| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| X01121887 ↗ | 2712 3 AVENUE BRONX | Alteration | Permit Issued | 10/04/2024 | 09/30/2026 | Contractor ABC CONSTRUCTION CONT INC | X149_ CTF Project. Convert existing lockers into new Practice Rooms and Lockers. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS PROPOSED UNDER T… |
| X01163321 ↗ | 2712 3 AVENUE BRONX | Alteration | Permit Issued | 01/07/2025 | 09/30/2026 | Contractor ABC CONSTRUCTION CONT INC | X149_ Toilets C1 & C3 located in the lockers areas to be updated. Updates to include new doors and finishes. NO CHANGE IN USE, EGRESS, OR … |
| Q01155037 ↗ | 156-10 BAISLEY BOULEVARD QUEENS | Alteration | Permit Issued | 12/20/2024 | 09/29/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor EMPIRE CONTROL ABATEMENT | Removing existing exhaust fans serving aeronautics lab and transportation shop with associated duct work. Providing new VRF heat pump unit w… |
| S01385326 ↗ | 1270 HYLAN BOULEVARD STATEN ISLAND | Alteration | Permit Issued | 04/20/2026 | 09/24/2026 | Contractor ABC CONSTRUCTION CONT INC | Conversion of existing classroom Room 211 to (2) new classrooms Room 211 and 211A. |
| B01192190 ↗ | 2650 SHORE PARKWAY BROOKLYN | Alteration | Permit Issued | 03/14/2025 | 09/16/2026 | Contractor MOSZO AIR CONDITION AND * | Room conversion to convert existing Boys' and Girls' Locker Rooms to a new Fitness Center. |
| Q00961742 ↗ | 201-02 53 AVENUE QUEENS | Alteration | Permit Issued | 12/19/2023 | 09/14/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor SAFECON BUILDERS CORP Filer JAM CONSULTANTS, INC. | Q162- Upgrades for Men's toilet 123 & Women's toilet 125 as part of the Path of Travel work applicable to the Playground Redevelopment paren… |
| Person | Filings | Most recent |
|---|---|---|
| Genaro Salierno | 204 | 08/17/2026 |
| BENJAMIN MALAMED | 20 | 06/22/2026 |
| MANUEL MILLAN | 19 | 02/17/2023 |
| TUSHAR ADVANI | 6 | 08/24/2023 |
| JOSEPH BONSIGNORE | 1 | 07/06/2022 |
| Name | Jobs together | Most recent |
|---|---|---|
| PRINCETON ENGINEERING SERVICES, PC | 88 | 09/11/2026 |
| KERI ENGINEERING, P.C. | 20 | 08/25/2026 |
| AI ENGINEERS, INC. | 13 | 04/29/2026 |
| IJKIM ARCHITECT PLLC | 11 | 05/14/2025 |
| HARTLAND ENGINEERING, DPC | 3 | 03/10/2026 |
| Withdrawn | 3 | 12/09/2024 |
| EDGEWATER DESIGN LLC | 2 | 03/10/2026 |
| YU & ASSOCIATES | 1 | 03/31/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| EMPIRE CONTROL ABATEMENT | 41 | 09/11/2026 |
| J & N CONSTRUCTION GROUP | 23 | 04/29/2026 |
| WDF INC | 16 | 01/09/2026 |
| ABC CONSTRUCTION CONT INC | 12 | 08/11/2026 |
| I.M.P. PLBG. & HTG. CORP | 9 | 09/11/2026 |
| MAR-SAL PLBG & HTG, INC | 8 | 08/25/2026 |
| VARSITY PLBG AND HTG INC | 8 | 02/10/2026 |
| A.T.J. ELECTRICAL CO INC | 6 | 02/10/2026 |
| EAGLE 1 MECHANICAL, INC | 5 | 08/11/2026 |
| FORSYTHE P&H CORP | 4 | 10/15/2025 |
| FORSYTHE PLBG & HTG CORP | 4 | 08/11/2026 |
| ACS SYSTEM ASSOCIATES INC | 3 | 06/22/2026 |
| ADAM'S EUROPEAN CONTRACTI | 3 | 09/22/2023 |
| AIR-TEK MECHANICAL INC | 3 | 12/09/2024 |
| AIRTONE CORP | 3 | 12/12/2025 |
| ARORA CONSTRUCTION INC | 3 | 11/19/2025 |
| AWL INDUSTRIES INC | 3 | 02/17/2026 |
| NATIONAL ENVIROMENTAL SAF | 3 | 11/01/2023 |
