Walk-up apt, over six families with stores
The 195 Humboldt Street Condominium
175 MESEROLE STREET · BIN 3429901
💬 Discuss this project
2024Year Built
4Stories
C7Building Class
R6Zoning
10,894 sfGross Floor Area
11Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 195 Humboldt Holdings · 3,228 sf lot · 3.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofZev Zafir INC.44p · 3 filings · 20 docs
BulkheadNew 4-story Concrete Residential Building3p · 1 filing · 20 docs
Floor 4Zev Zafir INC.46p · 3 filings · 20 docs
Floor 3Zev Zafir INC.44p · 3 filings · 20 docs
Floor 2New 4-story Concrete Residential Building42p · 2 filings · 20 docs
Floor 1New 4-story Concrete Residential Building44p · 2 filings · 20 docs
Site & exteriorRoberta's19p · 5 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
West 187 Holdings2007/08/2026
Miron Realty1503/21/2026
Zev Zafir408/29/2026
195 Humboldt Holdings203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing1603/21/2026
BAC Developers Group403/21/2026
NYC Design File203/21/2026
AE Design Solution803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Builders Group USAGeneral Contractor504/09/2026
Stateline BuildersScaffold407/08/2026
Builders Group USAScaffold407/08/2026
True Power Electrical ContElectrical303/21/2026
Core Scaffold SystemsScaffold207/08/2026
True Power Electrical ContGeneral Contractor203/22/2026
Nikolai Katz ArchitectGeneral Contractor103/22/2026
Dynamix Scaffold GroupScaffold104/09/2026
Nikolai KatzElectrical103/21/2026
Yellow Hat Construction IScaffold104/09/2026
B&B Mechanical Plumbing & HeatingPlumbing107/08/2026
Mpi PlumbingPlumbing107/08/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616907/26/2024
Building Lifecycle
All (151)Filed (23)Permit Issued (15)Signed Off (8)Violation (4)Inspection (4)Objection (64)Special Inspection (30)Tax Incentive (3)
10/15/2026
Objection resolved — Resolved
10/14/2026
Objection raised — Scope
09/16/2026
Objection resolved — Resolved
09/16/2026
Objection resolved — Resolved
08/25/2026
Objection resolved — Open
07/06/2026
Objection resolved — Addressed
07/02/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
421-a(16) construction completed
06/26/2026
Objection raised — Scope
06/26/2026
Objection raised — Scope
06/26/2026
Objection raised — Cost
06/26/2026
Objection raised — Structural
06/26/2026
Objection raised — Structural
06/25/2026
Objection resolved — Resolved
06/25/2026
Objection resolved — Resolved
06/25/2026
Objection resolved — Resolved
06/25/2026
Objection resolved — Resolved
06/25/2026
Objection resolved — Addressed
06/25/2026
Objection resolved — Resolved
06/24/2026
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01359448-I1
B01359448-S3
06/24/2026
Special inspection requirement — Sprinkler Systems
06/24/2026
Special inspection requirement — Post-installed Anchors
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/15/2026
Objection resolved — Addressed
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Scope
06/12/2026
Objection raised — Cost
06/12/2026
Objection raised — Accessibility
06/12/2026
Objection raised — Other
06/12/2026
Objection raised — Other
06/11/2026
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01359448-I1
B01359448-S2
06/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/10/2026
Special inspection requirement — Maintenance information
06/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/29/2026
Objection resolved — Addressed
05/29/2026
Objection resolved — Addressed
05/28/2026
Objection resolved — Addressed
05/27/2026
Objection raised — Cost
05/27/2026
Objection raised — Other
05/19/2026
Filed — Alteration CO
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION B01359448-I1
B01359448-S1
05/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/18/2026
Special inspection requirement — Final
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
05/18/2026
Special inspection requirement — Shutoff dampers
05/18/2026
Special inspection requirement — Maintenance information
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/18/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/18/2026
Special inspection requirement — Post-installed Anchors
05/18/2026
Special inspection requirement — Mechanical Systems
05/11/2026
Objection raised — Fire_Protection
05/11/2026
Objection raised — Scope
04/20/2026
Special inspection requirement — Air barrier — testing
Latest 60 of 151 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTarget Piping NY02/10/2025
DOB NOWSupported ScaffoldSigned-offBuilders Group USA07/11/2024
DOB NOWMechanical SystemsSigned-offBuilders Group USA07/08/2024
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems04/15/2024
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems03/19/2024
DOB NOWPlumbingSigned-offYG Services01/17/2024
DOB NOWSprinklersSigned-offAmb Mechanical01/17/2024
DOB NOWConstruction FenceSigned-offBuilders Group USA01/16/2024
DOB NOWMechanical SystemsSigned-offBuilders Group USA01/11/2024
DOB NOWSidewalk ShedSigned-offDynamix Scaffold Group01/02/2024
