← Back
BuildNYC
One family attached or semi-detached
1713 HART STREET
QUEENS · Ridgewood · BIN 4081655
💬 Discuss this project
1945Year Built
2Stories
A5Building Class
R4Zoning
1,140 sfGross Floor Area
1Units
0 Active Violations
One family attached or semi-detached · 1,600 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar panel installation on existing roof23p · 2 filings · 20 docs
Floor 2General construction and rear addition to residential buildi17p · 1 filing · 20 docs
Floor 1General construction and rear addition to residential buildi18p · 1 filing · 20 docs
CellarGeneral construction and rear addition to residential buildi17p · 1 filing · 20 docs
BasementSolar panel installation on existing roof1p · 1 filing · 3 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/09/2020$12K—Private party → Private party$11/sf building
03/15/2019$50K—Private party → 212 SAN JOSE LLC$44/sf building
03/15/2019$795K—212 SAN JOSE LLC → Private party$697/sf building
12/01/2014$441K—Private party → Private party$387/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Naresh Mahangu107/23/2025
Hamann Engineering206/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Big Orange Expediting403/21/2026
S R Solar Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Heavy Duty BuildersGeneral Contractor407/08/2026
Emes SolarGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244107/23/2025
Ans Consultants1768206/17/2022
O'Rourke Engineering5873206/17/2022
Building Lifecycle
08/08/2026
Permit expired, never signed off — Solar
The city's record still shows this permit as issued, with no sign-off on its filing
Q01225943-I1-SL
08/08/2025
Permit issued — Solar
Q01225943-I1-SL
07/23/2025
Filed — Alteration
Q01225943-I1
01/04/2023
Signed off — Alteration
HEREBY FILING GENERAL CONSTRUCTION AND STRUCTURAL WORK TO EXISTING 2 STORY, 1 FAMILY RESIDENTIAL BUILDING. WORK TO INCLUDE REAR ADDITION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00470943-I1
09/14/2022
Closed: Boro commissioner has ordered work stopped for # Q00470943-i 1 due to applicant withdrawal
DOB violation · closed on the city's record
40 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedEmes Solar08/08/2025
DOB NOWGeneral ConstructionSigned-offHeavy Duty Builders07/13/2022
DOB NOWGeneral ConstructionSigned-offHeavy Duty Builders09/02/2021
2 projects · most recent 06/11/2025
FiledStatusContractorScope
06/11/2025CompleteB.P. Electric—
03/07/2022CompleteMadison Electric—
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/07/2022Structural Stability – Alterations of existing buildingsATULKUMAR SHAH, PEspecial
07/07/2022Fire-Resistant Penetrations and JointsBRIAN O'ROURKEspecial
07/07/2022Energy Code Compliance InspectionsBRIAN O'ROURKEprogress
07/07/2022FinalBRIAN O'ROURKEprogress
07/07/2022Interior lighting powerBRIAN O'ROURKEenergy_progress
07/07/2022Fenestration areasBRIAN O'ROURKEenergy_progress
07/07/2022Fenestration air leakageBRIAN O'ROURKEenergy_progress
07/07/2022Air barrier - visual inspectionBRIAN O'ROURKEenergy_progress
07/07/2022Lighting controlsBRIAN O'ROURKEenergy_progress
06/16/2022Fire-Resistant Penetrations and JointsBRIAN O'ROURKEspecial
06/16/2022Structural Stability – Alterations of existing buildingsATULKUMAR SHAH, PEspecial
06/16/2022Energy Code Compliance InspectionsBRIAN O'ROURKEprogress
06/16/2022FinalBRIAN O'ROURKEprogress
06/16/2022Fenestration areasBRIAN O'ROURKEenergy_progress
06/16/2022Interior lighting powerBRIAN O'ROURKEenergy_progress
06/16/2022Lighting controlsBRIAN O'ROURKEenergy_progress
06/16/2022Fenestration air leakageBRIAN O'ROURKEenergy_progress
06/16/2022Air barrier - visual inspectionBRIAN O'ROURKEenergy_progress
40 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account