| 2 SAAB CONSTRUCTION INC | 2 | 09/08/2025 |
| A&H EXPRESS PLBG&HTG CORP | 2 | 05/22/2025 |
| LITEHOUSE BUILDERS INC | 2 | 07/23/2026 |
| LSS CONTRACTING LLC | 2 | 07/08/2025 |
| ROBERT PARCHMENT P&H.INC | 2 | 08/25/2025 |
| THE OUTFIT M&J LLC | 2 | 05/05/2025 |
| THERMO TECH MECHANICAL I* | 2 | 05/05/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| NYC SCHOOL CONSTRUCTION | 40 | 09/11/2026 |
| NYC SCHOOL CONSTRUCTION AUTHORITY | 33 | 08/25/2026 |
| NEW YORK CITY HOUSING AUTHORITY | 23 | 04/29/2026 |
| NYCSCA | 22 | 04/21/2026 |
| NYC Housing Authority | 17 | 05/14/2025 |
| NYCHA | 3 | 12/01/2025 |
| FSG HDFC | 1 | 11/04/2022 |
| THE MCKISSACK GROUP, INC | 1 | 07/29/2022 |
| Name | Jobs together | Most recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 2 | 03/10/2026 |
| A1 EXPEDITING SERVICE CORP. | 1 | 07/29/2022 |
| BETRO DESIGN GROUP | 1 | 12/01/2025 |
| KERI ENGINEERING, P.C. | 1 | 02/16/2023 |
| MS. LOTT | 1 | 07/08/2025 |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| X01121887 ↗ | 2712 3 AVENUE BRONX | Alteration | Permit Issued | 10/04/2024 | 09/30/2026 | Contractor ABC CONSTRUCTION CONT INC | X149_ CTF Project. Convert existing lockers into new Practice Rooms and Lockers. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS PROPOSED UNDER T… |
| X01163321 ↗ | 2712 3 AVENUE BRONX | Alteration | Permit Issued | 01/07/2025 | 09/30/2026 | Contractor ABC CONSTRUCTION CONT INC | X149_ Toilets C1 & C3 located in the lockers areas to be updated. Updates to include new doors and finishes. NO CHANGE IN USE, EGRESS, OR … |
| Q01155037 ↗ | 156-10 BAISLEY BOULEVARD QUEENS | Alteration | Permit Issued | 12/20/2024 | 09/29/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor EMPIRE CONTROL ABATEMENT | Removing existing exhaust fans serving aeronautics lab and transportation shop with associated duct work. Providing new VRF heat pump unit w… |
| S01385326 ↗ | 1270 HYLAN BOULEVARD STATEN ISLAND | Alteration | Permit Issued | 04/20/2026 | 09/24/2026 | Contractor ABC CONSTRUCTION CONT INC | Conversion of existing classroom Room 211 to (2) new classrooms Room 211 and 211A. |
| B01192190 ↗ | 2650 SHORE PARKWAY BROOKLYN | Alteration | Permit Issued | 03/14/2025 | 09/16/2026 | Contractor MOSZO AIR CONDITION AND * | Room conversion to convert existing Boys' and Girls' Locker Rooms to a new Fitness Center. |
| Q00961742 ↗ | 201-02 53 AVENUE QUEENS | Alteration | Permit Issued | 12/19/2023 | 09/14/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor SAFECON BUILDERS CORP Filer JAM CONSULTANTS, INC. | Q162- Upgrades for Men's toilet 123 & Women's toilet 125 as part of the Path of Travel work applicable to the Playground Redevelopment paren… |
| Q00544291 ↗ | 252-72 LITTLE NECK PARKWAY QUEENS | Alteration | Permit Issued | 06/28/2021 | 09/08/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor FORSYTHE P&H CORP | Q224_ Provide new drinking fountains along Path of Travel to Room 229. NO CHANGE IN USE, EGRESS OR OCCUPANCY IS PROPOSED UNDERT THIS APPLIC… |
| S01446609 ↗ | 200 MACFARLAND AVENUE STATEN ISLAND | Alteration | Filed — no permit on record | 08/19/2026 | — | — | |
