BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Chatham Condominium
181 EAST 65TH STREET · BIN 1042429
💬 Discuss this project
2000Year Built
32Stories
RMBuilding Class
C1-9Zoning
209,853 sfGross Floor Area
95Units
LL97 CoveredRent Stabilized2 Active Violations 1 unresolved · 1 paperwork only 1 likely answered 8 old, status unconfirmed ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 11,930 sf lot · 17.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof300 East 74 Owners CORP.24p · 6 filings · 20 docs
PenthouseUnit PHB5p · 2 filings · 7 docs
Floor 31Unit 31B1p · 1 filing · 4 docs
Floor 30
Floor 29Unit 29A, Unit 31B19p · 2 filings · 20 docs
Floor 28
Floor 27Unit 27A, Unit 27BUnder Construction51p · 2 filings · 20 docs
Floor 26
Floor 25Unit 25A11p · 2 filings · 11 docs
Floor 24
Floor 23Unit 23A11p · 1 filing · 20 docs
Floor 22
Floor 21
Floor 20Unit 20A3p · 2 filings · 14 docs
Floor 19
Floor 18Unit 18B11p · 1 filing · 20 docs
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10Unit 10C11p · 3 filings · 17 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Unit 5E9p · 1 filing · 7 docs
Floor 4Unit 4B12p · 3 filings · 19 docs
Floor 3
Floor 2One Medical24p · 6 filings · 20 docs
Floor 1One Medical, Manhattan Cardiology +193p · 14 filings · 20 docs
CellarAac Realty38p · 5 filings · 18 docs
Sub-CellarAac Realty31p · 4 filings · 14 docs
Site & exteriorTD Bank30p · 9 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Related2803/21/2026
Aac Realty1707/08/2026
Robin Baron Design907/08/2026
300 East 74 Owners703/22/2026
Guardian Contracting and Construction607/08/2026
Ashkenazy Acquisition603/22/2026
Evod Acquisition403/21/2026
Winchester Properties403/21/2026
1116-1118 3rd Ave203/21/2026
Audax Group103/21/2026
Nissen103/21/2026
181 East 65th Street Condo103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bridge Expediting403/21/2026
Related Companies303/21/2026
Ioad403/21/2026
Perotto Consulting Management403/21/2026
Agouti Construction Consulting603/21/2026
KC Expediting603/21/2026
Kushner Studios603/21/2026
PS Engineers403/21/2026
Municipal Building Consultants303/21/2026
Friedman Associates II203/21/2026
Rybak Development203/21/2026
Oef Consultants803/21/2026
Code603/21/2026
Maryclare Nepogoda303/21/2026
KX Consulting603/21/2026
Meszaros Engineering203/21/2026
Xinos Construction203/21/2026
Ggonzalez Bohlereng Company1203/21/2026
Bohler Engineering NY403/21/2026
Kazam Consultants403/21/2026
Lombardo Building Consultants203/21/2026
New Amsterdam Expediting403/21/2026
AE Design Solution403/21/2026
Dezignplus203/21/2026
Javith Camino103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Everest ScaffoldingScaffold1107/08/2026
UbertoGeneral Contractor807/08/2026
Sagewood Construction & DGeneral Contractor707/08/2026
Andamio ScaffoldingScaffold707/08/2026
Custom Commercial ConstructionGeneral Contractor507/08/2026
KC ExpeditingGeneral Contractor507/08/2026
Cooling ControlsGeneral Contractor507/08/2026
National MaintenanceSign hanger407/08/2026
Renovation PartnersGeneral Contractor407/08/2026
Power CoolingGeneral Contractor403/21/2026
Guardian Contracting andScaffold407/08/2026
United Brothers Pro ConstructionGeneral Contractor404/09/2026
Sagewood Construction & DScaffold303/21/2026
Orbit Plumbing & HeatingPlumbing307/08/2026
KSW Mechanicalspecialty_contractor303/21/2026
American Fire Restorationspecialty_contractor303/21/2026
Demaj 2General Contractor303/21/2026
Water Dynamic P & HPlumbing207/08/2026
