| Owner | Filings | Most Recent |
|---|---|---|
| Related | 28 | 03/21/2026 |
| Aac Realty | 17 | 07/08/2026 |
| Robin Baron Design | 9 | 07/08/2026 |
| 300 East 74 Owners | 7 | 03/22/2026 |
| Guardian Contracting and Construction | 6 | 07/08/2026 |
| Ashkenazy Acquisition | 6 | 03/22/2026 |
| Evod Acquisition | 4 | 03/21/2026 |
| Winchester Properties | 4 | 03/21/2026 |
| 1116-1118 3rd Ave | 2 | 03/21/2026 |
| Audax Group | 1 | 03/21/2026 |
| Nissen | 1 | 03/21/2026 |
| 181 East 65th Street Condo | 1 | 03/21/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| Bridge Expediting | 4 | 03/21/2026 |
| Related Companies | 3 | 03/21/2026 |
| Ioad | 4 | 03/21/2026 |
| Perotto Consulting Management | 4 | 03/21/2026 |
| Agouti Construction Consulting | 6 | 03/21/2026 |
| KC Expediting | 6 | 03/21/2026 |
| Kushner Studios | 6 | 03/21/2026 |
| PS Engineers | 4 | 03/21/2026 |
| Municipal Building Consultants | 3 | 03/21/2026 |
| Friedman Associates II | 2 | 03/21/2026 |
| Rybak Development | 2 | 03/21/2026 |
| Oef Consultants | 8 | 03/21/2026 |
| Code | 6 | 03/21/2026 |
| Maryclare Nepogoda | 3 | 03/21/2026 |
| KX Consulting | 6 | 03/21/2026 |
| Meszaros Engineering | 2 | 03/21/2026 |
| Xinos Construction | 2 | 03/21/2026 |
| Ggonzalez Bohlereng Company | 12 | 03/21/2026 |
| Bohler Engineering NY | 4 | 03/21/2026 |
| Kazam Consultants | 4 | 03/21/2026 |
| Lombardo Building Consultants | 2 | 03/21/2026 |
| New Amsterdam Expediting | 4 | 03/21/2026 |
| AE Design Solution | 4 | 03/21/2026 |
| Dezignplus | 2 | 03/21/2026 |
| Javith Camino | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Everest Scaffolding | Scaffold | 11 | 07/08/2026 |
| Uberto | General Contractor | 8 | 07/08/2026 |
| Sagewood Construction & D | General Contractor | 7 | 07/08/2026 |
| Andamio Scaffolding | Scaffold | 7 | 07/08/2026 |
| Custom Commercial Construction | General Contractor | 5 | 07/08/2026 |
| KC Expediting | General Contractor | 5 | 07/08/2026 |
| Cooling Controls | General Contractor | 5 | 07/08/2026 |
| National Maintenance | Sign hanger | 4 | 07/08/2026 |
| Renovation Partners | General Contractor | 4 | 07/08/2026 |
| Power Cooling | General Contractor | 4 | 03/21/2026 |
| Guardian Contracting and | Scaffold | 4 | 07/08/2026 |
| United Brothers Pro Construction | General Contractor | 4 | 04/09/2026 |
| Sagewood Construction & D | Scaffold | 3 | 03/21/2026 |
| Orbit Plumbing & Heating | Plumbing | 3 | 07/08/2026 |
| KSW Mechanical | specialty_contractor | 3 | 03/21/2026 |
| American Fire Restoration | specialty_contractor | 3 | 03/21/2026 |
| Demaj 2 | General Contractor | 3 | 03/21/2026 |
| Water Dynamic P & H | Plumbing | 2 | 07/08/2026 |
| Hite Construction | General Contractor | 2 | 03/21/2026 |
| Integkral Design & Construction | General Contractor | 2 | 07/08/2026 |
| Jbuild | General Contractor | 2 | 07/08/2026 |
| Lico Contracting | General Contractor | 2 | 03/21/2026 |
| Linked Mechanical | specialty_contractor | 2 | 03/21/2026 |
| Rally Restoration | specialty_contractor | 2 | 03/21/2026 |
| Spectra Construction & Development | General Contractor | 2 | 07/08/2026 |
| Demar Plumbing | Plumbing | 2 | 07/08/2026 |
| DNA Plumbing Contractors | Fire Protection | 2 | 07/08/2026 |
| Frankie Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| R.J.C. Mechanical | Plumbing | 2 | 07/08/2026 |
| Tap Plumbing | Plumbing | 2 | 07/08/2026 |
| Ward Piping Company | Fire Protection | 2 | 07/08/2026 |
| Schimenti Construction Co | General Contractor | 1 | 07/08/2026 |
| Pumping Sol Plumbing & Mechanical I | Plumbing | 1 | 07/08/2026 |
| Structural Preserv System | General Contractor | 1 | 06/28/2026 |