| B00843324 ↗ | 774 SARATOGA AVENUE BROOKLYN | Alteration | Permit Issued | 03/30/2023 | 08/18/2026 | Contractor LSS CONTRACTING LLC | Replace existing sink and associated plumbing with new. Provide new Grease interceptor. |
| X00686739 ↗ | 3030 ROBERTS AVENUE BRONX | Alteration | Permit Issued | 02/25/2022 | 08/17/2026 | Contractor NEELAM CONSTRUCTION CORP | Provide new steam radiators and unit heaters in all toilets and stairs modified for ADA compliance. Modify existing steam distribution pipin… |
| X08002793 ↗ | 1701 WEEKS AVENUE BRONX | Alteration | Permit Issued | 11/15/2022 | 08/13/2026 | Contractor JAYSAN CONTRACTING | Remove existing steam radiators and cap associated piping. Provide new split air handling unit with remote heat pump condenser unit. Provide… |
| Q01287696 ↗ | 98-15 98 PLACE QUEENS | Alteration | Permit Issued | 10/02/2025 | 08/10/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor LITEHOUSE BUILDERS INC | Q061_ Conversion of existing rooms on the second floor into additional classrooms as part of the Class Reduction Program. No change in use, … |
| S01441750 ↗ | 225 DURANT AVENUE STATEN ISLAND | Alteration | Filed — no permit on record | 08/10/2026 | — | — | |
| B01323386 ↗ | 6001 18 AVENUE BROOKLYN | Alteration | Permit Issued | 11/26/2025 | 08/07/2026 | Contractor EMPIRE CONTROL ABATEMENT | K048_ CTF_ Path of Travel Work. Provide a new drinking fountain along the path of travel of the parent project. No change in use, egress, o… |
| B01338735 ↗ | 90 NOLL STREET BROOKLYN | Alteration | Permit Issued | 12/23/2025 | 08/06/2026 | Contractor ABC CONSTRUCTION CONT INC | Third-floor CTF room conversion, Room 314 @ K145 School - no change to use, egress or occupancy under this filing. |
| S01440625 ↗ | 528 ACADEMY AVENUE STATEN ISLAND | Alteration | Filed — no permit on record | 08/05/2026 | — | — | |
| B00782672 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Permit Issued | 10/14/2022 | 08/03/2026 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| S01436467 ↗ | 455 HUGUENOT AVENUE STATEN ISLAND | Alteration | Filed — no permit on record | 07/29/2026 | — | — | |
| S01410544 ↗ | 100 ESSEX DRIVE STATEN ISLAND | Alteration | Permit Issued | 06/05/2026 | 07/28/2026 | Contractor EMPIRE CONTROL ABATEMENT | Scope limited to removal of fan-powered VAV and associated ductwork. |
| S01274936 ↗ | 105 ST MARKS PLACE STATEN ISLAND | Alteration | Permit Issued | 09/30/2025 | 07/27/2026 | Contractor ABC CONSTRUCTION CONT INC | Provide new electric convectors. |
| S01435499 ↗ | 100 ESSEX DRIVE STATEN ISLAND | Alteration | Filed — no permit on record | 07/27/2026 | — | — | — |
| X08002785 ↗ | 1000 TELLER AVENUE BRONX | Alteration | Permit Issued | 11/08/2022 | 07/27/2026 | Contractor LAMBO MECHANICAL | Remove existing steam radiators and cap associated piping. Provide new split air handling unit with remote heat pump condenser unit. Provide… |
| B00647134 ↗ | 322 KOSCIUSZKO STREET BROOKLYN | Alteration | Permit Issued | 12/14/2021 | 07/24/2026 | Contractor FOURTH AVENUE MERCHANTS I | Replace existing plumbing fixtures with ADA compliant fixtures. Modify existing plumbing distribution piping hot water, cold water, sanitary… |