Hite ConstructionGeneral Contractor203/21/2026
Integkral Design & ConstructionGeneral Contractor207/08/2026
JbuildGeneral Contractor207/08/2026
Lico ContractingGeneral Contractor203/21/2026
Linked Mechanicalspecialty_contractor203/21/2026
Rally Restorationspecialty_contractor203/21/2026
Spectra Construction & DevelopmentGeneral Contractor207/08/2026
Demar PlumbingPlumbing207/08/2026
DNA Plumbing ContractorsFire Protection207/08/2026
Frankie Plumbing & HeatingPlumbing207/08/2026
R.J.C. MechanicalPlumbing207/08/2026
Tap PlumbingPlumbing207/08/2026
Ward Piping CompanyFire Protection207/08/2026
Schimenti Construction CoGeneral Contractor107/08/2026
Pumping Sol Plumbing & Mechanical IPlumbing107/08/2026
Structural Preserv SystemGeneral Contractor106/28/2026
Javelin ElectricElectrical103/22/2026
HV ElectricElectrical103/22/2026
FSM ElectricalElectrical103/22/2026
Einstein ElectricalElectrical103/22/2026
Contact Plus ElectricalElectrical103/21/2026
Conductor Electrical ServicesElectrical103/22/2026
Tribute RestorationScaffold104/09/2026
C.M. Richey Electrical ContractingElectrical103/22/2026
Absolute Plumbing & HeatingPlumbing107/08/2026
American Standard P&H CororpPlumbing107/08/2026
A Plus PlumbingPlumbing107/08/2026
Arista Plumbing & HeatingPlumbing107/08/2026
A + SprinklerFire Protection107/08/2026
Casino Plumbing & HeatingFire Protection107/08/2026
Centric Plumbing & HeatingPlumbing107/08/2026
Tri City Mechanical GroupPlumbing107/08/2026
Smart Plumbing & HeatingPlumbing107/08/2026
Duo Plumbing & HeatingPlumbing107/08/2026
Dynamic Blue Water MechanicalPlumbing107/08/2026
Empire Group NYCGeneral Contractor104/09/2026
Forte Express P & HPlumbing107/08/2026
Laser Electrical Constr'gElectrical103/21/2026
Hydro MechanicalPlumbing107/08/2026
JP RocheGeneral Contractor107/08/2026
Ari GroupGeneral Contractor107/08/2026
R-2 ElectricElectrical103/22/2026
M&G Plumbing and HeatingPlumbing107/08/2026
Borowide Elect'l ContractorsElectrical103/22/2026
Phasepoint Electl Contg IElectrical103/21/2026
Premier Flow Plumbing and HeatingPlumbing107/08/2026
Litco ElectricElectrical103/22/2026
Dream Team ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Michael Patino Architectu8170306/12/2026
Desimone Consulting Engineering5942210/10/2025
Twig Special Inspections885207/01/2025
Gregory V. Perotto, P.E947305/01/2025
Grant Engineering2627304/15/2025
CBA5091211/04/2024
World Design Architecture9323309/04/2024
Amaracon Testing & Inspec5842108/08/2024
KZ Engineering4665107/02/2024
Doyun Kim; RA7415205/24/2024
Socotec301104/10/2024
Lombardo Prof Engineering8566103/22/2024
Metric Consulting and Ins1803203/05/2024
Oef Consultants3735401/31/2024
O'Rourke Engineering5873101/11/2024
AR Consulting Engineer P4054201/09/2024
Vincent J. Liotta P. E1974104/25/2023
CES Engineering1277202/22/2023
OI Architecture + Design2636101/30/2023
Piro Studio7503210/30/2021
H. A. Bader Consultants2332109/23/2021
Aks Architectural & Engineering1957404/06/2021
Michael Zenreich Architects1724102/24/2021
Shahrish Consulting5702402/10/2021
Wavic Engineering1733101/22/2020
Jarek Tresko Architect1086101/22/2020
Meszaros Engineering963101/17/2020
Markanics4600112/29/2019
Richard H. Balser Engineering3028112/05/2019
Building Lifecycle
All (300)Filed (59)Permit Issued (64)Signed Off (42)Facade (FISP) (3)Violation (10)Inspection (32)Objection (60)Special Inspection (30)
09/23/2026
Signed off — Alteration
Removal and Replacement of Plumbing Fixture in Bathroom and Kitchen.
