← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Century Tower Condominium
400 EAST 90 STREET · BIN 1087460
💬 Discuss this project
1999Year Built
23Stories
RMBuilding Class
C2-8Zoning
103,375 sfGross Floor Area
130Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: CENTURY TOWER CONDOMINIUM · 9,682 sf lot · 10.68 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction18p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RFR REALTY2208/29/2026
PLATINUM SERVICES NY407/08/2026
CENTURY TOWER CONDOMINIUM703/22/2026
ROCK GROUP NY903/22/2026
N7 OWNER203/21/2026
RFD 90TH FIRST403/21/2026
LONGFELLOW PROPERTIES103/21/2026
RFD 90TH 1ST1003/21/2026
JORDAN COOPER MANAGEMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EMPIRE CITY CONSULTANTS, INC.803/21/2026
METROPOLIS GROUP INC603/21/2026
EXPEDITE DEM203/21/2026
CATAPANO ENGINEERING203/21/2026
LOUIS STRIAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRODUCTION CONTRACT. LLCGeneral Contractor303/21/2026
BARTON CONSTRUCTION LLCGeneral Contractor306/27/2026
PIECE MANAGEMENT INCGeneral Contractor306/28/2026
NATIONAL RETAIL CONSTRUCTGeneral Contractor207/08/2026
LUIGI AMORESEElectrical203/21/2026
RAPTOR MECHANICAL,INCPlumbing107/08/2026
SCHUMACHER & FARLEY P&H CPlumbing107/08/2026
GOTHAM WIRING LICENSEDElectrical103/22/2026
NATIONAL SIGN LIGHTINGScaffold107/08/2026
RICHARD WEHNERElectrical103/21/2026
ALBA SERVICES INCGeneral Contractor104/09/2026
PLATINUM SERVICES NY LLCGeneral Contractor107/08/2026
GREGG NY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355107/14/2026
SHAHRISH SHUVO ENGINEERIN8524403/27/2026
SGM ENGINEERING2366403/26/2026
ANCORA ENGINEERING, PLLC6818104/24/2025
AKS ARCHITECTURAL & ENGIN1957201/17/2024
CATAPANO ENGINEERING & AR3235109/24/2019
Building Lifecycle
All (148)Filed (17)Permit Issued (13)Signed Off (6)Facade (FISP) (15)Violation (60)Inspection (3)Objection (4)Special Inspection (30)
08/12/2026
Signed off — Alteration
REMOVAL OF THE PLUMBING FIXTURES AND RELATED PIPING. CUT AND CAP BACK TO THE ACTIVE LINES/RISERS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01281201-S1
08/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/05/2026
Objection resolved — Addressed
08/05/2026
Objection resolved — Addressed
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
08/04/2026
Objection raised — Scope
08/04/2026
Objection raised — Cost
07/14/2026
Filed — Alteration
Interior renovation of bathroom in Apt 11E. All as per plans and applications. No change in use, egress or occupancy.
M01424413-I1
06/30/2026
Special inspection requirement — Final
ABDALLAH ELCHERBINI
06/24/2026
Violation issued (ECB, closed)
Construction
06/22/2026
Permit issued — Mechanical Systems
M00202448-I1-MS
06/15/2026
Signed off — Alteration
M01312578-I1
05/11/2026
Permit issued — Plumbing
M01366909-S2-PL
05/01/2026
Permit issued — General Construction
M01366909-I1-GC
05/01/2026
Permit issued — Mechanical Systems
M01366909-S1-MS
04/13/2026
Signed off — Alteration
REMOVAL OF THE PLUMBING FIXTURES AND RELATED PIPING. CUT AND CAP BACK TO THE ACTIVE LINES/RISERS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01281201-I1
04/07/2026
Signed off — Alteration
New Sheetrock Ceiling, Painting, New Flooring and replacement of handrails, No change in Occupancy, Egress or Use.
M01214313-I1
03/30/2026
Special inspection requirement — Mechanical Systems
Shahrish Shuvo
03/30/2026
Special inspection requirement — Final
Shahrish Shuvo
03/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
03/30/2026
Special inspection requirement — Duct leakage testing, insulation and design
Shahrish Shuvo
03/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
03/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
03/30/2026
Special inspection requirement — Maintenance information
Shahrish Shuvo
03/30/2026
Special inspection requirement — Shutoff dampers
Shahrish Shuvo
03/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Shahrish Shuvo
03/30/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
03/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
Shahrish Shuvo
03/27/2026
Filed — Alteration
REMOVAL OF THE PLUMBING FIXTURES AND RELATED PIPING. CUT AND CAP BACK TO THE ACTIVE LINES/RISERS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01281201-P1
03/26/2026
Filed — Alteration CO
MODIFICATIONS TO PLUMBING FIXTURES, PIPING AND RELATED COMPONENTS IN 1ST FLOOR YOGA STUDIO. FILED IN CONJUNCTION WITH ALT-CO #M01366909-I1.
