← Back
Primarily 2 family with 1 store or office
Asase Yaa Cultural Arts Foundation
1803 FULTON STREET · Bedford-Stuyvesant (East) · BIN 3047930
💬 Discuss this project
1901Year Built
3Stories
S2Building Class
R7DZoning
3,807 sfGross Floor Area
3Units
3 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: FULTON & BOY INC · 2,507 sf lot · 1.52 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 124p · 2 filings · 20 docs
Cellar35p · 3 filings · 20 docs
Site & exterior1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD DESIGN STUDIO1207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/25/2021$1.0M—Private party → FULTON & BOY INC$267/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIMENEZ BUILDING CONSULTING LLC1302/08/2024
ALLEN SHINFELD, P.E. PLLC102/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL SKYLINE1003/21/2026
SD DESIGN STUDIO1603/21/2026
J&J CONSTRUCTION SOLUTION INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K & BH PLUMBING & HTG INCPlumbing607/08/2026
WINWAY DEVELOPMENT LLCGeneral Contractor403/22/2026
SPLEN CONSTRUCTION INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376602/08/2024
SD TESTING & INSPECTION S7010912/28/2023
Building Lifecycle
All (111)Filed (14)Permit Issued (6)Signed Off (5)Violation (4)Inspection (11)Objection (41)Special Inspection (30)
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/02/2024
Signed off — Alteration
REMOVE EXISTING ONE (1) BOILER AND INSTALL NEW TWO (2) GAS BOILERS AT CELLAR. REMEDY CURE ECB VIOLATION #: 39101190X. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00981611-S1
04/02/2024
Signed off — Alteration
REMOVE EXISTING ONE (1) BOILER AND INSTALL NEW TWO (2) GAS BOILERS AT CELLAR. REMEDY CURE ECB VIOLATION #: 39101190X. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00981611-I1
02/29/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/20/2024
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING STORE TO A LAUNDROMAT. INSTALL NEW PARTITION, NEW DRYER EXHAUST DUCT, AND NEW PLUMBING FIXTURES FOR LAUNDROMAT ESTABLISHMENT. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
B00588992-I1
02/20/2024
Signed off — Alteration
PLUMBING PLAN AS PER PLAN & IN CONJUNCTION WITH DOB NOW JOB B00588992. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
B00634989-I1
02/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jian Yang
02/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
02/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jian Yang
02/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
02/09/2024
Special inspection requirement — Maintenance information
Jian Yang
02/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
02/09/2024
Special inspection requirement — Maintenance information
Jian Yang
02/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
02/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
02/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
02/09/2024
Special inspection requirement — Heating Systems
Jian Yang
02/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
02/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
02/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
02/08/2024
Filed — Alteration
REMOVE EXISTING ONE (1) BOILER AND INSTALL NEW TWO (2) GAS BOILERS AT CELLAR. REMEDY CURE ECB VIOLATION #: 39101190X. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00981611-P2
02/08/2024
Filed — Alteration
REMOVE EXISTING ONE (1) BOILER AND INSTALL NEW TWO (2) GAS BOILERS AT CELLAR. REMEDY CURE ECB VIOLATION #: 39101190X. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00981611-P1
02/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
02/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
02/05/2024
Special inspection requirement — Maintenance information
Jian Yang
02/05/2024
Special inspection requirement — Maintenance information
Jian Yang
02/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
02/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
02/05/2024
Special inspection requirement — Heating Systems
Jian Yang
02/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
02/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
02/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
02/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
02/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
02/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
02/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
01/17/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/10/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
01/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
01/03/2024
Objection raised — Other
01/03/2024
Objection resolved — Addressed
01/02/2024
Permit issued — Plumbing
B00981611-S1-PL
12/29/2023
Permit issued — Boiler Equipment
B00981611-I1-BE
12/28/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING STORE TO A LAUNDROMAT. INSTALL NEW PARTITION, NEW DRYER EXHAUST DUCT, AND NEW PLUMBING FIXTURES FOR LAUNDROMAT ESTABLISHMENT. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
B00588992-P4
12/22/2023
Filed — Alteration
REMOVE EXISTING ONE (1) BOILER AND INSTALL NEW TWO (2) GAS BOILERS AT CELLAR. REMEDY CURE ECB VIOLATION #: 39101190X. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00981611-S1
12/22/2023
Filed — Alteration
REMOVE EXISTING ONE (1) BOILER AND INSTALL NEW TWO (2) GAS BOILERS AT CELLAR. REMEDY CURE ECB VIOLATION #: 39101190X. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00981611-I1
12/12/2023
Violation issued (ECB, closed)
Boilers
11/08/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/25/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/12/2023
Objection resolved — Addressed
10/06/2023
Objection resolved — Addressed
09/18/2023
Objection resolved — Addressed
09/18/2023
Objection resolved — Addressed
09/14/2023
Objection raised — Scope
09/14/2023
Objection raised — Scope
09/07/2023
Objection raised — Scope
09/07/2023
Objection raised — Scope
08/26/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING STORE TO A LAUNDROMAT. INSTALL NEW PARTITION, NEW DRYER EXHAUST DUCT, AND NEW PLUMBING FIXTURES FOR LAUNDROMAT ESTABLISHMENT. NO CHANGE IN USE, EGRESS, BULK OR OCCUPANCY.