| Javelin Electric | Electrical | 1 | 03/22/2026 |
| HV Electric | Electrical | 1 | 03/22/2026 |
| FSM Electrical | Electrical | 1 | 03/22/2026 |
| Einstein Electrical | Electrical | 1 | 03/22/2026 |
| Contact Plus Electrical | Electrical | 1 | 03/21/2026 |
| Conductor Electrical Services | Electrical | 1 | 03/22/2026 |
| Tribute Restoration | Scaffold | 1 | 04/09/2026 |
| C.M. Richey Electrical Contracting | Electrical | 1 | 03/22/2026 |
| Absolute Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| American Standard P&H Cororp | Plumbing | 1 | 07/08/2026 |
| A Plus Plumbing | Plumbing | 1 | 07/08/2026 |
| Arista Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| A + Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Casino Plumbing & Heating | Fire Protection | 1 | 07/08/2026 |
| Centric Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Tri City Mechanical Group | Plumbing | 1 | 07/08/2026 |
| Smart Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Duo Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Dynamic Blue Water Mechanical | Plumbing | 1 | 07/08/2026 |
| Empire Group NYC | General Contractor | 1 | 04/09/2026 |
| Forte Express P & H | Plumbing | 1 | 07/08/2026 |
| Laser Electrical Constr'g | Electrical | 1 | 03/21/2026 |
| Hydro Mechanical | Plumbing | 1 | 07/08/2026 |
| JP Roche | General Contractor | 1 | 07/08/2026 |
| Ari Group | General Contractor | 1 | 07/08/2026 |
| R-2 Electric | Electrical | 1 | 03/22/2026 |
| M&G Plumbing and Heating | Plumbing | 1 | 07/08/2026 |
| Borowide Elect'l Contractors | Electrical | 1 | 03/22/2026 |
| Phasepoint Electl Contg I | Electrical | 1 | 03/21/2026 |
| Premier Flow Plumbing and Heating | Plumbing | 1 | 07/08/2026 |
| Litco Electric | Electrical | 1 | 03/22/2026 |
| Dream Team Electrical | Electrical | 1 | 03/21/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | Orbit Plumbing & Heating | 07/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Uberto | 07/06/2026 |
| DOB NOW | General Construction | Permit Issued | Uberto | 06/17/2026 |
| DOB NOW | Structural | Signed-off | Structural Preserv System | 09/25/2025 |
| DOB NOW | General Construction | Permit Issued | United Brothers Pro Construction | 03/06/2025 |
| DOB NOW | Plumbing | Signed-off | Orbit Plumbing & Heating | 02/26/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Power Cooling | 01/27/2025 |
| DOB NOW | Plumbing | Signed-off | Centric Plumbing & Heating | 01/07/2025 |
| DOB NOW | General Construction | Signed-off | Ari Group | 12/13/2024 |
| DOB NOW | General Construction | Permit Issued | United Brothers Pro Construction | 12/13/2024 |
| DOB NOW | General Construction | Signed-off | Uberto | 10/11/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | KC Expediting | 09/19/2024 |
| DOB NOW | General Construction | Permit Issued | KC Expediting | 09/19/2024 |
| DOB NOW | Sprinklers | Permit Issued | Casino Plumbing & Heating | 09/16/2024 |
| DOB NOW | Plumbing | Permit Issued | Flavio Mechanical | 08/30/2024 |
| DOB NOW | General Construction | Permit Issued | Spectra Construction & Development | 08/12/2024 |
| DOB NOW | Plumbing | Signed-off | Frankie Plumbing & Heating | 07/15/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | Rally Restoration | 07/02/2024 |
| DOB NOW | Plumbing | Permit Issued | Hydro Mechanical | 06/10/2024 |
| DOB NOW | Plumbing | Permit Issued | Jag Plumbing & Mechanical | 05/30/2024 |
| DOB NOW | General Construction | Signed-off | Rally Restoration | 05/15/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | Rally Restoration | 05/10/2024 |
| DOB NOW | General Construction | Signed-off | Jbuild | 04/30/2024 |
