprayed fire-resistant materials
JUAN GOMEZ
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
08/18/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JUAN GOMEZ
08/18/2026
Special inspection requirement — Fenestration areas
JUAN GOMEZ
08/18/2026
Special inspection requirement — Lighting in dwelling units
EDWIN HOPKINS
08/18/2026
Special inspection requirement — Fenestration air leakage
EDWIN HOPKINS
08/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
EDWIN HOPKINS
08/18/2026
Special inspection requirement — Insulation placement and R values
JUAN GOMEZ
08/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
EDWIN HOPKINS
08/18/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
JUAN GOMEZ
08/18/2026
Special inspection requirement — Maintenance information
EDWIN HOPKINS
08/18/2026
Special inspection requirement — Interior lighting power
EDWIN HOPKINS
08/18/2026
Special inspection requirement — Permanent certificate
EDWIN HOPKINS
08/18/2026
Special inspection requirement — Protection of exposed foundation insulation
JUAN GOMEZ
08/18/2026
Special inspection requirement — Electrical motors and elevators
JUAN GOMEZ
08/18/2026
Special inspection requirement — Metering
JUAN GOMEZ
08/18/2026
Special inspection requirement — Air barrier - visual inspection
JUAN GOMEZ
08/18/2026
Special inspection requirement — Lighting controls
EDWIN HOPKINS
08/18/2026
Special inspection requirement — Duct leakage testing, insulation and design
EDWIN HOPKINS
08/18/2026
Special inspection requirement — Exterior lighting power
EDWIN HOPKINS
08/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
EDWIN HOPKINS
08/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JUAN GOMEZ
08/18/2026
Special inspection requirement — Vestibules
EDWIN HOPKINS
08/17/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
X01443395-I1
08/11/2026
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
X01213441-P5
06/14/2026
Violation issued (ECB, closed)
Unknown
06/11/2026
Permit issued — Sidewalk Shed
X01222032-I1-SH
05/26/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01222032-P3
05/14/2026
Permit issued — Supported Scaffold
X01213441-I1-SF
05/14/2026
Permit issued — Protection and Mechanical Methods
X01222059-I1-PMM
05/14/2026
Permit issued — Construction Fence
X01157935-I1-FN
03/19/2026
Filed — New Building
New eight (8) story residential building.
X00757318-P3
03/19/2026
Objection raised — Other
03/19/2026
Objection resolved — Addressed
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
03/19/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JUAN GOMEZ
03/19/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
JUAN GOMEZ
03/19/2026
Special inspection requirement — Sprayed fire-resistant materials
JUAN GOMEZ
03/19/2026
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
01/29/2026
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
X01213441-P4
01/22/2026
Permit issued — Suspended Scaffold
X01213441-S2-SC
01/19/2026
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
X01213441-P3
01/14/2026
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
X01213441-S2
12/18/2025
Permit issued — Construction Fence
X01157935-I1-FN
12/17/2025
Permit issued — General Construction
X00757318-I1-GC
12/08/2025
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
X01213441-P2
12/03/2025
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
X01213441-S1
12/03/2025
Permit issued — Suspended Scaffold
X01213441-S1-SC
11/06/2025
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
X01213441-P1
09/19/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01222032-P2
08/27/2025
Permit issued — General Construction
X00757318-I1-GC
08/21/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X01222032-P1
07/24/2025
Filed — Alteration
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
X01213441-I1
07/24/2025
Permit issued — Supported Scaffold
X01213441-I1-SF
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedURBAN ATELIER GROUP LLC09/23/2026
DOB NOWSidewalk ShedPermit IssuedSKYLINE SCAFFOLDING GROUP09/01/2026
DOB NOWSolarPermit IssuedEMES SOLAR INC08/20/2026
DOB NOWSidewalk ShedPermit IssuedSKYLINE SCAFFOLDING GROUP06/11/2026
DOB NOWSupported ScaffoldPermit IssuedSKYLINE SCAFFOLDING GROUP05/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSKYLINE SCAFFOLDING GROUP05/14/2026
DOB NOWConstruction FencePermit IssuedSKYLINE SCAFFOLDING GROUP05/14/2026
DOB NOWSuspended ScaffoldPermit IssuedCRISTINA MICHAELS CONS MN01/22/2026
DOB NOWConstruction FencePermit IssuedSKYLINE SCAFFOLDING GROUP12/18/2025
DOB NOWGeneral ConstructionPermit IssuedURBAN ATELIER GROUP LLC12/17/2025
DOB NOWSuspended ScaffoldPermit IssuedCRISTINA MICHAELS CONS MN12/03/2025
DOB NOWGeneral ConstructionPermit IssuedURBAN ATELIER GROUP LLC08/27/2025
