← Back
Office with commercial, 7-19 stories
18 WEST 27 STREET
MANHATTAN · BIN 1015659
💬 Discuss this project
1908Year Built
12Stories
O6Building Class
M1-8A/R11Zoning
30,069 sfGross Floor Area
12Units
LL97 Covered4 Open Violations ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: 18 WEST 27TH STREET LLC · 2,469 sf lot · 12.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof35p · 7 filings · 20 docs
Floor 1211p · 1 filing · 20 docs
Floor 111p · 1 filing · 9 docs
Floor 10
Floor 93p · 2 filings · 16 docs
Floor 8
Floor 72p · 2 filings · 20 docs
Floor 6
Floor 55p · 2 filings · 20 docs
Floor 4
Floor 31p · 1 filing · 9 docs
Floor 2
Floor 135p · 5 filings · 20 docs
Cellar22p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
METROPLITAN DESIGN INC12607/08/2026
18 WEST 27TH STREET3703/22/2026
METRO DESIGN INC.403/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
REX A HEUERMANN ARCHITECT P C203/21/2026
JENNY FLORES EXPEDITING403/21/2026
METROPOLITAN DESIGN403/21/2026
MICHAEL ZENREICH ARCHITECT603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMTECK CORPGeneral Contractor1907/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor1207/08/2026
VEMA-P LLCGeneral Contractor1007/08/2026
VCMG LLCGeneral Contractor903/21/2026
ADRIANO PLMBG & HTG CORPPlumbing407/08/2026
AVALAIR COOLING CORPGeneral Contractor303/21/2026
A&M WARSHAW SERVICES LLCFire Protection207/08/2026
ALLSTATE SPRINKLER LLCFire Protection207/08/2026
BREFFNI MECHANICAL INCGeneral Contractor207/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
NM MECHANICAL CORPPlumbing107/08/2026
KILPATRICK, DONALDElectrical103/21/2026
PHILIP SCHWIMMERElectrical103/21/2026
BOYKO, JElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RED FLUX ARCHITECTURE6506903/07/2025
AUTOGRAPHIC CO1579101/02/2023
CATALPA SPECIAL INSPECTIO2004408/18/2022
MEP INSPECTIONS, INC1102108/18/2021
BENAZZI ENGINEERING, PC5603308/02/2021
Building Lifecycle
All (231)Filed (30)Permit Issued (33)Signed Off (13)Facade (FISP) (14)Violation (60)Inspection (15)Objection (36)Special Inspection (30)
09/10/2025
Signed off — Alteration
INSTALL NEW WET FIRE SPRINKLER SYSTEM FOR COMPLETE BUILDING COVERAGE AS PER PLANS AND IN ACCORDANCE WITH LL87/2004. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00405939-I1
07/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/24/2025
Signed off — Alteration
INSTALL NEW 4" FIRE WATER SERVICE, (2) TWO PRIMARY BACKFLOW PREVENTION ASSEMBLIES, AND FLOOR DRAIN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00405984-I1
05/19/2025
Signed off — Alteration
Filing to coordinate mechanical work for various previously permitted tenant fit-outs. HVAC units on roof.
M01177963-I1
05/09/2025
Permit issued — Mechanical Systems
M01177963-I1-MS
03/07/2025
Filed — Alteration
Filing to coordinate mechanical work for various previously permitted tenant fit-outs. HVAC units on roof.
M01177963-I1
02/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/11/2025
Signed off — Alteration
Office Fit-Out at 8th Floor. No Change to Use, Egress, or Occupancy. Condenser on Roof.
M01053397-I1
02/10/2025
Signed off — Alteration
Office Fit-Out at 8th Floor. No Change to Use, Egress, or Occupancy. Condenser on Roof.
M01062563-I1
02/10/2025
Filed — Alteration
Office Fit-Out at 8th Floor. No Change to Use, Egress, or Occupancy. Condenser on Roof.
M01062563-P1
02/10/2025
Special inspection requirement — Final
Charles Alwakeel
02/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Charles Alwakeel
02/10/2025
Special inspection requirement — Mechanical Systems
Charles Alwakeel
02/07/2025
Filed — Alteration
Office Fit-Out at 8th Floor. No Change to Use, Egress, or Occupancy. Condenser on Roof.
M01053397-P1
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Charles Alwakeel
02/07/2025
Special inspection requirement — Final
Charles Alwakeel
02/07/2025
Special inspection requirement — Mechanical Systems
Charles Alwakeel
11/22/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/09/2024
Permit issued — General Construction
M00518957-I1-GC
10/02/2024
Signed off — Alteration
Plumbing work associated with a new kitchenette, new accessible bathroom, and replacement of existing fixtures on existing bathroom.