| DOB NOW | General Construction | Permit Issued | Demaj 2 | 04/16/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | Rally Restoration | 04/09/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | Andamio Scaffolding | 04/05/2024 |
| DOB NOW | Plumbing | Signed-off | Frankie Plumbing & Heating | 03/14/2024 |
| DOB NOW | General Construction | Signed-off | Jbuild | 03/07/2024 |
| DOB NOW | General Construction | Signed-off | Power Cooling | 03/04/2024 |
| DOB NOW | General Construction | Permit Issued | Spectra Construction & Development | 02/29/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Uberto | 02/09/2024 |
| DOB NOW | General Construction | Permit Issued | KC Expediting | 12/13/2023 |
| DOB NOW | Plumbing | Signed-off | Orbit Plumbing & Heating | 11/13/2023 |
| DOB NOW | General Construction | Signed-off | Uberto | 11/09/2023 |
| DOB NOW | Mechanical Systems | Signed-off | Uberto | 11/09/2023 |
| DOB NOW | Supported Scaffold | Signed-off | Tribute Restoration | 10/23/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | KC Expediting | 10/11/2023 |
| DOB NOW | Structural | Signed-off | KC Expediting | 10/11/2023 |
| DOB NOW | General Construction | Signed-off | Sagewood Construction & D | 09/27/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | Andamio Scaffolding | 09/26/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/12/2026 | Permit Issued | Uberto | Heating and Air Conditioning Systems | Heat / Cool Carrier 42SGS04AOYADPC 15,475 BTU · Ahu ×3 42CGB06B*GYECY 15,352 BTU · Ahu ×1 42SGS06AOYADPC 21,004 BTU · Ahu ×1 42SGS06AOYDCPC 21,004 BTU · Ahu ×1 |
| 07/01/2025 | Permit Issued | Empire Group NYC | Associated Ducts and Piping | Ducts & Piping __Junk__ 00000 Ductwork ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/01/2025 | Signed-off | DNA Plumbing Contracting | — |
| 09/04/2024 | Permit Issued | Casino Plumbing & Heating | 154 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/12/2026 | Permit Issued | Orbit Plumbing & Heating | Gas, Water/Sanitary |
| 07/09/2025 | Signed-off | Frankie Plumbing & Heating | Gas, Water/Sanitary |
| 07/01/2025 | Signed-off | Tap Plumbing | Water/Sanitary |
| 05/01/2025 | Permit Issued | Pumping Sol Plumbing & Mechanical I | Gas |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/05/2026 | Permit Issued | Einstein Electrical | — |
| 06/09/2026 | Complete | Century Electric | General Wiring |
| 05/24/2025 | Complete | Contact Plus Electrical | General Wiring |
| 01/07/2025 | Complete | Amsterdam Electric | General Wiring |
| 07/18/2024 | Permit Issued | K & G Electric Co | General Wiring |
| 05/13/2024 | Complete | Conductor Electrical Services | General Wiring |
| 05/02/2024 | Complete | Borowide Elect'l Contractors | — |
| 04/22/2024 | Complete | HV Electric | General Wiring |
| 04/03/2024 | Permit Issued | Cunningham Electric | General Wiring |
| 02/16/2024 | Complete | Joseph Weinstein Electric | General Wiring |
| 12/11/2023 | Permit Issued | Tri-Power Electrical | General Wiring |
| 11/29/2023 | Complete | Einstein Electrical | — |
| 10/31/2023 | Complete | Einstein Electrical | General Wiring |
| 10/31/2023 | Complete | Einstein Electrical | — |
| 08/14/2023 | Complete | R-2 Electric | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/10/2025 | Signed-off | Structural Preserv System | Concrete |
