← Back
Multi-story retail building (2+)
174 7 AVENUE SOUTH
MANHATTAN · BIN 1010941
💬 Discuss this project
1922Year Built
2Stories
K2Building Class
C2-6Zoning
4,300 sfGross Floor Area
5Units
9 Open Violations 5 unresolved · 4 paperwork only ▸
Multi-story retail building (2+) · Owner of record: HUANG'S HOLDING CORP · 2,155 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 10 docs
Floor 1Under Construction18p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HUANG'S HOLDINGS CORP2307/08/2026
INDER CONSTRUCTION507/08/2026
178 7 AVE INC #1103/22/2026
212 ONE WAY CONSTRUCTION LLC203/21/2026
ACE GROUP NY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SMN CONSULTING SERVICES203/21/2026
RIP CC603/21/2026
J SIBAJA KITCHEN VENTILATION203/21/2026
AK CONSULTING SERVICES203/21/2026
ART OF FORM ARCHITECTS403/21/2026
GREEN STUDIO203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RICHARD NEUElectrical103/21/2026
ACE GROUP NY CORPGeneral Contractor104/09/2026
INDER CONSTRUCTION INCGeneral Contractor107/08/2026
K.I.M.CO. REFRIGERATIONGeneral Contractor107/08/2026
SARWAR BUILDERS INCGeneral Contractor104/09/2026
COLBREN PLBG & HTG INCPlumbing107/08/2026
JUST PLBG & HTG INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM ENGINEERING SERVICES P7975204/10/2026
BITOPI CONSULTANTS LLC7036112/31/2025
CROSSCHECK INSPECTION SER544307/19/2023
TAN ENGINEERING, P.C.1291205/16/2023
Building Lifecycle
All (82)Filed (11)Permit Issued (6)Signed Off (1)Violation (29)Inspection (15)Objection (9)Special Inspection (11)
06/04/2026
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
Albert Munoz
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
06/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Albert Munoz
05/22/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/15/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/10/2026
Filed — Alteration
INSTALLATION/ MODIFICATION OF PLUMBING FIXTURES GAS KITCHEN EQUIPMENT AND SHUT-OFF GAS VALVE FOR UPGRADE OF FIRE SUPPRESSION SYSTEM IN COMMERCIAL KITCHEN FOR EXISTING RESTAURANT/ NO CHANGE OR EGRESS OCCUPANCY.
M01005957-P1
01/14/2026
Permit issued — General Construction
M01219596-I1-GC
12/31/2025
Filed — Alteration
M01219596-I1
08/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Albert Munoz
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Albert Munoz
05/28/2025
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
Albert Munoz
05/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/09/2025
Permit issued — Plumbing
M01005957-I1-PL
05/09/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/04/2025
Permit issued — Sidewalk Shed
M01163469-I1-SH
02/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/28/2025
Permit issued — Sidewalk Shed
M01163469-I1-SH
01/13/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01163469-I1
01/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/12/2024
Violation issued (ECB, open)
Construction
07/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/28/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/03/2024
Objection raised — Admin
03/24/2024
Filed — Alteration
M01008023-I1
03/07/2024
Objection raised — Other
03/07/2024
Objection resolved — Addressed
03/07/2024
Objection raised — Other
03/07/2024
Objection resolved — Addressed
02/27/2024
Filed — Alteration
INSTALLATION/ MODIFICATION OF PLUMBING FIXTURES GAS KITCHEN EQUIPMENT AND SHUT-OFF GAS VALVE FOR UPGRADE OF FIRE SUPPRESSION SYSTEM IN COMMERCIAL KITCHEN FOR EXISTING RESTAURANT/ NO CHANGE OR EGRESS OCCUPANCY.
M01005957-I1
07/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
07/19/2023
Filed — Alteration
Installation & modification of plumbing fixtures for commercial space with Ansul system & shut off valve at commercial cellar. No change in egress, occupancy, or use.
M00872303-P2
07/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
07/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/16/2023
Filed — Alteration
Installation & modification of plumbing fixtures for commercial space with Ansul system & shut off valve at commercial cellar. No change in egress, occupancy, or use.