M01366909-I1
03/26/2026
Filed — Alteration CO
MODIFICATIONS TO PLUMBING FIXTURES, PIPING AND RELATED COMPONENTS IN 1ST FLOOR YOGA STUDIO. FILED IN CONJUNCTION WITH ALT-CO #M01366909-I1.
M01366909-S3
03/26/2026
Filed — Alteration CO
MODIFICATIONS TO PLUMBING FIXTURES, PIPING AND RELATED COMPONENTS IN 1ST FLOOR YOGA STUDIO. FILED IN CONJUNCTION WITH ALT-CO #M01366909-I1.
M01366909-S2
03/26/2026
Filed — Alteration CO
MODIFICATIONS TO PLUMBING FIXTURES, PIPING AND RELATED COMPONENTS IN 1ST FLOOR YOGA STUDIO. FILED IN CONJUNCTION WITH ALT-CO #M01366909-I1.
M01366909-S1
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
steven Giammona
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
steven Giammona
03/25/2026
Special inspection requirement — Lighting controls
steven Giammona
03/25/2026
Special inspection requirement — Interior lighting power
steven Giammona
03/23/2026
Special inspection requirement — Maintenance information
steven Giammona
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
03/23/2026
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
03/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
03/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
03/23/2026
Special inspection requirement — Shutoff dampers
steven Giammona
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
steven Giammona
03/23/2026
Special inspection requirement — Energy Code Compliance Inspections
steven Giammona
03/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
steven Giammona
03/23/2026
Special inspection requirement — Maintenance information
steven Giammona
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
steven Giammona
03/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
steven Giammona
12/02/2025
Permit issued — Sign
M01312578-I1-SG
11/25/2025
Permit issued — Plumbing
M01281201-S2-PL
11/24/2025
Filed — Alteration
M01312578-I1
11/05/2025
Permit issued — Mechanical Systems
M01281201-S1-MS
10/08/2025
Filed — Alteration
REMOVAL OF THE PLUMBING FIXTURES AND RELATED PIPING. CUT AND CAP BACK TO THE ACTIVE LINES/RISERS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01281201-S2
09/24/2025
Permit issued — General Construction
M01281201-I1-GC
09/19/2025
Filed — Alteration
REMOVAL OF THE PLUMBING FIXTURES AND RELATED PIPING. CUT AND CAP BACK TO THE ACTIVE LINES/RISERS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01281201-S1
09/15/2025
Filed — Alteration
REMOVAL OF THE PLUMBING FIXTURES AND RELATED PIPING. CUT AND CAP BACK TO THE ACTIVE LINES/RISERS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01281201-I1
05/02/2025
Permit issued — General Construction
M01214313-I1-GC
04/24/2025
Filed — Alteration
New Sheetrock Ceiling, Painting, New Flooring and replacement of handrails, No change in Occupancy, Egress or Use.
M01214313-I1
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPIECE MANAGEMENT INC06/22/2026
DOB NOWPlumbingPermit IssuedGREGG NY PLUMBING, INC05/11/2026
DOB NOWGeneral ConstructionPermit IssuedNATIONAL RETAIL CONSTRUCT05/01/2026
DOB NOWMechanical SystemsPermit IssuedNATIONAL RETAIL CONSTRUCT05/01/2026
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC12/02/2025
DOB NOWPlumbingPermit IssuedRAPTOR MECHANICAL, INC11/25/2025
DOB NOWMechanical SystemsSigned-offBARTON CONSTRUCTION11/05/2025
DOB NOWGeneral ConstructionSigned-offBARTON CONSTRUCTION09/24/2025
DOB NOWGeneral ConstructionSigned-offALBA SERVICES INC05/02/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC04/17/2024
DOB NOWGeneral ConstructionSigned-offPRODUCTION CONTRACT. LLC11/03/2022
DOB NOWPlumbingSigned-offSCHUMACHER & FARLEY P&H C11/03/2022
DOB NOWMechanical SystemsPermit IssuedPIECE MANAGEMENT INC10/11/2019
BISEQISSUEDROCK GROUP NY CORP08/04/2020
BISEQISSUEDROCK GROUP NY CORP02/14/2019
BISEQISSUEDROCK GROUP NY CORP08/30/2018
BISOTISSUEDDJM NYC, LLC08/23/2018
BISEQISSUEDROCK GROUP NY CORP02/08/2018
BISOTISSUEDDJM NYC, LLC11/03/2017
BISEQISSUEDROCK GROUP NY CORP09/22/2017
BISMHISSUEDELITE GC NY INC05/15/2017
BISPLISSUEDL&J PLG & HTG CO OF NY IN03/24/2017
