Hospital, sanitarium, mental institution
New York-presbyterian Hospital - Columbia Presbyterian Center
180 FT WASHINGTON AVENUE · BIN 1091001
💬 Discuss this project
1930Year Built
22Stories
I1Building Class
R8Zoning
3,693,539 sfGross Floor Area
1Units
LL97 Covered16 Open Violations 2 unresolved · 14 paperwork only ▸FISP: SWARMP
Hospital, sanitarium, mental institution · 364,433 sf lot · 10.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
Roof4p · 3 filings · 20 docs
Floor 24Under Construction10p · 1 filing · 20 docs
Floor 23Under Construction10p · 2 filings · 20 docs
Floor 22Under Construction11p · 1 filing · 20 docs
Floor 21Under Construction9p · 1 filing · 20 docs
Floor 20Under Construction11p · 1 filing · 20 docs
Floor 19Under Construction7p · 1 filing · 20 docs
Floor 18Under Construction12p · 2 filings · 20 docs
Floor 17Under Construction8p · 2 filings · 20 docs
Floor 16Under Construction7p · 1 filing · 20 docs
Floor 15Under Construction7p · 1 filing · 20 docs
Floor 14Under Construction15p · 1 filing · 20 docs
Floor 13Under Construction7p · 1 filing · 20 docs
Floor 12Under Construction22p · 3 filings · 20 docs
Floor 11Under Construction15p · 1 filing · 20 docs
Floor 10Under Construction21p · 2 filings · 20 docs
Floor 9Under Construction19p · 3 filings · 20 docs
Floor 8Under Construction21p · 2 filings · 20 docs
Floor 7Under Construction14p · 1 filing · 20 docs
Floor 6Under Construction7p · 1 filing · 20 docs
Floor 5Under Construction21p · 2 filings · 20 docs
Floor 4Under Construction27p · 3 filings · 20 docs
Floor 3Under Construction45p · 5 filings · 20 docs
Floor 2Under Construction41p · 6 filings · 20 docs
Floor 1Under Construction27p · 8 filings · 20 docs
CellarUnder Construction21p · 2 filings · 20 docs
Sub-CellarUnder Construction7p · 1 filing · 20 docs
Basement1p · 1 filing · 4 docs
Sub-BasementUnder Construction10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK PRESBYTERIAN HOSPITAL8409/22/2026
WESTERN WATERPROOFING CO INC307/08/2026
NEW YORK PRESBYTERIAN403/22/2026
WESTERN WATERPROOFING CO. INC. DBA303/22/2026
PRESBYTERIAN HOSPITAL103/22/2026
NYPH103/22/2026
COLUMBIA UNIVERSITY1103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL EXPEDITING7803/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
A1 EXPEDITING SERVICE603/21/2026
CONVERSANO ASSOCIATES, INC.1603/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LENDLEASE(US)CONSTRUCTIONGeneral Contractor807/08/2026
CONSIGLI CONSTRUCTION COGeneral Contractor707/30/2026
ALLIANCE PLUMBING CORPPlumbing607/08/2026
VANGUARD CONSTRUCTION ANDGeneral Contractor607/08/2026
WESTERN WATERPROOFING COMGeneral Contractor507/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor409/22/2026
P.K. CONSTRUCTION NY INCGeneral Contractor407/14/2026
RIEHM PLUMBING CORPPlumbing307/08/2026
SIRINA FIRE PROT CORPFire Protection308/06/2026
CARLITOS CONTRACTING CORPGeneral Contractor303/21/2026
HUNTER ROBERTS CONSTRUCTIONGeneral Contractor207/08/2026
RAEL AUTOMATIC SPR.CO INCFire Protection206/28/2026
IDEAL INTERIORS GROUP LLCGeneral Contractor207/08/2026
ALLAN BRITEWAY ELECTRICALElectrical103/22/2026
RIEHM PLUMBING CORP.Fire Protection107/08/2026
MANENGEERING BUREAU INCFire Protection107/08/2026
CURRENT FIRE PROTECTION INCFire Protection107/08/2026
CARDOZA PLUMBING CORPPlumbing107/08/2026
HARLEY ELECTRIC CO., INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4233009/15/2026
TECTONIC ENGINEERING CONS106603/20/2026
G. BLINN CONSULTING, LLC2894109/22/2025
AKF ENGINEERS, LLP2751603/04/2025
LPE ENGINEERING PC3102304/10/2024
Building Lifecycle
All (244)Filed (54)Permit Issued (49)Signed Off (19)Facade (FISP) (6)Violation (5)Inspection (31)Objection (50)Special Inspection (30)
09/22/2026
Special inspection requirement — Mechanical Systems
Young Suh
09/22/2026
Special inspection requirement — Final
Young Suh
09/21/2026
Permit issued — Supported Scaffold
M01290400-I1-SF
09/21/2026
Permit issued — Protection and Mechanical Methods
M01290400-S1-PMM
09/15/2026
Filed — Alteration
Remove existing mechanical equipment and ductwork and install new equipment, piping, and ductwork to accommodate the renovation of the 3rd floor MRI suite in the existing hospital as per plans filed herewith.