M01009949-I1
09/23/2026
Signed off — Alteration
Removal and Replacement of Plumbing Fixture in Bathroom and Kitchen.
M01009949-S1
07/06/2026
Permit issued — Plumbing
M01389597-S1-PL
07/06/2026
Permit issued — Mechanical Systems
M01389597-S2-MS
06/17/2026
Permit issued — General Construction
M01389597-I1-GC
06/12/2026
Filed — Alteration
Filing for the plumbing in conjunction with the renovation work to combine apartments 27A and 27B.
M01389597-S2
06/12/2026
Filed — Alteration
Filing for the plumbing in conjunction with the renovation work to combine apartments 27A and 27B.
M01389597-I1
06/12/2026
Filed — Alteration
Filing for the plumbing in conjunction with the renovation work to combine apartments 27A and 27B.
M01389597-S1
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Michael Patino
04/22/2026
Special inspection requirement — Duct leakage testing, insulation and design
Michael Patino
04/22/2026
Special inspection requirement — Maintenance information
Michael Patino
04/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Michael Patino
04/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Michael Patino
04/20/2026
Special inspection requirement — Final
Michael Patino
04/20/2026
Special inspection requirement — Mechanical Systems
Michael Patino
04/17/2026
Signed off — Alteration
M01111413-I1
02/17/2026
Signed off — Alteration
SUPPORTED PIPE SCAFFILD AS SHOWN ON THE PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00937023-I1
11/24/2025
Signed off — Alteration
REMOVING & REPLACING EXISTING PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLIACTION. GENERAL CONSTRUCTION FILED SEPARATELY
M01112141-I1
10/24/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/10/2025
Filed — Alteration
#8973 - Minor structural modifications to interior column. No change in egress, use, or occupancy.
M01265276-P1
10/10/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Borys Hayda
10/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Borys Hayda
10/10/2025
Special inspection requirement — Final
Borys Hayda
10/10/2025
Special inspection requirement — Concrete - Cast-In-Place
Borys Hayda
09/26/2025
Special inspection requirement — Concrete - Cast-In-Place
Borys Hayda
09/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Borys Hayda
09/26/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Borys Hayda
09/26/2025
Special inspection requirement — Final
Borys Hayda
09/25/2025
Permit issued — Structural
M01265276-I1-ST
08/04/2025
Filed — Alteration
#8973 - Minor structural modifications to interior column. No change in egress, use, or occupancy.
M01265276-I1
08/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2025
Special inspection requirement — Lighting in dwelling units
Theodore Bodnar
07/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Theodore Bodnar
07/17/2025
Special inspection requirement — Final
Theodore Bodnar
07/09/2025
Filed — Alteration
Removal and Replacement of Plumbing Fixture in Bathroom and Kitchen.
M01009949-P4
07/09/2025
Filed — Alteration
Removal and Replacement of Plumbing Fixture in Bathroom and Kitchen.
M01009949-P3
07/01/2025
Filed — Alteration
NEW DUCTWORK CONNECTED TO EXISTING HVAC UNIT. FILED IN CONJUNCTION WITH ALT II #123844288
M00279691-P4
05/29/2025
Signed off — Alteration
Renovation of an existing apartment#27A on the 27th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
M00942668-I1
05/28/2025
Signed off — Alteration
Renovation of an existing apartment#27A on the 27th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
M00942668-S2
05/28/2025
Signed off — Alteration
Renovation of an existing apartment#27A on the 27th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
M00942668-S1
05/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
05/06/2025
Special inspection requirement — Maintenance information
Gregory Perotto
05/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Perotto
05/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
05/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
05/01/2025
Filed — Alteration
Remove Existing Domestic Hot Water Heaters and associated venting. Existing gas main, gas branch piping, and gas valve to Remain. Install 2 New Domestic Hot water Heaters with new venting. No Change to the Use, Occupancy, or Egress.
