Office with commercial, 7-19 stories
18 East 50th Street
18 EAST 50 STREET · Midtown-Times Square · BIN 1035460
💬 Discuss this project
1916Year Built
11Stories
O6Building Class
C5-3Zoning
58,342 sfGross Floor Area
9Units
LL97 Covered10 Open Violations 6 unresolved · 4 paperwork only ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: PAMELA EQUITIES CORP · 5,640 sf lot · 10.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
Floor 8Under Construction1 filing · 3 docs
Floor 7Under Construction1 filing · 3 docs
Floor 6
Floor 517p · 3 filings · 20 docs
Floor 413p · 2 filings · 8 docs
Floor 313p · 2 filings · 8 docs
Floor 2
Floor 113p · 3 filings · 20 docs
Mezzanine1 filing · 10 docs
Site & exterior32p · 3 filings · 17 docs
Filed — no permit issued180p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PAN AM EQUITIES8709/29/2026
PAMELA EQUITIES1703/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC1403/21/2026
A1 EXPEDITING SERVICE803/21/2026
PATUXENT ENGINEERING603/21/2026
SOL BUILDING CONSULTING SERVICES303/21/2026
I L CONSULTING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HOWARD M.HAIMES INCGeneral Contractor1507/08/2026
NOVA CONSTRUCTION SERVICEGeneral Contractor1407/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor407/08/2026
SCAVUZZO ALDOElectrical103/21/2026
VINCENT BUONOElectrical103/21/2026
LEVINE, GEORGEFire Protection103/21/2026
ELYSIUM CONSTRUCTION INCGeneral Contractor109/29/2026
COPPER SERVICES, LLCPlumbing107/08/2026
ALDO SCAVUZZOElectrical103/21/2026
DONATO PLUMBING, INCPlumbing107/08/2026
JOSEPH SORTINOElectrical103/21/2026
PAUL BOCCIAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678805/19/2026
GEIGER ENGINEERING. PC689312/19/2024
EMTG CONSULTANTS4222112/18/2024
ADVANCED ENGINEERING & IN1224211/22/2021
JON LIBASCI3068207/12/2021
Building Lifecycle
All (222)Filed (29)Permit Issued (18)Signed Off (3)Facade (FISP) (15)Violation (60)Inspection (6)Objection (61)Special Inspection (30)
09/28/2026
Permit issued — General Construction
M01456981-I1-GC
09/02/2026
Signed off — Alteration
Mechanical Modification to 5th Floor Commercial Space. No change to use, occupancy, or egress.
M01130955-I1
08/06/2026
Objection resolved — Resolved
08/06/2026
Objection resolved — Resolved
07/28/2026
Objection resolved — Addressed
07/06/2026
Objection resolved — Resolved
06/04/2026
Objection resolved — Resolved
06/03/2026
Objection resolved — Resolved
06/02/2026
Objection raised — Other
06/01/2026
Objection raised — Other
05/27/2026
Filed — Alteration
Interior renovation to existing Commercial space at 1ST floor, , construct new bathroom , all as per plan. no change in use egress or occupancy.
M01406626-I1
05/26/2026
Signed off — Alteration
Interior Renovation of 5th Floor Commercial (Office) Space. As per plans filed herewith. No change to use, occupancy or egress.
M01130946-I1
05/19/2026
Filed — Alteration CO
HEREWITH FILING STRUCTURAL WORK IN CONJUNCTION WITH ENLARGEMENT.
M01257434-S7
05/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
05/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
05/11/2026
Special inspection requirement — Post-installed Anchors
Ari Kamo
05/07/2026
Filed — Alteration
HEREWITH FILING FOR SUPPORT OF EXTERIOR STAIR RENOVATION AS PER PLANS. THIS IS BEING FILED IN CONJUCTION WITH PDA00010098 WHICH IS TIED TO M01257434-I1
M01387831-I1
05/07/2026
Objection resolved — Resolved
05/07/2026
Objection resolved — Resolved
05/07/2026
Objection resolved — Resolved
05/07/2026
Objection resolved — Resolved
05/07/2026
Objection resolved — Resolved
05/07/2026
Objection resolved — Resolved
05/07/2026
Objection resolved — Resolved
05/07/2026
Objection resolved — Resolved
05/07/2026
Objection resolved — Resolved
05/06/2026
Special inspection requirement — Post-installed Anchors
05/06/2026
Special inspection requirement — Structural Steel - Welding
05/06/2026
Special inspection requirement — Structural Steel - High Strength Bolting
04/20/2026
Special inspection requirement — Structural Steel - Details
04/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/15/2026
Special inspection requirement — Final
04/09/2026
Filed — Alteration CO
HEREWITH FILING STRUCTURAL WORK IN CONJUNCTION WITH ENLARGEMENT.
