← Back
Two family converted from one family
176-08 130 AVENUE
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R3XZoning
2,000 sfGross Floor Area
2Units
Rent Stabilized12 Open Violations ▸FDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 215p · 2 filings · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar17p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MORELL BUILDERS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TURNIER ENGINEERING PC801/08/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WSCONSULTANT & EXPEDITING SERVICES1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor204/09/2026
MIDTOWN PLBG & HTNG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781501/08/2026
TURNIER ENGINEERING PC6900701/08/2026
Building Lifecycle
All (80)Filed (8)Permit Issued (3)Signed Off (1)Violation (14)Inspection (6)Objection (18)Special Inspection (30)
06/04/2026
Signed off — Alteration
vertical and horizontal extension to existing 2famail house, kitchen to be relocated on the 2nd floor.
Q00687922-I1
03/02/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/22/2026
Special inspection requirement — Lighting in dwelling units
EUGENE TURNIER
01/22/2026
Special inspection requirement — Chimneys and vents
EUGENE TURNIER
01/22/2026
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
01/22/2026
Special inspection requirement — Masonry
CHRISTIAN LOZADA
01/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE TURNIER
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE TURNIER
01/22/2026
Special inspection requirement — Final
EUGENE TURNIER
01/22/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE TURNIER
01/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE TURNIER
01/22/2026
Special inspection requirement — Exterior lighting power
EUGENE TURNIER
01/22/2026
Special inspection requirement — Interior lighting power
EUGENE TURNIER
01/08/2026
Filed — Alteration
REMOVE AND REPLACE 1ST FLOOR ROOF IN FRONT OF THE BUILDING. PROVIDE enlargement to the side and rear of the house cellar, 1ST & 2ND FLOOR.
Q00571483-P5
12/10/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/25/2025
Violation issued (HPD, open)
I
03/14/2025
Filed — Alteration
REMOVE AND REPLACE 1ST FLOOR ROOF IN FRONT OF THE BUILDING. PROVIDE enlargement to the side and rear of the house cellar, 1ST & 2ND FLOOR.
Q00571483-P4
03/07/2025
Special inspection requirement — Chimneys and vents
EUGENE TURNIER
03/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE TURNIER
03/07/2025
Special inspection requirement — Masonry
CHRISTIAN LOZADA
03/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE TURNIER
03/07/2025
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
03/07/2025
Special inspection requirement — Energy Code Compliance Inspections
EUGENE TURNIER
03/07/2025
Special inspection requirement — Final
EUGENE TURNIER
03/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE TURNIER
03/07/2025
Special inspection requirement — Lighting in dwelling units
EUGENE TURNIER
03/07/2025
Special inspection requirement — Interior lighting power
EUGENE TURNIER
03/07/2025
Special inspection requirement — Exterior lighting power
EUGENE TURNIER
02/04/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/05/2024
Violation issued (HPD, open)
I
08/16/2024
Objection raised — Fire_Protection
08/16/2024
Objection resolved — Addressed
07/02/2024
Objection raised — Other
07/02/2024
Objection resolved — Addressed
07/02/2024
Objection raised — Other
07/02/2024
Objection resolved — Addressed
07/02/2024
Objection raised — Other
07/02/2024
Objection resolved — Addressed
06/10/2024
Objection raised — Other
06/10/2024
Objection resolved — Addressed
05/30/2024
Filed — Alteration
REMOVE AND REPLACE 1ST FLOOR ROOF IN FRONT OF THE BUILDING. PROVIDE enlargement to the side and rear of the house cellar, 1ST & 2ND FLOOR.
Q00571483-P3
11/30/2023
Violation issued (HPD, open)
I
07/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE TURNIER
07/10/2023
Filed — Alteration
vertical and horizontal extension to existing 2famail house, kitchen to be relocated on the 2nd floor.
Q00687922-P1
06/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE TURNIER
04/18/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/22/2023
Permit issued — Plumbing
Q00687922-I1-PL
02/20/2023
Filed — Alteration
REMOVE AND REPLACE 1ST FLOOR ROOF IN FRONT OF THE BUILDING. PROVIDE enlargement to the side and rear of the house cellar, 1ST & 2ND FLOOR.
Q00571483-P2
02/16/2023
Special inspection requirement — Chimneys and vents
EUGENE TURNIER
02/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE TURNIER
02/16/2023
Special inspection requirement — Masonry
CHRISTIAN LOZADA
02/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE TURNIER
02/16/2023
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
02/16/2023
Special inspection requirement — Energy Code Compliance Inspections
EUGENE TURNIER
02/02/2023
Permit issued — General Construction
Q00571483-I1-GC
01/18/2023
Violation issued (ECB, open)
Construction
12/19/2022
Filed — Alteration
vertical and horizontal extension to existing 2famail house, kitchen to be relocated on the 2nd floor.