| M01342579 ↗ | 409 WEST 49 STREET MANHATTAN | Alteration | Permit Issued | 01/18/2026 | 07/24/2026 | Owner NYCSCA Contractor EMPIRE CONTROL ABATEMENT | Existing School Building, M625, CTF Room Conversion, Path of Travel |
| B00967664 ↗ | 768 EAST NEW YORK AVENUE BROOKLYN | Alteration | Permit Issued | 02/02/2024 | 07/16/2026 | Contractor ACS SYSTEM ASSOCIATES INC. | Replace existing (1) chiller and (1) condensing unit and associated equipment with (1) new Heat Pump Chiller/Heater and associated new equip… |
| B01313482 ↗ | 3000 AVENUE X BROOKLYN | Alteration | Permit Issued | 12/31/2025 | 07/16/2026 | Contractor WDF INC | Provide new RTU, associated ductwork and duct heaters and associated accessories. |
| Q01426187 ↗ | 35-12 QUEENS BOULEVARD QUEENS | Alteration | Filed — no permit on record | 07/15/2026 | — | Owner NYC SCHOOL CONSTRUCTION | — |
| Q01127272 ↗ | 143-10 SPRINGFIELD BLVD QUEENS | Alteration | Permit Issued | 10/21/2024 | 07/13/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor WDF INC | Remove existing science lab and prep room sinks and associated plumbing piping. Remove gas turrets, MGCV and piping. Provide new Lavatory, w… |
| B00782735 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Permit Issued | 10/17/2022 | 07/01/2026 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| B08014579 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Permit Issued | 10/17/2022 | 07/01/2026 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| S01419829 ↗ | 225 DURANT AVENUE STATEN ISLAND | Alteration | Filed — no permit on record | 06/30/2026 | — | — | |
| Q01124102 ↗ | 179-37 137 AVENUE QUEENS | Alteration | Permit Issued | 10/11/2024 | 06/24/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor EMPIRE CONTROL ABATEMENT | Renovating existing toilet in Room 358 and replacing drinking fountain on third-floor corridor |
| Q01127168 ↗ | 62-89 FOREST AVENUE QUEENS | Alteration | Permit Issued | 10/18/2024 | 06/24/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor I.M.P. PLBG. & HTG. CORP | Q071 - Existing School Building - Renovation of Existing 3rd floor Girls Toilet Area; New handrail and edge protection at existing ADA Ramp |
| Q01290848 ↗ | 62-89 FOREST AVENUE QUEENS | Alteration | Permit Issued | 10/07/2025 | 06/22/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor EMPIRE CONTROL ABATEMENT | Q071 - CTF ROOM CONVERSION - CONVERT EXISTING 1ST FLOOR CLASSROOM #112 INTO A NEW SENSORY CLASSROOM #112 |
| Q01400021 ↗ | 35-12 QUEENS BOULEVARD QUEENS | Alteration | Filed — no permit on record | 06/19/2026 | — | Owner NYC SCHOOL CONSTRUCTION | — |
| X01405375 ↗ | 2770 LAFAYETTE AVENUE BRONX | Alteration | Filed — no permit on record | 06/19/2026 | — | — | — |
| B00782651 ↗ | 5800 20 AVENUE BROOKLYN | Alteration | Permit Issued | 07/29/2022 | 06/15/2026 | Contractor AWL INDUSTRIES INC | REMOVE AND PROVIDE NEW VENTILATION SYSYTEM AND PROVIDE NEW DUCTLESS MINI SPLIT AC UNITS. PROVIDE NEW LIGHTS AND LIGHTING CONTROLS. |
| S01412745 ↗ | 455 HUGUENOT AVENUE STATEN ISLAND | Alteration | Filed — no permit on record | 06/12/2026 | — | — | |
| M01373407 ↗ | 460 WEST END AVENUE MANHATTAN | Alteration | Filed — no permit on record | 06/10/2026 | — | — | — |
