← Back
One family attached or semi-detached
18 FILLMORE PLACE
BROOKLYN · BIN 3062653
💬 Discuss this project
1854Year Built
3Stories
A5Building Class
R6BZoning
2,336 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · Owner of record: 18 FILLMORE LLC · 1,200 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof4p · 3 filings · 20 docs
Floor 390p · 3 filings · 20 docs
Floor 281p · 3 filings · 20 docs
Floor 181p · 3 filings · 20 docs
Cellar84p · 4 filings · 20 docs
Basement93p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/12/2024$5.2M—— → —$2,247/sf building
04/07/2021$1.5M—Private party → Private party$642/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESTER KATZ, NCARB411/15/2024
RAAD811/14/2023
BARRY STRUCTURAL ENGINEERING, PLLC403/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A EXPEDITING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABSOLUTE COMFORT SOLUTIONGeneral Contractor1007/08/2026
PFL MECHANICAL CORPPlumbing207/08/2026
GRUSHINSKY PIPNG & HTG INFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BARRY STRUCTURAL ENGINEER749511/15/2024
INTERNATIONAL GEOTEHCNICA1795311/15/2024
RAAD7727811/14/2023
GRANT ENGINEERING2627305/08/2023
Building Lifecycle
All (151)Filed (16)Permit Issued (7)Signed Off (5)Violation (5)Inspection (8)Objection (80)Special Inspection (30)
11/22/2024
Objection raised — Scope
11/22/2024
Objection resolved — Addressed
11/22/2024
Special inspection requirement — Interior lighting power
Lester Katz
11/22/2024
Special inspection requirement — Masonry
MICHAEL BARRY
11/22/2024
Special inspection requirement — Post-installed Anchors
MICHAEL KARANTINIDIS, P.E.
11/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL BARRY
11/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
11/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
Lester Katz
11/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Lester Katz
11/22/2024
Special inspection requirement — Lighting controls
Lester Katz
11/22/2024
Special inspection requirement — Fenestration areas
Lester Katz
11/22/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Lester Katz
11/22/2024
Special inspection requirement — Insulation placement and R values
Lester Katz
11/22/2024
Special inspection requirement — Fenestration air leakage
Lester Katz
11/15/2024
Filed — Alteration CO
HEREBY FILING TO CONVERT 2 FAMILY TO 1 FAMILY DWELLING. LOWER EXISTING CELLAR, INTERIOR AND EXTERIOR RENOVATION OF RENOVATION.
B00724540-P3
11/14/2024
Special inspection requirement — Fenestration air leakage
Lester Katz
11/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL KARANTINIDIS, P.E.
11/14/2024
Special inspection requirement — Masonry
MICHAEL BARRY
11/14/2024
Special inspection requirement — Post-installed Anchors
MICHAEL KARANTINIDIS, P.E.
11/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL BARRY
11/14/2024
Special inspection requirement — Energy Code Compliance Inspections
Lester Katz
11/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
Lester Katz
11/14/2024
Special inspection requirement — Fenestration areas
Lester Katz
11/14/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Lester Katz
11/14/2024
Special inspection requirement — Lighting controls
Lester Katz
11/14/2024
Special inspection requirement — Interior lighting power
Lester Katz
11/14/2024
Special inspection requirement — Insulation placement and R values
Lester Katz
09/09/2024
Signed off — Alteration
INSTALLATION AND MODIFICATION OF PLUMBING SYSTEM
B00710649-I1
11/14/2023
Filed — Alteration
INSTALLATION AND MODIFICATION OF PLUMBING SYSTEM
B00710649-P3
11/13/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/01/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/26/2023
Signed off — Alteration CO
HEREBY FILING TO CONVERT 2 FAMILY TO 1 FAMILY DWELLING. LOWER EXISTING CELLAR, INTERIOR AND EXTERIOR RENOVATION OF RENOVATION.
B00724540-S1
10/26/2023
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM.
B08002407-I1
10/26/2023
Permit issued — Plumbing
B00710649-I1-PL
10/25/2023
Signed off — Alteration
INSTALLATION OF HVAC SYSTEMS FOR NEW ARCHITECTURAL LAYOUT
B00710644-I1
10/24/2023
Signed off — Alteration
THIS APPLICATION IS FOR THE STRUCTURAL SCOPE ASSOCIATED WITH A NEW CONCRETE RETAINING WALL& FOOTING AT THE REAR YARD& THE REINFORCEMENT OF THE EXTG TIMBER FRAMING AT EACH LEVEL FOR REMOVAL OF EXISTING INTERIOR BEARING WALLS. NO CHANGE TO USE OCC OR EGRESS
B00714208-I1
10/16/2023
Filed — Alteration
INSTALLATION AND MODIFICATION OF PLUMBING SYSTEM
B00710649-P2
10/16/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
NICHOLAS AZADIAN
10/13/2023
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS AZADIAN
10/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
NICHOLAS AZADIAN
10/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NICHOLAS AZADIAN
10/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NICHOLAS AZADIAN
10/12/2023
Permit issued — Mechanical Systems
B00710644-I1-MS
10/11/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/08/2023
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM.
B08002407-P2
05/02/2023
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM.
