← Back
Miscellaneous two family
183 29 STREET
BROOKLYN · BIN 3009821
💬 Discuss this project
1905Year Built
2Stories
B9Building Class
R6BZoning
2,394 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Miscellaneous two family · 1,783 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAMANN ENGINEERING, PLLC203/03/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOMCHRIS CONTRACTING CORPGeneral Contractor107/08/2026
Z.W. PLBG & HTG CORPPlumbing107/08/2026
Building Lifecycle
All (12)Filed (2)Permit Issued (2)Signed Off (2)Violation (3)Inspection (2)Special Inspection (1)
07/01/2025
Signed off — Alteration
B01185393-S1
07/01/2025
Signed off — Alteration
B01185393-I1
06/05/2025
Violation issued (ECB, closed)
Unknown
06/05/2025
Violation issued (ECB, open)
Unknown
05/29/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/20/2025
Permit issued — Plumbing
B01185393-S1-PL
05/13/2025
Permit issued — General Construction
B01185393-I1-GC
03/03/2025
Filed — Alteration
B01185393-S1
03/03/2025
Filed — Alteration
B01185393-I1
02/28/2025
Special inspection requirement — Final
CARL HAMANN
09/26/2003
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZ.W. PLBG & HTG CORP05/20/2025
DOB NOWGeneral ConstructionSigned-offTOMCHRIS CONTRACTING CORP05/13/2025
2 projects · most recent 07/30/2025
HVAC Wiring
FiledStatusContractorScope
07/30/2025CompleteA & S MASTER ELEC'L CORPHVAC Wiring
07/14/2025CancelledA & S MASTER ELEC'L CORPHVAC Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
02/28/2025FinalCARL HAMANNprogress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026B01185393-S1Request digital key ↗
08/22/2026B01185393-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B01185393-S1Open ↗
08/13/2026B01185393-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026B01185393-I1Open ↗