| Q01155263 ↗ | 143-10 SPRINGFIELD BLVD QUEENS | Alteration | Permit Issued | 12/19/2024 | 06/08/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor WDF INC | Renovating existing toilet for ADA compliance, remove existing water closets and lavatory and provide new fixtures and modify existing plumb… |
| X01409288 ↗ | 2770 LAFAYETTE AVENUE BRONX | Alteration | Filed — no permit on record | 06/05/2026 | — | — | — |
| X01164981 ↗ | 2770 LAFAYETTE AVENUE BRONX | Alteration | Permit Issued | 01/17/2025 | 06/02/2026 | Contractor EMPIRE CONTROL ABATEMENT | Room conversion project that includes the conversion of an existing Boys Locker Room and accessory rooms to new classrooms. Exterior work i… |
| S01406155 ↗ | 1270 HYLAN BOULEVARD STATEN ISLAND | Alteration | Filed — no permit on record | 06/01/2026 | — | — | |
| B00783848 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Permit Issued | 10/13/2022 | 05/26/2026 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| B00783910 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Permit Issued | 10/14/2022 | 05/26/2026 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| Q01231148 ↗ | 8-21 BAY 25 STREET QUEENS | Alteration | Permit Issued | 05/30/2025 | 05/22/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor EMPIRE CONTROL ABATEMENT | Q465, CTF Room Conversion of Room B44 into Classrooms. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS PROPOSED UNDER THIS APPLICATION. |
| M00622070 ↗ | 195 WEST 134 STREET MANHATTAN | Alteration | Permit Issued | 11/04/2021 | 05/13/2026 | Owner NYCSCA Contractor THE OUTFIT M&J LLC | Remove existing auditorium blower and exhaust fan. Provide new Roof Top Unit (RTU) with DX cooling and steam heating. Extend existing ductwo… |
| M00621979 ↗ | 409 WEST 49 STREET MANHATTAN | Alteration | Signed-off | 11/03/2021 | 05/05/2026 | Owner NYCSCA Contractor CHAPMAN EVANS | Provide sixteen (16) new supplemental cooling units along with sixteen (16) new air cooled condensing units. Provide associated refrigerant … |
| Q01323334 ↗ | 88-17 NORTH CONDUIT AVENUE QUEENS | Alteration | Permit Issued | 11/25/2025 | 04/29/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor EMPIRE CONTROL ABATEMENT | Q202_ CTF Room Conversion of Rooms 142A/142bB into one full classroom. No change in use, egress, or occupancy is proposed under this applica… |
| S01306533 ↗ | 105 ST MARKS PLACE STATEN ISLAND | Alteration | Permit Issued | 11/05/2025 | 04/29/2026 | Contractor FORSYTHE PLBG & HTG CORP | Provide new lavatory & associated accessories & sanitary & vent & cold water & hot water piping & shutoff valves. Reconnect new plumbing to … |
| Q01224330 ↗ | 8-21 BAY 25 STREET QUEENS | Alteration | Permit Issued | 05/20/2025 | 04/28/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor EMPIRE CONTROL ABATEMENT | Q465, CTF Room Conversion of Room 230 into Classroom and Office. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS PROPOSED UNDER THIS APPLICATION… |
| B00782684 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Permit Issued | 10/14/2022 | 04/24/2026 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| B00782723 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Permit Issued | 10/17/2022 | 04/24/2026 | Contractor J & N CONSTRUCTION GROUP | Roofing Replacement and Roof Structure Renovation |