M01055767-P3
05/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
05/01/2025
Special inspection requirement — Maintenance information
Gregory Perotto
05/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
05/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
05/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Perotto
04/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Morse
04/25/2025
Special inspection requirement — Final
Stephen Morse
04/15/2025
Filed — Alteration
Renovation of an existing apartment#27A on the 27th floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
M00942668-P1
04/11/2025
Filed — Alteration
Removal and Replacement of Plumbing Fixture in Bathroom and Kitchen.
M01009949-P1
04/11/2025
Filed — Alteration
Removal and Replacement of Plumbing Fixture in Bathroom and Kitchen.
M01009949-P2
03/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedOrbit Plumbing & Heating07/06/2026
DOB NOWMechanical SystemsPermit IssuedUberto07/06/2026
DOB NOWGeneral ConstructionPermit IssuedUberto06/17/2026
DOB NOWStructuralSigned-offStructural Preserv System09/25/2025
DOB NOWGeneral ConstructionPermit IssuedUnited Brothers Pro Construction03/06/2025
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating02/26/2025
DOB NOWMechanical SystemsSigned-offPower Cooling01/27/2025
DOB NOWPlumbingSigned-offCentric Plumbing & Heating01/07/2025
DOB NOWGeneral ConstructionSigned-offAri Group12/13/2024
DOB NOWGeneral ConstructionPermit IssuedUnited Brothers Pro Construction12/13/2024
DOB NOWGeneral ConstructionSigned-offUberto10/11/2024
DOB NOWMechanical SystemsPermit IssuedKC Expediting09/19/2024
DOB NOWGeneral ConstructionPermit IssuedKC Expediting09/19/2024
DOB NOWSprinklersPermit IssuedCasino Plumbing & Heating09/16/2024
DOB NOWPlumbingPermit IssuedFlavio Mechanical08/30/2024
DOB NOWGeneral ConstructionPermit IssuedSpectra Construction & Development08/12/2024
DOB NOWPlumbingSigned-offFrankie Plumbing & Heating07/15/2024
DOB NOWSuspended ScaffoldSigned-offRally Restoration07/02/2024
DOB NOWPlumbingPermit IssuedHydro Mechanical06/10/2024
DOB NOWPlumbingPermit IssuedJag Plumbing & Mechanical05/30/2024
DOB NOWGeneral ConstructionSigned-offRally Restoration05/15/2024
DOB NOWSuspended ScaffoldSigned-offRally Restoration05/10/2024
DOB NOWGeneral ConstructionSigned-offJbuild04/30/2024
DOB NOWGeneral ConstructionPermit IssuedDemaj 204/16/2024
DOB NOWSuspended ScaffoldSigned-offRally Restoration04/09/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding04/05/2024
DOB NOWPlumbingSigned-offFrankie Plumbing & Heating03/14/2024
DOB NOWGeneral ConstructionSigned-offJbuild03/07/2024
DOB NOWGeneral ConstructionSigned-offPower Cooling03/04/2024
DOB NOWGeneral ConstructionPermit IssuedSpectra Construction & Development02/29/2024
DOB NOWMechanical SystemsSigned-offUberto02/09/2024
DOB NOWGeneral ConstructionPermit IssuedKC Expediting12/13/2023
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating11/13/2023
DOB NOWGeneral ConstructionSigned-offUberto11/09/2023
DOB NOWMechanical SystemsSigned-offUberto11/09/2023
DOB NOWSupported ScaffoldSigned-offTribute Restoration10/23/2023
DOB NOWMechanical SystemsPermit IssuedKC Expediting10/11/2023
DOB NOWStructuralSigned-offKC Expediting10/11/2023
DOB NOWGeneral ConstructionSigned-offSagewood Construction & D09/27/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/26/2023
+ 60 more permits on file
2 projects · most recent 06/12/2026
Heating and Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
06/12/2026Permit IssuedUbertoHeating and Air Conditioning Systems
Heat / Cool
Carrier 42SGS04AOYADPC 15,475 BTU · Ahu ×3
42CGB06B*GYECY 15,352 BTU · Ahu ×1
