← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Rockaway Village Condominium
1725 VILLAGE LANE · BIN 4623326
💬 Discuss this project
2020Year Built
10Stories
RMBuilding Class
R7-1Zoning
1,194,864 sfGross Floor Area
1,866Units
Rent Stabilized59 Active Violations 57 unresolved · 2 paperwork only ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Mott Center · 327,013 sf lot · 3.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofInstallation of 6 new gas boilers on roof14p · 1 filing · 20 docs
Floor 2Carvel5p · 2 filings · 4 docs
Floor 1CarvelUnder Construction60p · 8 filings · 20 docs
MezzanineMott Center LLCUnder Construction7p · 1 filing · 20 docs
CellarMott Center LLCUnder Construction11p · 2 filings · 20 docs
Site & exteriorFine & Fair Supermarket5p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mott Center4809/16/2026
Phipps Houses Services3603/22/2026
Rockaway Village Condominium303/21/2026
RSC Group203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WJY Electric507/02/2026
Solanki Engineering105/06/2026
Murdoch Engineering202/11/2026
MK Associates409/26/2025
Leon Skvirsky PE207/03/2025
JKM Architecture306/19/2025
McHenery Testing Lab204/14/2025
Insight Studio Architecture112/06/2024
Dagher Engineering408/02/2021
Paul Perdek, Prof. Engineering107/24/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
All in Permit Consultants203/21/2026
C Plus Design Group603/21/2026
JRK Creative603/21/2026
Loxton403/21/2026
JM Zoning403/21/2026
New York Signs203/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Francis B ConstructionGeneral Contractor603/21/2026
John Evan ContractingGeneral Contractor303/21/2026
Domus DesignGeneral Contractor303/21/2026
Symmetrical ConstructionGeneral Contractor304/09/2026
Neptune Signs & AwningsSign hanger207/08/2026
AP Plumbing & HVACPlumbing209/16/2026
Five Town Neon Sign CoSign hanger207/08/2026
Avon Plumbing & HeatingFire Protection107/08/2026
Crossfield Plumbing & HeatingFire Protection107/08/2026
Difalzo Electric NYElectrical103/22/2026
TT MechanicalPlumbing107/08/2026
Newbridge Electl ContngElectrical103/22/2026
Nycom ElectricalElectrical103/22/2026
N.Z. Pilgrim ElectricElectrical103/22/2026
J. Sibaja Kitchen and VE*General Contractor104/09/2026
Skyline Scaffolding GroupScaffold107/08/2026
Avon Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Philibert Engineering223607/02/2026
Solanki Engineering8451105/06/2026
Sohail Humayun P E8457109/26/2025
Korman Design & Build8792206/19/2025
HRF Services5616104/24/2025
McHenery Testing Lab9181204/14/2025
JKM Architecture8906112/27/2024
Domani Inspection Service843408/02/2021
Building Lifecycle
All (152)Filed (25)Permit Issued (18)Signed Off (4)Violation (34)Inspection (7)Objection (34)Special Inspection (30)
09/29/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/15/2026
Permit issued — Plumbing
Q01146137-S2-PL
08/06/2026
Violation issued (HPD, closed)
C
07/09/2026
Special inspection requirement — Mechanical Systems
Jacky Philibert
07/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Jacky Philibert
07/09/2026
Special inspection requirement — Final
Jacky Philibert
07/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jacky Philibert
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jacky Philibert
07/08/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jacky Philibert
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jacky Philibert
07/07/2026
Objection resolved — Addressed
07/07/2026
Objection resolved — Addressed
07/07/2026
Objection resolved — Addressed
07/02/2026
Filed — Alteration
File plumbing PAA application to reflect the site as-built condition.
Q01146137-P2
06/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/11/2026
Special inspection requirement — Mechanical Systems
Jacky Philibert
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jacky Philibert
06/11/2026
Special inspection requirement — Final
Jacky Philibert
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Jacky Philibert
05/15/2026
Objection raised — Other
05/15/2026
Objection raised — Other
05/15/2026
Objection raised — Other
05/08/2026
Violation issued (HPD, closed)
C
05/08/2026
Violation issued (HPD, open)
A
05/06/2026
Filed — Alteration
Q01389147-I1
05/01/2026
Special inspection requirement — Interior lighting power
04/22/2026
Filed — Alteration
File plumbing PAA application to reflect the site as-built condition.