DOB NOWStructuralSigned-offBuilders Group USA07/21/2023
DOB NOWConstruction FenceSigned-offBuilders Group USA01/13/2023
DOB NOWConstruction FenceSigned-offYellow Hat Construction I11/04/2022
DOB NOWConstruction FenceSigned-offStateline Builders05/21/2021
DOB NOWConstruction FenceSigned-offStateline Builders01/29/2020
BIS—ISSUEDBuilders Group USA05/20/2024
BIS—ISSUEDBuilders Group USA03/04/2024
BIS—ISSUEDBuilders Group USA01/01/2024
BIS—ISSUEDBuilders Group USA12/27/2023
BIS—ISSUEDBuilders Group USA10/31/2023
BIS—ISSUEDBuilders Group USA07/24/2023
BIS—ISSUEDBuilders Group USA05/25/2023
BIS—ISSUEDStateline Builders03/25/2022
BISOTISSUEDStateline Builders03/02/2021
BIS—ISSUEDStateline Builders09/18/2020
BISOTISSUEDHigh Rise Build & Des04/07/2017
BISEQISSUEDHigh Rise Build & Des04/07/2017
2 projects · most recent 06/24/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/24/2026——Heating and Air Conditioning Systems
Heat / Cool
Daikin RXTA24AAVJU 25,000 BTU · Vrf Outdoor ×2
10/11/2019Signed-offBuilders Group USAAir Conditioning Systems
Cooling
Daikin 4MXS36NMVJU 36,000 BTU · Heat Pump Outdoor ×6
3MXS24NMVJU 24,000 BTU · Heat Pump Outdoor ×1
5MXS48TVJU 47,000 BTU · Heat Pump Outdoor ×1
RMXS48LVJU 48,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 06/24/2026
Sprinkler System
FiledStatusContractorScope
06/24/2026——Sprinkler System
2 projects · most recent 06/24/2026
Water/Sanitary Storm
FiledStatusContractorScope
06/24/2026——Water/Sanitary
10/11/2019——Storm, Water/Sanitary
6 projects · most recent 02/12/2025
General Wiring
FiledStatusContractorScope
02/12/2025CompleteTrue Power Electrical ContGeneral Wiring
07/03/2024CompleteTrue Power Electrical ContGeneral Wiring
04/13/2024CompleteSolas Electrical—
01/02/2024CompleteHigh Quality Electric of—
08/13/2020CompleteHivolts ElectricalGeneral Wiring
08/13/2020CompleteHivolts Electrical—
1 project · most recent 11/04/2020
Steel Concrete
FiledStatusContractorScope
11/04/2020——Steel, Concrete
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/07/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/07/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
06/24/2026Fire-Resistant Penetrations and Joints—special
06/24/2026Post-installed Anchors—special
06/24/2026Sprinkler Systems—special
06/10/2026HVAC-R and service water heating equipment—energy_progress
06/10/2026HVAC-R and service water heating system controls—energy_progress
06/10/2026Maintenance information—energy_progress
06/10/2026HVAC-R and service water piping design and insulation—energy_progress
06/10/2026Fire-Resistant Penetrations and Joints—special
05/18/2026Final—progress
05/18/2026Post-installed Anchors—special
05/18/2026Fire-Resistant Penetrations and Joints—special
05/18/2026Mechanical Systems—special
05/18/2026Shutoff dampers—energy_progress
05/18/2026HVAC-R and service water heating system controls—energy_progress
05/18/2026Maintenance information—energy_progress
05/18/2026HVAC-R and service water piping design and insulation—energy_progress
05/18/2026Duct leakage testing, insulation and design—energy_progress
05/18/2026HVAC-R and service water heating equipment—energy_progress
05/18/2026Energy Code Compliance Inspections—progress
04/20/2026Air barrier — testing —energy_progress
04/12/2026Insulation placement and R values—energy_progress
04/12/2026Protection of exposed foundation insulation—energy_progress
04/12/2026Interior lighting power—energy_progress
04/12/2026Lighting controls—energy_progress
04/12/2026Air barrier - visual inspection—energy_progress
Latest 25 of 82.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Roberta'sRestaurant / Food Service—
Project B00244787 Alteration · LOC Issued · 11/20/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 258 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch17
08/27/2026B00830579-I1Request digital key ↗
08/27/2026B00830579-P5Request digital key ↗
08/27/2026B00830579-P3Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/15/2026B00244787-I1Request digital key ↗
08/14/2026B00244787-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00271546-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/15/2026B00224580-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026B00224556-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/14/2026B00259924-I1Request digital key ↗
▸Applications & Permits51
▸BISPLAN / WORK APPROVAL APPLICATION35
11/06/2025322122332Open ↗
07/29/2025321941048Open ↗
02/05/2025321941048Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION12
05/20/2024321941048Open ↗
03/05/2024321941048Open ↗
02/26/2024321941048Open ↗
Showing 3 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
04/04/2024321956914Open ↗
05/18/2020321956914Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/08/2024321941048Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/12/2025322122332Open ↗
▸Zoning, Tax Lot & Property Records13
▸BISZONING DIAGRAM4
02/14/2024321941048Open ↗
01/25/2024321941048Open ↗
03/28/2023321941048Open ↗
Showing 3 of 4 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
11/13/2025322122332Open ↗