Q00687922-I1
11/18/2022
Violation issued (HPD, open)
I
11/10/2022
Permit issued — General Construction
Q00571483-I1-GC
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMIDTOWN PLBG & HTNG CORP02/22/2023
DOB NOWGeneral ConstructionPermit IssuedMORELL BUILDERS INC02/02/2023
DOB NOWGeneral ConstructionPermit IssuedMORELL BUILDERS INC11/10/2022
BIS—ISSUEDGENET PLUMBING & HEATING CORP.06/02/2004
BISPLISSUEDGENET PLBG AND HTG CORP06/02/2004
BIS—ISSUEDH. BROWN_ CONSTRUCTION CO INC01/28/1991
BISPLISSUEDBO-RICH MECHANICAL06/29/1990
BIS—ISSUEDH. BROWN_ CONSTRUCTION CO INC01/12/1990
1 project · most recent 03/13/2024
General Wiring
FiledStatusContractorScope
03/13/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/02/2026Pass-Final General Construction Non-Directive 14PassView ↗
12/10/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/04/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/18/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
01/22/2026Lighting in dwelling unitsEUGENE TURNIERenergy_progress
01/22/2026Chimneys and ventsEUGENE TURNIERspecial
01/22/2026Subgrade InspectionsCHRISTIAN LOZADAspecial
01/22/2026MasonryCHRISTIAN LOZADAspecial
01/22/2026Structural Stability – Alterations of existing buildingsEUGENE TURNIERspecial
01/22/2026Fire-Resistant Penetrations and JointsEUGENE TURNIERspecial
01/22/2026FinalEUGENE TURNIERprogress
01/22/2026Energy Code Compliance InspectionsEUGENE TURNIERprogress
01/22/2026Fire-Resistance Rated ConstructionEUGENE TURNIERprogress
01/22/2026Exterior lighting powerEUGENE TURNIERenergy_progress
01/22/2026Interior lighting powerEUGENE TURNIERenergy_progress
03/07/2025Chimneys and ventsEUGENE TURNIERspecial
03/07/2025Fire-Resistant Penetrations and JointsEUGENE TURNIERspecial
03/07/2025MasonryCHRISTIAN LOZADAspecial
03/07/2025Structural Stability – Alterations of existing buildingsEUGENE TURNIERspecial
03/07/2025Subgrade InspectionsCHRISTIAN LOZADAspecial
03/07/2025Energy Code Compliance InspectionsEUGENE TURNIERprogress
03/07/2025FinalEUGENE TURNIERprogress
03/07/2025Fire-Resistance Rated ConstructionEUGENE TURNIERprogress
03/07/2025Lighting in dwelling unitsEUGENE TURNIERenergy_progress
03/07/2025Interior lighting powerEUGENE TURNIERenergy_progress
03/07/2025Exterior lighting powerEUGENE TURNIERenergy_progress
07/19/2023Fire-Resistant Penetrations and JointsEUGENE TURNIERspecial
06/30/2023Fire-Resistant Penetrations and JointsEUGENE TURNIERspecial
02/16/2023Chimneys and ventsEUGENE TURNIERspecial
Latest 25 of 46.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026Q00687922-I1Request digital key ↗
08/24/2026Q00687922-P1Request digital key ↗
08/17/2026Q00571483-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram6
08/13/2026Q00571483-P5Open ↗
08/13/2026Q00571483-P3Open ↗
08/13/2026Q00571483-P1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWSpecial Inspector Seal & Signature14
08/31/2026Q00687922-P1Open ↗
08/29/2026Q00571483-P4Open ↗
08/29/2026Q00571483-P4Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/29/2026Q00571483-P4Open ↗
08/29/2026Q00571483-P4Open ↗
08/29/2026Q00571483-P4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026Q00687922-I1Open ↗
08/13/2026Q00571483-P2Open ↗
08/13/2026Q00571483-I1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/24/2026Q00687922-I1Open ↗
08/13/2026Q00571483-P4Open ↗
08/13/2026Q00571483-P3Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00571483-I1Open ↗
▸Other Documents17
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/13/2026Q00571483-P1Open ↗
08/13/2026Q00571483-I1Open ↗
08/13/2026Q00571483-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlot Diagram6
08/13/2026Q00571483-P4Open ↗
08/13/2026Q00571483-P3Open ↗
08/13/2026Q00571483-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026Q00571483-P4Open ↗
08/13/2026Q00571483-P2Open ↗
08/13/2026Q00571483-I1Open ↗
Showing 3 of 5 on file for this type