Q01146137-P1
04/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashray Solanki
04/17/2026
Special inspection requirement — Final
04/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jacky Philibert
04/10/2026
Permit issued — Sprinklers
Q01146137-S3-EW-SP
03/31/2026
Violation issued (ECB, open)
Unknown
03/31/2026
Violation issued (ECB, open)
Unknown
03/28/2026
Violation issued (HPD, closed)
C
03/12/2026
Signed off — Alteration
INSTALL (1) ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR FINE FAIR SUPERMARKET.
Q01349544-I1
03/12/2026
Signed off — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR FINE FAIR SUPERMARKET.
Q01349565-I1
03/05/2026
Violation issued (HPD, open)
C
03/05/2026
Violation issued (HPD, open)
C
02/17/2026
Permit issued — Sign
Q01349544-I1-SG
02/17/2026
Permit issued — Sign
Q01349565-I1-SG
02/11/2026
Filed — Alteration
INSTALL (1) ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR FINE FAIR SUPERMARKET.
Q01349544-I1
02/11/2026
Filed — Alteration
ERECT NON-ILLUMINATED ACCESSORY BUSINESS WALL SIGN FOR FINE FAIR SUPERMARKET.
Q01349565-I1
01/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/14/2026
Permit issued — General Construction
Q01146137-I1-GC
01/09/2026
Permit issued — Mechanical Systems
Q01146137-S1-MS
12/31/2025
Violation issued (ECB, closed)
Elevators
12/19/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/17/2025
Violation issued (HPD, closed)
C
10/06/2025
Permit issued — Mechanical Systems
Q01213144-S2-GC-CX
09/26/2025
Filed — Alteration
THE SCOPE OF WORK CONSISTS OF INTERIOR REMODELING FOR NEW DELI AND REPLACING STOREFRONT
Q01213144-S2
09/25/2025
Filed — Alteration
THE SCOPE OF WORK CONSISTS OF INTERIOR REMODELING FOR NEW DELI AND REPLACING STOREFRONT
Q01213144-S3
09/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
SOHAIL HUMAYUN
09/11/2025
Special inspection requirement — Final
Mourad Kicha
09/11/2025
Special inspection requirement — Mechanical Systems
SOHAIL HUMAYUN
07/30/2025
Permit issued — Sign
Q01245334-I1-SG
07/28/2025
Permit issued — Sign
Q01245087-I1-SG
Latest 60 of 152 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAP Plumbing & HVAC09/15/2026
DOB NOWSprinklersPermit IssuedCrossfield Plumbing & Heating04/10/2026
DOB NOWSignSigned-offDesthers, Joseph02/17/2026
DOB NOWSignSigned-offDesthers, Joseph02/17/2026
DOB NOWGeneral ConstructionPermit IssuedFrancis B Construction01/14/2026
DOB NOWMechanical SystemsPermit IssuedJ. Sibaja Kitchen and VE*01/09/2026
DOB NOWMechanical SystemsPermit IssuedSymmetrical Construction10/06/2025
DOB NOWSignPermit IssuedEnrico Passaro07/30/2025
DOB NOWSignPermit IssuedEnrico Passaro07/28/2025
DOB NOWSprinklersSigned-offAvon Plumbing & Heating06/10/2025
DOB NOWPlumbingSigned-offAvon Plumbing & Heating06/09/2025
DOB NOWGeneral ConstructionPermit IssuedSymmetrical Construction05/27/2025
DOB NOWGeneral ConstructionPermit IssuedJohn Evan Contracting05/16/2025
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating04/29/2025
DOB NOWGeneral ConstructionPermit IssuedFrancis B Construction03/21/2025
DOB NOWMechanical SystemsPermit IssuedDomus Design01/02/2025
DOB NOWBoiler EquipmentSigned-offRentom Group04/26/2021
DOB NOWSupported ScaffoldSigned-offSkyline Scaffolding Group07/27/2020
BIS—ISSUEDLettire Construction11/15/2022
BISSPISSUEDUpright Fire Protctn10/19/2022
BISOTISSUEDLettire Construction08/17/2022
BISOTISSUEDBright Power06/30/2022
BIS—ISSUEDLettire Construction05/31/2022
BIS—ISSUEDLettire Construction03/29/2022
BISSDISSUEDUpright Fire Protctn12/15/2021
BIS—ISSUEDLettire Construction11/18/2021
BIS—ISSUEDLettire Construction11/18/2021
BIS—ISSUEDLettire Construction11/05/2021
BISPLISSUEDTT Mechanical09/17/2021
BISSDISSUEDUpright Fire Protctn08/05/2021