M01247419-P1
09/03/2026
Special inspection requirement — Mechanical Systems
Young Suh
09/03/2026
Special inspection requirement — Final
Young Suh
08/05/2026
Permit issued — Plumbing
M01247419-S1-EW-SP
07/29/2026
Permit issued — Structural
M01247427-I1-ST
07/13/2026
Permit issued — General Construction
M01309014-I1-GC
07/13/2026
Permit issued — Mechanical Systems
M01309261-I1-MS
06/24/2026
Permit issued — Mechanical Systems
M01247419-I1-MS
06/16/2026
Permit issued — General Construction
M01247415-I1-GC
06/02/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/02/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/02/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
06/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/29/2026
Permit issued — Mechanical Systems
M01248002-S1-MS
04/24/2026
Permit issued — Sprinklers
M01247419-S1-PL
04/14/2026
Permit issued — Sprinklers
M01248002-I1-EW-SP
04/14/2026
Permit issued — Sprinklers
M01307840-I1-EW-SP
04/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2026
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — Electrical motors and elevators
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — Smoke Control Systems Testing
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
04/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
GEORGE GHEBRYAL
04/08/2026
Permit issued — General Construction
M01248002-S2-GC
03/20/2026
Filed — Alteration
PH SP A: Sprinkler modification throughout as indicated on plans filed herewith. No change to use, egress or occupancy.
M01248002-P1
03/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2026
Permit issued — Mechanical Systems
M01309261-I1-MS
02/26/2026
Permit issued — Plumbing
M01309261-S1-EW-SP
02/25/2026
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
02/17/2026
Objection resolved — Addressed
01/27/2026
Objection resolved — Addressed
01/27/2026
Objection resolved — Addressed
01/24/2026
Objection raised — Scope
01/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/06/2026
Permit issued — Plumbing
M01309261-S1-PL
12/30/2025
Permit issued — General Construction
M01309014-I1-GC
12/22/2025
Special inspection requirement — Mechanical Systems
Young Suh
12/22/2025
Special inspection requirement — Final
Young Suh
12/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
12/22/2025
Special inspection requirement — Maintenance information
Young Suh
12/22/2025
Special inspection requirement — Duct leakage testing, insulation and design
Young Suh
12/05/2025
Filed — Alteration
CHAPEL SP: Sprinkler modification throughout as indicated on plans filed herewith. No change to use, egress or occupancy.
M01322992-I1
12/05/2025
Objection resolved — Addressed
12/05/2025
Objection resolved — Addressed
12/05/2025
Objection resolved — Addressed
12/05/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
Latest 60 of 244 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedSAFWAY ATLANTIC, LLC09/21/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/21/2026
DOB NOWPlumbingPermit IssuedSIRINA FIRE PROT CORP08/05/2026
DOB NOWStructuralPermit IssuedCONSIGLI CONSTRUCTION CO07/29/2026
DOB NOWGeneral ConstructionSigned-offP.K. CONSTRUCTION NY INC07/13/2026
DOB NOWMechanical SystemsSigned-offP.K. CONSTRUCTION NY INC07/13/2026
DOB NOWMechanical SystemsPermit IssuedCONSIGLI CONSTRUCTION CO06/24/2026
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO06/16/2026
DOB NOWMechanical SystemsPermit IssuedHUNTER ROBERTS CONSTRUCTION04/29/2026
DOB NOWSprinklersPermit IssuedALLIANCE PLUMBING CORP04/24/2026
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC04/14/2026
DOB NOWSprinklersPermit IssuedRAEL AUTOMATIC SPR.CO INC04/14/2026
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION04/08/2026
DOB NOWMechanical SystemsSigned-offP.K. CONSTRUCTION NY INC03/04/2026
DOB NOWPlumbingPermit IssuedRIEHM PLUMBING CORP.02/26/2026
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE01/06/2026
DOB NOWGeneral ConstructionSigned-offP.K. CONSTRUCTION NY INC12/30/2025
DOB NOWSprinklersPermit IssuedCARDOZA PLUMBING WMBE11/18/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/22/2025
DOB NOWSupported ScaffoldPermit IssuedSAFWAY ATLANTIC, LLC09/22/2025
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP08/14/2025
DOB NOWSprinklersPermit IssuedCARDOZA PLUMBING WMBE07/29/2025
DOB NOWStructuralPermit IssuedCONSIGLI CONSTRUCTION CO07/28/2025