M01062579-I1
10/02/2024
Signed off — Alteration
Fixture replacements for two restrooms and additional fixtures at office kitchenette.
M00704172-I1
10/02/2024
Signed off — Alteration
M01054731-I1
09/27/2024
Permit issued — Sprinklers
M00405939-I1-EW-SP
09/03/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/11/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2024
Permit issued — General Construction
M01062563-I1-GC
07/12/2024
Permit issued — General Construction
M01062563-I1-MS
07/08/2024
Permit issued — Plumbing
M01062579-I1-PL
07/03/2024
Violation issued (ECB, closed)
Construction
07/01/2024
Permit issued — Mechanical Systems
M01053397-I1-MS
07/01/2024
Permit issued — General Construction
M01053397-I1-GC
06/25/2024
Filed — Alteration
Office Fit-Out at 8th Floor. No Change to Use, Egress, or Occupancy. Condenser on Roof.
M01062563-I1
06/25/2024
Filed — Alteration
Plumbing work associated with a new kitchenette, new accessible bathroom, and replacement of existing fixtures on existing bathroom.
M01062579-I1
06/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Charles Alwakeel
06/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2024
Permit issued — Plumbing
M01054731-I1-PL
06/05/2024
Filed — Alteration
M01054731-I1
06/04/2024
Filed — Alteration
Office Fit-Out at 8th Floor. No Change to Use, Egress, or Occupancy. Condenser on Roof.
M01053397-I1
06/04/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/14/2024
Signed off — Alteration
M00949235-I1
05/14/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M08054890-I1
03/13/2024
Permit issued — General Construction
M00815517-I1-MS
03/13/2024
Permit issued — General Construction
M00815517-I1-GC
03/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/30/2024
Signed off — Alteration
M00497467-I1
12/08/2023
Permit issued — Supported Scaffold
M08054890-I1-SF
11/15/2023
Permit issued — Sidewalk Shed
M00949235-I1-SH
10/27/2023
Permit issued — Sprinklers
M00405939-I1-EW-SP
10/20/2023
Filed — Alteration
M00949235-I1
08/11/2023
Permit issued — Sidewalk Shed
M00497467-I1-SH
08/03/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/25/2023
Permit issued — Structural
M08029811-I1-ST
07/07/2023
Permit issued — General Construction
M08019328-I1-GC
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/20/2023
Permit issued — Plumbing
M00405984-I1-PL
03/16/2023
Filed — Alteration
Fixture replacements for two restrooms and additional fixtures at office kitchenette.
M00704172-P2
Latest 60 of 231 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAVALAIR COOLING CORP05/09/2025
DOB NOWGeneral ConstructionPermit IssuedAMTECK CORP10/09/2024
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC09/27/2024
DOB NOWGeneral ConstructionSigned-offAMTECK CORP07/15/2024
DOB NOWGeneral ConstructionSigned-offAMTECK CORP07/12/2024
DOB NOWPlumbingSigned-offADRIANO PLMBG & HTG CORP07/08/2024
DOB NOWMechanical SystemsSigned-offAMTECK CORP07/01/2024
DOB NOWGeneral ConstructionSigned-offAMTECK CORP07/01/2024
DOB NOWPlumbingSigned-offADRIANO PLMBG & HTG CORP06/10/2024
DOB NOWGeneral ConstructionPermit IssuedAMTECK CORP03/13/2024
DOB NOWGeneral ConstructionPermit IssuedAMTECK CORP03/13/2024
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC12/08/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC11/15/2023
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC10/27/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/11/2023
DOB NOWStructuralSigned-offVEMA-P LLC07/25/2023
DOB NOWGeneral ConstructionPermit IssuedVEMA-P LLC07/07/2023
DOB NOWPlumbingSigned-offADRIANO PLMBG & HTG CORP03/20/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC12/22/2022
DOB NOWSprinklersSigned-offA&M WARSHAW SERVICES LLC12/14/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/17/2022
DOB NOWMechanical SystemsPermit IssuedBREFFNI MECHANICAL05/02/2022
DOB NOWGeneral ConstructionPermit IssuedVCMG LLC05/02/2022
DOB NOWPlumbingPermit IssuedA&M WARSHAW SERVICES LLC04/27/2022
DOB NOWMechanical SystemsPermit IssuedBREFFNI MECHANICAL04/26/2022
DOB NOWSprinklersSigned-offNM MECHANICAL CORP04/25/2022
DOB NOWPlumbingSigned-offADRIANO PLMBG & HTG CORP04/05/2022
DOB NOWGeneral ConstructionPermit IssuedVEMA-P LLC03/19/2022
DOB NOWGeneral ConstructionPermit IssuedVEMA-P LLC03/19/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/17/2021
DOB NOWConstruction FenceSigned-offVCMG LLC09/01/2021
DOB NOWGeneral ConstructionSigned-offVCMG LLC09/01/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC04/07/2021
BISOTISSUEDVEMA-P LLC05/22/2023
