| Owner | Filings | Most Recent |
|---|---|---|
| NEW YORK PRESBYTERIAN HOSPITAL | 427 | 09/12/2026 |
| NEW YORK PRESBYTERIAN | 57 | 07/08/2026 |
| CHILDREN HOSPITAL OF NY P | 1 | 03/22/2026 |
| NY PRESBYERIAN HOSPITAL | 159 | 03/22/2026 |
| OWNER OF 3959 BROADWAY | 4 | 03/22/2026 |
| EURO CASTLE CONST CORP | 1 | 03/22/2026 |
| PRESBYTERIAN HOSPITAL | 6 | 03/22/2026 |
| NEW YORK PRESBYTERIAN UNIV HOSPITAL | 1 | 03/22/2026 |
| NYPH | 9 | 03/21/2026 |
| COLUMBIA UNIVERSITY | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| LEVIN ENGINEERING PLLC | 1 | 05/18/2026 |
| AKF ENGINEERS, LLP | 9 | 01/05/2026 |
| HASCHEK AND BATHGATE ENG. DPC | 2 | 10/23/2025 |
| S. REJEILI ARCHITECT, PLLC | 2 | 10/16/2025 |
| COSENTINI ASSOCIATES | 13 | 10/06/2025 |
| ARRAY ARCHITECTS | 4 | 10/03/2025 |
| CANNON DESIGN | 1 | 07/01/2025 |
| RSC ARCHITECTS | 2 | 01/15/2025 |
| O'DONNELL & NACCARATO STRUCTURAL EN | 3 | 04/08/2024 |
| GOLDMAN COPELAND ASSOCIATES | 5 | 09/25/2023 |
| LILKER ASSOCIATES CONSULTING ENGINE | 4 | 09/15/2023 |
| JACK L. GORDON ARCHITECTS, PC | 2 | 08/28/2023 |
| SYSKA HENNESSY GROUP | 6 | 08/15/2023 |
| FL&M ENGINEERING DESIGN &INSPECTION | 2 | 06/28/2022 |
| LPE ENGINEERING, PC | 2 | 09/14/2021 |
| SEVERUD ASSOCIATES | 1 | 01/08/2021 |
| PAUL PERDEK, PROF. ENG. PLLC | 2 | 08/22/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| MUNICIPAL EXPEDITING | 112 | 03/21/2026 |
| AE DESIGN SOLUTION | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| LENDLEASE(US)CONSTRUCTION | General Contractor | 34 | 07/08/2026 |
| HELLMAN CONSTRUCTION CO | General Contractor | 26 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 14 | 07/08/2026 |
| CONSIGLI CONSTRUCTION CO | General Contractor | 13 | 09/12/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 8 | 07/08/2026 |
| PJP INSTALLERS INC | General Contractor | 6 | 07/08/2026 |
| HEMSING, ROBERT | Electrical | 6 | 03/21/2026 |
| SHORT, HENRY | Electrical | 6 | 03/21/2026 |
| PAR PLUMBING CO., INC | Plumbing | 5 | 07/08/2026 |
| ALLIANCE PLUMBING CORP | Plumbing | 5 | 07/08/2026 |
| IRA KATZ | Electrical | 4 | 03/21/2026 |
| L.F. DRISCOLL COMPANY LLC | General Contractor | 3 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 3 | 03/21/2026 |
| RIEHM PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| HARLEY ELECTRIC CO., INC. | Electrical | 2 | 03/22/2026 |
| RIEHM PLUMBING CORP. | Fire Protection | 2 | 07/08/2026 |
| THE GRENADIER CORPORATION | General Contractor | 2 | 03/21/2026 |
| CARDOZA PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| SILVESTRO PACE | Electrical | 1 | 03/21/2026 |
| SCALA, JR., ANTHONY | Electrical | 1 | 03/21/2026 |
| ROBERT CHAIKIN | Electrical | 1 | 03/21/2026 |
| HATZEL AND BUEHLER, INC | Electrical | 1 | 03/22/2026 |
| VANGUARD CONSTRUCTION AND | General Contractor | 1 | 07/08/2026 |
| MOORE, KEVIN | Electrical | 1 | 03/21/2026 |
| ADCO ELEC'L CORP | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ALAN MARGOLIN & ASSOC | 423 | 42 | 05/18/2026 |
| FENAGH, INC | 6942 | 3 | 07/02/2025 |
| TECTONIC ENGINEERING CONS | 106 | 4 | 08/15/2023 |
| LPE ENGINEERING PC | 3102 | 1 | 09/14/2021 |
| SKYLINE ENGINEERING, PLLC | 267 | 2 | 03/18/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | CONSIGLI CONSTRUCTION CO | 09/10/2026 |
| DOB NOW | General Construction | Permit Issued | CONSIGLI CONSTRUCTION CO | 08/13/2026 |
| DOB NOW | Structural | Permit Issued | CONSIGLI CONSTRUCTION CO | 08/13/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CONSIGLI CONSTRUCTION CO | 08/12/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 05/18/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 04/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 04/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 03/27/2026 |
| DOB NOW | Sprinklers | Permit Issued | RIEHM PLUMBING CORP | 01/25/2026 |
| DOB NOW | Plumbing | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 01/23/2026 |
| DOB NOW | Plumbing | Permit Issued | RIEHM PLUMBING CORP. | 01/22/2026 |
| DOB NOW | General Construction | Permit Issued | HELLMAN CONSTRUCTION CO | 01/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | HELLMAN CONSTRUCTION CO | 01/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CONSIGLI CONSTRUCTION CO | 12/19/2025 |
| DOB NOW | Sprinklers | Signed-off | CARDOZA PLUMBING WMBE | 11/07/2025 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 10/27/2025 |
| DOB NOW | Plumbing | Permit Issued | SIRINA FIRE PROT CORP | 10/24/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | HELLMAN CONSTRUCTION CO | 10/21/2025 |