DOB NOWSupported ScaffoldPermit IssuedSKYLINE SCAFFOLDING GROUP07/24/2025
DOB NOWSidewalk ShedPermit IssuedSKYLINE SCAFFOLDING GROUP06/12/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSKYLINE SCAFFOLDING GROUP06/06/2025
DOB NOWConstruction FencePermit IssuedSKYLINE SCAFFOLDING GROUP12/27/2024
DOB NOWGeneral ConstructionPermit IssuedURBAN ATELIER GROUP LLC12/13/2024
DOB NOWGeneral ConstructionPermit IssuedURBAN ATELIER GROUP LLC12/10/2024
DOB NOWGeneral ConstructionPermit IssuedURBAN ATELIER GROUP LLC12/03/2024
DOB NOWConstruction FenceSigned-offTITAN INDUSTRIAL SVC CORP07/29/2024
DOB NOWConstruction FenceSigned-offTJRE LLC11/15/2023
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC03/10/2023
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC03/10/2023
DOB NOWConstruction FenceSigned-offTITAN INDUSTRIAL SVC CORP02/07/2023
DOB NOWConstruction FenceSigned-offTITAN INDUSTRIAL SVC CORP12/30/2022
BISEQISSUEDTITAN INDUSTRIAL SVC CORP05/17/2023
BIS—ISSUEDTITAN INDUSTRIAL SVC CORP05/17/2023
BISFSISSUEDEAST COAST PETROLEUM INC06/06/2016
BISOTISSUEDRND SERVICES LLC01/05/2016
BISEQISSUEDVLAD RESTORATION LTD07/22/2010
BISOTISSUEDVLAD RESTORATION LTD10/07/2009
BISFBISSUEDBRYAN A. ENNIST07/05/2007
BISFBISSUEDLARRY BERGE02/07/1996
1 project · most recent 08/20/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/20/2026Permit IssuedURBAN ATELIER GROUP LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ice Air RSXC18 16,300 CFM · Ptac ×1,360
RSXC09 9,200 BTU · Ptac ×4
RSXC13 12,500 BTU · Heat Pump Outdoor ×4
Stelpro ×1,360
Lg ARUN024GSS4 24,000 BTU · Vrf Outdoor ×8
LS240HFV3 24,000 BTU · Condensing Unit ×8
ARUM144DTE5 144,000 BTU · Vrf Outdoor ×4
ARUM96BTE5 96,000 BTU · Vrf Outdoor ×4
ARUN048GSS4 48,000 BTU · Vrf Outdoor ×4
Ventilation
Panasonic FV-15NLFS1 75 CFM · Exhaust Fan ×1,360
Renewaire HE1.0XinH 450 CFM · Erv ×16
HE1.0Xinh 450 CFM · Erv ×4
6 projects · most recent 08/17/2026
FiledStatusContractorScope
08/17/2026Permit IssuedB.P. ELECTRIC CORP3 meters
06/08/2026Permit IssuedTOP SHELF ELECTRIC CORP—
12/08/2025Permit IssuedTUXEDO ELEC'L CONTR'G INC—
06/17/2024Permit IssuedCENTRIFUGAL ELECTRIC LLC1 meters, 1 new_meters
07/25/2023CompletePOLARIS ELEC'L CONST CORP—
04/04/2023CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 08/20/2026
FiledStatusContractorScope
08/20/2026Permit IssuedURBAN ATELIER GROUP LLC1 scope_items
1 project · most recent 08/17/2026
FiledStatusContractorScope
08/17/2026Permit IssuedEMES SOLAR INC286 panels, 148.72 kw, 4,457.88 roof_area_sqft
2 projects · most recent 08/11/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/11/2026Permit IssuedSKYLINE SCAFFOLDING GROUPScaffold
05/26/2026Permit IssuedSKYLINE SCAFFOLDING GROUPSidewalk Shed
1 project · most recent 08/11/2026
Suspended Scaffold
FiledStatusContractorScope
08/11/2026Permit IssuedSKYLINE SCAFFOLDING GROUPSuspended Scaffold
1 project · most recent 08/11/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/11/2026Permit IssuedSKYLINE SCAFFOLDING GROUPSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 114
DateRequirementInspectorRole
08/18/2026Exterior Insulation and Finish Systems (EIFS)JUAN GOMEZspecial
08/18/2026Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
08/18/2026Mastic and Intumescent Fire-resistant CoatingsJUAN GOMEZspecial
08/18/2026Sprayed fire-resistant materialsJUAN GOMEZspecial
08/18/2026Energy Code Compliance InspectionsJUAN GOMEZprogress
08/18/2026Fire-Resistance Rated ConstructionJUAN GOMEZprogress
08/18/2026Interior lighting powerEDWIN HOPKINSenergy_progress
08/18/2026Lighting in dwelling unitsEDWIN HOPKINSenergy_progress
08/18/2026Fenestration air leakageEDWIN HOPKINSenergy_progress
08/18/2026Fenestration and door U-factor and product ratingsEDWIN HOPKINSenergy_progress
08/18/2026Insulation placement and R valuesJUAN GOMEZenergy_progress
08/18/2026HVAC-R and service water heating equipmentEDWIN HOPKINSenergy_progress
08/18/2026VestibulesEDWIN HOPKINSenergy_progress
08/18/2026Fenestration areasJUAN GOMEZenergy_progress
08/18/2026Maintenance informationEDWIN HOPKINSenergy_progress
08/18/2026Permanent certificateEDWIN HOPKINSenergy_progress
08/18/2026Protection of exposed foundation insulationJUAN GOMEZenergy_progress
08/18/2026Electrical motors and elevatorsJUAN GOMEZenergy_progress
08/18/2026MeteringJUAN GOMEZenergy_progress
08/18/2026Air barrier - visual inspectionJUAN GOMEZenergy_progress
08/18/2026Lighting controlsEDWIN HOPKINSenergy_progress
08/18/2026Duct leakage testing, insulation and designEDWIN HOPKINSenergy_progress
08/18/2026Exterior lighting powerEDWIN HOPKINSenergy_progress
08/18/2026HVAC-R and service water heating system controlsEDWIN HOPKINSenergy_progress
08/18/2026HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
Latest 25 of 114.