| B00779880 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Permit Issued | 08/03/2022 | 04/23/2026 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing replacement and rooftop structure renoavation |
| B00784104 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Permit Issued | 10/14/2022 | 04/23/2026 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| S00568524 ↗ | 80 MAPLE PARKWAY STATEN ISLAND | Alteration | Permit Issued | 08/11/2021 | 04/08/2026 | Contractor DEAN ENERGY SOLUTIONS COR Filer JAM CONSULTANTS, INC. | Replacement of exhaust pipe for HVAC equipment. The structural work consists of providing supports for the exhaust pipe. |
| M00682828 ↗ | 460 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 02/17/2022 | 03/30/2026 | Owner NYCSCA Contractor EURO CASTLE CONSTRUCTION | Remove & re-install existing utility type exhaust fan and associated ductwork. Remove & re-install existing gooseneck duct and condensing un… |
| B00782720 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Permit Issued | 10/14/2022 | 03/11/2026 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing replacement and rooftop structure renovation |
| Q01363968 ↗ | 129-15 150 AVENUE QUEENS | Alteration | Filed — no permit on record | 02/27/2026 | — | Owner NYC SCHOOL CONSTRUCTION | — |
| B01283395 ↗ | 6001 18 AVENUE BROOKLYN | Alteration | Permit Issued | 09/10/2025 | 02/25/2026 | Contractor EMPIRE CONTROL ABATEMENT | Provide new thermostat and associated wiring and conduit. |
| Q01133556 ↗ | 191-02 90 AVENUE QUEENS | Alteration | Permit Issued | 10/30/2024 | 02/23/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor A.T.J. ELECTRICAL CO INC | Replace existing drinking fountains with new drinking fountains & associated accessories & piping. |
| Q01062161 ↗ | 62-89 FOREST AVENUE QUEENS | Alteration | Permit Issued | 06/06/2024 | 02/20/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor EMPIRE CONTROL ABATEMENT | Q071 - CTF ROOM CONVERSION - CONVERT EXISTING 3RD FLOOR CLASSROOMS 306, 308A & 308B INTO A NEW MULTIMEDIA CENTER ROOM #306 |
| Q00748089 ↗ | 125-20 SUTPHIN BOULEVARD QUEENS | Alteration | Permit Issued | 06/09/2022 | 02/12/2026 | Owner NYC SCHOOL CONSTRUCTION Contractor WDF INC | REMOVE EXISTING & PROVIDE NEW SINK & ASSOCIATED COLD WATER, HOT WATER, SANITARY & VENT PIPING. PROVIDE NEW DRINKING FOUNTAIN & ASSOCIATED CO… |
| Q01329169 ↗ | 98-15 98 PLACE QUEENS | Alteration | Filed — no permit on record | 02/10/2026 | — | — | — |
| Q01355165 ↗ | 88-17 NORTH CONDUIT AVENUE QUEENS | Alteration | Filed — no permit on record | 02/05/2026 | — | Owner NYC SCHOOL CONSTRUCTION | — |
| B01350666 ↗ | 3000 AVENUE X BROOKLYN | Alteration | Filed — no permit on record | 02/04/2026 | — | — | — |
| Q01329163 ↗ | 98-15 98 PLACE QUEENS | Alteration | Filed — no permit on record | 01/28/2026 | — | Owner NYC SCHOOL CONSTRUCTION | — |
| X01312824 ↗ | 339 MORRIS AVENUE BRONX | Alteration | Permit Issued | 11/05/2025 | 01/20/2026 | Contractor ABC CONSTRUCTION CONT INC | Provide new wall mounted lavatory & associated plumbing piping. Provide new drinking fountain & associated plumbing piping. Provide new wall… |
