← Back
Miscellaneous two family
175 WEST 88 STREET
MANHATTAN · BIN 1032311
💬 Discuss this project
1891Year Built
3Stories
B9Building Class
R7-2Zoning
3,400 sfGross Floor Area
2Units
0 Open Violations
Miscellaneous two family · Owner of record: 175 WEST 88 T LLC · 1,678 sf lot · 2.03 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar8p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B H B CONSTRUCTION503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE203/21/2026
JM ZONING, LLC.1203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY FINE INTERIORS & WOODWGeneral Contractor507/08/2026
IRVING BAPTISTEElectrical103/21/2026
PIOTR RADZIKElectrical103/21/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D&B ENGINEERS AND ARCHITE2461302/17/2022
NVDESIGN.ARCHITECTURE PLL4608202/15/2022
Building Lifecycle
All (41)Filed (9)Permit Issued (4)Signed Off (4)Violation (3)Inspection (3)Special Inspection (18)
04/20/2023
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF FLOORS CEL, BAS, 001. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00613605-I1
04/18/2023
Signed off — Alteration
RENOVATION OF UNIT 1- FLOORS CEL, BAS, 001 OF 2 FAMILY HOME. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00610509-S1
04/17/2023
Signed off — Alteration
RENOVATION OF UNIT 1- FLOORS CEL, BAS, 001 OF 2 FAMILY HOME. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00610509-I1
04/16/2023
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF FLOORS CEL, BAS, 001. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00613605-P4
03/03/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/03/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/15/2023
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF FLOORS CEL, BAS, 001. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00613605-P3
08/22/2022
Permit issued — Structural
M00610509-S1-ST
05/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/18/2022
Permit issued — Plumbing
M00613605-I1-PL
02/28/2022
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF FLOORS CEL, BAS, 001. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00613605-P2
02/22/2022
Special inspection requirement — Structural Steel - Details
Christopher Desmond
02/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Desmond
02/22/2022
Special inspection requirement — Masonry
Christopher Desmond
02/22/2022
Special inspection requirement — Final
Christopher Desmond
02/18/2022
Permit issued — General Construction
M00610509-I1-GC
02/17/2022
Filed — Alteration
RENOVATION OF UNIT 1- FLOORS CEL, BAS, 001 OF 2 FAMILY HOME. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00610509-P2
02/17/2022
Special inspection requirement — Final
Arturo Barcenas
02/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Vandenbout
02/17/2022
Special inspection requirement — Fire-Resistance Rated Construction
Arturo Barcenas
02/15/2022
Filed — Alteration
RENOVATION OF UNIT 1- FLOORS CEL, BAS, 001 OF 2 FAMILY HOME. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00610509-P1
01/20/2022
Special inspection requirement — Final
Christopher Desmond
01/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Vandenbout
01/20/2022
Special inspection requirement — Final
Arturo Barcenas
01/20/2022
Special inspection requirement — Fire-Resistance Rated Construction
Arturo Barcenas
01/20/2022
Special inspection requirement — Masonry
Christopher Desmond
01/20/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Desmond
01/20/2022
Special inspection requirement — Structural Steel - Details
Christopher Desmond
01/07/2022
Filed — Alteration
RENOVATION OF UNIT 1- FLOORS CEL, BAS, 001 OF 2 FAMILY HOME. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00610509-S1
11/23/2021
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF FLOORS CEL, BAS, 001. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00613605-I1
11/23/2021
Filed — Alteration
RENOVATION OF UNIT 1- FLOORS CEL, BAS, 001 OF 2 FAMILY HOME. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M00610509-I1
03/31/2020
Signed off — Alteration
STRUCTURAL WORK OF AN EXISTING UNIT (UPPER UNIT) OF AN EXISTING TWO (2) FAMILY DWELLING IN CONJUNCTION WITH APPLICATION #123768921. STRUCTURAL WORK CONSISTS OF THE REPLACEMENT OF HEADER AND JOISTS FOR STAIR OPENING BETWEEN SECOND AND THIRD FLOORS.
M00246091-I1
03/20/2020
Permit issued — Structural
M00246091-I1-ST
11/21/2019
Filed — Alteration
STRUCTURAL WORK OF AN EXISTING UNIT (UPPER UNIT) OF AN EXISTING TWO (2) FAMILY DWELLING IN CONJUNCTION WITH APPLICATION #123768921. STRUCTURAL WORK CONSISTS OF THE REPLACEMENT OF HEADER AND JOISTS FOR STAIR OPENING BETWEEN SECOND AND THIRD FLOORS.
