Elevator apt, semi-fireproof without stores
184 JORALEMON STREET
BROOKLYN · Brooklyn Heights · BIN 3002547
💬 Discuss this project
1911Year Built
12Stories
D1Building Class
C5-2AZoning
27,732 sfGross Floor Area
24Units
LL97 CoveredRent Stabilized6 Open Violations 5 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 184 JORALEMON LLC · 2,519 sf lot · 11.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Roof8p · 3 filings · 10 docs
Floor 107p · 2 filings · 11 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exterior33p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI BOROUGH SCAFFOLDING1907/08/2026
184 JORALEMON803/22/2026
SILVERCUP SCAFFOLDING 1503/21/2026
BROOKLYN LAW SCHOOL503/21/2026
TALICO CONTRACTING303/21/2026
184 JORALEMON STREET303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.202/13/2023
LANE ENGINEERING CONSULTING, P.C.201/27/2023
KZ ENGINEERING, P.C607/07/2022
SRL ASSOCIATES311/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY BUILDING CONSULTANTS903/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
RICHARD MORTMAN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI BOROUGH SCAFFOLDINGGeneral Contractor3007/08/2026
E & S AND SONS CORPGeneral Contractor707/08/2026
THE METRO GROUP PLBG LLCPlumbing207/08/2026
TORRES IVANElectrical103/21/2026
THE METRO GROUP, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808102/13/2023
LANE ENGINEERING CONSULTI2967201/27/2023
Building Lifecycle
All (130)Filed (13)Permit Issued (22)Signed Off (6)Facade (FISP) (15)Violation (60)Inspection (1)Special Inspection (13)
05/05/2026
Violation issued (HPD, open)
A
02/27/2026
Signed off — Alteration
B01178393-I1
06/13/2025
Cycle 10 facade report submitted
06/13/2025
Cycle 10 facade report signed — SWARMP
05/15/2025
Cycle 10 facade inspection completed
03/26/2025
Violation issued (FDNY_NOV, closed)
03/26/2025
Violation issued (FDNY_NOV, closed)
02/28/2025
Permit issued — Suspended Scaffold
B01178393-I1-SC
02/25/2025
Filed — Alteration
B01178393-I1
09/11/2024
Violation issued (FDNY_NOV, closed)
09/11/2024
Violation issued (FDNY_NOV, closed)
05/13/2024
Violation issued (HPD, closed)
B
05/13/2024
Violation issued (HPD, closed)
C
02/02/2024
Permit issued — Plumbing
B00815238-I1-PL
09/20/2023
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00614086-I1
07/19/2023
Signed off — Alteration
Installation of temporary roof protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00740063-I1
07/19/2023
Signed off — Alteration
B00074270-I1
06/22/2023
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00074265-I1
06/13/2023
Violation issued (ECB, closed)
Construction
06/13/2023
Violation issued (ECB, closed)
Construction
06/13/2023
Violation issued (ECB, closed)
Construction
05/31/2023
Permit issued — Sidewalk Shed
B00074265-I1-SH
05/25/2023
Cycle 9 facade report submitted
05/25/2023
Cycle 9 facade inspection completed
05/24/2023
Cycle 9 facade report signed — SAFE
05/02/2023
Signed off — Alteration
B00506765-I1
03/23/2023
Violation issued (ECB, closed)
Construction
03/13/2023
Permit issued — General Construction
B00506765-I1-GC
03/10/2023
Cycle 7 facade report signed — SAFE
02/27/2023
Special inspection requirement — Final
Douglas Lane
02/27/2023
Special inspection requirement — Air barrier - visual inspection
Douglas Lane
02/27/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Douglas Lane
02/27/2023
Special inspection requirement — Masonry
Douglas Lane
02/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Douglas Lane
02/23/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/22/2023
Permit issued — Plumbing
B00815238-I1-PL
02/16/2023
Permit issued — Mechanical Systems
B00815228-I1-MS
02/13/2023
Filed — Alteration
REPLACE WALL-MOUNTED GAS-FIRED FURNACE IN APT. 10B AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00815228-I1
02/13/2023
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT WALL-MOUNTED GAS-FIRED FURNACE IN APT. 10B AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00815238-I1
02/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
01/27/2023
Filed — Alteration
B00506765-P1
01/23/2023
Special inspection requirement — Air barrier - visual inspection
Douglas Lane
01/23/2023
Special inspection requirement — Energy Code Compliance Inspections
Douglas Lane
01/23/2023
Special inspection requirement — Final
Douglas Lane
01/23/2023
Special inspection requirement — Masonry
Douglas Lane
01/23/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Douglas Lane
01/19/2023
Special inspection requirement — Final
Joseph Bazini
01/19/2023
Special inspection requirement — Mechanical Systems
Joseph Bazini
01/17/2023
Violation issued (ECB, closed)
Construction
01/11/2023
Cycle 7 facade inspection completed
12/16/2022
Violation issued (ECB, closed)
Local Law
11/04/2022
Violation issued (HPD, closed)
I
09/26/2022
Permit issued — Supported Scaffold
B00614086-I1-SF
07/07/2022
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00074265-P2
07/07/2022
Filed — Alteration
Installation of temporary roof protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00740063-P1
06/01/2022
Filed — Alteration
Installation of temporary roof protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00740063-I1
06/01/2022
Permit issued — Protection and Mechanical Methods
B00740063-I1-PM
05/31/2022
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00074265-P1
04/01/2022
Permit issued — Sidewalk Shed
B00074265-I1-SH
03/30/2022
Permit issued — General Construction
B00506765-I1-GC
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM02/28/2025
DOB NOWPlumbingPermit IssuedTHE METRO GROUP PLBG LLC02/02/2024
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING05/31/2023
DOB NOWGeneral ConstructionSigned-offE S SONS03/13/2023
DOB NOWPlumbingPermit IssuedTHE METRO GROUP PLBG LLC02/22/2023
DOB NOWMechanical SystemsPermit IssuedTHE METRO GROUP, INC02/16/2023
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING09/26/2022
DOB NOWProtection and Mechanical MethodsSigned-offTRI BOROUGH SCAFFOLDING06/01/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING04/01/2022
DOB NOWGeneral ConstructionSigned-offE S SONS03/30/2022
DOB NOWGeneral ConstructionSigned-offE S SONS12/14/2021
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING10/25/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING10/18/2021
DOB NOWGeneral ConstructionSigned-offE S SONS07/01/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING04/02/2020
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING04/01/2020
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING03/29/2019
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING03/29/2019
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING11/28/2018
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING11/27/2018
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING09/06/2018
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING09/04/2018
BISEQISSUEDPRESERV BLD RESTOR MGT IN02/10/2020
BISOTISSUEDPRESERV BLD RESTOR MGT IN10/09/2019
BISOTISSUEDPRESERV BLD RESTOR MGT IN04/05/2019
BISEQISSUEDTALICO CONTRACTING INC08/01/2018
BISEQISSUEDTALICO CONTRACTING INC08/01/2017
BISEQISSUEDTALICO CONTRACTING INC06/28/2016
BISPLISSUEDG.N.T. MECHANICAL, LLC05/04/2015
BISOTISSUEDNY1 SARPANCH CONSTRUCTION02/25/2015
BISPLISSUEDG.N.T. MECHANICAL, LLC05/19/2014
BISPLISSUEDG.N.T. MECHANICAL, LLC05/28/2013
BISEQISSUEDSILVERCUP SCAFFOLDING 1 L05/07/2013
BISEQISSUEDSILVERCUP SCAFFOLDING 1 L04/17/2013
BISMHISSUEDE & S AND SONS CORP09/19/2012
BISPLISSUEDG.N.T. MECHANICAL, LLC05/18/2012
BISOTISSUEDE & S AND SONS CORP05/10/2012
BISOTISSUEDE & S AND SONS CORP12/29/2011
BISEQISSUEDJERRICK ASSOCIATES INC03/05/2008
BISEQISSUEDJERRICK WATERPROOFING CO INC04/13/2001
+ 7 more permits on file
1 project · most recent 02/13/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/13/2023Permit IssuedTHE METRO GROUP, INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
National Comfort CPG42364-U 22,000 BTU · Rooftop Unit ×1
Heating
National Comfort CPG42364-U 64,000 BTU · Rooftop Unit ×1
Ventilation
National Comfort CPG42364-U 850 CFM · Rooftop Unit ×1
1 project · most recent 08/29/2018
FiledStatusContractorScope
08/29/2018CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/23/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
02/27/2023FinalDouglas Laneprogress
02/27/2023Air barrier - visual inspectionDouglas Laneenergy_progress
02/27/2023Structural Stability – Alterations of existing buildingsDouglas Lanespecial
02/27/2023MasonryDouglas Lanespecial
02/27/2023Energy Code Compliance InspectionsDouglas Laneprogress
02/13/2023HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
01/23/2023Air barrier - visual inspectionDouglas Laneenergy_progress
01/23/2023Energy Code Compliance InspectionsDouglas Laneprogress
01/23/2023FinalDouglas Laneprogress
01/23/2023MasonryDouglas Lanespecial
01/23/2023Structural Stability – Alterations of existing buildingsDouglas Lanespecial
01/19/2023FinalJoseph Baziniprogress
01/19/2023Mechanical SystemsJoseph Bazinispecial
▾Documents — 210 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch12
09/02/2026B00074265-I1Request digital key ↗