BISOTISSUEDBright Power06/29/2021
BISOTISSUEDBright Power03/03/2021
BISOTISSUEDBright Power03/03/2021
BISEQISSUEDStructuretech New York02/23/2021
BISEQISSUEDRepublic Scaffold & Hoist02/09/2021
BISEQISSUEDRepublic Scaffold & Hoist02/05/2021
BISSDISSUEDDynamic Plumbing & Sprinkler12/17/2020
BISSDISSUEDM. Early Plumbing & Heating12/15/2020
BISSPISSUEDDynamic Plumbing & Sprinkler12/15/2020
BIS—ISSUEDLettire Construction11/18/2020
+ 15 more permits on file
4 projects · most recent 07/02/2026
Ventilation Systems Heating and Air Conditioning Systems Others Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/02/2026Permit IssuedFrancis B ConstructionHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin REYQ96XATJA 8 tons · Vrf Outdoor ×9
RX18NMVJU 18,000 BTU · Condensing Unit ×1
Ventilation
Greenheck CUE-180-VG-2 3,750 CFM · Kitchen Exhaust ×1
CUE-200-VG-2 5,370 CFM · Exhaust Fan ×1
GB-060-VG 150 CFM · Exhaust Fan ×1
GB-180-VG-2 4,600 CFM · Exhaust Fan ×1
Daikin VAM1200GVJU 1,200 CFM · Erv ×3
__Junk__ AH-A2-20D-MPU 3,000 CFM ×1
09/26/2025Permit IssuedSymmetrical ConstructionOthers
Other
Daikin DX14XA0903AA 7 BTU · Ahu ×1
06/19/2025Permit IssuedDomus DesignAir Conditioning Systems
Cooling
Sigma SIG-SDSH048C.3 1,600 CFM · Wshp ×2
04/14/2025Permit IssuedJohn Evan ContractingVentilation Systems—
2 projects · most recent 07/02/2026
FiledStatusContractorScope
07/02/2026Permit IssuedCrossfield Plumbing & Heating—
06/19/2025Signed-offAvon Plumbing & Heating9 heads
4 projects · most recent 07/02/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/02/2026Permit IssuedCrossfield Plumbing & HeatingGas, Water/Sanitary
09/26/2025——Water/Sanitary
06/19/2025Signed-offAvon Plumbing & HeatingWater/Sanitary
04/14/2025——Water/Sanitary
25 projects · most recent 05/13/2026
General Wiring
FiledStatusContractorScope
05/13/2026CompleteN.Z. Pilgrim ElectricGeneral Wiring
05/06/2026Permit IssuedWCK Electric5 meters, 1 new_meters
03/03/2026CompleteProff Electrical—
09/17/2025Permit IssuedAL-Lectric Elect'l Contracting1 meters, 1 new_meters
06/29/2025CompleteAsko Electric Construction & MaintenanceGeneral Wiring
05/02/2025Permit IssuedPower Surge ElectricGeneral Wiring
12/11/2024Permit IssuedAL-Lectric Elect'l Contracting1 meters, 1 new_meters
07/05/2022CompleteDifalzo Electric NYGeneral Wiring
07/05/2022CompleteDifalzo Electric NYGeneral Wiring
07/05/2022CompleteDifalzo Electric NYGeneral Wiring
07/05/2022CompleteDifalzo Electric NYGeneral Wiring
07/05/2022CompleteDifalzo Electric NYGeneral Wiring
02/08/2022CompleteSigma ElectricGeneral Wiring
02/08/2022CompleteSigma Electric3 meters, 3 new_meters
12/20/2021CompleteMetropolitan Electric of NY I—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/29/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/19/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
07/09/2026Tenant Protection Plan ComplianceJacky Philibertspecial
07/09/2026Fire-Resistant Penetrations and JointsJacky Philibertspecial
07/09/2026FinalJacky Philibertprogress
07/09/2026Mechanical SystemsJacky Philibertspecial
07/09/2026Energy Code Compliance InspectionsJacky Philibertprogress
07/08/2026Tenant Protection Plan ComplianceJacky Philibertspecial
07/08/2026Fire-Resistant Penetrations and JointsJacky Philibertspecial
06/12/2026Tenant Protection Plan Compliance—special
06/11/2026Energy Code Compliance InspectionsJacky Philibertprogress
06/11/2026Mechanical SystemsJacky Philibertspecial
06/11/2026Fire-Resistant Penetrations and JointsJacky Philibertspecial
06/11/2026FinalJacky Philibertprogress
05/01/2026Interior lighting power—energy_progress
04/17/2026Fire-Resistance Rated Construction—progress
04/17/2026Final—progress
04/17/2026Fire-Resistant Penetrations and JointsAshray Solankispecial