DOB NOWMechanical SystemsPermit IssuedCONSIGLI CONSTRUCTION CO07/24/2025
DOB NOWGeneral ConstructionPermit IssuedCONSIGLI CONSTRUCTION CO07/16/2025
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE06/13/2024
DOB NOWConstruction FenceSigned-offWESTERN WATERPROOFING COM03/26/2024
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE09/19/2023
DOB NOWSidewalk ShedSigned-offCARLITOS CONTRACTING CORP06/29/2023
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND06/14/2023
DOB NOWMechanical SystemsSigned-offVANGUARD CONSTRUCTION AND04/11/2023
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND04/11/2023
DOB NOWPlumbingSigned-offCARDOZA PLUMBING CORP03/17/2023
DOB NOWSprinklersSigned-offCURRENT FIRE PROTECTION I03/07/2023
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP03/07/2023
DOB NOWConstruction FenceSigned-offWESTERN WATERPROOFING COM03/07/2023
DOB NOWGeneral ConstructionSigned-offWESTERN WATERPROOFING COM02/22/2023
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND02/09/2023
DOB NOWGeneral ConstructionSigned-offIDEAL INTERIORS GROUP LLC01/11/2023
DOB NOWMechanical SystemsSigned-offIDEAL INTERIORS GROUP LLC01/11/2023
+ 41 more permits on file
2 projects · most recent 09/15/2026
Ventilation Systems Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/15/2026Permit IssuedCONSIGLI CONSTRUCTION COAir Conditioning Systems, Ventilation Systems
Cooling
Liebert MCS028E1 4,649 CFM · Crac Unit ×1
PX018UA1 64,700 BTU · Crac Unit ×1
Filtrine PCP-2000-230-A-WP & QCP-3/4AS 167,237 BTU · Chiller ×2
Haakon ×1
Tsi (Technical System Industries) 20A0LD18-2 12,160 CFM · Rooftop Unit ×1
Nortek ×1
03/20/2026Permit IssuedHUNTER ROBERTS CONSTRUCTIHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PEFY-P096NMSU-E 192,000 BTU · Vrf Indoor ×2
PUHY-EP168YNU-A1 188,000 BTU · Vrf Outdoor ×1
Ventilation
Greenheck USF-4 & USF-10 350 CFM · Exhaust Fan ×5
4 projects · most recent 09/15/2026
Sprinkler System
FiledStatusContractorScope
09/15/2026Permit IssuedSIRINA FIRE PROT CORP25 heads
03/20/2026Permit IssuedRAEL AUTOMATIC SPR.CO INCSprinkler System
12/05/2025——185 heads
12/03/2025Permit IssuedRIEHM PLUMBING CORP4 heads
4 projects · most recent 09/15/2026
Water/Sanitary Medical Gas
FiledStatusContractorScope
09/15/2026Permit IssuedCARDOZA PLUMBING WMBEMedical Gas, Water/Sanitary
03/20/2026———
12/05/2025———
12/03/2025Permit IssuedCARDOZA PLUMBING CORPWater/Sanitary
15 projects · most recent 03/09/2026
General Wiring Lighting
FiledStatusContractorScope
03/09/2026Permit IssuedNEAD ELECTRIC INC.General Wiring
11/04/2025Permit IssuedALLAN BRITEWAY ELECTRICALGeneral Wiring
09/08/2025Permit IssuedHATZEL AND BUEHLER, INCGeneral Wiring
09/06/2025Permit IssuedALLAN BRITEWAY ELECTRICALGeneral Wiring
07/25/2025CompleteHARLEY ELECTRIC CO., INC.General Wiring
04/04/2024CompleteA.S.R. ELEC'L CONTR'G INCGeneral Wiring, Lighting
03/08/2024CompleteE-J ELEC. INSTALLATION COGeneral Wiring
11/09/2023CompleteE-J ELEC. INSTALLATION COGeneral Wiring
06/05/2023CompleteLOWY & DONNATH INC.—
05/08/2023CompleteNEAD ELECTRIC INC.General Wiring
03/31/2023CompleteLOWY & DONNATH INC.—
02/03/2023CompleteFOREST ELECTRIC CORP.General Wiring
12/20/2022CompleteLOWY & DONNATH INC.General Wiring
10/24/2022CancelledLOWY & DONNATH INC.General Wiring
10/21/2022CompleteLOWY & DONNATH INC.General Wiring
1 project · most recent 07/08/2025
Steel
FiledStatusContractorScope
07/08/2025Permit IssuedCONSIGLI CONSTRUCTION COSteel
1 project · most recent 10/14/2025
Scaffold
FiledStatusContractorScope
10/14/2025Permit IssuedSAFWAY ATLANTIC, LLCScaffold
▾Field Inspections (DOB CAP) — 31
DateTypeResultReport
06/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/02/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
06/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/25/2026Fail-Final Construction Permit WithdrawalFailView ↗
01/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/12/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/24/2025Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2024Fail-Final PL - More than 10 Requested FloorsFailView ↗
07/05/2024Fail-Final PL - More than 10 Requested FloorsFailView ↗
02/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/16/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/16/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/31/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/31/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 31.
▾Special Inspection Requirements (DOB NOW) — 136
DateRequirementInspectorRole
09/22/2026Mechanical SystemsYoung Suhspecial
09/22/2026FinalYoung Suhprogress
09/03/2026FinalYoung Suhprogress
09/03/2026Mechanical SystemsYoung Suhspecial
04/10/2026Mechanical SystemsGEORGE GHEBRYALspecial
04/10/2026HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
04/10/2026Electrical motors and elevatorsGEORGE GHEBRYALenergy_progress
04/10/2026HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
04/10/2026HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
04/10/2026Duct leakage testing, insulation and designGEORGE GHEBRYALenergy_progress
04/10/2026Maintenance informationGEORGE GHEBRYALenergy_progress
04/10/2026FinalGEORGE GHEBRYALprogress
04/10/2026Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
04/10/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
04/10/2026Heating SystemsGEORGE GHEBRYALspecial
04/10/2026Smoke Control Systems TestingGEORGE GHEBRYALspecial
12/22/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
12/22/2025Mechanical SystemsYoung Suhspecial
12/22/2025FinalYoung Suhprogress
12/22/2025Duct leakage testing, insulation and designYoung Suhenergy_progress
12/22/2025Maintenance informationYoung Suhenergy_progress
12/03/2025Sprinkler SystemsYoung Suhspecial
12/03/2025Fire-Resistant Penetrations and JointsYoung Suhspecial
12/03/2025Maintenance informationYoung Suhenergy_progress
12/03/2025Duct leakage testing, insulation and designYoung Suhenergy_progress
Latest 25 of 136.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Rving Medical CenterMedical / Healthcare—
Project M01307840 Alteration · Permit Entire · 11/05/2025
NewYork Presbyterian | The University Hospital of Columbia and Cornell. | COLUMBIA UNIVERSITY | IRVING MEDICAL CENTERMedical / HealthcareSub-cellar, Cellar, Sub-basement, Basement, Floors 1–24
Project M01248002 Alteration · Permit Entire · 07/11/2025
New York Presbyterian Eye InstituteMedical / HealthcareCellar, Floor 1
Project M00826803 Alteration · LOC Issued · 03/28/2023
Project M08052633 Alteration · LOC Issued · 01/16/2023
CuimcMedical / HealthcareFloor 18
Project M00714581 Alteration · LOC Issued · 11/14/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 303 on file (BIS + DOB NOW)
▸Plans & Drawings51
▸DOB NOWPlans/Sketch51
09/02/2026M00539539-P1Request digital key ↗
09/02/2026M00539539-I1Request digital key ↗
09/02/2026M00744241-I1Request digital key ↗
Showing 3 of 51 on file for this type
▸Applications & Permits1
▸BISWORK PERMIT APPLICATION1
03/05/2008110056714Open ↗
▸Seals & Professional Certifications147
▸DOB NOWDPL-1: Design Professional Seal & Signature53
09/22/2026M01247419-P2Open ↗
09/22/2026M01247419-P1Open ↗
09/02/2026M00744241-I1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWProgress Inspector Seal & Signature46
09/23/2026M01247419-P1Open ↗
09/23/2026M01247419-I1Open ↗
09/02/2026M01309261-I1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature45
09/27/2026M00790708-P2Open ↗
09/23/2026M01247419-P1Open ↗
09/23/2026M01247419-P2Open ↗
Showing 3 of 45 on file for this type
▸BISPC FULL REPORT1
01/07/2008110056714Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/07/2008110056714Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/07/2008110056714Open ↗
▸Environmental & Asbestos45
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/22/2026M01247419-P2Open ↗
09/22/2026M01247419-P1Open ↗
08/31/2026M00829882-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form13
09/02/2026M00744241-I1Open ↗
09/01/2026M00790610-I1Open ↗
09/01/2026M00744268-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice to Proceed5
08/22/2026M01248002-S1Open ↗
08/22/2026M01248002-S2Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/07/2008110056714Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs56
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter54
09/22/2026M01247419-P2Open ↗
09/22/2026M01247419-P1Open ↗
09/02/2026M00744241-I1Open ↗
Showing 3 of 54 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
01/07/2008110056714Open ↗
▸DOB NOWDEP Variance (V5) letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
03/05/2008110056714Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
05/27/2008110056714Open ↗