← Back
BuildNYC
Public elementary, junior or senior high
P.S. 175 Henry H Garnet
175 WEST 134TH STREET · BIN 1058248
💬 Discuss this project
1957Year Built
3Stories
W1Building Class
R7-2Zoning
219,780 sfGross Floor Area
1Units
LL97 Covered13 Active Violations 0 unresolved · 13 paperwork only 2 likely answered 3 old, status unconfirmed ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 77,435 sf lot · 2.84 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 175 Henry H Garnet, New York City Department of EducatiUnder Construction3p · 3 filings · 20 docs
Floor 3P.S. 175 Manhattan Roofs and Parapets1 filing · 10 docs
Floor 2P.S. 175 Henry H Garnet9p · 3 filings · 20 docs
Floor 1P.S. 175 Henry H Garnet, New York City Department of EducatiUnder Construction19p · 5 filings · 20 docs
CellarP.S. 175 Henry H Garnet1p · 1 filing · 20 docs
Site & exteriorP.S. 175M14p · 3 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority7407/08/2026
NYC Department of Education703/22/2026
New York City Public School404/09/2026
New York City School Construction303/21/2026
Success Academy Charter Schools103/22/2026
NYC Division of School Facilitie103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Caso Associates403/21/2026
AK Consulting Services803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
The Outfit M&JGeneral Contractor2607/08/2026
The Outfit M&JScaffold1307/08/2026
Thermo Tech Mechanical I*specialty_contractor303/21/2026
Franco Belli PLMG & Heating SonPlumbing207/08/2026
D.M.P. ElectricElectrical103/21/2026
Thorn ElectricElectrical103/21/2026
Anco Electl ContctngElectrical103/22/2026
Tristar Plumbing & HeatingGeneral Contractor104/09/2026
Urban ElectricalElectrical103/22/2026
Prince ElectricElectrical103/21/2026
Charan Electrical Enterp'sElectrical103/22/2026
Urban ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351312/12/2025
20/20 Inspections14711112/27/2024
Building Lifecycle
All (161)Filed (23)Permit Issued (29)Signed Off (1)Violation (60)Objection (18)Special Inspection (30)
08/03/2026
Violation issued (ECB, open)
Construction
08/03/2026
Violation issued (ECB, open)
Construction
05/13/2026
Permit issued — Supported Scaffold
M00896409-I1-SF
05/13/2026
Permit issued — General Construction
M00622070-S1-GC
05/13/2026
Permit issued — Protection and Mechanical Methods
M00944826-I1-PMM
03/04/2026
Objection raised — Other
03/03/2026
Objection raised — Other
02/20/2026
Filed — Alteration
M01361793-S1
02/19/2026
Filed — Alteration
M01361793-I1
01/30/2026
Violation issued (ECB, open)
Elevators
01/02/2026
Permit issued — Mechanical Systems
M01261362-I1-MS
12/22/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
12/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
12/22/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
12/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
12/22/2025
Special inspection requirement — Final
Asma Hashmi
12/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
12/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
12/22/2025
Special inspection requirement — Maintenance information
Asma Hashmi
12/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
12/12/2025
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN THE KITCHEN AREA.
M01261362-P1
12/02/2025
Signed off — Alteration
M00896405-I1
12/02/2025
Permit issued — General Construction
M00650522-S2-GC
12/02/2025
Permit issued — General Construction
M00650522-S1-GC
11/06/2025
Objection resolved — Addressed
11/06/2025
Objection resolved — Addressed
10/22/2025
Objection resolved — Addressed
10/20/2025
Objection raised — Plumbing
10/20/2025
Objection raised — Admin
10/20/2025
Objection raised — Fire_Protection
09/26/2025
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN THE KITCHEN AREA.
M01261362-I1
08/29/2025
Violation issued (ECB, open)
Construction
08/29/2025
Violation issued (ECB, open)
Construction
08/29/2025
Violation issued (ECB, closed)
Construction
07/01/2025
Permit issued — General Construction
M00650522-S1-GC
07/01/2025
Permit issued — General Construction
M00650522-S2-GC
06/06/2025
Permit issued — Plumbing
M00650522-I1-PL
05/13/2025
Special inspection requirement — Lighting controls
JACOB HAAS
05/13/2025
Special inspection requirement — Interior lighting power
JACOB HAAS
05/13/2025
Special inspection requirement — Energy Code Compliance Inspections
05/05/2025
Filed — Alteration
M175_ Auditorium Upgrade. PAA issued to reduce scope of work at the auditorium's ceiling areas and roof areas.