09/17/2019321941048Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
11/13/2025322122332Open ↗
09/30/2024321941048Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/17/2019321941048Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/13/2025322122332Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
11/13/2025322122332Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/13/2025322122332Open ↗
▸BISVERIFY TAX LOT1
07/15/2024321941048Open ↗
▸Seals & Professional Certifications44
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/29/2026B00244787-P1Open ↗
08/29/2026B00244787-I1Open ↗
08/27/2026B00830579-P5Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
10/08/2026B00224580-I1Open ↗
10/08/2026B00224580-I1Open ↗
08/30/2026B00830579-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/08/2026B00224580-I1Open ↗
10/08/2026B00224580-I1Open ↗
08/30/2026B00830579-S2Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/15/2019321941048Open ↗
04/18/2017321531142Open ↗
03/08/2017321531142Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/08/2017321531142Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/08/2017321531142Open ↗
▸Trade Schedules & Equipment1
▸BISDEFERRED SITE SEWER CONNECTION APPROVAL1
09/19/2024321941048Open ↗
▸Safety & Tenant Protection8
▸BISSTREET TREE CHECKLIST4
09/09/2025321941048Open ↗
04/04/2024321956914Open ↗
05/18/2020321956914Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
09/10/2024321941048Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/16/2020321941048Open ↗
▸BISSTREET TREE SIGNOFF1
04/07/2025321941048Open ↗
▸DOB NOWStreet Tree Checklist1
08/15/2026B01359448-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/08/2017321531142Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
08/15/2019321941048Open ↗
04/18/2017321531142Open ↗
03/08/2017321531142Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/16/2020321941048Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/08/2025321941048Open ↗
▸Inspections & Test Reports24
▸BISTECHNICAL REPORT: SOIL INSPECTION5
08/25/2025321941048Open ↗
08/21/2025321941048Open ↗
08/20/2025321941048Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/16/2024321941048Open ↗
07/01/2021321531142Open ↗
09/16/2020321941048Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
09/16/2024321941048Open ↗
09/16/2024321941048Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
09/16/2024321941048Open ↗
09/16/2024321941048Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
01/30/2025321941048Open ↗
01/30/2025321941048Open ↗
▸BISSOIL REPORT2
02/20/2020321941048Open ↗
02/20/2020321941048Open ↗
▸BIS__EPIC TESTING SERVICES (SOIL REPORT)2
07/23/2025321941048Open ↗
09/16/2020321941048Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
07/23/2025321941048Open ↗
01/30/2025321941048Open ↗
▸BISMECHANICAL SYSTEMS1
09/10/2024321941048Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/10/2024321941048Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
01/30/2025321941048Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/10/2024321941048Open ↗
▸Approvals, Objections & Sign-offs32
▸BISLETTERS - SUPPORTING DOCUMENTATION20
11/12/2025322122332Open ↗
11/12/2025322122332Open ↗
11/12/2025322122332Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
08/09/2024321941048Open ↗
08/08/2024321941048Open ↗
03/20/2023321941048Open ↗
Showing 3 of 10 on file for this type
▸BISHOUSE CONNECTION SIGNOFF1
07/17/2024321941048Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
09/08/2025321941048Open ↗
▸Cost, Insurance & Ownership18
▸BISPROJECT-SPECIFIC GL INSURANCE8
05/20/2024321941048Open ↗
03/05/2024321941048Open ↗
01/04/2024321941048Open ↗
Showing 3 of 8 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)8
05/20/2024321941048Open ↗
03/05/2024321941048Open ↗
02/26/2024321941048Open ↗
Showing 3 of 8 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
02/26/2024321941048Open ↗
▸BISCOST AFFIDAVIT1
03/08/2017321531142Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION11
10/31/2024321956914Open ↗
09/19/2024321941048Open ↗
08/15/2024321941048Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET6
11/06/2025322122332Open ↗
05/12/2021322095843Open ↗
01/03/2020321941048Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
05/18/2020321956914Open ↗
▸Other Documents20
▸BISBPP - SUPPORTING DOCUMENTATION5
04/04/2024321956914Open ↗
04/04/2024321956914Open ↗
04/04/2024321956914Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
11/06/2025322122332Open ↗
03/05/2024321941048Open ↗
02/26/2024321941048Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL COLD-FORMED STEEL2
09/16/2024321941048Open ↗
09/16/2024321941048Open ↗
▸BISUNDERPINNING (2014)2
09/16/2024321941048Open ↗
09/16/2024321941048Open ↗
▸BISPLOT DIAGRAM2
11/12/2025322122332Open ↗
09/26/2019321941048Open ↗
▸BISLOWEST FLOOR ELEVATION2
09/16/2024321941048Open ↗
09/16/2024321941048Open ↗
▸BISSITE SURVEY: FINAL1
—321941048Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
11/13/2025322122332Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026B01359448-I1Open ↗