BISOTISSUEDVEMA-P LLC06/15/2022
BISOTISSUEDVEMA-P LLC08/23/2021
BISOTISSUEDVEMA-P LLC02/23/2021
BISOTISSUEDGA INDUSTRIES INC08/31/2020
BISOTISSUEDGA INDUSTRIES INC08/13/2020
BISMHISSUEDGA INDUSTRIES INC02/25/2020
+ 23 more permits on file
3 projects · most recent 03/13/2023
Associated Ducts and Piping Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/13/2023Permit IssuedAMTECK CORPAssociated Ducts and Piping
Ducts & Piping
N/A No change 1 BTU · Ductwork ×1
08/18/2022Permit IssuedBREFFNI MECHANICAL INCAir Conditioning Systems
Cooling
United Cool Air E8G3AGA 5,200 CFM · Condensing Unit ×2
06/07/2022Permit IssuedVEMA-P LLCAssociated Ducts and Piping—
10 projects · most recent 12/13/2022
General Wiring Lighting
FiledStatusContractorScope
12/13/2022Permit IssuedKGK ELECTRIC CORP.General Wiring
04/06/2021CompleteBOROWIDE ELECT'L CONTR'S—
11/24/2020Permit IssuedS.E. ELECTL CONTNG CORPGeneral Wiring
03/04/2020Permit IssuedLIMONGELLI ELECTRIC CORPGeneral Wiring
03/04/2020Permit IssuedSTAR ELEC'L CONTRACTORS C—
01/03/2020Permit IssuedLIMONGELLI ELECTRIC CORPGeneral Wiring, Lighting
12/11/2019Permit IssuedLIMONGELLI ELECTRIC CORPGeneral Wiring
10/22/2019Permit IssuedLIMONGELLI ELECTRIC CORPGeneral Wiring
09/04/2019Permit IssuedFOSTER ELEC'L SVC., INC.General Wiring
01/23/2018Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
07/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/22/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
02/10/2025FinalCharles Alwakeelprogress
02/10/2025Fire-Resistant Penetrations and JointsCharles Alwakeelspecial
02/10/2025Mechanical SystemsCharles Alwakeelspecial
02/07/2025Fire-Resistant Penetrations and JointsCharles Alwakeelspecial
02/07/2025FinalCharles Alwakeelprogress
02/07/2025Mechanical SystemsCharles Alwakeelspecial
06/25/2024Fire-Resistant Penetrations and JointsCharles Alwakeelspecial
01/19/2023Mechanical SystemsCharles Alwakeelspecial
01/19/2023FinalCharles Alwakeelprogress
11/17/2022Fenestration areasGregory Benazzienergy_progress
11/17/2022Insulation placement and R valuesGregory Benazzienergy_progress
11/17/2022Fire-Resistance Rated ConstructionGregory Benazziprogress
11/17/2022Fenestration and door U-factor and product ratingsGregory Benazzienergy_progress
10/13/2022FinalREX HEUERMANNprogress
10/13/2022Interior lighting powerGregory Benazzienergy_progress
10/13/2022Energy Code Compliance InspectionsGregory Benazziprogress
09/14/2022Fire-Resistant Penetrations and JointsGregory Benazzispecial
09/14/2022Post-installed AnchorsGregory Benazzispecial
09/14/2022Sprinkler SystemsGregory Benazzispecial
09/08/2022Post-installed Anchors—special
09/08/2022Fire-Resistant Penetrations and Joints—special
09/08/2022Sprinkler Systems—special
06/08/2022Mechanical SystemsCharles Alwakeelspecial
06/08/2022Fire-Resistance Rated ConstructionCharles Alwakeelprogress
06/08/2022Lighting controlsCharles Alwakeelenergy_progress
Latest 25 of 42.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
PeachyOfficeGround
Project M00576210 Alteration · Permit Entire · 08/18/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 482 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch27
09/03/2026M00497467-I1Request digital key ↗
09/03/2026M00518957-I1Request digital key ↗
09/03/2026M00538493-P1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/04/2026M00405939-P1Request digital key ↗
08/15/2026M00405939-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00405984-P1Request digital key ↗
08/14/2026M00405984-I1Request digital key ↗
▸Applications & Permits93
▸BISPLAN / WORK APPROVAL APPLICATION35
10/12/2023140774188Open ↗
09/28/2023140774188Open ↗
09/22/2023140774188Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION33
05/23/2023140936441Open ↗
05/16/2023140936441Open ↗
06/17/2022140936441Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWLPC Approval/Permit25
09/03/2026M00538493-P1Open ↗
09/03/2026M00538493-I1Open ↗
09/02/2026M00704172-I1Open ↗
Showing 3 of 25 on file for this type
▸Seals & Professional Certifications112
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/04/2026M00405939-P1Open ↗
09/04/2026M00405939-I1Open ↗
09/03/2026M00518957-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
09/23/2026M01053397-P1Open ↗
09/02/2026M08019328-P1Open ↗
09/02/2026M08019328-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026M01053397-P1Open ↗
09/23/2026M01053397-P1Open ↗
09/01/2026M00573957-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
03/05/2020123753651Open ↗
03/05/2020123753651Open ↗