BISEQISSUEDROCK GROUP NY CORP02/24/2017
BISOTISSUEDELITE GC NY INC02/23/2017
BISPLISSUEDTW PLUMBING & HEATING INC12/16/2016
BISOTISSUEDAUGUST CONSTRUCTION GROUP10/18/2016
BISPLISSUEDPARKSET PLUMBING CO INC09/26/2016
BISPLISSUEDPETER PLUMBING ASSOC. INC.05/13/2015
BISOTISSUEDHD HVAC OF NY INC05/11/2015
BISMHISSUEDTITAN MECHANICAL SERVICES04/17/2015
BIS—ISSUEDMAUCERI SIGN CO., INC03/20/2013
BISOTISSUEDLELCAJ CONSTRUCTION LLC08/02/2012
BISOTISSUEDRSM MAINTENANCE LLC12/15/2011
BISMHISSUEDRSM MAINTENANCE LLC12/15/2011
BISPLISSUEDPRACTICAL PLBG & HTG INC02/08/2010
BISPLRE-ISSUEDSTEPHEN FOY MECH SVC CORP12/08/2009
BISOTISSUEDD.D. INTERIORS INC12/04/2009
BISOTISSUEDRCD RESTORATIONS INC10/05/2006
BISEQISSUEDEVEREST SCAFFOLDING INC08/08/2006
BISOTISSUEDUNITECH DESIGN INC03/15/2004
+ 23 more permits on file
1 project · most recent 03/27/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2026Signed-offBARTON CONSTRUCTION LLCAir Conditioning Systems
Cooling
Sigma SDSH-C.2-120-2 4,000 CFM ×2
1 project · most recent 03/26/2026
Sprinkler System
FiledStatusContractorScope
03/26/2026——Sprinkler System
2 projects · most recent 03/27/2026
Water/Sanitary
FiledStatusContractorScope
03/27/2026Permit IssuedRAPTOR MECHANICAL, INCWater/Sanitary
03/26/2026Permit IssuedGREGG NY PLUMBING, INCWater/Sanitary
13 projects · most recent 06/02/2026
General Wiring Lighting
FiledStatusContractorScope
06/02/2026Permit IssuedEURO ELEC'L CONTRG, INCGeneral Wiring
04/23/2026Permit IssuedHOME RUN ELECTRIC—
10/06/2025Permit IssuedSUREPOWER ELECTRIC, INCGeneral Wiring
10/06/2025Permit IssuedSUREPOWER ELECTRIC, INC—
09/30/2025CompleteMODERN VOLTAGE NYC INC—
04/24/2025Permit IssuedALBA ELECTRIC CORPGeneral Wiring
12/23/2024Permit IssuedAPOLLO ELECTRIC NYG, INCGeneral Wiring
04/18/2024Permit IssuedILLUMINOUS ELECTRIC CORP.—
12/05/2023CompleteACCURATE ELEC'L CORP.General Wiring
10/26/2022Permit IssuedROBERT CHIMENTI7 meters, 1 new_meters
12/11/2020Permit IssuedCANDELA SYSTEMS CORP DBALighting
10/13/2019CompleteASTER ELECTRIC, INC—
08/12/2019CompleteGOTHAM WIRING LICENSEDGeneral Wiring
1 project · most recent 03/26/2026
FiledStatusContractorScope
03/26/2026Permit IssuedGREGG NY PLUMBING, INC1 scope_items
1 project · most recent 04/15/2024
Sidewalk Shed
FiledStatusContractorScope
04/15/2024Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
08/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
08/05/2026Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
06/30/2026FinalABDALLAH ELCHERBINIprogress
03/30/2026Mechanical SystemsShahrish Shuvospecial
03/30/2026FinalShahrish Shuvoprogress
03/30/2026Energy Code Compliance InspectionsShahrish Shuvoprogress
03/30/2026Duct leakage testing, insulation and designShahrish Shuvoenergy_progress
03/30/2026HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
03/30/2026HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
03/30/2026Maintenance informationShahrish Shuvoenergy_progress
03/30/2026Shutoff dampersShahrish Shuvoenergy_progress
03/30/2026HVAC-R and service water piping design and insulationShahrish Shuvoenergy_progress
03/30/2026Post-installed AnchorsShahrish Shuvospecial
03/30/2026Tenant Protection Plan ComplianceShahrish Shuvospecial
03/26/2026Tenant Protection Plan Compliancesteven Giammonaspecial
03/26/2026Tenant Protection Plan Compliancesteven Giammonaspecial
03/25/2026Lighting controlssteven Giammonaenergy_progress
03/25/2026Interior lighting powersteven Giammonaenergy_progress
03/23/2026Maintenance informationsteven Giammonaenergy_progress
03/23/2026Fire-Resistant Penetrations and Jointssteven Giammonaspecial
03/23/2026Energy Code Compliance Inspectionssteven Giammonaprogress
03/23/2026HVAC-R and service water piping design and insulationsteven Giammonaenergy_progress
03/23/2026HVAC-R and service water heating equipmentsteven Giammonaenergy_progress
03/23/2026HVAC-R and service water heating system controlssteven Giammonaenergy_progress
03/23/2026Shutoff damperssteven Giammonaenergy_progress
03/23/2026Fire-Resistant Penetrations and Jointssteven Giammonaspecial
Latest 25 of 48.