M01257434-P1
03/19/2026
Objection raised — Cost
03/12/2026
Special inspection requirement — Post-installed Anchors
03/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/26/2026
Objection resolved — Addressed
02/26/2026
Objection resolved — Addressed
02/26/2026
Objection resolved — Addressed
02/26/2026
Objection resolved — Addressed
02/11/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
02/09/2026
Objection resolved — Addressed
02/09/2026
Objection resolved — Addressed
02/09/2026
Objection resolved — Addressed
02/07/2026
Objection raised — Zoning
12/08/2025
Objection resolved — Resolved
12/03/2025
Objection raised — Fire_Protection
12/03/2025
Objection raised — Fire_Protection
12/03/2025
Objection raised — Fire_Protection
12/03/2025
Objection raised — Fire_Protection
12/03/2025
Objection raised — Fire_Protection
12/03/2025
Objection raised — Fire_Protection
12/03/2025
Objection raised — Fire_Protection
12/03/2025
Objection raised — Admin
12/03/2025
Objection raised — Structural
12/03/2025
Objection raised — Structural
12/03/2025
Objection raised — Admin
12/03/2025
Objection raised — Fire_Protection
12/03/2025
Objection raised — Structural
Latest 60 of 222 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedELYSIUM CONSTRUCTION INC09/28/2026
DOB NOWGeneral ConstructionSigned-offHOWARD M.HAIMES INC03/26/2025
DOB NOWMechanical SystemsSigned-offHOWARD M.HAIMES INC02/18/2025
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC01/21/2025
DOB NOWGeneral ConstructionPermit IssuedHOWARD M.HAIMES INC08/19/2022
DOB NOWPlumbingSigned-offCOPPER SERVICES, LLC07/26/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedNOVA CONSTRUCTION SERVICE05/25/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES02/17/2022
DOB NOWGeneral ConstructionPermit IssuedHOWARD M.HAIMES INC12/04/2021
DOB NOWGeneral ConstructionPermit IssuedHOWARD M.HAIMES INC07/19/2021
DOB NOWProtection and Mechanical MethodsPermit IssuedNOVA CONSTRUCTION SERVICE06/03/2021
DOB NOWSupported ScaffoldPermit IssuedNOVA CONSTRUCTION SERVICE06/03/2021
DOB NOWProtection and Mechanical MethodsPermit IssuedNOVA CONSTRUCTION SERVICE03/05/2021
DOB NOWSupported ScaffoldPermit IssuedNOVA CONSTRUCTION SERVICE03/04/2021
DOB NOWGeneral ConstructionPermit IssuedHOWARD M.HAIMES INC02/16/2021
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES02/12/2021
DOB NOWConstruction FencePermit IssuedHOWARD M.HAIMES INC02/28/2020
DOB NOWStructuralPermit IssuedHOWARD M.HAIMES INC11/22/2019
BISOTISSUEDHOWARD M.HAIMES INC09/01/2023
BISOTISSUEDNOVA CONSTRUCTION SERVICE01/13/2022
BISOTISSUEDHOWARD M.HAIMES INC07/01/2021
BISOTISSUEDHOWARD M.HAIMES INC06/22/2020
BIS—ISSUEDPAN AM EQUITIES06/21/2017
BISPLISSUEDCOPPER SERVICES, LLC03/11/2016
BISPLISSUEDCOPPER III HTG & PLBG LLC06/23/2015
BISMHISSUEDPOWER COOLING INC10/06/2014
BISSPISSUEDCHIEF FIRE CONTR. CO. INC09/11/2013
BISMHISSUEDRUBEN REFRIGERATION & AC08/03/2012
BISSPISSUEDCHIEF FIRE CONTR. CO. INC07/20/2012
BISPLISSUEDCOPPER III HTG & PLBG LLC12/02/2011
BISMHISSUEDHOWARD M.HAIMES INC09/26/2011
BISOTISSUEDHOWARD M.HAIMES INC09/26/2011
BISMHISSUEDPEAK COOLING CORP03/21/2011
BISOTISSUEDHOWARD M.HAIMES INC05/13/2010
BISOTISSUEDHOWARD M.HAIMES INC05/13/2010
BISOTISSUEDHOWARD M.HAIMES INC04/22/2010
BISEQISSUEDOUTDOOR INSTALLATIONS LLC04/08/2010
BISPLISSUEDCOPPER PLUMBING & HEATING12/09/2009
BISOTISSUEDHOWARD M.HAIMES INC04/23/2009
BISSPISSUEDUNIVERSAL FIRE SPR LLC10/10/2008
+ 26 more permits on file
2 projects · most recent 05/19/2026
Air Conditioning Systems Heating Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/19/2026——Air Conditioning Systems, Heating Systems