| DOB NOW | General Construction | Permit Issued | HELLMAN CONSTRUCTION CO | 10/16/2025 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 10/16/2025 |
| DOB NOW | Plumbing | Signed-off | SIRINA FIRE PROT CORP | 10/16/2025 |
| DOB NOW | General Construction | Permit Issued | CONSIGLI CONSTRUCTION CO | 10/14/2025 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 10/08/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | CONSIGLI CONSTRUCTION CO | 10/08/2025 |
| DOB NOW | Structural | Permit Issued | CONSIGLI CONSTRUCTION CO | 09/12/2025 |
| DOB NOW | General Construction | Permit Issued | CONSIGLI CONSTRUCTION CO | 09/12/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | CONSIGLI CONSTRUCTION CO | 09/11/2025 |
| DOB NOW | General Construction | Signed-off | HELLMAN CONSTRUCTION CO | 07/01/2025 |
| DOB NOW | Mechanical Systems | Signed-off | HELLMAN CONSTRUCTION CO | 07/01/2025 |
| DOB NOW | Plumbing | Signed-off | CARDOZA PLUMBING WMBE | 05/16/2025 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 05/15/2025 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 03/31/2025 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 03/28/2025 |
| DOB NOW | General Construction | Signed-off | HELLMAN CONSTRUCTION CO | 03/07/2025 |
| DOB NOW | Mechanical Systems | Signed-off | HELLMAN CONSTRUCTION CO | 03/07/2025 |
| DOB NOW | Plumbing | Signed-off | CARDOZA PLUMBING WMBE | 02/25/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | HELLMAN CONSTRUCTION CO | 01/09/2025 |
| DOB NOW | General Construction | Permit Issued | HELLMAN CONSTRUCTION CO | 01/09/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | CONSIGLI CONSTRUCTION CO | 12/27/2024 |
| DOB NOW | Plumbing | Signed-off | SIRINA FIRE PROT CORP | 10/22/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 01/05/2026 | Permit Issued | CONSIGLI CONSTRUCTION CO | Associated Ducts and Piping | — |
| 01/17/2025 | Signed-off | HELLMAN CONSTRUCTION CO | Ventilation Systems | |
| 08/29/2023 | Permit Issued | HELLMAN CONSTRUCTION CO | Air Conditioning Systems, Associated Ducts and Piping | Cooling Mitsubishi Electric MMD36E (Indoor), PFH037A (outdoor) 800 CFM · Vrf Indoor ×1 Ducts & Piping __Junk__ ductwork & piping 1 BTU · Ductwork ×1 |
| 08/15/2023 | Permit Issued | LENDLEASE(US)CONSTRUCTION | Air Conditioning Systems, Ventilation Systems | Cooling Mitsubishi Electric TPKFYP030KM142A 30,000 BTU · Vrf Indoor ×3 10-TON TUHYP1203AN40A(N/B) 10 tons · Vrf Outdoor ×1 Ventilation __Junk__ EXHAUST & RETURN DUCT & FAN 1 CFM · Exhaust Fan ×1 |
| 05/18/2023 | Permit Issued | CONSIGLI CONSTRUCTION CO | Ventilation Systems | Ventilation __Junk__ EXHAUST DUCT & FAN 1 CFM · Ductwork ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/18/2026 | Permit Issued | SIRINA FIRE PROT CORP | 14 heads |
| 01/05/2026 | Permit Issued | SIRINA FIRE PROT CORP | 484 heads, 6 outlets |
| 10/06/2025 | Permit Issued | SIRINA FIRE PROT CORP | 152 heads |
| 07/02/2025 | Permit Issued | RIEHM PLUMBING CORP | 24 heads |
| 01/17/2025 | Signed-off | SIRINA FIRE PROT CORP | — |
| 08/15/2023 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | — |
| 05/18/2023 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | — |
| 03/18/2020 | — | — | 8 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/05/2026 | Signed-off | ALLIANCE PLUMBING CORP | Water/Sanitary |
| 10/06/2025 | — | — | — |
| 07/02/2025 | Permit Issued | RIEHM PLUMBING CORP | Medical Gas, Water/Sanitary |
| 01/17/2025 | Signed-off | CARDOZA PLUMBING CORP | Water/Sanitary |
| 03/18/2020 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/30/2026 | Permit Issued | GILSTON ELEC'L CONTNG LLC | General Wiring |
| 02/20/2026 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 12/21/2025 | Permit Issued | HARLEY ELECTRIC CO., INC. | General Wiring |
| 12/21/2025 | Permit Issued | HARLEY ELECTRIC CO., INC. | General Wiring |
| 12/21/2025 | Permit Issued | HARLEY ELECTRIC CO., INC. | General Wiring |
| 06/20/2025 | Permit Issued | E-J ELEC. INSTALLATION CO | General Wiring |
| 03/26/2025 | Permit Issued | E-J ELEC. INSTALLATION CO | General Wiring |
| 03/26/2025 | Permit Issued | E-J ELEC. INSTALLATION CO | General Wiring |
| 10/23/2024 | Permit Issued | E-J ELEC. INSTALLATION CO | General Wiring |
| 03/04/2024 | Permit Issued | E-J ELEC. INSTALLATION CO | General Wiring |
| 01/18/2024 | Complete | HATZEL AND BUEHLER, INC | General Wiring |
