| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01270755 ↗ | 278 DYCKMAN STREET MANHATTAN | Alteration | Permit Issued | 10/20/2025 | 08/19/2026 | Design C2B ARCHITECTS PC Owner GUARDIAN THOMAS CORP. Filer JAM CONSULTANTS, INC. | APPLICATION FILED FOR RELOCATION OF BATHROOM AND OTHER PLUMBING MODIFICATIONS AS PER PLANS HERE WITHIN. NO CHANGE IN USE, OCCUPANCY, OR EGR… |
| M00755303 ↗ | 1578 LEXINGTON AVENUE MANHATTAN | New Building | Permit Issued | 11/02/2022 | 08/12/2026 | Owner Evenhar Development Corp Filer JM ZONING, LLC. | TEMP SD job in conjunction with the NB application filed to construct a new 13 story commercial building. Tax lots 57, 60, 62, 163 merged in… |
| M01383353 ↗ | 396 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/04/2026 | 07/27/2026 | Design ROCK ARCH ENG CORP Filer CSR EXPEDITERS | CONTAINMENT NETTING TO BE INSTALLED AS A MEANS OF PROTECTION TO THE PUBLIC IN ACCORDANCE WITHDOB 2013-006 BULLETIN SECTION I |
| M00905707 ↗ | 154 WEST 73 STREET MANHATTAN | Alteration | Permit Issued | 08/16/2023 | 07/01/2026 | Design PAUL S. ALTER - LHSA+DP | TEMPORARY SHORING TO SUPPORT EXISTING FRONT FACADE OVER TEMPORARY WALL OPENING. |
| S00653489 ↗ | 389 ST GEORGE ROAD STATEN ISLAND | Alteration | Permit Issued | 01/19/2022 | 06/12/2026 | Design RAHMAN CONSULTING | PLUMBING APPLICATION OF EXISTING SINGLE-FAMILY HOUSE. HORIZONTAL ENLARGEMENT AND INTERIOR RENOVATION UNDER A SEPARATE APPLICATION. |
| M01321712 ↗ | 303 EAST 44 STREET MANHATTAN | Alteration | Permit Issued | 11/19/2025 | 04/08/2026 | Design ALBER CAMARGO Filer Hierarch-E LLC | Mini Crane in conjunction with Climbing system installation as per plans filed herewith. |
| Name | Jobs together | Most recent |
|---|---|---|
| STRUCTURETECH NEW YORK, INC | 21 | 07/07/2022 |
| JRS ENGINEERING SERVICES | 13 | 04/18/2022 |
| LOMBARDO PROFESSIONAL ENGINEERING | 10 | 07/15/2022 |
| ALBER CAMARGO | 5 | 05/05/2026 |
| PLAN B ENGINEERING | 5 | 04/26/2021 |
| PAUL PERDEK, PROF. ENG. PLLC | 4 | 05/23/2022 |
| STRUCTURETECHNY | 3 | 10/19/2021 |
| TOHFAZ UDDIN PE PC | 3 | 12/04/2017 |
| WRG ENGINEERING, P.C. | 2 | 06/06/2024 |
| ADG ENGINEERING | 1 | 04/07/2026 |
| C2B ARCHITECTS PC | 1 | 04/07/2026 |
| GACE DPC | 1 | 07/23/2024 |
| KPFF CONSULTING ENGINEERS | 1 | 05/05/2026 |
| KUTNICKI BERNSTEIN ARCHITECTS | 1 | 08/06/2026 |
| MCNAMARA SALVIA | 1 | 08/06/2026 |
| MJ ENGINEERING & DESIGN | 1 | 01/13/2020 |
| MURRAY ENGINEERING PC | 1 | 05/05/2026 |
| OSPINO ENGINEERING PLLC | 1 | 12/29/2021 |
| PAUL S. ALTER - LHSA+DP | 1 | 05/05/2026 |
| PAUL S. GLEICHER - ARCHITECT, PC | 1 | 05/05/2026 |
| PE AND CONSULTANTS NY LLC | 1 | 11/17/2017 |
| R.G. VANDERWEIL ENGINEERS, PC | 1 | 08/06/2026 |
| RA ENGINEERING LLP | 1 | 08/06/2026 |
| RAHMAN CONSULTING | 1 | 03/29/2024 |
| ROCK ARCH ENG CORP | 1 | 05/04/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| A & M WARSHAW PLBG & HTG | 1 | 08/06/2026 |
| A.L.L. CONSTRUCTION AND D | 1 | 05/05/2026 |
| DV PLUMBING INC | 1 | 04/07/2026 |
| GREGG NY PLUMBING, INC | 1 | 03/29/2024 |
| HIGHLEVEL GROUP INC | 1 | 03/29/2024 |
| MILL BROOK FIRE PROTECTIO | 1 | 08/06/2026 |
| PAVARINI MCGOVERN LLC | 1 | 02/18/2022 |
| PRECISE CONSTRUCTION CONR | 1 | 04/08/2022 |
| RINNOVO CONSTRUCTION, LLC | 1 | 04/07/2026 |
| SD BUILDERS AND CONSTRUCT | 1 | 08/06/2026 |