▾Documents — 279 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch16
09/01/2026M08020808-I1Request digital key ↗
09/01/2026M08020808-P1Request digital key ↗
08/27/2026M01035355-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00202448-I1Request digital key ↗
▸Applications & Permits47
▸BISWORK PERMIT APPLICATION25
02/15/2019140608028Open ↗
08/24/2018123301382Open ↗
02/14/2018140608028Open ↗
Showing 3 of 25 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION21
12/02/2020140691534Open ↗
08/10/2020140691534Open ↗
06/22/2018122966022Open ↗
Showing 3 of 21 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/01/2015122379247Open ↗
▸Seals & Professional Certifications89
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
08/29/2019123301382Open ↗
11/27/2018122966022Open ↗
11/27/2018122966022Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/05/2026M00202448-I1Open ↗
09/01/2026M08020808-P1Open ↗
09/01/2026M08020808-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/05/2026M01366909-S2Open ↗
09/05/2026M01366909-S2Open ↗
08/28/2026M01214313-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/05/2026M01366909-S2Open ↗
08/28/2026M01214313-I1Open ↗
08/27/2026M01281201-S1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/12/2015122379247Open ↗
04/30/2015122370488Open ↗
03/21/2013121554031Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
09/21/2017140691534Open ↗
02/23/2017140608028Open ↗
09/23/2016140553381Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/21/2017140691534Open ↗
02/23/2017140608028Open ↗
09/23/2016140553381Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/21/2017140691534Open ↗
02/23/2017140608028Open ↗
09/23/2016140553381Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
03/21/2013121554031Open ↗
08/06/2012121176912Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
06/22/2018122966022Open ↗
04/20/2017122966022Open ↗
12/15/2016122966022Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING5
09/23/2016140553381Open ↗
10/18/2011120854370Open ↗
11/20/2009120153252Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
09/15/2015122379247Open ↗
07/17/2015122379247Open ↗
03/05/2010120198838Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS2
06/09/2016122370488Open ↗
04/30/2015122370488Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
04/30/2015122370488Open ↗
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes5
08/16/2017123301382Open ↗
08/08/2017123301382Open ↗
10/14/2016122912857Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
12/15/2016122966022Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00202448-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/18/2026M01366909-I1Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS-CERTIFICATION (DEP ACP5)5
10/18/2011120854370Open ↗
10/18/2011120854370Open ↗
10/18/2011120854370Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/05/2026M00202448-I1Open ↗
09/01/2026M08020808-I1Open ↗
09/01/2026M08020808-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
08/29/2019123301382Open ↗
11/27/2018122966022Open ↗
08/16/2017123301382Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
08/29/2019123301382Open ↗
11/27/2018122966022Open ↗
05/22/2017140553381Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections1
10/18/2011120854370Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/23/2016140553381Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/23/2016140553381Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/13/2020140691534Open ↗
08/10/2020140608028Open ↗
09/21/2017140691534Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs21
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
12/09/2020140691534Open ↗
08/10/2020140608028Open ↗
08/29/2019123301382Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
03/21/2013121554031Open ↗
08/06/2012121176912Open ↗
Showing 2 of 4 on file for this type
▸BISSHED LETTER3
02/15/2019140608028Open ↗
02/15/2019140608028Open ↗
02/14/2018140608028Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/22/2017140553381Open ↗
10/01/2015122379247Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT21
08/29/2019123301382Open ↗
11/27/2018122966022Open ↗
08/08/2017123301382Open ↗
Showing 3 of 21 on file for this type
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET10
08/08/2017123301382Open ↗
12/15/2016122966022Open ↗
10/14/2016122912857Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION5
08/28/2019123301382Open ↗
06/26/2018122966022Open ↗
05/25/2018140608028Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
08/29/2019123301382Open ↗
11/27/2018122966022Open ↗
06/22/2018122966022Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/21/2017140691534Open ↗
02/23/2017140608028Open ↗
09/23/2016140553381Open ↗
▸Other Documents4
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
02/23/2017140608028Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/06/2012121176912Open ↗
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
08/18/2026M01366909-I1Open ↗