M00622070-P6
05/02/2025
Special inspection requirement — Lighting controls
JACOB HAAS
05/02/2025
Special inspection requirement — Energy Code Compliance Inspections
05/02/2025
Special inspection requirement — Interior lighting power
JACOB HAAS
01/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
12/27/2024
Filed — Alteration
Renovate existing toilet 126. Remove existing plumbing fixtures and provide new. Remove existing light fixtures and provide new.
M00650522-P3
12/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
09/19/2024
Violation issued (ECB, open)
Construction
09/19/2024
Violation issued (ECB, closed)
Construction
09/19/2024
Violation issued (ECB, closed)
Construction
09/19/2024
Violation issued (ECB, closed)
Construction
09/19/2024
Violation issued (ECB, closed)
Construction
09/19/2024
Violation issued (ECB, closed)
Construction
09/19/2024
Violation issued (ECB, closed)
Construction
08/29/2024
Filed — Alteration
Renovate existing toilet 126. Remove existing plumbing fixtures and provide new. Remove existing light fixtures and provide new.
M00650522-P2
07/01/2024
Permit issued — Construction Fence
M00896405-I1-FN
07/01/2024
Permit issued — Protection and Mechanical Methods
M00944826-I1-PMM
07/01/2024
Permit issued — Supported Scaffold
M00896409-I1-SF
07/01/2024
Permit issued — General Construction
M00650522-S2-GC
07/01/2024
Permit issued — General Construction
M00622070-S1-GC
Latest 60 of 161 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedThe Outfit M&J05/13/2026
DOB NOWGeneral ConstructionPermit IssuedThe Outfit M&J05/13/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedThe Outfit M&J05/13/2026
DOB NOWMechanical SystemsPermit IssuedTristar Plumbing & Heating01/02/2026
DOB NOWGeneral ConstructionPermit IssuedThe Outfit M&J12/02/2025
DOB NOWGeneral ConstructionPermit IssuedThe Outfit M&J12/02/2025
DOB NOWGeneral ConstructionPermit IssuedThe Outfit M&J07/01/2025
DOB NOWGeneral ConstructionPermit IssuedThe Outfit M&J07/01/2025
DOB NOWPlumbingPermit IssuedFranco Belli PLMG & Heating Son06/06/2025
DOB NOWConstruction FenceSigned-offThe Outfit M&J07/01/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedThe Outfit M&J07/01/2024
DOB NOWSupported ScaffoldPermit IssuedThe Outfit M&J07/01/2024
DOB NOWGeneral ConstructionPermit IssuedThe Outfit M&J07/01/2024
DOB NOWGeneral ConstructionPermit IssuedThe Outfit M&J07/01/2024
DOB NOWGeneral ConstructionPermit IssuedThe Outfit M&J07/01/2024
DOB NOWGeneral ConstructionPermit IssuedThe Outfit M&J06/25/2024
DOB NOWGeneral ConstructionPermit IssuedThe Outfit M&J06/25/2024
DOB NOWGeneral ConstructionPermit IssuedThe Outfit M&J06/25/2024
DOB NOWConstruction FenceSigned-offThe Outfit M&J06/25/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedThe Outfit M&J06/25/2024
DOB NOWSupported ScaffoldPermit IssuedThe Outfit M&J06/25/2024
DOB NOWGeneral ConstructionPermit IssuedThe Outfit M&J01/05/2024
DOB NOWPlumbingPermit IssuedFranco Belli PLMG & Heating Son01/05/2024
DOB NOWGeneral ConstructionPermit IssuedThe Outfit M&J01/05/2024
DOB NOWMechanical SystemsPermit IssuedThermo Tech Mechanical I*11/20/2023
DOB NOWGeneral ConstructionPermit IssuedThe Outfit M&J11/14/2023
DOB NOWSupported ScaffoldPermit IssuedThe Outfit M&J10/31/2023
DOB NOWConstruction FenceSigned-offThe Outfit M&J10/31/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedThe Outfit M&J10/23/2023
BISSPISSUEDEagle Mechanical02/20/2026
BISPLISSUEDMar-Sal Plumbing & Heating02/20/2026
BISSPISSUEDEagle Mechanical04/10/2024
BISPLISSUEDMar-Sal Plumbing & Heating04/10/2024
BISSPISSUEDEagle Mechanical02/21/2023
BISPLISSUEDMar-Sal Plumbing & Heating02/21/2023
BISPLISSUEDMar-Sal Plumbing & Heating10/05/2021
BISSPISSUEDEagle Mechanical10/05/2021
BISOTISSUEDF & S General Construction02/09/2021
BISOTISSUEDF & S General Construction05/11/2018
