| Owner | Filings | Most Recent |
|---|---|---|
| PAN AM EQUITIES | 87 | 09/29/2026 |
| PAMELA EQUITIES | 17 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| FRANK DENNER ARCHITECT | 9 | 05/27/2026 |
| ENGINEERING GROUP ASSOCIATES, PC | 1 | 05/19/2026 |
| PLAN B ENGINEERING | 1 | 05/07/2026 |
| MG ENGINEERING D.P.C. | 5 | 04/09/2026 |
| DESIMONE CONSULTING ENGINEERS | 2 | 09/29/2025 |
| PERKINS EASTMAN | 1 | 09/18/2025 |
| EMTG CONSULTANTS INC | 1 | 12/18/2024 |
| PAUL PERDEK, PROF. ENG. PLLC | 4 | 09/07/2021 |
| PATUXENT ENGINEERING LLC | 3 | 06/09/2021 |
| BRYAN M BROWN ARCHITECTS LLC | 1 | 11/15/2019 |
| CRAFT ENGINEERING STUDIO PLLC | 1 | 11/14/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| METROPOLIS GROUP INC | 14 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 8 | 03/21/2026 |
| PATUXENT ENGINEERING | 6 | 03/21/2026 |
| SOL BUILDING CONSULTING SERVICES | 3 | 03/21/2026 |
| I L CONSULTING | 16 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| HOWARD M.HAIMES INC | General Contractor | 15 | 07/08/2026 |
| NOVA CONSTRUCTION SERVICE | General Contractor | 14 | 07/08/2026 |
| MANHATTAN D ENTERPRISES | General Contractor | 4 | 07/08/2026 |
| SCAVUZZO ALDO | Electrical | 1 | 03/21/2026 |
| VINCENT BUONO | Electrical | 1 | 03/21/2026 |
| LEVINE, GEORGE | Fire Protection | 1 | 03/21/2026 |
| ELYSIUM CONSTRUCTION INC | General Contractor | 1 | 09/29/2026 |
| COPPER SERVICES, LLC | Plumbing | 1 | 07/08/2026 |
| ALDO SCAVUZZO | Electrical | 1 | 03/21/2026 |
| DONATO PLUMBING, INC | Plumbing | 1 | 07/08/2026 |
| JOSEPH SORTINO | Electrical | 1 | 03/21/2026 |
| PAUL BOCCIA | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AK ENGINEERING PC | 678 | 8 | 05/19/2026 |
| GEIGER ENGINEERING. PC | 689 | 3 | 12/19/2024 |
| EMTG CONSULTANTS | 4222 | 1 | 12/18/2024 |
| ADVANCED ENGINEERING & IN | 1224 | 2 | 11/22/2021 |
| JON LIBASCI | 3068 | 2 | 07/12/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | ELYSIUM CONSTRUCTION INC | 09/28/2026 |
| DOB NOW | General Construction | Signed-off | HOWARD M.HAIMES INC | 03/26/2025 |
| DOB NOW | Mechanical Systems | Signed-off | HOWARD M.HAIMES INC | 02/18/2025 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 01/21/2025 |
| DOB NOW | General Construction | Permit Issued | HOWARD M.HAIMES INC | 08/19/2022 |
| DOB NOW | Plumbing | Signed-off | COPPER SERVICES, LLC | 07/26/2022 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NOVA CONSTRUCTION SERVICE | 05/25/2022 |
| DOB NOW | Sidewalk Shed | Signed-off | MANHATTAN D ENTERPRISES | 02/17/2022 |
| DOB NOW | General Construction | Permit Issued | HOWARD M.HAIMES INC | 12/04/2021 |
| DOB NOW | General Construction | Permit Issued | HOWARD M.HAIMES INC | 07/19/2021 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NOVA CONSTRUCTION SERVICE | 06/03/2021 |
| DOB NOW | Supported Scaffold | Permit Issued | NOVA CONSTRUCTION SERVICE | 06/03/2021 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NOVA CONSTRUCTION SERVICE | 03/05/2021 |
| DOB NOW | Supported Scaffold | Permit Issued | NOVA CONSTRUCTION SERVICE | 03/04/2021 |
| DOB NOW | General Construction | Permit Issued | HOWARD M.HAIMES INC | 02/16/2021 |
| DOB NOW | Sidewalk Shed | Signed-off | MANHATTAN D ENTERPRISES | 02/12/2021 |
| DOB NOW | Construction Fence | Permit Issued | HOWARD M.HAIMES INC | 02/28/2020 |
| DOB NOW | Structural | Permit Issued | HOWARD M.HAIMES INC | 11/22/2019 |
| BIS | OT | ISSUED | HOWARD M.HAIMES INC | 09/01/2023 |
| BIS | OT | ISSUED | NOVA CONSTRUCTION SERVICE | 01/13/2022 |
| BIS | OT | ISSUED | HOWARD M.HAIMES INC | 07/01/2021 |
| BIS | OT | ISSUED | HOWARD M.HAIMES INC | 06/22/2020 |
| BIS | — | ISSUED | PAN AM EQUITIES | 06/21/2017 |
| BIS | PL | ISSUED | COPPER SERVICES, LLC | 03/11/2016 |
| BIS | PL | ISSUED | COPPER III HTG & PLBG LLC | 06/23/2015 |
| BIS | MH | ISSUED | POWER COOLING INC | 10/06/2014 |
| BIS | SP | ISSUED | CHIEF FIRE CONTR. CO. INC | 09/11/2013 |
| BIS | MH | ISSUED | RUBEN REFRIGERATION & AC | 08/03/2012 |
| BIS | SP | ISSUED | CHIEF FIRE CONTR. CO. INC | 07/20/2012 |
| BIS | PL | ISSUED | COPPER III HTG & PLBG LLC | 12/02/2011 |
| BIS | MH | ISSUED | HOWARD M.HAIMES INC | 09/26/2011 |