42SGS06AOYADPC 21,004 BTU · Ahu ×1
42SGS06AOYDCPC 21,004 BTU · Ahu ×1
07/01/2025Permit IssuedEmpire Group NYCAssociated Ducts and Piping
Ducts & Piping
__Junk__ 00000 Ductwork ×2
2 projects · most recent 07/01/2025
FiledStatusContractorScope
07/01/2025Signed-offDNA Plumbing Contracting—
09/04/2024Permit IssuedCasino Plumbing & Heating154 heads
4 projects · most recent 06/12/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/12/2026Permit IssuedOrbit Plumbing & HeatingGas, Water/Sanitary
07/09/2025Signed-offFrankie Plumbing & HeatingGas, Water/Sanitary
07/01/2025Signed-offTap PlumbingWater/Sanitary
05/01/2025Permit IssuedPumping Sol Plumbing & Mechanical IGas
25 projects · most recent 07/05/2026
General Wiring
FiledStatusContractorScope
07/05/2026Permit IssuedEinstein Electrical—
06/09/2026CompleteCentury ElectricGeneral Wiring
05/24/2025CompleteContact Plus ElectricalGeneral Wiring
01/07/2025CompleteAmsterdam ElectricGeneral Wiring
07/18/2024Permit IssuedK & G Electric CoGeneral Wiring
05/13/2024CompleteConductor Electrical ServicesGeneral Wiring
05/02/2024CompleteBorowide Elect'l Contractors—
04/22/2024CompleteHV ElectricGeneral Wiring
04/03/2024Permit IssuedCunningham ElectricGeneral Wiring
02/16/2024CompleteJoseph Weinstein ElectricGeneral Wiring
12/11/2023Permit IssuedTri-Power ElectricalGeneral Wiring
11/29/2023CompleteEinstein Electrical—
10/31/2023CompleteEinstein ElectricalGeneral Wiring
10/31/2023CompleteEinstein Electrical—
08/14/2023CompleteR-2 ElectricGeneral Wiring
2 projects · most recent 10/10/2025
Concrete Steel
FiledStatusContractorScope
10/10/2025Signed-offStructural Preserv SystemConcrete
12/29/2019Signed-offKC ExpeditingSteel, Concrete
▾Field Inspections (DOB CAP) — 32
DateTypeResultReport
10/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/09/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 32.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/22/2026HVAC-R and service water heating equipmentMichael Patinoenergy_progress
04/22/2026Energy Code Compliance InspectionsMichael Patinoprogress
04/22/2026Maintenance informationMichael Patinoenergy_progress
04/22/2026Duct leakage testing, insulation and designMichael Patinoenergy_progress
04/22/2026HVAC-R and service water heating system controlsMichael Patinoenergy_progress
04/20/2026Mechanical SystemsMichael Patinospecial
04/20/2026FinalMichael Patinoprogress
10/10/2025Concrete - Cast-In-PlaceBorys Haydaspecial
10/10/2025FinalBorys Haydaprogress
10/10/2025Alternative Materials - OTCR Buildings Bulletin NumberBorys Haydaspecial
10/10/2025Structural Stability – Alterations of existing buildingsBorys Haydaspecial
09/26/2025Structural Stability – Alterations of existing buildingsBorys Haydaspecial
09/26/2025Alternative Materials - OTCR Buildings Bulletin NumberBorys Haydaspecial
09/26/2025Concrete - Cast-In-PlaceBorys Haydaspecial
09/26/2025FinalBorys Haydaprogress
07/17/2025Lighting in dwelling unitsTheodore Bodnarenergy_progress
07/17/2025Energy Code Compliance InspectionsTheodore Bodnarprogress
07/17/2025FinalTheodore Bodnarprogress
05/06/2025HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
05/06/2025Tenant Protection Plan ComplianceGregory Perottospecial
05/06/2025HVAC-R and service water heating system controlsGregory Perottoenergy_progress
05/06/2025Maintenance informationGregory Perottoenergy_progress
05/06/2025HVAC-R and service water heating equipmentGregory Perottoenergy_progress
05/01/2025HVAC-R and service water heating equipmentGregory Perottoenergy_progress
05/01/2025Maintenance informationGregory Perottoenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
One MedicalMedical / HealthcareFloors 1, 2