M00872303-P1
06/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
06/15/2023
Signed off — Alteration
Install RTU at existing roof, all as shown on drawings herewith submitted. Amended drawings to correct the specifications for the units
M08038698-I1
06/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/26/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/26/2023
Objection raised — Other
05/26/2023
Objection resolved — Resolved
05/25/2023
Objection raised — Other
05/25/2023
Objection resolved — Resolved
05/24/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/16/2023
Filed — Alteration
Install RTU at existing roof, all as shown on drawings herewith submitted. Amended drawings to correct the specifications for the units
M08038698-P1
05/16/2023
Permit issued — Plumbing
M00872303-I1-PL
05/16/2023
Special inspection requirement — Mechanical Systems
Roger Tan
05/16/2023
Special inspection requirement — Final
Mark Searage
05/11/2023
Filed — Alteration
Installation & modification of plumbing fixtures for commercial space with Ansul system & shut off valve at commercial cellar. No change in egress, occupancy, or use.
M00872303-I1
05/10/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00871985-I1
04/19/2023
Permit issued — Mechanical Systems
M08038698-I1-MS
12/16/2022
Filed — Alteration
Install RTU at existing roof, all as shown on drawings herewith submitted. Amended drawings to correct the specifications for the units
M08038698-I1
10/14/2022
Violation issued (ECB, open)
Construction
10/25/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/25/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/12/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/12/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/12/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSARWAR BUILDERS INC01/14/2026
DOB NOWPlumbingPermit IssuedMOHAMED ABDELRAZEK05/09/2025
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP03/04/2025
DOB NOWSidewalk ShedPermit IssuedINDER CONSTRUCTION INC01/28/2025
DOB NOWPlumbingPermit IssuedCOLBREN PLBG & HTG INC05/16/2023
DOB NOWMechanical SystemsSigned-offK.I.M.CO. REFRIGERATION04/19/2023
BISEQISSUEDMBR CONTRACTING INC09/27/2006
BISEQISSUEDMBR CONTRACTING INC09/11/2006
BISEQISSUEDMBR CONTRACTING INC05/04/2006
BISOTISSUEDTRICE CONTRACTING INC04/13/2006
BISEQISSUEDMBR CONTRACTING INC04/07/2006
BISEQISSUEDNEW SUN DESIGN CONST.CORP11/13/1997
BISMHISSUEDWELMADE REALTY CORP.12/12/1995
2 projects · most recent 04/10/2026
Gas
FiledStatusContractorScope
04/10/2026Permit IssuedJUST PLBG & HTG INCGas
07/19/2023Permit IssuedCOLBREN PLBG & HTG INCGas
1 project · most recent 01/29/2025
FiledStatusContractorScope
01/29/2025CompleteRICHARD NEU—
2 projects · most recent 01/13/2025
Sidewalk Shed
FiledStatusContractorScope
01/13/2025Permit IssuedACE GROUP NY CORPSidewalk Shed
05/10/2023——Sidewalk Shed
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
05/22/2026Fail-Final General Construction Non-Directive 14FailView ↗
05/15/2026Fail-Final General Construction Non-Directive 14FailView ↗
08/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/09/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/26/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/04/2026High-Pressure Fuel-Gas Piping (Welding)Albert Munozspecial
06/04/2026Fire-Resistant Penetrations and JointsAlbert Munozspecial
06/04/2026Energy Code Compliance InspectionsAlbert Munozprogress
05/28/2025Energy Code Compliance InspectionsAlbert Munozprogress
05/28/2025Fire-Resistant Penetrations and JointsAlbert Munozspecial
05/28/2025High-Pressure Fuel-Gas Piping (Welding)Albert Munozspecial
07/20/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/19/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
06/16/2023Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
05/16/2023Mechanical SystemsRoger Tanspecial
05/16/2023FinalMark Searageprogress
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/01/2026M08038698-P1Request digital key ↗
09/01/2026M08038698-I1Request digital key ↗
08/29/2026M00872303-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit8
08/13/2026M01219596-I1Open ↗
08/13/2026M00872303-P2Open ↗
08/13/2026M00872303-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
01/24/2018120373096Open ↗
01/23/2018120373096Open ↗
06/24/2010120373096Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/01/2026M08038698-P1Open ↗
09/01/2026M08038698-I1Open ↗
08/31/2026M00871985-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026M00872303-I1Open ↗
08/26/2026M00872303-P1Open ↗
08/26/2026M01005957-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026M01005957-P1Open ↗
08/24/2026M01005957-I1Open ↗
08/23/2026M08038698-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026M08038698-P1Open ↗
09/01/2026M08038698-I1Open ↗
08/17/2026M01005957-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
06/24/2010120373096Open ↗
06/24/2010120373096Open ↗
06/24/2010120373096Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/24/2010120373096Open ↗
▸Filing & Intake Forms1
▸BISBOROUGH INTAKE FORM1
01/24/2018120373096Open ↗