▾Documents — 206 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch29
08/24/2026X00757318-P5Request digital key ↗
08/23/2026X00841113-I1Request digital key ↗
08/23/2026X00841096-P1Request digital key ↗
Showing 3 of 29 on file for this type
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION9
11/14/2025220755519Open ↗
02/08/2023220746423Open ↗
01/19/2022220741776Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION9
05/19/2023220746423Open ↗
05/18/2023220746423Open ↗
06/06/2016220457100Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/19/2022220741776Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/20/2026X00757318-P5Open ↗
08/14/2026X00757318-P3Open ↗
08/13/2026X00757318-P2Open ↗
Showing 3 of 5 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
12/26/2025220755519Open ↗
05/19/2022220741776Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/26/2025220755519Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
12/26/2025220755519Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
12/26/2025220755519Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00757318-I1Open ↗
▸Seals & Professional Certifications68
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/23/2026X00841113-I1Open ↗
08/23/2026X00841096-I1Open ↗
08/23/2026X00841096-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/28/2026X00757318-P5Open ↗
09/28/2026X00757318-P5Open ↗
09/28/2026X00757318-P5Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/28/2026X00757318-P5Open ↗
09/28/2026X00757318-P5Open ↗
09/01/2026X00757318-S2Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
05/18/2023220746423Open ↗
05/18/2023220746423Open ↗
07/20/2016220457100Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/19/2010220072294Open ↗
07/15/2010220072285Open ↗
06/26/2007210000256Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
07/19/2010220072294Open ↗
07/15/2010220072285Open ↗
06/26/2007210000256Open ↗
▸BISPC FULL REPORT1
06/26/2007210000256Open ↗
▸Trade Schedules & Equipment10
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/14/2026X00757318-P3Open ↗
08/13/2026X00757318-I1Open ↗
08/13/2026X00757318-P2Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
11/10/2015220457100Open ↗
06/26/2007210000256Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0212
05/18/2023220746423Open ↗
05/18/2023220746423Open ↗
▸BISELECTRIC CUT-OFF1
05/18/2023220746423Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/20/2026X00757318-I1—
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist5
08/20/2026X00757318-P1Open ↗
08/20/2026X00757318-P5Open ↗
08/20/2026X00757318-I1Open ↗
Showing 3 of 5 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/18/2023220746423Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
05/18/2023220746423Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/18/2023220746423Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00757318-I1Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
07/19/2010220072294Open ↗
07/15/2010220072285Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/19/2023220746423Open ↗
10/06/2015220457100Open ↗
▸BISRODENT CONTROL1
05/18/2023220746423Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/14/2009220023356Open ↗
▸BISASBESTOS INSPECTION REPORT1
06/26/2007210000256Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/20/2016220457100Open ↗
01/05/2016220457100Open ↗
10/06/2015220457100Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/20/2016220457100Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLETTERS - SUPPORTING DOCUMENTATION8
12/26/2025220755519Open ↗
12/26/2025220755519Open ↗
05/19/2023220746423Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/19/2010220072294Open ↗
07/15/2010220072285Open ↗
08/14/2009220023356Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/15/2016220457100Open ↗
07/20/2016220457100Open ↗
07/25/2012210000256Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
05/18/2023220746423Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
07/20/2016220457100Open ↗
10/06/2015220457100Open ↗
08/14/2009220023356Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/18/2023220746423Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET8
11/14/2025220755519Open ↗
02/08/2023220746423Open ↗
01/19/2022220741776Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION2
05/19/2022220741776Open ↗
05/19/2022220741776Open ↗
▸BISBOROUGH INTAKE FORM1
02/08/2023220746423Open ↗
▸Other Documents19
▸DOB NOWProperty Ownership Certification5
08/20/2026X00757318-P5Open ↗
08/20/2026X00757318-I1Open ↗
08/20/2026X00757318-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/20/2026X00757318-P5Open ↗
08/14/2026X00757318-P3Open ↗
08/13/2026X00757318-P2Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM2
12/26/2025220755519Open ↗
05/19/2022220741776Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026X01213441-S1Open ↗
08/13/2026X01213441-S2Open ↗
▸DOB NOWCalculations2
08/13/2026X01213441-S2Open ↗
08/13/2026X01213441-S1Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
05/18/2023220746423Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
12/26/2025220755519Open ↗
▸DOB NOWSite Survey: Initial1
08/20/2026X00757318-P5Open ↗