← Back
BuildNYC
Banking facility, with or without parking
1731 VICTORY BOULEVARD
STATEN ISLAND · BIN 5009547
💬 Discuss this project
1950Year Built
2Stories
K7Building Class
R3-1Zoning
6,927 sfGross Floor Area
1Units
0 Active Violations
Banking facility, with or without parking · Owner of record: Blue Star · 29,476 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Floor 12 filings
Cellar1 filing
Site & exterior3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Northfield Savings Bank603/21/2026
Bluestar Properties103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A Tech Engineering NYC202/18/2026
GNP Design Group105/13/2025
Longo Architects & Associates105/09/2025
IW Architecture303/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York Sign Consultants603/21/2026
A Tech Engineering NYC403/21/2026
Metropolis Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Going Sign & ServicingSign hanger307/08/2026
MVS Heating & Air Conditspecialty_contractor303/21/2026
Scaran PlumbingPlumbing203/21/2026
Phoenix Diversified GroupGeneral Contractor107/08/2026
Blue Star Groupspecialty_contractor104/09/2026
Watson's Plumbing, Heating, & BuildingPlumbing107/08/2026
Cannella ElectricElectrical103/22/2026
Scaran Oil ServiceGeneral Contractor107/13/2000
Scaran PlumbingGeneral Contractor110/10/2008
Scaran PlumbingPlumbing111/18/2003
Scaran PlumbingGeneral Contractor109/03/2014
Tarato Construction CompanyGeneral Contractor201/30/2008
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738202/18/2026
Shahrish Shuvo Engineering8524105/13/2025
Building Lifecycle
10/23/2026
Boiler inspection report filed
Subsequent · no defects · Accepted
10/22/2026
Boiler inspection report filed
Initial · defects found · Accepted
04/22/2026
Signed off — Alteration
HERWITH FILING FOR INTERIOR RENOVATIONS, INCLUDING REMOVAL/INSTALLATION OF NON-LOAD BEARING PARTITIONS AND FINISHES AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
S01207186-I1
03/03/2026
Signed off — Alteration
HEREWITH FILING FOR PLUMBING MODIFICATIONS TO EXISTING SYSTEM AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
S01207238-I1
02/24/2026
Signed off — Alteration
DIRECT REPLACEMENT OF (4) ROOFTOP HVAC UNITS
S01360846-I1
61 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Blue Star Group—
DOB NOW—Watson's Plumbing, Heating, & Building—
DOB NOW—Phoenix Diversified Group—
DOB NOW—Polsinelli, Henry—
DOB NOW—Polsinelli, Henry—
DOB NOW—Polsinelli, Henry—
DOB NOW—MVS Heating & Air Condit—
BIS—Scaran Plumbing—
BIS—Scaran Plumbing—
BIS—Scaran Plumbing—
BIS—Mad Signs—
BIS—Mad Signs—
BIS—Tarato Construction Company—
BIS—Tarato Construction Company—
BIS—Scaran Plumbing—
BIS—Scaran Oil Service—
BIS—Scaran Plumbing—
BIS—Scaran Plumbing—
BIS—Scaran Plumbing—
Nothing on file for this building.
Nothing on file for this building.
117 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account