| 12/26/2023 | Complete | E-J ELEC. INSTALLATION CO | General Wiring |
| 11/29/2023 | Complete | E-J ELEC. INSTALLATION CO | General Wiring |
| 10/30/2023 | Cancelled | LOWY & DONNATH INC. | General Wiring |
| 09/26/2023 | Complete | NEAD ELECTRIC INC. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/05/2026 | Permit Issued | CONSIGLI CONSTRUCTION CO | Steel, Concrete |
| 08/28/2023 | Permit Issued | HELLMAN CONSTRUCTION CO | 1 scope_items |
| 02/19/2020 | — | — | Steel, Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/16/2026 | Fail-Final Boiler Equipment Inspection | Fail | View ↗ |
| 06/23/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/18/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/17/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 05/22/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/22/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/22/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 03/05/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/03/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/03/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/29/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/29/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/10/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/04/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/30/2025 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 05/23/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/03/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/10/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/10/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/10/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/22/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/23/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/12/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/13/2023 | Certified Medical Gas - MG - PL - Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/07/2026 | Standpipe Systems | Young Suh | special |
| 05/07/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 05/07/2026 | Post-installed Anchors | Young Suh | special |
| 05/07/2026 | Sprinkler Systems | Young Suh | special |
| 10/22/2025 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 10/22/2025 | Post-installed Anchors | Young Suh | special |
| 10/20/2025 | Sprinkler Systems | Young Suh | special |
| 10/07/2025 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 10/06/2025 | Final | Young Suh | progress |
| 10/06/2025 | Lighting controls | Young Suh | energy_progress |
| 10/06/2025 | Interior lighting power | Young Suh | energy_progress |
| 10/06/2025 | Energy Code Compliance Inspections | Young Suh | progress |
| 10/03/2025 | Duct leakage testing, insulation and design | Young Suh | energy_progress |
| 10/03/2025 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 10/03/2025 | HVAC-R and service water piping design and insulation | Young Suh | energy_progress |
| 10/03/2025 | Maintenance information | Young Suh | energy_progress |
| 10/01/2025 | Energy Code Compliance Inspections | Young Suh | progress |
| 10/01/2025 | Lighting controls | Young Suh | energy_progress |
| 10/01/2025 | Mechanical Systems | Young Suh | special |
| 10/01/2025 | Final | Young Suh | progress |
| 10/01/2025 | Sprinkler Systems | Young Suh | special |
| 10/01/2025 | Final | Young Suh | progress |
| 10/01/2025 | Interior lighting power | Young Suh | energy_progress |
| 07/02/2025 | Duct leakage testing, insulation and design | AILANTO DANIEL MINAWI | energy_progress |
| 07/02/2025 | HVAC-R and service water piping design and insulation | AILANTO DANIEL MINAWI | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Nyp Chony | Medical / Healthcare | Floor 4 | Project M01396126 Project M00446904 |
| lewYork-Presbyteriar | Medical / Healthcare | — | Project M01305134 |
| NewYork Presbyterian c.e | Medical / Healthcare | Floor 1, Penthouse | Project M00860644 |
| NewYork Presbyterian | The University Hospital of Columbia and Cornell | Medical / Healthcare | Cellar, Sub-basement, Basement, Floors 1–9, 11, Penthouse | Project M00860642 |
| New York Presbyterian Chony Tower | Medical / Healthcare | Floors 3–6 | Project M00899487 |
| New York Presbyterian Ms Childrens Hospital Ms Chony North, Center Eye Institute | Medical / Healthcare | Floor 5 | Project M00809851 |
| Morgan Stanley Children's Hospital | Medical / Healthcare | Floor 5 | Project M00298757 |
| NYPH - Radio Lollipop | Medical / Healthcare | Floor 1 | Project M00208996 |