04/17/2026Tenant Protection Plan Compliance—special
04/14/2026Fire-Resistant Penetrations and JointsJacky Philibertspecial
04/14/2026Tenant Protection Plan Compliance—special
09/20/2025Tenant Protection Plan ComplianceSOHAIL HUMAYUNspecial
09/20/2025Tenant Protection Plan Compliance—special
09/11/2025Mechanical SystemsSOHAIL HUMAYUNspecial
09/11/2025FinalMourad Kichaprogress
06/20/2025Sprinkler SystemsKENNY LEEspecial
06/20/2025Tenant Protection Plan Compliance—special
Latest 25 of 61.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Fine & Fair SupermarketRetailFloor 1
Project Q01349544 Alteration · LOC Issued · 02/11/2026
Project Q01349565 Alteration · LOC Issued · 02/11/2026
CarvelRestaurant / Food ServiceFloors 1, 2
Project Q01245087 Alteration · Permit Entire · 07/03/2025
Project Q01245334 Alteration · Permit Entire · 07/03/2025
Project Q01150544 Alteration · Permit Entire · 12/27/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 494 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch21
08/20/2026Q01112845-S2Request digital key ↗
08/20/2026Q01112845-S1Request digital key ↗
08/20/2026Q01112845-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
08/27/2026Q00441525-P2Request digital key ↗
08/27/2026Q00441525-I1Request digital key ↗
08/15/2026Q00441525-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00373145-I1Request digital key ↗
▸Applications & Permits91
▸BISPLAN / WORK APPROVAL APPLICATION64
02/01/2024420663712Open ↗
07/26/2023420663712Open ↗
01/25/2023421646954Open ↗
Showing 3 of 64 on file for this type
▸BISWORK PERMIT APPLICATION25
08/17/2022440698363Open ↗
05/24/2022420663712Open ↗
03/29/2022440481177Open ↗
Showing 3 of 25 on file for this type
▸BISOPEN APPLICATIONS SEARCH1
03/26/2025420663712Open ↗
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records9
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
04/12/2022421134150Open ↗
Showing 1 of 2 on file for this type
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
04/12/2022421134150Open ↗
Showing 1 of 2 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
04/12/2022421134150Open ↗
▸BISVERIFY TAX LOT1
08/23/2023420663712Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/26/2022420663712Open ↗
▸Seals & Professional Certifications91
▸DOB NOWSpecial Inspector Seal & Signature29
10/03/2026Q00441525-I1Open ↗
10/03/2026Q00441525-I1Open ↗
09/23/2026Q01213144-S2Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/27/2026Q00441525-I1Open ↗
08/27/2026Q00441525-P1Open ↗
08/27/2026Q00441525-P2Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026Q01213144-S2Open ↗
09/01/2026Q01146137-P2Open ↗
09/01/2026Q01146137-P2Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
09/15/2022420663712Open ↗
09/15/2022420663712Open ↗
Showing 2 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
12/10/2021440698363Open ↗
Showing 1 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
12/10/2021440698363Open ↗
10/14/2020440633646Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
12/10/2021440698363Open ↗
Showing 1 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment29
▸BISSCHEDULE B - PLUMBING24
09/07/2022440476487Open ↗
05/24/2022420663712Open ↗
05/02/2022420663712Open ↗
Showing 3 of 24 on file for this type
▸BISSTANDPIPE SYSTEMS2
07/01/2022440476487Open ↗
01/24/2022440481177Open ↗
▸BISSPRINKLER SYSTEMS1
07/01/2022440476487Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/05/2025420663712Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
09/15/2022420663712Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos33
▸DOB NOWOER: Notice to Proceed13
08/13/2026Q00441525-P1Open ↗
08/13/2026Q00441525-I1Open ↗
08/13/2026Q00373145-I1Open ↗