B00588992-P3
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offK & BH PLUMBING & HTG INC01/02/2024
DOB NOWBoiler EquipmentSigned-offK & BH PLUMBING & HTG INC12/29/2023
DOB NOWPlumbingSigned-offK & BH PLUMBING & HTG INC03/07/2023
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC02/11/2023
DOB NOWPlumbingSigned-offK & BH PLUMBING & HTG INC03/14/2022
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC01/26/2022
1 project · most recent 07/06/2023
General Wiring
FiledStatusContractorScope
07/06/2023CompleteP.L. ELEC'L CONTR'G CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
02/29/2024Pass-Final Boiler Equipment InspectionPassView ↗
02/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/10/2024Pass-Final General Construction Non-Directive 14PassView ↗
11/08/2023Fail-Final General Construction Non-Directive 14FailView ↗
10/25/2023Fail-Final General Construction Non-Directive 14FailView ↗
05/18/2023Fail-Final General Construction Non-Directive 14FailView ↗
04/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
03/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
02/09/2024Energy Code Compliance InspectionsJian Yangprogress
02/09/2024HVAC-R and service water piping design and insulationJian Yangenergy_progress
02/09/2024HVAC-R and service water heating equipmentJian Yangenergy_progress
02/09/2024Maintenance informationJian Yangenergy_progress
02/09/2024HVAC-R and service water heating system controlsJian Yangenergy_progress
02/09/2024Fire-Resistant Penetrations and JointsJian Yangspecial
02/09/2024HVAC-R and service water heating system controlsJian Yangenergy_progress
02/09/2024Heating SystemsJian Yangspecial
02/09/2024HVAC-R and service water piping design and insulationJian Yangenergy_progress
02/09/2024HVAC-R and service water heating equipmentJian Yangenergy_progress
02/09/2024Maintenance informationJian Yangenergy_progress
02/09/2024Tenant Protection Plan ComplianceJian Yangspecial
02/09/2024Fire-Resistant Penetrations and JointsJian Yangspecial
02/09/2024Tenant Protection Plan ComplianceJian Yangspecial
02/05/2024Fire-Resistant Penetrations and JointsJian Yangspecial
02/05/2024Energy Code Compliance InspectionsJian Yangprogress
02/05/2024HVAC-R and service water heating equipmentJian Yangenergy_progress
02/05/2024HVAC-R and service water heating system controlsJian Yangenergy_progress
02/05/2024Maintenance informationJian Yangenergy_progress
02/05/2024HVAC-R and service water piping design and insulationJian Yangenergy_progress
02/05/2024Fire-Resistant Penetrations and JointsJian Yangspecial
02/05/2024Heating SystemsJian Yangspecial
02/05/2024Tenant Protection Plan Compliance—special
02/05/2024Maintenance informationJian Yangenergy_progress
02/05/2024HVAC-R and service water heating system controlsJian Yangenergy_progress
Latest 25 of 71.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/31/2026B00634989-P1Request digital key ↗
08/31/2026B00634989-P3Request digital key ↗
08/31/2026B00634989-P2Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
01/03/2022301399706Open ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature23
10/02/2026B00981611-S1Open ↗
10/02/2026B00981611-S1Open ↗
09/23/2026B00981611-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/31/2026B00588992-P1Open ↗
08/31/2026B00588992-P2Open ↗
08/31/2026B00588992-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/02/2026B00981611-S1Open ↗
10/02/2026B00981611-S1Open ↗
09/23/2026B00981611-I1Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/31/2026B00634989-P3Open ↗
08/31/2026B00634989-P2Open ↗
08/31/2026B00634989-P1Open ↗
Showing 3 of 13 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00588992-I1Open ↗
08/13/2026B00634989-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/29/2021301399706Open ↗
12/29/2021301399706Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/30/2021301399706Open ↗