BISOTISSUEDU.A. Construction07/28/2017
+ 28 more permits on file
2 projects · most recent 12/12/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/12/2025Permit IssuedTristar Plumbing & HeatingAir Conditioning Systems
Cooling
Lg LG - ZRNU363SRAA 3 tons · Fan Coil Indoor ×6
LG - ZRUM036GSS0 36,000 BTU · Vrf Outdoor ×2
LG-ZRUN072BSS0 6 tons · Vrf Outdoor ×2
06/30/2021——Air Conditioning Systems
Cooling
Fujitsu ASUB36TLAV1 34,000 BTU · Fan Coil Indoor ×12
AOUA96RLAVL 96,000 BTU · Vrf Outdoor ×4
1 project · most recent 12/27/2024
Water/Sanitary
FiledStatusContractorScope
12/27/2024Permit IssuedFranco Belli PLMG & Heating SonWater/Sanitary
15 projects · most recent 08/19/2026
General Wiring
FiledStatusContractorScope
08/19/2026Permit IssuedGemini Electric CoGeneral Wiring
01/14/2026Permit IssuedA & S ElectricGeneral Wiring
07/15/2025Permit IssuedMulti-Tech ElectricGeneral Wiring
11/12/2024CompleteAnco Electl Contctng—
06/04/2024CompleteAnco Electl ContctngGeneral Wiring
04/05/2024CompleteUrban ElectricalGeneral Wiring
06/27/2023Permit IssuedMulti-Tech ElectricGeneral Wiring
08/15/2022CompleteCharan Electrical Enterp's—
03/18/2022CompleteCharan Electrical Enterp's—
12/03/2021CompleteMac Fhionnghaile & SonsGeneral Wiring
08/11/2021CompleteCharan Electrical Enterp's—
07/01/2019Permit IssuedJamcob ElectricGeneral Wiring
06/26/2019CompleteGia ElectricalGeneral Wiring
02/24/2019CompleteLaser Electrical Constr'g—
04/25/2018CompleteNew York MechanicalGeneral Wiring
1 project · most recent 06/29/2023
Sidewalk Shed
FiledStatusContractorScope
06/29/2023——Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
12/22/2025Mechanical SystemsAsma Hashmispecial
12/22/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
12/22/2025Post-installed AnchorsAsma Hashmispecial
12/22/2025Energy Code Compliance InspectionsAsma Hashmiprogress
12/22/2025FinalAsma Hashmiprogress
12/22/2025HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
12/22/2025HVAC-R and service water heating equipmentAsma Hashmienergy_progress
12/22/2025Maintenance informationAsma Hashmienergy_progress
12/22/2025HVAC-R and service water heating system controlsAsma Hashmienergy_progress
05/13/2025Lighting controlsJACOB HAASenergy_progress
05/13/2025Interior lighting powerJACOB HAASenergy_progress
05/13/2025Energy Code Compliance Inspections—progress
05/02/2025Lighting controlsJACOB HAASenergy_progress
05/02/2025Energy Code Compliance Inspections—progress
05/02/2025Interior lighting powerJACOB HAASenergy_progress
01/06/2025Fire-Resistant Penetrations and JointsJACOB HAASspecial
12/26/2024Fire-Resistant Penetrations and JointsJACOB HAASspecial
03/18/2024Fire-Resistant Penetrations and JointsJACOB HAASspecial
02/28/2024Fire-Resistant Penetrations and JointsJACOB HAASspecial
02/09/2024Mechanical SystemsJACOB HAASspecial
02/09/2024Interior lighting powerJACOB HAASenergy_progress
02/09/2024Fire-Resistant Penetrations and JointsJACOB HAASspecial
02/09/2024Lighting controlsJACOB HAASenergy_progress
02/09/2024Energy Code Compliance InspectionsJACOB HAASprogress
02/09/2024FinalJACOB HAASprogress
Latest 25 of 41.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
New York City Department of EducationEducationFloor 1
Project M01261362 Alteration · Permit Entire · 09/26/2025
P.S. 175MEducation—
Project M00944826 Alteration · Permit Entire · 10/13/2023
Project M00896405 Alteration · LOC Issued · 06/29/2023
Project M00896407 Alteration · Filing Withdrawn · 06/29/2023
Project M00896409 Alteration · Permit Entire · 06/29/2023
P.S. 175 Henry H GarnetEducationFloors 1, 2, Penthouse
Project M00622070 Alteration · Permit Entire · 11/04/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 225 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
09/03/2026M00650522-P3Request digital key ↗
09/03/2026M00650522-S1Request digital key ↗