Showing 3 of 13 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION7
12/13/2022440481177Open ↗
12/01/2022440633646Open ↗
11/10/2022440476487Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction7
08/13/2026Q00441525-I1Open ↗
08/13/2026Q01112845-S1Open ↗
08/13/2026Q01146137-S1Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED6
12/10/2021440698363Open ↗
10/14/2020440633646Open ↗
Showing 2 of 6 on file for this type
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/30/2021420663712Open ↗
10/14/2020440633646Open ↗
Showing 2 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/01/2022440633646Open ↗
05/23/2022420663712Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
12/01/2022440633646Open ↗
01/24/2022420663712Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL2
12/01/2022440633646Open ↗
01/24/2022420663712Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
01/24/2022420663712Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/24/2022420663712Open ↗
▸BISELECTRIC MOTORS1
01/24/2022420663712Open ↗
▸BISLIGHTING CONTROLS1
01/24/2022420663712Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/24/2022420663712Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00441525-I1Open ↗
▸Inspections & Test Reports40
▸BISTECHNICAL REPORT: RESPONSIBILITY18
01/20/2022420663712Open ↗
12/10/2021440698363Open ↗
09/17/2021420663712Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX11
10/26/2020420663712Open ↗
Showing 1 of 11 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
10/11/2022440626413Open ↗
08/17/2022440698363Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
12/01/2022440633646Open ↗
01/05/2022420663712Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
11/09/2022420663712Open ↗
Showing 1 of 2 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
01/24/2022420663712Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
01/24/2022420663712Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
01/24/2022420663712Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/20/2022420663712Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs49
▸BISSUPERSEDING LETTER14
03/29/2022440481177Open ↗
03/08/2022420663712Open ↗
09/07/2021440476487Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
02/01/2024420663712Open ↗
07/26/2023420663712Open ↗
10/07/2021420663712Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
12/22/2022421646945Open ↗
12/14/2022440481177Open ↗
12/02/2022440633646Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
05/24/2022420663712Open ↗
04/12/2022421134150Open ↗
04/12/2022421134150Open ↗
Showing 3 of 7 on file for this type
▸BISFINAL5
12/01/2022440633646Open ↗
10/11/2022440626413Open ↗
09/27/2022440698363Open ↗
Showing 3 of 5 on file for this type
▸BISBSA/CPC APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT5
12/10/2021440698363Open ↗
11/22/2021440633646Open ↗
Showing 2 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
12/20/2022421646945Open ↗
12/13/2022440481177Open ↗
12/01/2022440633646Open ↗
Showing 3 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms51
▸BISADDITIONAL INFORMATION30
02/04/2025420663712Open ↗
09/16/2022440476487Open ↗
05/23/2022420663712Open ↗
Showing 3 of 30 on file for this type
▸BISBOROUGH INTAKE FORM8
03/29/2022440481177Open ↗
09/07/2021440476487Open ↗
09/07/2021440476487Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
12/10/2021440698363Open ↗
Showing 1 of 7 on file for this type
▸BISEFILING COVER SHEET6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Other Documents4
▸BISVESTIBULES1
01/24/2022420663712Open ↗
▸BISMAINTENANCE INFORMATION1
01/24/2022420663712Open ↗
▸BIS* LOADING DECK WEATHER SEALS1
01/24/2022420663712Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
01/24/2022420663712Open ↗