| X01340483 ↗ | 1160 NEILL AVENUE BRONX | Alteration | Filed — no permit on record | 01/07/2026 | — | — | |
| B00783870 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Signed-off | 10/14/2022 | 12/22/2025 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| X01262678 ↗ | 200 WEST 167 STREET BRONX | Alteration | Permit Issued | 08/04/2025 | 12/22/2025 | Contractor FORSYTHE PLBG & HTG CORP | Provide new Drinking Fountain with Bottle Filler and Associated Accessories & sanitary, vent, Cold water piping & Shutoff Valves. Reconnect … |
| B00780116 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Signed-off | 08/03/2022 | 12/19/2025 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roof replacement and rooftop structure renovation |
| B00783933 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Signed-off | 10/14/2022 | 12/19/2025 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| B00783964 ↗ | 373 MOTHER GASTON BLVD BROOKLYN | Alteration | Signed-off | 10/18/2022 | 12/19/2025 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| B00784092 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Signed-off | 10/14/2022 | 12/19/2025 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| B00784118 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Signed-off | 10/17/2022 | 12/19/2025 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| B00784136 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Signed-off | 10/17/2022 | 12/19/2025 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| B00784162 ↗ | 766 BLAKE AVENUE BROOKLYN | Alteration | Signed-off | 10/17/2022 | 12/19/2025 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| B00784174 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Signed-off | 10/17/2022 | 12/19/2025 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| X01260014 ↗ | 339 MORRIS AVENUE BRONX | Alteration | Permit Issued | 07/25/2025 | 12/16/2025 | Contractor ABC CONSTRUCTION CONT INC | Provide New Exhaust Air Grille and Associated duct work & volume Damper. Provide New Supply Air Diffuser & Associated Duct work & Volume Dam… |
| M00870187 ↗ | 45 PIKE STREET MANHATTAN | Alteration | Signed-off | 05/09/2023 | 12/11/2025 | Owner NYCHA Contractor EASTERN PLBG & MECH CONTR Filer BETRO DESIGN GROUP | Interior Renovations to the existing kitchen at the Rutgers Community Center, building #5 |
| M00881945 ↗ | 1833 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 06/02/2023 | 12/10/2025 | Owner NYCHA Contractor D.D.S. MECHANICAL PLUMB | NYCHA Johnson Houses, Building #10; Men's and Women's Bathroom Interior Renovations at existing ground floor (1stfloor) of existing communit… |
| Q01062209 ↗ | 179-37 137 AVENUE QUEENS | Alteration | Permit Issued | 06/07/2024 | 12/08/2025 | Owner NYC SCHOOL CONSTRUCTION Contractor EMPIRE CONTROL ABATEMENT | Q037_ CTF Project. Convert existing room 309 into new Media Center Classroom. NO CHANGE IN USE, EGRESSOROCCUPANCY IS PROPOSED UNDERT THIS A… |
| M00650522 ↗ | 195 WEST 134 STREET MANHATTAN | Alteration | Permit Issued | 01/03/2022 | 12/02/2025 | Owner NYCSCA Contractor THE OUTFIT M&J LLC | Renovate existing toilet 126. Remove existing plumbing fixtures and provide new. Remove existing light fixtures and provide new. |