| UPSTRATE INC | 1 | 03/29/2024 |
| VOLK INDUSTRIAL SERVICES | 1 | 06/06/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| LEVIEN & COMPANY, INC. | 2 | 10/31/2018 |
| Cathedral of The Holy Trinity | 1 | 07/23/2024 |
| Evenhar Development Corp | 1 | 08/06/2026 |
| GO HPS LLC | 1 | 12/12/2019 |
| GUARDIAN THOMAS CORP. | 1 | 04/07/2026 |
| HALLETTS BUILDING 7 SPE LLC | 1 | 12/03/2019 |
| NY 70TH STREET LLC | 1 | 12/04/2018 |
| PHIPPS HOUSES | 1 | 04/18/2022 |
| SD BUILDERS AND CONSTRUCTION LLC | 1 | 08/06/2026 |
| SL GREEN REALTY CORP | 1 | 06/10/2022 |
| SUMAIDA+KHURANA | 1 | 04/20/2018 |
| TISHMAN SPEYER | 1 | 04/19/2022 |
| Name | Jobs together | Most recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 9 | 05/23/2022 |
| LOMBARDO BUILDING CONSULTANTS | 6 | 06/10/2022 |
| Hierarch-E LLC | 5 | 05/05/2026 |
| EUROCELT EXPEDITING, INC | 3 | 12/04/2018 |
| WILLIAM VITACCO ASSOCIATES | 3 | 05/05/2026 |
| CSR EXPEDITERS | 1 | 05/04/2026 |
| JAM CONSULTANTS, INC. | 1 | 04/07/2026 |
| JM ZONING, LLC. | 1 | 08/06/2026 |
| JME BUILDING CONSULTING, LLC | 1 | 02/18/2022 |
| ROYAL CONSTRUCTION SERVICES,INC. | 1 | 04/20/2018 |
| URBAN ENGINEERING, PC | 1 | 04/28/2025 |
| VALJATO ENGINEERING P.C | 1 | 04/19/2022 |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01270755 ↗ | 278 DYCKMAN STREET MANHATTAN | Alteration | Permit Issued | 10/20/2025 | 08/19/2026 | Design C2B ARCHITECTS PC Owner GUARDIAN THOMAS CORP. Filer JAM CONSULTANTS, INC. | APPLICATION FILED FOR RELOCATION OF BATHROOM AND OTHER PLUMBING MODIFICATIONS AS PER PLANS HERE WITHIN. NO CHANGE IN USE, OCCUPANCY, OR EGR… |
| M00755303 ↗ | 1578 LEXINGTON AVENUE MANHATTAN | New Building | Permit Issued | 11/02/2022 | 08/12/2026 | Owner Evenhar Development Corp Filer JM ZONING, LLC. | TEMP SD job in conjunction with the NB application filed to construct a new 13 story commercial building. Tax lots 57, 60, 62, 163 merged in… |
| M01383353 ↗ | 396 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/04/2026 | 07/27/2026 | Design ROCK ARCH ENG CORP Filer CSR EXPEDITERS | CONTAINMENT NETTING TO BE INSTALLED AS A MEANS OF PROTECTION TO THE PUBLIC IN ACCORDANCE WITHDOB 2013-006 BULLETIN SECTION I |
| M00905707 ↗ | 154 WEST 73 STREET MANHATTAN | Alteration | Permit Issued | 08/16/2023 | 07/01/2026 | Design PAUL S. ALTER - LHSA+DP | TEMPORARY SHORING TO SUPPORT EXISTING FRONT FACADE OVER TEMPORARY WALL OPENING. |
| S00653489 ↗ | 389 ST GEORGE ROAD STATEN ISLAND | Alteration | Permit Issued | 01/19/2022 | 06/12/2026 | Design RAHMAN CONSULTING | PLUMBING APPLICATION OF EXISTING SINGLE-FAMILY HOUSE. HORIZONTAL ENLARGEMENT AND INTERIOR RENOVATION UNDER A SEPARATE APPLICATION. |
| M01321712 ↗ | 303 EAST 44 STREET MANHATTAN | Alteration | Permit Issued | 11/19/2025 | 04/08/2026 | Design ALBER CAMARGO Filer Hierarch-E LLC | Mini Crane in conjunction with Climbing system installation as per plans filed herewith. |
| M01065741 ↗ | 339 EAST 74 STREET MANHATTAN | Alteration | Signed-off | 07/23/2024 | 08/08/2025 | Design GACE DPC | Filing for garage repair at the cellar floor. No change to use, egress, or occupancy. |
| B01210281 ↗ | 130 SACKMAN STREET BROOKLYN | Alteration | Permit Issued | 04/28/2025 | 06/10/2025 | Design URBAN ENGINEERING, PC Filer URBAN ENGINEERING, PC | EXISTING BUILDING STRUCTURAL RETROFIT INCLUDING EXTERIOR CMU WALL RETROFIT, PARAPET STEEL BRACING, TEMPORARY SHORING, AND PARTIAL DEMOLITIO… |