M00246091-I1
10/15/2019
Special inspection requirement — Final
Rob Raab
10/15/2019
Special inspection requirement — Structural Stability – Alterations of existing buildings
Rob Raab
10/15/2019
Special inspection requirement — Structural Steel - Details
Rob Raab
10/15/2019
Special inspection requirement — Structural Wood Frame
Rob Raab
04/11/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/22/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/22/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offNY FINE INTERIORS & WOODW08/22/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC03/18/2022
DOB NOWGeneral ConstructionSigned-offNY FINE INTERIORS & WOODW02/18/2022
DOB NOWStructuralSigned-offNY FINE INTERIORS & WOODW03/20/2020
BISOTISSUEDNY FINE INTERIORS & WOODW09/03/2019
BISEQISSUEDB H & B CONSTRUCTION INC10/18/2013
BISEQISSUEDB H & B CONSTRUCTION INC10/15/2013
2 projects · most recent 08/26/2022
General Wiring Lighting
FiledStatusContractorScope
08/26/2022CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
09/25/2019CompleteAPPO ELECTRICAL CONTRS INLighting
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/03/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
02/22/2022Structural Steel - DetailsChristopher Desmondspecial
02/22/2022Structural Stability – Alterations of existing buildingsChristopher Desmondspecial
02/22/2022MasonryChristopher Desmondspecial
02/22/2022FinalChristopher Desmondprogress
02/17/2022FinalArturo Barcenasprogress
02/17/2022Fire-Resistant Penetrations and JointsThomas Vandenboutspecial
02/17/2022Fire-Resistance Rated ConstructionArturo Barcenasprogress
01/20/2022FinalChristopher Desmondprogress
01/20/2022Fire-Resistant Penetrations and JointsThomas Vandenboutspecial
01/20/2022FinalArturo Barcenasprogress
01/20/2022Fire-Resistance Rated ConstructionArturo Barcenasprogress
01/20/2022MasonryChristopher Desmondspecial
01/20/2022Structural Stability – Alterations of existing buildingsChristopher Desmondspecial
01/20/2022Structural Steel - DetailsChristopher Desmondspecial
10/15/2019FinalRob Raabprogress
10/15/2019Structural Stability – Alterations of existing buildingsRob Raabspecial
10/15/2019Structural Steel - DetailsRob Raabspecial
10/15/2019Structural Wood FrameRob Raabprogress
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
09/03/2026M00610509-P2Request digital key ↗
09/03/2026M00610509-I1Request digital key ↗
09/03/2026M00610509-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00246091-I1Request digital key ↗
▸Applications & Permits16
▸DOB NOWLPC Approval/Permit9
09/03/2026M00610509-I1Open ↗
09/03/2026M00610509-S1Open ↗
08/13/2026M00610509-P2Open ↗
Showing 3 of 9 on file for this type
▸BISWORK PERMIT APPLICATION4
09/19/2019123768921Open ↗
09/03/2019123768921Open ↗
10/17/2013140124684Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
06/14/2019123768921Open ↗
10/17/2013140124684Open ↗
10/14/2013140124513Open ↗
▸Seals & Professional Certifications39
▸DOB NOWSpecial Inspector Seal & Signature10
08/30/2026M00610509-I1Open ↗
08/29/2026M00246091-I1Open ↗
08/29/2026M00246091-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026M00610509-S1Open ↗
09/03/2026M00610509-I1Open ↗
09/02/2026M00613605-P4Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
04/29/2020123768921Open ↗
04/29/2020123768921Open ↗
06/14/2019123768921Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/30/2026M00610509-I1Open ↗
08/29/2026M00246091-I1Open ↗
08/29/2026M00246091-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/17/2013140124684Open ↗
10/14/2013140124513Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/17/2013140124684Open ↗
10/14/2013140124513Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/17/2013140124684Open ↗
10/14/2013140124513Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/14/2019123768921Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
06/14/2019123768921Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/03/2026M00610509-S1Open ↗
09/03/2026M00610509-I1Open ↗
09/02/2026M00613605-P3Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/14/2019123768921Open ↗
▸Energy Compliance1
▸BISENERGY CODE 1ST REVIEW COMPLETE1
06/14/2019123768921Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/17/2013140124684Open ↗
10/14/2013140124513Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLANDMARKS APPROVAL3
04/29/2020123768921Open ↗
10/17/2013140124684Open ↗
10/14/2013140124513Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
04/29/2020123768921Open ↗
05/05/2015140124684Open ↗
05/05/2015140124513Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/29/2020123768921Open ↗
06/14/2019123768921Open ↗
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
10/17/2013140124684Open ↗
10/14/2013140124513Open ↗
▸BISBOROUGH INTAKE FORM1
04/29/2020123768921Open ↗
▸BISEFILING COVER SHEET1
06/14/2019123768921Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/14/2019123768921Open ↗