06/26/2019123753651Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
08/05/2020140927111Open ↗
04/08/2019140834195Open ↗
Showing 2 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
10/05/2020140936441Open ↗
08/05/2020140927111Open ↗
04/08/2019140834195Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
08/05/2020140927111Open ↗
04/08/2019140834195Open ↗
Showing 2 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
10/05/2020140936441Open ↗
02/11/2020140886655Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment28
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
04/10/2019140774053Open ↗
04/10/2019140791221Open ↗
03/11/2019140774053Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
12/03/2023140774188Open ↗
10/16/2023140774188Open ↗
09/07/2023140774188Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS6
03/05/2020123753651Open ↗
03/05/2020123753651Open ↗
03/05/2020123753651Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
04/08/2019140834195Open ↗
Showing 1 of 5 on file for this type
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos42
▸DOB NOWDEP ACP-5: Asbestos Assessment Report26
09/04/2026M00405939-P1Open ↗
09/03/2026M00518957-I1Open ↗
09/03/2026M00538493-I1Open ↗
Showing 3 of 26 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
10/05/2020140936441Open ↗
08/05/2020140927111Open ↗
06/16/2020140886655Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
03/05/2020123753651Open ↗
03/05/2020123753651Open ↗
10/28/2019123753651Open ↗
Showing 3 of 7 on file for this type
▸BISNYCECC EXEMPTION6
08/05/2020140927111Open ↗
06/16/2020140886655Open ↗
04/08/2019140834195Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/23/2024140936441Open ↗
09/07/2023140774188Open ↗
10/05/2020140936441Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
05/23/2024140936441Open ↗
05/09/2019123356849Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/05/2020140936441Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY16
05/23/2024140936441Open ↗
09/08/2023140774188Open ↗
09/08/2023140774188Open ↗
Showing 3 of 16 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION3
09/07/2023140774188Open ↗
09/07/2023140774188Open ↗
06/07/2022140791221Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
09/07/2023140774188Open ↗
06/07/2022140791221Open ↗
▸BISMECHANICAL SYSTEMS2
09/07/2023140774188Open ↗
06/07/2022140791221Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
05/09/2019123356849Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
08/13/2020140927111Open ↗
▸Approvals, Objections & Sign-offs44
▸BISLANDMARKS APPROVAL14
09/08/2023140774188Open ↗
10/05/2020140936441Open ↗
08/05/2020140927111Open ↗
Showing 3 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
09/08/2023140774188Open ↗
05/23/2023140936441Open ↗
07/13/2022140791221Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
05/24/2024140936441Open ↗
12/06/2023140774188Open ↗
08/09/2022140791221Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS SIGNOFF6
05/24/2024140936441Open ↗
09/07/2023140774188Open ↗
06/08/2022140791221Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL3
09/07/2023140774188Open ↗
06/07/2022140791221Open ↗
06/07/2022140791221Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership29
▸BISCOST AFFIDAVIT19
05/23/2024140936441Open ↗
04/24/2023140936441Open ↗
10/05/2020140936441Open ↗
Showing 3 of 19 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST7
04/26/2019140834195Open ↗
11/13/2018140774188Open ↗
11/13/2018140774188Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
09/07/2023140774188Open ↗
06/07/2022140791221Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
06/24/2020140886655Open ↗
▸Filing & Intake Forms40
▸BISBOROUGH INTAKE FORM17
05/23/2023140936441Open ↗
05/16/2023140936441Open ↗
06/17/2022140936441Open ↗
Showing 3 of 17 on file for this type
▸BISADDITIONAL INFORMATION9
10/12/2023140774188Open ↗
05/24/2023140936441Open ↗
05/01/2023140936441Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
10/05/2020140936441Open ↗
08/05/2020140927111Open ↗
02/11/2020140886655Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET6
06/26/2019123753651Open ↗
Showing 1 of 6 on file for this type
▸Other Documents14
▸DOB NOWProof of Historic Building11
09/02/2026M00704172-P1Open ↗
09/02/2026M00704172-I1Open ↗
08/27/2026M01062563-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPRELIMINARY2
09/07/2023140774188Open ↗
06/07/2022140791221Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/08/2019140834195Open ↗