Cooling
Lg ARUM168BTE5 168,000 BTU · Vrf Outdoor ×4
ARUN024GSS4 36,000 BTU · Vrf Outdoor ×3
ARUN060GSS4 60,000 BTU · Vrf Outdoor ×1
Heating
Lg ARUM168BTE5 189,000 BTU · Vrf Outdoor ×7
ARUN060GSS4 64,000 BTU · Vrf Outdoor ×1
12/18/2024Signed-offHOWARD M.HAIMES INCHeating and Air Conditioning Systems
Heat / Cool
Lg ARNU076B8A4 162,400 BTU · Vrf Indoor ×1
ARNU963B8A4 203,400 BTU · Vrf Indoor ×1
ARUM168BTE5 357,000 BTU · Vrf Outdoor ×1
Loren Cook GC-148 100 CFM · Exhaust Fan ×1
GN-422 225 CFM · Exhaust Fan ×1
GN-622 375 CFM · Exhaust Fan ×1
1 project · most recent 05/19/2026
Sprinkler System
FiledStatusContractorScope
05/19/2026——Sprinkler System
3 projects · most recent 05/19/2026
Water/Sanitary Storm
FiledStatusContractorScope
05/19/2026——Storm, Water/Sanitary
12/19/2024Signed-offDONATO PLUMBING, INCWater/Sanitary
02/09/2022Signed-offCOPPER SERVICES, LLCWater/Sanitary
8 projects · most recent 04/01/2026
General Wiring
FiledStatusContractorScope
04/01/2026Permit IssuedEXECUTIVE ELECTL SER INCGeneral Wiring
01/23/2026Permit IssuedTOP SHELF ELECTRIC CORP—
12/19/2025Permit IssuedLAREDO ELECTRIC, INC.General Wiring
06/04/2021Permit IssuedCAPUTEK ELEC'L SERVICES,—
04/29/2021CompleteLAREDO ELECTRIC, INC.General Wiring
02/04/2021Complete5 J'S ELECTL CONTS CORP—
08/04/2020CompleteLAREDO ELECTRIC, INC.—
02/26/2020CompleteLAREDO ELECTRIC, INC.—
3 projects · most recent 05/19/2026
Steel Concrete Masonry
FiledStatusContractorScope
05/19/2026——Steel, Concrete, Masonry
05/07/2026——Steel
11/14/2019Permit IssuedHOWARD M.HAIMES INCSteel, Concrete
2 projects · most recent 09/07/2021
Scaffold Fence
FiledStatusContractorScope
09/07/2021Permit IssuedNOVA CONSTRUCTION SERVICEScaffold
11/15/2019Permit IssuedHOWARD M.HAIMES INCFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/14/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
05/11/2026Post-installed AnchorsAri Kamospecial
05/11/2026HVAC-R and service water piping design and insulationAri Kamoenergy_progress
05/11/2026Fire-Resistant Penetrations and JointsAri Kamospecial
05/06/2026Structural Steel - Welding—special
05/06/2026Post-installed Anchors—special
05/06/2026Structural Steel - High Strength Bolting—special
04/20/2026Structural Steel - Details—special
04/16/2026Structural Stability – Alterations of existing buildings—special
04/15/2026Final—progress
03/12/2026Fire-Resistant Penetrations and Joints—special
03/12/2026HVAC-R and service water piping design and insulation—energy_progress
03/12/2026Post-installed Anchors—special
02/11/2026Subsurface Investigations (Borings/Test Pits)—special
08/08/2025HVAC-R and service water piping design and insulationAri Kamoenergy_progress
08/08/2025HVAC-R and service water heating equipmentAri Kamoenergy_progress
08/08/2025HVAC-R and service water heating system controlsAri Kamoenergy_progress
08/07/2025Fire-Resistant Penetrations and JointsAri Kamospecial
08/07/2025Footing and FoundationAri Kamoprogress
08/07/2025FinalAri Kamoprogress
08/07/2025Construction Operations Influencing Adjacent StructuresAri Kamospecial
08/07/2025Concrete - Cast-In-PlaceAri Kamospecial
08/07/2025Post-installed AnchorsAri Kamospecial
07/31/2025Ventilation and air distribution systemAri Kamoenergy_progress
07/31/2025Emergency and Standby Power Systems (Generator)Ari Kamospecial
07/31/2025Fire-Resistant Penetrations and JointsAri Kamospecial
Latest 25 of 81.
▾Documents — 512 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch17
09/03/2026M00604404-I1Request digital key ↗
09/02/2026M00675920-I1Request digital key ↗
09/02/2026M00676161-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold5