B08002407-P1
05/02/2023
Special inspection requirement — Post-installed Anchors
Stephen Morse
05/01/2023
Permit issued — Sprinklers
B08002407-I1-EW-SP
04/07/2023
Objection resolved — Addressed
04/07/2023
Objection resolved — Addressed
04/07/2023
Objection resolved — Addressed
04/07/2023
Objection resolved — Addressed
04/07/2023
Objection resolved — Addressed
04/07/2023
Objection resolved — Addressed
04/04/2023
Filed — Alteration
INSTALLATION AND MODIFICATION OF PLUMBING SYSTEM
B00710649-P1
03/30/2023
Objection raised — Scope
Latest 60 of 151 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPFL MECHANICAL CORP10/26/2023
DOB NOWMechanical SystemsSigned-offABSOLUTE COMFORT SOLUTION10/12/2023
DOB NOWSprinklersSigned-offGRUSHINSKY PIPNG & HTG IN05/01/2023
DOB NOWStructuralSigned-offABSOLUTE COMFORT SOLUTION12/09/2022
DOB NOWFoundationSigned-offABSOLUTE COMFORT SOLUTION10/28/2022
DOB NOWPlumbingSigned-offPFL MECHANICAL CORP10/24/2022
DOB NOWGeneral ConstructionPermit IssuedABSOLUTE COMFORT SOLUTION10/21/2022
3 projects · most recent 01/25/2024
General Wiring
FiledStatusContractorScope
01/25/2024CompleteKINGS ELECTRIC CO., INC.General Wiring
03/05/2023CompleteKINGS ELECTRIC CO., INC.1 meters, 1 new_meters
02/11/2022CompleteKINGS ELECTRIC CO., INC.—
1 project · most recent 11/15/2024
FiledStatusContractorScope
11/15/2024Signed-offABSOLUTE COMFORT SOLUTION2 scope_items
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
11/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
11/22/2024Interior lighting powerLester Katzenergy_progress
11/22/2024MasonryMICHAEL BARRYspecial
11/22/2024Post-installed AnchorsMICHAEL KARANTINIDIS, P.E.special
11/22/2024Structural Stability – Alterations of existing buildingsMICHAEL BARRYspecial
11/22/2024Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
11/22/2024Fire-Resistance Rated ConstructionLester Katzprogress
11/22/2024Energy Code Compliance InspectionsLester Katzprogress
11/22/2024Lighting controlsLester Katzenergy_progress
11/22/2024Fenestration areasLester Katzenergy_progress
11/22/2024Fenestration and door U-factor and product ratingsLester Katzenergy_progress
11/22/2024Insulation placement and R valuesLester Katzenergy_progress
11/22/2024Fenestration air leakageLester Katzenergy_progress
11/14/2024Fenestration air leakageLester Katzenergy_progress
11/14/2024Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
11/14/2024MasonryMICHAEL BARRYspecial
11/14/2024Post-installed AnchorsMICHAEL KARANTINIDIS, P.E.special
11/14/2024Structural Stability – Alterations of existing buildingsMICHAEL BARRYspecial
11/14/2024Energy Code Compliance InspectionsLester Katzprogress
11/14/2024Fire-Resistance Rated ConstructionLester Katzprogress
11/14/2024Fenestration areasLester Katzenergy_progress
11/14/2024Fenestration and door U-factor and product ratingsLester Katzenergy_progress
11/14/2024Lighting controlsLester Katzenergy_progress
11/14/2024Interior lighting powerLester Katzenergy_progress
11/14/2024Insulation placement and R valuesLester Katzenergy_progress
10/13/2023HVAC-R and service water heating system controlsNICHOLAS AZADIANenergy_progress
Latest 25 of 52.
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/30/2026B00710649-P3Request digital key ↗
08/30/2026B00710649-P2Request digital key ↗
08/30/2026B00710649-P1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits13
▸DOB NOWLPC Approval/Permit13
08/30/2026B00710649-P2Open ↗
08/30/2026B00710649-P1Open ↗
08/30/2026B00710649-P3Open ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00724540-I1Open ↗
▸Seals & Professional Certifications57
▸DOB NOWSpecial Inspector Seal & Signature25
08/31/2026B00714208-I1Open ↗
08/31/2026B00714208-I1Open ↗
08/31/2026B00714208-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
08/31/2026B00714208-I1Open ↗
08/28/2026B00710649-P1Open ↗
08/28/2026B00710649-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/30/2026B00710649-P2Open ↗
08/30/2026B00710649-P1Open ↗
08/30/2026B00710649-I1Open ↗
Showing 3 of 16 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026B00724540-P3Open ↗
08/13/2026B00724540-I1Open ↗
08/13/2026B00724540-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00724540-I1Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/30/2026B00710649-P2Open ↗
08/30/2026B00710649-P1Open ↗
08/30/2026B00710649-P3Open ↗
Showing 3 of 16 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/15/2026B00710649-I1Open ↗
08/13/2026B00724540-I1Open ↗
08/13/2026B00710644-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/13/2026B00724540-I1Open ↗
08/13/2026B00724540-P1Open ↗
08/13/2026B00724540-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00724540-I1Open ↗