| M01044639 ↗ | 1309 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/06/2024 | 05/07/2025 | Design WRG ENGINEERING, P.C. | Structural Work: New Steel Dunnage System at main roof |
| M01185006 ↗ | 540 WEST 21 STREET MANHATTAN | Alteration | Permit Issued | 02/21/2025 | 02/25/2025 | Design ALBER CAMARGO Filer Hierarch-E LLC | Fence Installation as per plans filed herewih. |
| B00682885 ↗ | 11 OCEAN PARKWAY BROOKLYN | Alteration | Signed-off | 02/18/2022 | 01/04/2024 | Design JRS ENGINEERING SERVICES | Construction fence filed as per plans filed herewith. No change in use, egress or occupancy. |
| B00712518 ↗ | 109 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 04/08/2022 | 12/14/2023 | Design JRS ENGINEERING SERVICES | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE … |
| 440663970BIS | 1-17 57 AVENUE QUEENS | — | ISSUED | 03/18/2021 | 10/13/2022 | — | EQ |
| 440683690BIS | 17-20 VILLAGE LANE QUEENS | — | ISSUED | 08/20/2021 | 09/23/2022 | — | EQ |
| M00772705 ↗ | 262 5 AVENUE MANHATTAN | Alteration | Permit Issued | 07/15/2022 | 07/16/2022 | INSTALLATION AND USE OF CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | |
| M00002546 ↗ | 48 WEST 69 STREET MANHATTAN | Alteration | Signed-off | 11/17/2017 | 07/14/2022 | Design PE AND CONSULTANTS NY LLC | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NY… |
| M00772593 ↗ | 261 11 AVENUE MANHATTAN | Alteration | Signed-off | 07/11/2022 | 07/13/2022 | INSTALLATION AND USE OF TEMPORARY CUSTOM SHORING SCAFFOLD SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | |
| B00766749 ↗ | 95 YORK STREET BROOKLYN | Alteration | Signed-off | 07/07/2022 | 07/08/2022 | Design STRUCTURETECH NEW YORK, INC | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO … |
| X00763666 ↗ | 101 LINCOLN AVENUE BRONX | Alteration | Signed-off | 06/24/2022 | 06/24/2022 | Application for the installation and use of a Spyder URW095 Mini Crane filed herein. No change in egress, use or occupancy. | |
| 141019671BIS | 60 MADISON AVENUE MANHATTAN | — | ISSUED | 06/18/2022 | 06/18/2022 | — | EQ |
| M00751679 ↗ | 15 BEEKMAN STREET MANHATTAN | Alteration | Signed-off | 06/10/2022 | 06/13/2022 | Owner SL GREEN REALTY CORP. | APPLICATION FOR THE INSTALLATION AND USE OF MOBILE EQUIPMENT - MINI CRANE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.. |
| B00752629 ↗ | 204 4 AVENUE BROOKLYN | Alteration | Signed-off | 06/07/2022 | 06/08/2022 | Design ALBER CAMARGO Filer Hierarch-E LLC | Construction fence installation , chain link, plywood and fence on barricades on all street elevations. No change in use, egress or occupanc… |
| B00748772 ↗ | 11 OCEAN PARKWAY BROOKLYN | Alteration | Signed-off | 06/06/2022 | 06/06/2022 | Design ALBER CAMARGO Filer Hierarch-E LLC | Construction fence filed as per plans filed herewith. No change in use, egress or occupancy. |
| X00520581 ↗ | 101 LINCOLN AVENUE BRONX | Alteration | Signed-off | 05/17/2021 | 05/23/2022 | Design STRUCTURETECH NEW YORK, INC Filer STRUCTURETECH NY | INSTALLATION OF TEMPORARY SUPPORTED SCAFFOLD AS PER DRAWINGS.TEMPORARY SUPPORTED SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING … |
| X00723629 ↗ | 101 LINCOLN AVENUE BRONX | Alteration | Signed-off | 05/10/2022 | 05/12/2022 | APPLICATION FOR THE INSTALLATION OF MOBILE EQUIPMENT FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY | |
| B00719797 ↗ | 11 HOYT STREET BROOKLYN | Alteration | Signed-off | 04/19/2022 | 04/25/2022 | Design VALJATO ENGINEERING PC Owner TISHMAN SPEYER Filer VALJATO ENGINEERING P.C | PARTIAL SLAB DEMOLITION |
| M00710968 ↗ | 300 EAST 50 STREET MANHATTAN | Alteration | Signed-off | 04/18/2022 | 04/19/2022 | Design JRS ENGINEERING SERVICES | INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY O… |
| 440712766BIS | 25-34 JACKSON AVENUE QUEENS | — | ISSUED | 04/18/2022 | 04/18/2022 | — | EQ |
| M00611407 ↗ | 1309 5 AVENUE MANHATTAN | Alteration | Permit Issued | 11/01/2021 | 04/11/2022 | Design WRG ENGINEERING, P.C. | Application filed for enlargement of elevator shaft as shown on plans |
| M00636816 ↗ | 1309 5 AVENUE MANHATTAN | Alteration | Signed-off | 11/30/2021 | 04/11/2022 | Design JRS ENGINEERING SERVICES Filer STRUCTURETECH NY | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE NO C… |
| Q00714090 ↗ | 25-34 JACKSON AVENUE QUEENS | Alteration | Signed-off | 04/07/2022 | 04/07/2022 | — | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE NO C… |
| M00339161 ↗ | 378 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 06/24/2020 | 03/29/2022 | Design STRUCTURETECH NEW YORK, INC Filer STRUCTURETECH NY | INSTALLATION OF TEMPORARY SCAFFOLDING AS PER DRAWINGS.TEMPORARY SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANG… |
| Q00464739 ↗ | 1-17 57 AVENUE QUEENS | Alteration | Signed-off | 02/11/2021 | 03/29/2022 | Design STRUCTURETECH NEW YORK, INC Filer STRUCTURETECH NY | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO … |
| Q00706333 ↗ | 3-24 27TH AVENUE QUEENS | Alteration | Signed-off | 03/25/2022 | 03/25/2022 | Design STRUCTURETECH NEW YORK, INC Filer STRUCTURETECH NY | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO… |
| 140997722BIS | 1841 BROADWAY MANHATTAN | — | ISSUED | 02/18/2021 | 02/14/2022 | — | EQ |
| M00676746 ↗ | 135 EAST 47TH STREET MANHATTAN | Alteration | Signed-off | 02/10/2022 | 02/10/2022 | Design JRS ENGINEERING SERVICES Filer STRUCTURETECH NY | Installation of pre-manufacture platform installation in conjunction with NB and minicrane installation. No change in use, egress or occupan… |
| B00654414 ↗ | 322 THIRD AVENUE BROOKLYN | Alteration | Signed-off | 12/29/2021 | 12/30/2021 | Design OSPINO ENGINEERING PLLC | INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD PER DRAWINGS. CD-5 NOT REQUIRED BECAUSE SUSPENDED SCAFFOLD WILL BE USED DURING NB CONST. SUSPEN… |
| X00643486 ↗ | 101 LINCOLN AVENUE BRONX | Alteration | Signed-off | 12/15/2021 | 12/15/2021 | Design PAUL PERDEK, PROF. ENG. PLLC | INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, … |
| M00625317 ↗ | 1841 BROADWAY MANHATTAN | Alteration | Permit Issued | 11/05/2021 | 11/05/2021 | Design JRS ENGINEERING SERVICES | INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN US… |
| M00611750 ↗ | 501 WEST 218 STREET MANHATTAN | Alteration | Signed-off | 10/14/2021 | 10/29/2021 | Design JRS ENGINEERING SERVICES | Support of excavation as per plans filed herewith for NB 121208512. No Chang in use, egress or occupancy. |
| M00613318 ↗ | 501 WEST 218 STREET MANHATTAN | Alteration | Signed-off | 10/19/2021 | 10/20/2021 | Design STRUCTURETECHNY | Installation of construction fence as per plans filed herewith. No change in use, egress or occupancy. |
| 440592903BIS | 56-28 2ND STREET QUEENS | — | ISSUED | 10/08/2020 | 10/06/2021 | — | EQ |
| M00603380 ↗ | 1841 BROADWAY MANHATTAN | Alteration | Permit Issued | 09/30/2021 | 10/01/2021 | USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | |
| M00598656 ↗ | 2420 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 09/27/2021 | 09/30/2021 | Design STRUCTURETECH NEW YORK, INC Filer STRUCTURETECH NY | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO … |
| M00592360 ↗ | 135 EAST 47TH STREET MANHATTAN | Alteration | Signed-off | 09/15/2021 | 09/15/2021 | INSTALLATION AND USE OF TEMPORARY MATERIAL PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | |
| Q00585822 ↗ | 3-24 27TH AVENUE QUEENS | Alteration | Signed-off | 09/14/2021 | 09/15/2021 | Design PAUL PERDEK, PROF. ENG. PLLC | INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD PER DRAWINGS. CD-5 NOT REQUIRED BECAUSE SUSPENDED SCAFFOLD WILL BE USED DURING NB CONST. SUSPEN… |
| 340699792BIS | 95 YORK STREET BROOKLYN | — | ISSUED | 09/25/2020 | 09/11/2021 | — | EQ |
| Q00580506 ↗ | 17-20 VILLAGE LANE QUEENS | Alteration | Signed-off | 08/24/2021 | 08/24/2021 | Design STRUCTURETECH NEW YORK, INC Owner PHIPPS HOUSES Filer STRUCTURETECH NY | INSTALLATION OF SUPPORTING SCAFFOLD AS PER DRAWINGS. TEMPORARY SUPPORTING SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THENYC BUILDING CODE NO … |
| 140935969BIS | 1241 BROADWAY MANHATTAN | — | ISSUED | 08/14/2020 | 08/13/2021 | — | EQ |
| 340818510BIS | 361 BEDFORD AVENUE BROOKLYN | — | ISSUED | 08/10/2021 | 08/10/2021 | — | EQ |
| 321960856BIS | 322 THIRD AVENUE BROOKLYN | — | ISSUED | 06/28/2019 | 08/03/2021 | — | OT |
| 240304167BIS | 101 LINCOLN AVENUE BRONX | — | ISSUED | 07/27/2021 | 07/27/2021 | — | EQ |
| 440681228BIS | 17-20 VILLAGE LANE QUEENS | — | ISSUED | 07/19/2021 | 07/19/2021 | — | EQ |
| 140751719BIS | 130 WILLIAM STREET MANHATTAN | — | ISSUED | 03/28/2018 | 07/01/2021 | — | EQ |
| 140854895BIS | 130 WILLIAM STREET MANHATTAN | — | ISSUED | 06/18/2019 | 07/01/2021 | — | EQ |
| Q00542252 ↗ | 25-34 JACKSON AVENUE QUEENS | Alteration | Signed-off | 06/22/2021 | 06/23/2021 | Design JRS ENGINEERING SERVICES | INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. PLYWOOD FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN… |
| Q00542265 ↗ | 25-34 JACKSON AVENUE QUEENS | Alteration | Signed-off | 06/22/2021 | 06/23/2021 | Design JRS ENGINEERING SERVICES | INSTALLATION OF PLYWOOD FENCE AS PER DRAWINGS. PLYWOOD FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS U… |
| Q00535601 ↗ | 30-14 CRESCENT STREET QUEENS | Alteration | Signed-off | 06/08/2021 | 06/11/2021 | Design STRUCTURETECHNY | Wall bracket installation as per plans filed herewith. no change in use, egress or occupancy. |
| B00529955 ↗ | 361 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 06/09/2021 | 06/10/2021 | INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | |
| Q00535597 ↗ | 30-14 CRESCENT STREET QUEENS | Alteration | Signed-off | 06/09/2021 | 06/09/2021 | Design STRUCTURETECHNY | Built up scaffold installation. no change in use, egress or occupancy. |
| B00503713 ↗ | 361 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 04/26/2021 | 04/27/2021 | Design JRS ENGINEERING SERVICES | Shear wall bracket installation under New Building Application Job No: 321193196. No change to egress occupancy. |
| 340808923BIS | 361 BEDFORD AVENUE BROOKLYN | — | ISSUED | 04/20/2021 | 04/20/2021 | — | EQ |
| B00297483 ↗ | 95 YORK STREET BROOKLYN | Alteration | Signed-off | 01/16/2020 | 04/13/2021 | Design STRUCTURETECH NEW YORK, INC | HEREWITH SUBMITTING AMENDED SCAFFOLD PLANS. NEW DRAWING ADDED TO THE APPROVED DRAWING SET. DRAWING # EQ-027.00 |
| B00298901 ↗ | 322 THIRD AVENUE BROOKLYN | Alteration | Signed-off | 01/29/2020 | 04/13/2021 | Design PAUL PERDEK, PROF. ENG. PLLC | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS.TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO C… |
| B00360230 ↗ | COMMERCIAL STREET BROOKLYN | Alteration | Signed-off | 06/23/2020 | 04/13/2021 | Design STRUCTURETECH NEW YORK, INC | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE NO C… |
| M00316160 ↗ | 150 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 02/17/2020 | 04/13/2021 | Design STRUCTURETECH NEW YORK, INC Filer STRUCTURETECH NY | INSTALLATION OF TEMPORARY SUPPORTED SCAFFOLD AS PER DRAWINGS.TEMPORARY SUPPORTED SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING … |
| M00423057 ↗ | 19 EAST 70 STREET MANHATTAN | Alteration | Signed-off | 01/07/2021 | 04/13/2021 | Design PLAN B ENGINEERING Filer EUROCELT EXPEDITING, INC | INSTALLATION OF TEMPORARY SCAFFOLD @ ROOF LEVEL AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFO… |
| M00453537 ↗ | 86 JANE STREET MANHATTAN | Alteration | Signed-off | 01/27/2021 | 04/13/2021 | Design STRUCTURETECH NEW YORK, INC Filer STRUCTURETECH NY | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS.TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO C… |
| Q00439669 ↗ | 56-28 2ND STREET QUEENS | Alteration | Signed-off | 12/14/2020 | 04/13/2021 | Design STRUCTURETECH NEW YORK, INC Filer STRUCTURETECH NY | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS.TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THENYC BUILDING CODE. NO CH… |
| M00002875 ↗ | 48 WEST 69 STREET MANHATTAN | Alteration | Signed-off | 11/21/2017 | 04/12/2021 | Design TOHFAZ UDDIN PE PC | INSTALLATION OF FENCE ENCLOSURE AS PER DRAWINGS. FENCE ENCLOSURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, O… |
| B00422010 ↗ | 361 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 11/05/2020 | 04/09/2021 | Design JRS ENGINEERING SERVICES | INSTALLATION OF PLYWOOD FENCE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUI… |
| M00385538 ↗ | 135 EAST 47TH STREET MANHATTAN | Alteration | Signed-off | 08/19/2020 | 04/09/2021 | Design JRS ENGINEERING SERVICES | INSTALLATION OF TEMPORARY FENCE DURING NB CONSTRUCTION, FILED SEPARATELY. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO C… |
| 340722187BIS | COMMERCIAL STREET BROOKLYN | — | ISSUED | 03/24/2020 | 03/24/2021 | — | EQ |
| 440587161BIS | 17-20 VILLAGE LANE QUEENS | — | ISSUED | 03/12/2020 | 02/23/2021 | — | EQ |
| 140989054BIS | 454 GREENWICH STREET MANHATTAN | — | ISSUED | 12/10/2020 | 12/10/2020 | — | EQ |
| 140960609BIS | 454 GREENWICH STREET MANHATTAN | — | ISSUED | 11/28/2020 | 11/28/2020 | — | EQ |
| 140955900BIS | 454 GREENWICH STREET MANHATTAN | — | ISSUED | 09/28/2020 | 09/28/2020 | — | EQ |