09/02/2026B00074270-I1Request digital key ↗
09/01/2026B00506765-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/02/2026B00074265-P1Request digital key ↗
09/02/2026B00074265-P2Request digital key ↗
09/02/2026B00074265-I1Request digital key ↗
▸Applications & Permits39
▸BISPLAN / WORK APPROVAL APPLICATION18
05/05/2020321677690Open ↗
02/07/2020340716817Open ↗
02/06/2018321677690Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION17
02/07/2020340716817Open ↗
10/09/2019321677690Open ↗
04/08/2019321677690Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWLPC Approval/Permit4
08/13/2026B00815228-I1Open ↗
08/13/2026B00506765-P1Open ↗
08/13/2026B00815238-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications56
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
04/08/2019321677690Open ↗
09/02/2016320580652Open ↗
07/29/2016320415047Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/02/2026B00074265-P2Open ↗
09/02/2026B00074265-I1Open ↗
09/02/2026B00074265-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/25/2026B00506765-I1Open ↗
08/25/2026B00506765-I1Open ↗
08/25/2026B00506765-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/25/2026B00506765-I1Open ↗
08/25/2026B00506765-I1Open ↗
08/23/2026B00506765-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
05/09/2013320536121Open ↗
04/19/2013320564171Open ↗
01/09/2012320415047Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
05/09/2013320536121Open ↗
04/19/2013320564171Open ↗
01/09/2012320415047Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/07/2020340716817Open ↗
06/15/2016340391613Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/07/2020340716817Open ↗
06/15/2016340391613Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/07/2020340716817Open ↗
06/15/2016340391613Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING4
07/15/2014320415047Open ↗
05/08/2012320415047Open ↗
04/18/2012320415047Open ↗
Showing 3 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
09/22/2016320821722Open ↗
09/22/2016320821722Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/20/2014320415047Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
11/02/2017321677690Open ↗
02/07/2020340716817Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026B00074265-P2Open ↗
08/13/2026B00074265-P1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00506765-P1Open ↗
09/01/2026B00506765-I1Open ↗
08/27/2026B00815238-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
11/02/2017321677690Open ↗
05/09/2013320536121Open ↗
12/01/2012320580652Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/03/2008310102402Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/09/2012320415047Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
06/03/2013320536121Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/06/2018321677690Open ↗
11/02/2017321677690Open ↗
12/01/2012320580652Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
10/29/2020321677690Open ↗
09/22/2016320821722Open ↗
09/02/2016320580652Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00506765-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
11/12/2020321677690Open ↗
11/02/2020321677690Open ↗
11/02/2020321677690Open ↗
Showing 3 of 6 on file for this type
▸BISSTRUCTURAL STEEL - WELDING1
07/15/2020321677690Open ↗
▸BISMASONRY1
07/15/2020321677690Open ↗
▸Approvals, Objections & Sign-offs31
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
11/12/2020321677690Open ↗
11/12/2020321677690Open ↗
11/02/2020321677690Open ↗
Showing 3 of 13 on file for this type
▸BISLANDMARKS APPROVAL8
02/07/2020340716817Open ↗
02/06/2018321677690Open ↗
09/02/2016320580652Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
12/20/2013320821722Open ↗
05/09/2013320536121Open ↗
04/19/2013320564171Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/31/2012320415047Open ↗
08/06/2012320415047Open ↗
▸BISSHED LETTER1
08/02/2017340391613Open ↗
▸BISLANDMARKS SIGNOFF1
10/29/2020321677690Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT15
10/29/2020321677690Open ↗
06/17/2020321677690Open ↗
02/06/2018321677690Open ↗
Showing 3 of 15 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
07/28/2016320415047Open ↗
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET7
11/02/2017321677690Open ↗
12/20/2013320821722Open ↗
05/08/2013320536121Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION7
07/15/2020321677690Open ↗
07/14/2020321677690Open ↗
06/17/2020321677690Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/07/2020340716817Open ↗
06/15/2016340391613Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026B01178393-I1Open ↗