| X01247140 ↗ | 200 WEST 167 STREET BRONX | Alteration | Permit Issued | 07/03/2025 | 11/25/2025 | Contractor ABC CONSTRUCTION CONT INC | Relocate existing Sprinkler heads & extend existing piping as required. Provide New Sprinkler heads & extend existing piping as required. |
| S01313430 ↗ | 100 LUTEN AVENUE STATEN ISLAND | Alteration | Filed — no permit on record | 11/13/2025 | — | — | |
| X00505019 ↗ | 991 TELLER AVENUE BRONX | Alteration | Permit Issued | 04/16/2021 | 11/13/2025 | Contractor WDF INC | X145_REPLACE EXISTING DRINKING FOUNTAIN IN THE PATH OF TRAVEL TO ROOM 343. NO CHANGEINUSE,EGRESS OR OCCUPANCY. PAA: Testing was performed an… |
| Q01313064 ↗ | 8-21 BAY 25 STREET QUEENS | Alteration | Filed — no permit on record | 11/07/2025 | — | Owner NYC SCHOOL CONSTRUCTION | — |
| M01273547 ↗ | 409 WEST 49 STREET MANHATTAN | Alteration | Filed — no permit on record | 11/06/2025 | — | Owner NYCSCA | — |
| Q01308298 ↗ | 62-89 FOREST AVENUE QUEENS | Alteration | Filed — no permit on record | 11/05/2025 | — | Owner NYC SCHOOL CONSTRUCTION | — |
| B00784184 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Permit Issued | 10/17/2022 | 10/29/2025 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| B00782737 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Permit Issued | 10/17/2022 | 10/27/2025 | Contractor J & N CONSTRUCTION GROUP Filer NERIS LLC | Roofing Replacement and Roof Structure Renovation |
| B00782739 ↗ | 430 DUMONT AVENUE BROOKLYN | Alteration | Permit Issued | 10/17/2022 | 10/27/2025 | Contractor J & N CONSTRUCTION GROUP | Roofing Replacement and Roof Structure Renovation |
| X00548688 ↗ | 650 HOLLYWOOD AVENUE BRONX | Alteration | Permit Issued | 07/20/2021 | 10/27/2025 | Contractor MAR-SAL PLBG & HTG, INC | Work is limited to the corridor walls including repair of the existing wall to accommodate the installation of the new drinking fountain on … |
| X00875799 ↗ | 2770 LAFAYETTE AVENUE BRONX | Alteration | Permit Issued | 05/22/2023 | 10/15/2025 | Contractor EAGLE 1 MECHANICAL, INC | Installation of (1) single drinking fountain and (1) dual drinking fountain. |
| Q01197361 ↗ | 156-10 BAISLEY BOULEVARD QUEENS | Alteration | Permit Issued | 03/24/2025 | 10/10/2025 | Owner NYC SCHOOL CONSTRUCTION Contractor EAGLE 1 MECHANICAL, INC | Replace existing drinking fountains in the corridors of path of travel with ADA compliant fixture and reconnect to existing plumbing distrib… |
| Q01299159 ↗ | 98-15 98 PLACE QUEENS | Alteration | Filed — no permit on record | 10/09/2025 | — | — | — |
| Q01299303 ↗ | 8-21 BAY 25 STREET QUEENS | Alteration | Filed — no permit on record | 10/09/2025 | — | — | — |
| Q00702100 ↗ | 167-01 GOTHIC DRIVE QUEENS | Alteration | Signed-off | 03/23/2022 | 10/06/2025 | Owner NYC SCHOOL CONSTRUCTION Contractor EMPIRE CONTROL ABATEMENT | DISCONNECT & REMOVE EXISTING SINK INCLUDING BUTNOT LIMITED TO SANITARY & VENT, DOMESTIC COLD & HOT WATER, FAUCET AND TRIMS. CAP PLUMBING LIN… |
| Q00788465 ↗ | 64-20 65 AVENUE QUEENS | Alteration | Signed-off | 08/12/2022 | 09/30/2025 | Owner NYC SCHOOL CONSTRUCTION Contractor A.T.J. ELECTRICAL CO INC | Remove existing and provide new bi-level ADA compliant drinking fountain and associated plmbing. |