Project M00298814 Alteration · LOC Issued · 01/22/2020
Project M00231707 Alteration · LOC Issued · 12/05/2019
Project M00225709 Alteration · LOC Issued · 11/26/2019
TD BankBank / Financial branchFloor 1
Project M00294922 Alteration · LOC Issued · 01/21/2020
Project M00294924 Alteration · LOC Issued · 01/21/2020
Project M00272768 Alteration · LOC Issued · 01/02/2020
Project M00273285 Alteration · LOC Issued · 01/02/2020
Project M00275958 Alteration · LOC Issued · 01/02/2020
Project M00276003 Alteration · LOC Issued · 01/02/2020
Manhattan CardiologyMedical / HealthcareFloor 1
Project M00279691 Alteration · Permit Entire · 12/18/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,367 on file (BIS + DOB NOW)
▸Plans & Drawings91
▸DOB NOWPlans/Sketch62
09/06/2026M00034778-I1Request digital key ↗
09/06/2026M00048779-I1Request digital key ↗
09/03/2026M00464685-I1Request digital key ↗
Showing 3 of 62 on file for this type
▸DOB NOWPlans/Sketch - Plumbing10
09/05/2026M00225709-I1Request digital key ↗
09/05/2026M00273285-I1Request digital key ↗
09/05/2026M00297261-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems7
09/05/2026M00231707-I1Request digital key ↗
09/05/2026M00279691-S1Request digital key ↗
09/03/2026M00272768-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00276003-I1Request digital key ↗
09/05/2026M00298814-I1Request digital key ↗
09/05/2026M00279691-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/05/2026M00276860-I1Request digital key ↗
09/04/2026M00275958-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00464685-P1Request digital key ↗
09/03/2026M00464685-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00294922-I1Request digital key ↗
09/05/2026M00294924-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00159231-I1Request digital key ↗
▸Applications & Permits239
▸BISWORK PERMIT APPLICATION123
04/28/2022123690808Open ↗
03/18/2022123690808Open ↗
09/20/2021123844288Open ↗
Showing 3 of 123 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION112
08/26/2025123854187Open ↗
11/03/2023123854187Open ↗
10/27/2023123854187Open ↗
Showing 3 of 112 on file for this type
▸BISLL114/19 PERMIT RESTRICTION2
11/16/2021123867592Open ↗
10/18/2021140991434Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
08/14/2020123711199Open ↗
05/08/2020123909155Open ↗
▸Seals & Professional Certifications386
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION116
01/31/2020123854187Open ↗
01/31/2020123854187Open ↗
12/30/2019123867592Open ↗
Showing 3 of 116 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature86
09/06/2026M00034778-I1Open ↗
09/06/2026M00048779-I1Open ↗
09/05/2026M00231707-I1Open ↗
Showing 3 of 86 on file for this type
▸DOB NOWProgress Inspector Seal & Signature73
10/17/2026M01009949-I1Open ↗
10/17/2026M01009949-I1Open ↗
10/17/2026M01009949-I1Open ↗
Showing 3 of 73 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature49
09/19/2026M00295045-I1Open ↗
09/19/2026M00295045-I1Open ↗
09/19/2026M00295045-I1Open ↗
Showing 3 of 49 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST24
01/31/2020123854187Open ↗
12/10/2019123865077Open ↗
Showing 2 of 24 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
01/31/2020123854187Open ↗
12/10/2019123865077Open ↗
Showing 2 of 15 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment85
▸BISSCHEDULE B - PLUMBING29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISSELF-CERT PLUMBING NOTICE28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISEQUIPMENT USE PERMITS7
06/22/2020140841542Open ↗
Showing 1 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
06/22/2020140841542Open ↗