09/03/2026M00650522-P2Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION8
12/12/2017121293153Open ↗
08/03/2017121293153Open ↗
07/14/2017121293153Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
07/28/2017121293153Open ↗
07/28/2017121293153Open ↗
08/20/2010120395036Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications79
▸DOB NOWProgress Inspector Seal & Signature24
09/23/2026M01261362-I1Open ↗
09/23/2026M01261362-I1Open ↗
09/23/2026M01261362-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/30/2026M00896407-I1Open ↗
08/30/2026M00896405-I1Open ↗
08/30/2026M00896409-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/27/2026M00622070-S1Open ↗
09/23/2026M01261362-I1Open ↗
09/23/2026M01261362-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
06/20/2018121293153Open ↗
06/20/2018121293153Open ↗
08/03/2017121293153Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
12/06/2010120544081Open ↗
12/06/2010120544081Open ↗
12/02/2010120544081Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
06/08/2017121293153Open ↗
06/08/2017121293153Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/08/2017121293153Open ↗
12/06/2010120544081Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026M00896405-I1Open ↗
08/13/2026M00896409-I1Open ↗
08/13/2026M00896407-I1Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/12/2017121293153Open ↗
08/03/2017121293153Open ↗
07/14/2017121293153Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
06/30/2010120395036Open ↗
06/30/2010120395036Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026M01261362-I1Open ↗
08/20/2026M01261362-P1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/28/2026M00622070-I1Open ↗
08/15/2026M00622070-S1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/06/2010120544081Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/20/2018121293153Open ↗
06/20/2018121293153Open ↗
06/08/2017121293153Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: SOIL INSPECTION2
06/20/2018121293153Open ↗
07/14/2017121293153Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
06/20/2018121293153Open ↗
▸Approvals, Objections & Sign-offs55
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
08/30/2026M00896405-I1Open ↗
08/30/2026M00896409-I1Open ↗
08/13/2026M01261362-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)21
08/13/2026M00622070-I1Open ↗
08/13/2026M00622070-P3Open ↗
08/13/2026M00622070-P5Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDEP Variance (V5) letter5
08/13/2026M00622070-S1Open ↗
08/13/2026M00622070-I1Open ↗
08/13/2026M00650522-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026M01361793-S1Open ↗
08/13/2026M01361793-I1Open ↗
08/13/2026M00896405-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/20/2018121293153Open ↗
06/27/2011120395036Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/20/2018121293153Open ↗
06/27/2011120395036Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/30/2010120395036Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT6
06/20/2018121293153Open ↗
06/08/2017121293153Open ↗
06/27/2011120395036Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWNYCSCA Wrap-up Insurance2
08/13/2026M00622070-S1Open ↗
08/13/2026M00896405-I1Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
06/08/2017121293153Open ↗
06/08/2017121293153Open ↗
12/06/2010120544081Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
06/20/2018121293153Open ↗
▸BISADDITIONAL INFORMATION1
06/19/2018121293153Open ↗
▸Other Documents25
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal21
08/13/2026M00622070-S2Open ↗
08/13/2026M00896405-I1Open ↗
08/13/2026M00896409-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
08/13/2026M01361793-I1Open ↗
08/13/2026M01361793-S1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/02/2017121293153Open ↗
▸DOB NOWNYCSCA Exhibit 21
08/13/2026M00896405-I1Open ↗