09/03/2026M00468341-I1Request digital key ↗
09/03/2026M00468341-P3Request digital key ↗
08/15/2026M00468341-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/03/2026M00448167-P2Request digital key ↗
09/03/2026M00448167-P1Request digital key ↗
09/03/2026M00448167-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/03/2026M00464020-I1Request digital key ↗
08/15/2026M00464020-P1Request digital key ↗
08/15/2026M00464020-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00217348-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Protection of Mechanical Methods1
09/04/2026M00473480-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00208752-I1Request digital key ↗
▸Applications & Permits85
▸BISPLAN / WORK APPROVAL APPLICATION36
02/06/2026141028643Open ↗
02/03/2026141028643Open ↗
01/14/2026141028643Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION27
09/01/2023140897830Open ↗
08/23/2023140897830Open ↗
01/14/2022140977799Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWLPC Approval/Permit18
08/17/2026M01406626-I1Open ↗
08/15/2026M01387831-I1Open ↗
08/15/2026M01257434-S7Open ↗
Showing 3 of 18 on file for this type
▸BISPLACE OF ASSEMBLY3
01/10/2019123362360Open ↗
01/10/2019123362360Open ↗
06/25/2018123362360Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/24/2017121478855Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M01257434-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026M01257434-I1Open ↗
▸Seals & Professional Certifications158
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION33
10/28/2019123745554Open ↗
10/03/2019123745554Open ↗
08/29/2019123799078Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/03/2026M00468341-P3Open ↗
09/03/2026M00468341-P2Open ↗
09/03/2026M00468341-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/25/2026M00448167-I1Open ↗
09/02/2026M01257434-S5Open ↗
09/02/2026M01257434-S5Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/25/2026M00448167-I1Open ↗
09/02/2026M00448167-P2Open ↗
09/01/2026M01130946-I1Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST17
10/03/2019123745554Open ↗
09/26/2019123745554Open ↗
08/29/2019123799078Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
08/16/2014122072960Open ↗
Showing 1 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
04/28/2020140897830Open ↗
08/29/2019123799078Open ↗
02/12/2018123362360Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
01/14/2026141028643Open ↗
12/04/2020140977799Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/04/2020140977799Open ↗
04/28/2020140897830Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/28/2020140897830Open ↗
▸BISProfessional and Owner Certification (POC3)1
09/26/2019123745554Open ↗
▸Trade Schedules & Equipment20
▸BISEQUIPMENT USE APPLICATION/PERMIT6
06/22/2015121110163Open ↗
10/29/2014122072960Open ↗
10/29/2014122072960Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
11/19/2015122078973Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
10/29/2014122072960Open ↗
Showing 1 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
10/24/2016121012199Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/05/2014122078973Open ↗
▸Safety & Tenant Protection5
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
10/03/2019123745554Open ↗
10/03/2019123745554Open ↗
09/12/2019123799078Open ↗
▸BISST-1 Street Tree Checklist1
01/17/2013121478855Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M01257434-I1Open ↗
▸Environmental & Asbestos41
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/03/2026M00604404-I1Open ↗
08/25/2026M01130955-I1Open ↗
08/17/2026M01406626-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