| BIS | OT | ISSUED | HOWARD M.HAIMES INC | 09/26/2011 |
| BIS | MH | ISSUED | PEAK COOLING CORP | 03/21/2011 |
| BIS | OT | ISSUED | HOWARD M.HAIMES INC | 05/13/2010 |
| BIS | OT | ISSUED | HOWARD M.HAIMES INC | 05/13/2010 |
| BIS | OT | ISSUED | HOWARD M.HAIMES INC | 04/22/2010 |
| BIS | EQ | ISSUED | OUTDOOR INSTALLATIONS LLC | 04/08/2010 |
| BIS | PL | ISSUED | COPPER PLUMBING & HEATING | 12/09/2009 |
| BIS | OT | ISSUED | HOWARD M.HAIMES INC | 04/23/2009 |
| BIS | SP | ISSUED | UNIVERSAL FIRE SPR LLC | 10/10/2008 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/19/2026 | — | — | Air Conditioning Systems, Heating Systems | |
| 12/18/2024 | Signed-off | HOWARD M.HAIMES INC | Heating and Air Conditioning Systems | Heat / Cool Lg ARNU076B8A4 162,400 BTU · Vrf Indoor ×1 ARNU963B8A4 203,400 BTU · Vrf Indoor ×1 ARUM168BTE5 357,000 BTU · Vrf Outdoor ×1 Loren Cook GC-148 100 CFM · Exhaust Fan ×1 GN-422 225 CFM · Exhaust Fan ×1 GN-622 375 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/19/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/19/2026 | — | — | Storm, Water/Sanitary |
| 12/19/2024 | Signed-off | DONATO PLUMBING, INC | Water/Sanitary |
| 02/09/2022 | Signed-off | COPPER SERVICES, LLC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/01/2026 | Permit Issued | EXECUTIVE ELECTL SER INC | General Wiring |
| 01/23/2026 | Permit Issued | TOP SHELF ELECTRIC CORP | — |
| 12/19/2025 | Permit Issued | LAREDO ELECTRIC, INC. | General Wiring |
| 06/04/2021 | Permit Issued | CAPUTEK ELEC'L SERVICES, | — |
| 04/29/2021 | Complete | LAREDO ELECTRIC, INC. | General Wiring |
| 02/04/2021 | Complete | 5 J'S ELECTL CONTS CORP | — |
| 08/04/2020 | Complete | LAREDO ELECTRIC, INC. | — |
| 02/26/2020 | Complete | LAREDO ELECTRIC, INC. | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/19/2026 | — | — | Steel, Concrete, Masonry |
| 05/07/2026 | — | — | Steel |
| 11/14/2019 | Permit Issued | HOWARD M.HAIMES INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/07/2021 | Permit Issued | NOVA CONSTRUCTION SERVICE | Scaffold |
| 11/15/2019 | Permit Issued | HOWARD M.HAIMES INC | Fence |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/30/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/11/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/09/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/14/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/03/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/15/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/11/2026 | Post-installed Anchors | Ari Kamo | special |
| 05/11/2026 | HVAC-R and service water piping design and insulation | Ari Kamo | energy_progress |
| 05/11/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 05/06/2026 | Structural Steel - Welding | — | special |
| 05/06/2026 | Post-installed Anchors | — | special |
| 05/06/2026 | Structural Steel - High Strength Bolting | — | special |
| 04/20/2026 | Structural Steel - Details | — | special |
| 04/16/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 04/15/2026 | Final | — | progress |
| 03/12/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 03/12/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 03/12/2026 | Post-installed Anchors | — | special |
| 02/11/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 08/08/2025 | HVAC-R and service water piping design and insulation | Ari Kamo | energy_progress |
| 08/08/2025 | HVAC-R and service water heating equipment | Ari Kamo | energy_progress |
| 08/08/2025 | HVAC-R and service water heating system controls | Ari Kamo | energy_progress |
| 08/07/2025 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 08/07/2025 | Footing and Foundation | Ari Kamo | progress |
| 08/07/2025 | Final | Ari Kamo | progress |
| 08/07/2025 | Construction Operations Influencing Adjacent Structures | Ari Kamo | special |
| 08/07/2025 | Concrete - Cast-In-Place | Ari Kamo | special |
| 08/07/2025 | Post-installed Anchors | Ari Kamo | special |
| 07/31/2025 | Ventilation and air distribution system | Ari Kamo | energy_progress |
| 07/31/2025 | Emergency and Standby Power Systems (Generator) | Ari Kamo | special |
| 07/31/2025 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |