180 RIVERSIDE BOULEVARD
MANHATTAN · BIN 1085805
💬 Discuss this project
1998Year Built
40Stories
D6Building Class
R10Zoning
589,670 sfGross Floor Area
523Units
LL97 CoveredRent Stabilized18 Open Violations 16 unresolved · 2 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: EQR-180 RIVERSIDE H, L.L.C. · 50,574 sf lot · 11.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
Roof5p · 3 filings · 12 docs
BulkheadUnder Construction1p · 1 filing · 2 docs
CellarUnder Construction1p · 2 filings · 9 docs
Sub-Cellar2p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EQUITY RESIDENTIAL5909/30/2026
PLATINUM SERVICES NY507/08/2026
EQR 180 RIVERSIDE1103/22/2026
EQR-180 RIVERSIDE SIDE H103/22/2026
ANDREW REMODELING CORP103/22/2026
ADVANCED CONSTRUCTION EQU103/22/2026
STRUCTURAL PRESERV SYSTEM103/22/2026
HUDSON WATERFRONT ASSOCIATES3103/22/2026
QUICK PARK HUDSON 180 LLC303/22/2026
ROCK GROUP NY CORP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D R BROWN203/21/2026
CONVERSANO ASSOCIATES, INC.803/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
RIGGINING CONSULTANTS103/21/2026
JP EXPEDITE803/21/2026
BUILDING BROTHERS203/21/2026
DI DIO ARCHITECTURE, PC203/21/2026
SAGHARI ARCHITECTURAL SERVICES P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW STAR CONTRACTING INCGeneral Contractor603/21/2026
MICHAEL ASPRAS CREATIVEGeneral Contractor404/09/2026
ANDREU REMODELING CORPGeneral Contractor407/08/2026
SIGNS CADScaffold307/08/2026
AFGO MECHANICAL SVCS INCGeneral Contractor309/22/2026
STRUCTURAL PRESERV SYSTEMGeneral Contractor209/30/2026
PLATINUM SERVICES NY LLCGeneral Contractor207/08/2026
LINKED MECHANICAL LLCGeneral Contractor203/21/2026
ALAIMO JOSEPHElectrical103/21/2026
TEE BEE SIGN INSTScaffold107/08/2026
JOSEPH ALAIMOElectrical103/21/2026
KNIGHT ELEC'L SERV. CORP.Electrical103/22/2026
RICHARD NEUElectrical103/22/2026
RICHARD NEUElectrical103/21/2026
SIGNS CAD CORPGeneral Contractor103/21/2026
TRV MECHANICAL CONTRACTORGeneral Contractor107/08/2026
PAUL SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY RESTORATION TECHNOLOGY6187205/28/2025
MG NEW YORK ARCHITECTS, P3444204/18/2025
STEVEN R. SAVINO ARCHIT1216102/14/2024
VINCENT J. LIOTTA P. E.1974102/14/2024
PIRO STUDIO LLC7503302/12/2024
AMKA & ASSOCIATES LLC8239112/06/2023
BURTNER ENGINEERING SERVI5910106/27/2019
Building Lifecycle
All (161)Filed (18)Permit Issued (22)Signed Off (13)Facade (FISP) (12)Violation (60)Inspection (3)Objection (3)Special Inspection (30)
09/29/2026
Permit issued — General Construction
M01144742-I1-GC
09/21/2026
Permit issued — Mechanical Systems
M01454759-I1-MS
07/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/06/2026
Signed off — Alteration
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
M01377286-I1
06/22/2026
Violation issued (HPD, open)
B
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, closed)
C
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, closed)
C
06/10/2026
Violation issued (ECB, open)
Elevators
05/26/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/23/2026
Violation issued (HPD, closed)
B
04/23/2026
Violation issued (HPD, closed)
B
04/23/2026
Violation issued (HPD, closed)
B
04/23/2026
Violation issued (HPD, closed)
C
04/15/2026
Violation issued (ECB, open)
Elevators
04/13/2026
Permit issued — Suspended Scaffold
M01377286-I1-SC
04/06/2026
Filed — Alteration
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
M01377286-I1
02/14/2026
Violation issued (HPD, closed)
C
01/16/2026
Permit issued — General Construction
M01207999-I1-GC
10/16/2025
Violation issued (FDNY_NOV, closed)
10/03/2025
Permit issued — General Construction
M01144742-I1-GC
10/02/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M01294107-I1
10/02/2025
Permit issued — Sidewalk Shed
M01294107-I1-SH
10/02/2025
Permit issued — Supported Scaffold
M01294107-I1-SF
08/20/2025
Violation issued (HPD, closed)
B
08/20/2025
Violation issued (HPD, open)
B
08/20/2025
Violation issued (HPD, open)
B
08/20/2025
Violation issued (HPD, open)
B
06/09/2025
Objection resolved — Addressed
06/05/2025
Objection raised — Scope
05/29/2025
Permit issued — General Construction
M01207999-I1-GC
05/28/2025
Filed — Alteration
Facade repairs as per plans; no change to use, egress, or occupancy.
M01144742-I1
04/18/2025
Filed — Alteration
FILING HEREWITH FOR THE REMOVAL OF NON-LOAD BEARING PARTITION WALLS AND FINISHES. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY
M01207999-I1
04/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
MICHAEL GADALETA
04/09/2025
Special inspection requirement — Final
MICHAEL GADALETA
04/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL GADALETA
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL GADALETA
04/01/2025
Violation issued (FDNY_ORDER, closed)
03/24/2025
Violation issued (HPD, closed)
B
03/24/2025
Violation issued (HPD, closed)
C
03/24/2025
Violation issued (HPD, closed)
B
11/16/2024
Violation issued (HPD, closed)
C
09/24/2024
Signed off — Alteration
Installation of (1) new 4 ton split system (48,000 BTUH, 1600 CFM each) Air Cooled - Heat Pump System.
M01002374-I1
09/24/2024
Violation issued (HPD, closed)
B
08/19/2024
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
M00999057-I1
05/13/2024
Cycle 9 facade report signed — SWARMP
05/01/2024
Violation issued (FDNY_NOV, closed)
04/30/2024
Signed off — Alteration
M01000295-I1
04/03/2024
Permit issued — Mechanical Systems
M01002374-I1-MS
02/29/2024
Permit issued — Mechanical Systems
M01000295-I1-MS
02/15/2024
Cycle 9 facade report submitted
02/14/2024
Filed — Alteration
M01000295-I1
02/12/2024
Filed — Alteration
Installation of (1) new 4 ton split system (48,000 BTUH, 1600 CFM each) Air Cooled - Heat Pump System.
M01002374-I1
02/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
MICHAEL GADALETA
02/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
02/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
02/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
02/11/2024
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
Latest 60 of 161 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM09/29/2026
DOB NOWMechanical SystemsPermit IssuedAFGO MECHANICAL SVCS INC09/21/2026
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S04/13/2026
DOB NOWGeneral ConstructionPermit IssuedMICHAEL ASPRAS CREATIVE01/16/2026
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURAL PRESERV SYSTEM10/03/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC10/02/2025
DOB NOWSupported ScaffoldPermit IssuedPLATINUM SERVICES NY LLC10/02/2025
DOB NOWGeneral ConstructionPermit IssuedMICHAEL ASPRAS CREATIVE05/29/2025
DOB NOWMechanical SystemsSigned-offTRV MECHANICAL CONTRACTOR04/03/2024
DOB NOWMechanical SystemsSigned-offAFGO MECHANICAL SVCS02/29/2024
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM02/06/2024
DOB NOWStructuralSigned-offNEW STAR CONTRACTING INC12/26/2023
DOB NOWGeneral ConstructionSigned-offNEW STAR CONTRACTING INC12/22/2023
DOB NOWGeneral ConstructionSigned-offANDREU REMODELING CORP01/05/2023
DOB NOWGeneral ConstructionSigned-offANDREU REMODELING CORP07/28/2022
DOB NOWStructuralSigned-offSIGNS CAD CORP06/08/2022
DOB NOWSignSigned-offSIGNS CAD CORP04/28/2022
DOB NOWSignSigned-offSIGNS CAD CORP04/27/2022
DOB NOWSignSigned-offSIGNS CAD CORP04/27/2022
DOB NOWSignSigned-offWEINFELD, ELLIOT08/10/2021
DOB NOWMechanical SystemsSigned-offLINKED MECHANICAL06/14/2021
DOB NOWSignSigned-offPAUL SIGNS, INC02/25/2019
BISMHISSUEDLINKED MECHANICAL LLC08/17/2018
BISOTISSUEDLINKED MECHANICAL LLC08/17/2018
BISOTISSUEDLINKED MECHANICAL LLC08/23/2017
BIS—ISSUEDAMAZING BUILDERS AND RENO02/02/2017
BISPLISSUEDRAPTOR MECHANICAL,INC05/03/2016
BISOTISSUEDAGIM NDREU11/05/2015
BISOTRE-ISSUEDSTRUCTURAL PRESERV SYSTEM10/23/2015
BISEQISSUEDROCK GROUP NY CORP08/28/2015
BISOTISSUEDSTRUCTURAL PRESERV SYSTEM08/06/2015
BISEQISSUEDSTRUCTURAL PRESERV SYSTEM06/02/2015
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT06/02/2015
BISMHISSUEDAEGIS ENERGY SERVICES LLC10/27/2014
BISPLISSUEDRAPTOR MECHANICAL,INC07/16/2014
BISOTISSUEDAEGIS ENERGY SERVICES LLC06/06/2014
BISPLISSUEDPAR PLUMBING CO., INC04/14/2014
BISPLISSUEDPAR PLUMBING CO., INC04/14/2014
BISPLISSUEDHARLEY PLUMB & HEAT INC03/26/2014
BISPLISSUEDPLUMBING & HTG DOCTOR INC08/22/2012
+ 32 more permits on file
9 projects · most recent 03/30/2026
General Wiring
FiledStatusContractorScope
03/30/2026Permit IssuedKAYLEE ELECTRIC CORPGeneral Wiring
11/05/2025Permit IssuedT & R ALARM AND ELEC'L—
10/03/2025Permit IssuedRICHARD NEU—
09/29/2022Permit IssuedKNIGHT ELEC'L SERV. CORP.General Wiring
09/29/2022Permit IssuedKNIGHT ELEC'L SERV. CORP.General Wiring
08/18/2022CompleteSIGNS CAD CORP—
02/01/2022CompleteINTERSTATE ELECTRIC, LLCGeneral Wiring
02/25/2021CancelledTHYSSENKRUPP ELEVATOR CO—
02/25/2021CancelledTHYSSENKRUPP ELEVATOR CO—
1 project · most recent 10/02/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/02/2025Permit IssuedPLATINUM SERVICES NY LLCScaffold, Sidewalk Shed
1 project · most recent 04/06/2026
FiledStatusContractorScope
04/06/2026Permit IssuedSTRUCTURAL PRESERVATION S—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/26/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
04/09/2025Tenant Protection Plan ComplianceMICHAEL GADALETAspecial
04/09/2025FinalMICHAEL GADALETAprogress
04/09/2025Fire-Resistance Rated ConstructionMICHAEL GADALETAprogress
04/09/2025Fire-Resistant Penetrations and JointsMICHAEL GADALETAspecial
02/12/2024Tenant Protection Plan ComplianceMICHAEL GADALETAspecial
02/11/2024HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
02/11/2024HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
02/11/2024HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
02/11/2024Energy Code Compliance InspectionsPIETRO ROSATOprogress
02/11/2024Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
02/07/2024Mechanical SystemsPIETRO ROSATOspecial
02/07/2024FinalPIETRO ROSATOprogress
12/05/2023FinalAHMAD KHANZADAprogress
12/05/2023Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
12/05/2023Tenant Protection Plan ComplianceHamidreza Sagharispecial
03/28/2022FinalHackjong Choiprogress
03/25/2022FinalHackjong Choiprogress
03/25/2022FinalHackjong Choiprogress
03/25/2022FinalHackjong Choiprogress
08/23/2021HVAC and service water heating equipment PIETRO ROSATOenergy_progress
08/23/2021Mechanical SystemsPIETRO ROSATOspecial
08/23/2021Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
08/23/2021Energy Code Compliance InspectionsPIETRO ROSATOprogress
08/23/2021FinalPIETRO ROSATOprogress
08/23/2021HVAC insulation and sealing PIETRO ROSATOenergy_progress
Latest 25 of 34.
▾Documents — 447 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch13
09/03/2026M00520841-I1Request digital key ↗
09/03/2026M00563031-I1Request digital key ↗
09/02/2026M00706611-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00434215-I1Request digital key ↗
08/15/2026M00434215-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
09/05/2026M00179448-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00133157-I1Request digital key ↗
▸Applications & Permits92
▸BISPLAN / WORK APPROVAL APPLICATION61
12/10/2025100923985Open ↗
12/05/2025100923985Open ↗
11/25/2025100923985Open ↗
Showing 3 of 61 on file for this type
▸BISWORK PERMIT APPLICATION31
08/17/2018123484345Open ↗
08/17/2018123484345Open ↗
08/22/2017140685257Open ↗
Showing 3 of 31 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE DESIGN CERTIFICATION1
08/22/2017140685257Open ↗
▸DOB NOWFlood Zone Design Certification1
09/05/2026M00179448-I1Open ↗
▸DOB NOWFlood Zone Compliance1
09/05/2026M00179448-I1Open ↗
▸Seals & Professional Certifications119
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION36
02/10/2020123484345Open ↗
01/17/2020123484345Open ↗
08/17/2018123484345Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/02/2026M00706584-I1Open ↗
09/01/2026M00706599-I1Open ↗
09/01/2026M00434215-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/05/2026M00133157-I1Open ↗
09/05/2026M00179448-I1Open ↗
09/04/2026M00434215-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026M00434215-P1Open ↗
09/01/2026M00434215-P1Open ↗
08/30/2026M00434215-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
08/17/2018123484345Open ↗
08/17/2018123484345Open ↗
08/22/2017140685257Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
03/23/2022123484345Open ↗
11/12/2021123484345Open ↗
08/17/2018123484345Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
08/22/2017140685257Open ↗
08/26/2015140393205Open ↗
08/04/2015140384420Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
08/22/2017140685257Open ↗
08/26/2015140393205Open ↗
08/04/2015140384420Open ↗
Showing 3 of 5 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment23
▸BISSCHEDULE B - PLUMBING9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS2
10/03/2017140685257Open ↗
10/03/2017140685257Open ↗
▸BISSTANDPIPE (SD) SIGNOFF1
06/22/2023100923985Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
08/15/2016122009664Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
06/22/2023100923985Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
10/03/2017140685257Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026M00434215-I1Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
08/22/2017140685257Open ↗
06/01/2015140354792Open ↗
04/30/2015122228142Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M01207999-I1Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
02/10/2020123484345Open ↗
08/17/2018123484345Open ↗
08/17/2018123484345Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
04/06/2022123484345Open ↗
07/18/2020123484345Open ↗
10/03/2017140685257Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/22/2017140685257Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/29/2015140354453Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/22/2017140685257Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY14
04/06/2022123484345Open ↗
01/24/2022123484345Open ↗
01/20/2022123484345Open ↗
Showing 3 of 14 on file for this type
▸Approvals, Objections & Sign-offs42
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
03/06/2023122009664Open ↗
04/07/2022123484345Open ↗
12/13/2021101757528Open ↗
Showing 3 of 26 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
11/25/2025100923985Open ↗
08/07/2025100923985Open ↗
03/31/2021100923985Open ↗
Showing 3 of 4 on file for this type
▸BISCURB CUT (CC) SIGNOFF1
06/20/2023100923985Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/20/2016122033575Open ↗
▸BISSUPERSEDING LETTER1
02/14/2017104401719Open ↗
▸DOB NOWNYS DEC Tidal Wetlands Approval1
09/05/2026M00179448-I1Open ↗
▸Cost, Insurance & Ownership35
▸BISCOST AFFIDAVIT32
04/06/2022123484345Open ↗
08/17/2018123484345Open ↗
08/17/2018123484345Open ↗
Showing 3 of 32 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/03/2023122009664Open ↗
03/03/2023122009664Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms45
▸BISBOROUGH INTAKE FORM18
06/25/2019100923985Open ↗
06/18/2019104514740Open ↗
06/18/2019140354792Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET15
08/17/2018123484345Open ↗
08/17/2018123484345Open ↗
04/30/2015122228142Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION6
11/15/2021123484345Open ↗
12/28/2016122228142Open ↗
Showing 2 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
08/22/2017140685257Open ↗
08/26/2015140393205Open ↗
08/04/2015140384420Open ↗
Showing 3 of 6 on file for this type
▸Other Documents17
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
12/13/2021101757528Open ↗
12/08/2021101757528Open ↗
08/22/2017140685257Open ↗
Showing 3 of 4 on file for this type
▸BISDHCR DOCUMENT3
12/08/2021101757528Open ↗
08/17/2021122009664Open ↗
03/05/2019100923985Open ↗
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation2
09/05/2026M00179448-I1Open ↗
08/13/2026M00133157-I1Open ↗
▸DOB NOWDHCR Document2
09/04/2026M00434215-I1Open ↗
08/13/2026M00434215-P1Open ↗
▸DOB NOWIRA Certification2
08/18/2026M01377286-I1Open ↗
08/13/2026M00999057-I1Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
08/26/2015140393205Open ↗
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
09/05/2026M00179448-I1Open ↗
▸DOB NOWNYS DEC Tidal Wetlands Map1
09/05/2026M00179448-I1Open ↗