02/03/2026141028643Open ↗
04/28/2020140897830Open ↗
10/28/2019123745554Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/17/2026M01257434-S2Open ↗
08/17/2026M01257434-S1Open ↗
08/17/2026M01257434-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
06/01/2021140977799Open ↗
▸Energy Compliance26
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
09/26/2019123745554Open ↗
08/29/2019123799078Open ↗
06/22/2015121110163Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
12/13/2023123799078Open ↗
06/22/2015121110163Open ↗
06/15/2015121110163Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
12/20/2023123745554Open ↗
12/13/2023123799078Open ↗
11/10/2023140897830Open ↗
▸BISNYCECC EXEMPTION2
02/09/2026141028643Open ↗
02/01/2021140977799Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/18/2020140897830Open ↗
04/28/2020140897830Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/28/2020140897830Open ↗
▸BISFENESTRATION AIR LEAKAGE1
11/10/2023140897830Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/10/2023140897830Open ↗
▸BISFENESTRATION AREAS1
11/10/2023140897830Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/04/2020140977799Open ↗
06/18/2020140897830Open ↗
06/16/2020140897830Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/18/2023140977799Open ↗
▸BISMASONRY1
01/18/2023140977799Open ↗
▸BISPOST-INSTALLED ANCHORS1
01/18/2023140977799Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/17/2026M01257434-S6Open ↗
▸DOB NOWSOIL REPORT1
08/17/2026M01257434-S6Open ↗
▸Approvals, Objections & Sign-offs53
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
12/20/2023123745554Open ↗
12/14/2023123799078Open ↗
11/17/2023140897830Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
02/13/2018121478855Open ↗
02/09/2018121478855Open ↗
02/09/2018121478855Open ↗
Showing 3 of 8 on file for this type
▸BISFINAL4
12/20/2023123745554Open ↗
12/13/2023123799078Open ↗
11/10/2023140897830Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/15/2023123799078Open ↗
04/04/2016122078973Open ↗
10/29/2014122072960Open ↗
▸BISLANDMARKS APPROVAL3
02/09/2026141028643Open ↗
12/04/2020140977799Open ↗
04/28/2020140897830Open ↗
▸BISLANDMARKS SIGNOFF2
11/17/2023140897830Open ↗
01/19/2023140977799Open ↗
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT24
12/04/2020140977799Open ↗
04/28/2020140897830Open ↗
09/26/2019123745554Open ↗
Showing 3 of 24 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
12/20/2023123745554Open ↗
12/13/2023123799078Open ↗
11/16/2023140897830Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms37
▸BISBOROUGH INTAKE FORM19
01/14/2022140977799Open ↗
01/12/2022140977799Open ↗
07/01/2021140897830Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET14
09/26/2019123745554Open ↗
08/29/2019123799078Open ↗
09/05/2014122078973Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
01/14/2026141028643Open ↗
12/04/2020140977799Open ↗
04/28/2020140897830Open ↗
▸BISADDITIONAL INFORMATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
12/14/2023123799078Open ↗
05/30/2017121478855Open ↗
05/30/2017121478855Open ↗
▸DOB NOWPlot Diagram3
08/15/2026M01257434-S7Open ↗
08/13/2026M01257434-I1Open ↗
08/13/2026M01257434-S6Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026M01257434-I1Open ↗
08/13/2026M01257434-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
06/08/2021140977799Open ↗
▸BISPlot Diagram1
01/17/2013121478855Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026M01257434-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M01257434-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/15/2026M01257434-S7Open ↗