| M00332904 ↗ | 1241 BROADWAY MANHATTAN | Alteration | Signed-off | 09/10/2020 | 09/14/2020 | Design STRUCTURETECH NEW YORK, INC Filer STRUCTURETECH NY | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO … |
| 340758585BIS | 95 YORK STREET BROOKLYN | — | ISSUED | 09/04/2020 | 09/04/2020 | — | EQ |
| B00388089 ↗ | 322 THIRD AVENUE BROOKLYN | Alteration | Signed-off | 08/24/2020 | 08/27/2020 | Design PAUL PERDEK, PROF. ENG. PLLC | INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY … |
| 140939689BIS | 1241 BROADWAY MANHATTAN | — | ISSUED | 08/19/2020 | 08/19/2020 | — | EQ |
| 123876877BIS | 1241 BROADWAY MANHATTAN | — | ISSUED | 07/31/2020 | 07/31/2020 | — | EQ |
| 140915160BIS | 322-326 7TH AVENUE MANHATTAN | — | ISSUED | 07/29/2020 | 07/29/2020 | — | EQ |
| M00370374 ↗ | 322-326 7TH AVENUE MANHATTAN | Alteration | Signed-off | 07/20/2020 | 07/28/2020 | Design STRUCTURETECH NEW YORK, INC Filer STRUCTURETECH NY | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE NO C… |
| 140850167BIS | 540 WEST 21 STREET MANHATTAN | — | ISSUED | 07/23/2020 | 07/23/2020 | — | EQ |
| 140850185BIS | 540 WEST 21 STREET MANHATTAN | — | ISSUED | 06/20/2019 | 07/23/2020 | — | EQ |
| 140861020BIS | 1241 BROADWAY MANHATTAN | — | ISSUED | 07/08/2020 | 07/08/2020 | — | EQ |
| 140861244BIS | 1241 BROADWAY MANHATTAN | — | ISSUED | 07/08/2020 | 07/08/2020 | — | EQ |
| 140899507BIS | 322-326 7TH AVENUE MANHATTAN | — | ISSUED | 06/30/2020 | 06/30/2020 | — | EQ |
| 140898866BIS | 378 WEST END AVENUE MANHATTAN | — | ISSUED | 06/23/2020 | 06/23/2020 | — | EQ |
| 340725638BIS | 95 YORK STREET BROOKLYN | — | ISSUED | 06/15/2020 | 06/15/2020 | — | EQ |
| 340679206BIS | 70 SCHERMERHORN STREET BROOKLYN | — | ISSUED | 06/13/2019 | 06/10/2020 | — | EQ |
| M00327391 ↗ | 130 WILLIAM STREET MANHATTAN | Alteration | Signed-off | 03/11/2020 | 06/09/2020 | Design JRS ENGINEERING SERVICES Filer STRUCTURETECH NY | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS.TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE NO CH… |
| 140891391BIS | 322-326 7TH AVENUE MANHATTAN | — | ISSUED | 06/09/2020 | 06/09/2020 | — | EQ |
| 140891408BIS | 322-326 7TH AVENUE MANHATTAN | — | ISSUED | 06/05/2020 | 06/05/2020 | — | EQ |
| M00002547 ↗ | 48 WEST 69 STREET MANHATTAN | Alteration | Signed-off | 11/17/2017 | 04/06/2020 | Design TOHFAZ UDDIN PE PC | INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EG… |
| Q00255850 ↗ | 3-24 27TH AVENUE QUEENS | Alteration | Signed-off | 12/03/2019 | 04/06/2020 | Design STRUCTURETECH NEW YORK, INC | INSTALLATION OF TEMPORARY FENCE AS PER DRAWINGS. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY O… |
| Q00279999 ↗ | 56-28 2ND STREET QUEENS | Alteration | Signed-off | 12/12/2019 | 04/06/2020 | Design STRUCTURETECH NEW YORK, INC Owner GO HPS LLC | INSTALLATION OF TEMPORARY FENCE AS PER DRAWINGS. FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY O… |
| 140890622BIS | 322-326 7TH AVENUE MANHATTAN | — | ISSUED | 03/11/2020 | 03/11/2020 | — | EQ |
| Q00322825 ↗ | 1725 VILLAGE LANE QUEENS | Alteration | Signed-off | 02/28/2020 | 03/02/2020 | Design STRUCTURETECH NEW YORK, INC Filer STRUCTURETECH NY | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS.TEMPORARY PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE NO CH… |