Showing 1 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection45
▸DOB NOWTenant Protection Plan25
09/05/2026M00273285-I1Open ↗
09/05/2026M00294924-I1Open ↗
Showing 2 of 25 on file for this type
▸BISTenant Protection Plan and Notes19
05/15/2020123909155Open ↗
01/31/2020123854187Open ↗
12/30/2019123867592Open ↗
Showing 3 of 19 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
12/18/2020140991434Open ↗
▸Environmental & Asbestos41
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
12/19/2020140991434Open ↗
Showing 1 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
09/03/2026M00590470-S1Open ↗
Showing 1 of 9 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance103
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS41
01/31/2020123854187Open ↗
01/31/2020123854187Open ↗
12/30/2019123867592Open ↗
Showing 3 of 41 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS18
02/23/2022123844288Open ↗
11/23/2021123844288Open ↗
10/18/2021140991434Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY12
04/28/2023123658407Open ↗
08/08/2022123658407Open ↗
11/15/2021123867592Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)7
08/30/2023123865077Open ↗
08/30/2023123690808Open ↗
08/08/2022123658407Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
08/27/2023123690808Open ↗
08/27/2023123865077Open ↗
04/28/2023123658407Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISINTERIOR LIGHTING POWER1
07/25/2022123854187Open ↗
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY18
09/27/2023123865077Open ↗
09/27/2023123690808Open ↗
07/25/2023123658407Open ↗
Showing 3 of 18 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)4
08/27/2023123690808Open ↗
08/27/2023123865077Open ↗
04/28/2023123658407Open ↗
Showing 3 of 4 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
08/27/2023123690808Open ↗
08/27/2023123865077Open ↗
▸BISMECHANICAL SYSTEMS1
04/28/2023123658407Open ↗
▸Approvals, Objections & Sign-offs88
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST45
09/28/2023123865077Open ↗
09/28/2023123690808Open ↗
07/25/2023123658407Open ↗
Showing 3 of 45 on file for this type
▸BISADMINISTRATIVE OBJECTIONS28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
10/27/2023123854187Open ↗
06/21/2023123854187Open ↗
06/20/2023123854187Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL3
08/27/2023123690808Open ↗
08/27/2023123865077Open ↗
08/08/2022123658407Open ↗
▸Cost, Insurance & Ownership102
▸BISCOST AFFIDAVIT88
02/23/2022123844288Open ↗
11/23/2021123844288Open ↗
10/18/2021140991434Open ↗
Showing 3 of 88 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW38
09/28/2023123865077Open ↗
09/28/2023123690808Open ↗
06/08/2023104141527Open ↗
Showing 3 of 8 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST2
01/11/2021123867592Open ↗
01/04/2021123867592Open ↗
▸Filing & Intake Forms119
▸BISEFILING COVER SHEET49
05/08/2020123909155Open ↗
01/31/2020123854187Open ↗
12/30/2019123867592Open ↗
Showing 3 of 49 on file for this type
▸BISBOROUGH INTAKE FORM33
04/28/2022123690808Open ↗
03/18/2022123690808Open ↗
09/20/2021123844288Open ↗
Showing 3 of 33 on file for this type
▸BISADDITIONAL INFORMATION30
11/03/2023123854187Open ↗
03/16/2021123711199Open ↗
02/09/2021123844288Open ↗
Showing 3 of 30 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
12/18/2020140991434Open ↗
Showing 1 of 7 on file for this type
▸Other Documents23
▸DOB NOWPro Cert Restriction Exception (LL158/17)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSupporting Document: Fee Exempt4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
02/24/2022123844288Open ↗
06/08/2021123844288Open ↗
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type