| 12/29/2019 | Signed-off | KC Expediting | Steel, Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 10/24/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/24/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/21/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/04/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/06/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/25/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/13/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 02/26/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/12/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/12/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/24/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/22/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/31/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/18/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/12/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/29/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/26/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/19/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/17/2024 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 11/05/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/02/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/14/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/09/2023 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 05/30/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/24/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/22/2026 | HVAC-R and service water heating equipment | Michael Patino | energy_progress |
| 04/22/2026 | Energy Code Compliance Inspections | Michael Patino | progress |
| 04/22/2026 | Maintenance information | Michael Patino | energy_progress |
| 04/22/2026 | Duct leakage testing, insulation and design | Michael Patino | energy_progress |
| 04/22/2026 | HVAC-R and service water heating system controls | Michael Patino | energy_progress |
| 04/20/2026 | Mechanical Systems | Michael Patino | special |
| 04/20/2026 | Final | Michael Patino | progress |
| 10/10/2025 | Concrete - Cast-In-Place | Borys Hayda | special |
| 10/10/2025 | Final | Borys Hayda | progress |
| 10/10/2025 | Alternative Materials - OTCR Buildings Bulletin Number | Borys Hayda | special |
| 10/10/2025 | Structural Stability – Alterations of existing buildings | Borys Hayda | special |
| 09/26/2025 | Structural Stability – Alterations of existing buildings | Borys Hayda | special |
| 09/26/2025 | Alternative Materials - OTCR Buildings Bulletin Number | Borys Hayda | special |
| 09/26/2025 | Concrete - Cast-In-Place | Borys Hayda | special |
| 09/26/2025 | Final | Borys Hayda | progress |
| 07/17/2025 | Lighting in dwelling units | Theodore Bodnar | energy_progress |
| 07/17/2025 | Energy Code Compliance Inspections | Theodore Bodnar | progress |
| 07/17/2025 | Final | Theodore Bodnar | progress |
| 05/06/2025 | HVAC-R and service water piping design and insulation | Gregory Perotto | energy_progress |
| 05/06/2025 | Tenant Protection Plan Compliance | Gregory Perotto | special |
| 05/06/2025 | HVAC-R and service water heating system controls | Gregory Perotto | energy_progress |
| 05/06/2025 | Maintenance information | Gregory Perotto | energy_progress |
| 05/06/2025 | HVAC-R and service water heating equipment | Gregory Perotto | energy_progress |
| 05/01/2025 | HVAC-R and service water heating equipment | Gregory Perotto | energy_progress |
| 05/01/2025 | Maintenance information | Gregory Perotto | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| One Medical | Medical / Healthcare | Floors 1, 2 | Project M00298814 Project M00231707 Project M00225709 |
| TD Bank | Bank / Financial branch | Floor 1 | Project M00294922 Project M00294924 Project M00272768 Project M00273285 Project M00275958 Project M00276003 |
| Manhattan Cardiology | Medical / Healthcare | Floor 1 | Project M00279691 |