| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01048429 ↗ | 33 UNION SQUARE MANHATTAN | Alteration | Permit Issued | 07/29/2024 | 09/23/2026 | Design THOMAS RAEL | GENERAL CONSTRUCTION WORK INCLUDING DEMO OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS, CEILINGS FLOORS 1-10 AS SHOWN ON PLA… |
| M00603579 ↗ | 78 READE STREET MANHATTAN | Alteration | Permit Issued | 03/14/2023 | 05/27/2026 | Design TSF ENGINEERING, PC | MECHANICAL WORK ON FLOORS CELLAR, 001 THRU 005 & ROOF AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS… |
| B00501348 ↗ | 447 FULTON STREET BROOKLYN | Alteration | Signed-off | 08/26/2022 | 05/21/2026 | Design SDG ENGINEERING PC Filer SDG ENGINEERING PC | New elevator shaft |
| B00468028 ↗ | 80 WILLOUGHBY STREET BROOKLYN | Alteration | Permit Issued | 04/16/2021 | 05/20/2026 | HEREWITH FILING GENERAL CONSTRUCTION WORK ON FLOORS 009,010 & ROOF AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | |
| M01018854 ↗ | 83 CHAMBERS STREET MANHATTAN | Alteration | Permit Issued | 05/07/2024 | 05/20/2026 | Design SDG ENGINEERING PC | STRUCTURAL WORK IN CONJUCTION WITH ALT-1 123700637 |
| M01018862 ↗ | 83 CHAMBERS STREET MANHATTAN | Alteration | Permit Issued | 05/17/2024 | 05/20/2026 | Design TSF ENGINEERING, PC | MECHANICAL WORK AND HVAC UNIT INSTALLATION IN CONJUCTION WITH ALT-1 APPLICATION 123700637 |
| Name | Projects together | Most recent |
|---|---|---|
| DAVID TURNER ARCHITECT PC | 12 | 08/05/2024 |
| SDG ENGINEERING PC | 11 | 07/16/2025 |
| NEW YORK DESIGN ARCHITECTS, LLP | 10 | 04/22/2026 |
| TSF ENGINEERING, PC | 10 | 06/11/2026 |
| COSTA ARCH & ENG LLP | 6 | 09/08/2022 |
| H & O ENGINEERING, DPC | 3 | 05/20/2020 |
| ABS ENGINEERING, PLLC | 2 | 02/19/2021 |
| ACTIVE DESIGN GROUP ENGINEERING | 2 | 12/16/2020 |
| AM ARCHITECT P.C. | 2 | 11/05/2019 |
| DIPROPERZIO & MALLIA ARCHITECTS,LLP | 2 | 04/16/2021 |
| PKSB ARCHITECTS, PC | 2 | 11/30/2022 |
| AR Figueroa Architect LLC | 1 | 03/20/2023 |
| ASIF JAMIL, RA | 1 | 07/17/2019 |
| CONCEPT DESIGN GROUP | 1 | 02/06/2025 |
| DEREK ZIEMER ARCHITECTURE, PLLC | 1 | 01/09/2023 |
| FISKAA ENGINEERING | 1 | 11/16/2022 |
| GAMILL ENGINEERING, P.C | 1 | 10/17/2022 |
| HKC ENGINEERING P.C. | 1 | 02/06/2025 |
| LANE ENGINEERING CONSULTING, P.C. | 1 | 01/27/2023 |
| NAZZARENO CALLIPO P.E. | 1 | 03/30/2026 |
| PAKNIA ENGINEERING, PC | 1 | 05/19/2026 |
| PRUDIGM ENGINEERING LLC | 1 | 03/30/2026 |
| SHALAT ARCHITECTS P.C. | 1 | 05/12/2026 |
| STEVEN PAUL HAMMER | 1 | 05/11/2022 |
| T. LAPORTA ARCHITECT | 1 | 06/27/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| CELTIC SERVICES NYC INC | 4 | 12/20/2022 |
| M&R CONSTRUCTION GROUP IN | 4 | 06/11/2026 |
| ALL CITY REMODELING, INC | 1 | 12/16/2020 |
| ASE HVAC INC | 1 | 03/20/2023 |
| CUSTOM COMMERCIAL CONSTRU | 1 | 02/06/2025 |
| DUPRAT CONSTRUCTION CORP | 1 | 03/20/2023 |
| G.N.T. MECHANICAL LLC | 1 | 02/06/2025 |
| GINOS GC CORP | 1 | 07/17/2019 |
| J. CAIAZZO PLBG & HTG COR | 1 | 02/06/2025 |
| JAT CONSTRUCTION GROUP IN | 1 | 04/04/2025 |
| MJM ASSOCIATES CONSTR LLC | 1 | 12/16/2020 |
| TMG CONSTRUCTION CORP | 1 | 01/09/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| 1571-1573 THIRD AVENUE LLC | 1 | 02/06/2025 |
| 557 ATLANTIC OWNERS LLC | 1 | 01/11/2022 |
| ALLIED PROPERTY GROUP | 1 | 02/19/2021 |
| DAVID TURNER ARCHITECT, P.C | 1 | 08/05/2024 |
| EDDIE | 1 | 04/04/2025 |
| G.N.T MECHANICAL LLC | 1 | 10/17/2022 |
| MACK EDGE MGMT LLC | 1 | 06/29/2021 |
| THE BRODSKY ORGANIZATION | 1 | 03/30/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| OUTSOURCE CONSULTANTS, INC. | 18 | 06/11/2026 |
| COSTA ARCHITECTURE & ENGINEERING LL | 6 | 09/08/2022 |
| NEW YORK DESIGN ARCHITECT LLP | 6 | 08/28/2023 |
| CDEM,CORP | 1 | 01/16/2023 |
| CONCEPT DESIGN GROUP | 1 | 02/06/2025 |
| CONVERSANO ASSOCIATES, INC. | 1 | 04/04/2025 |
| GAMILL ENGINEERING, PC | 1 | 10/17/2022 |
| GZ NC CODE PLANNING ENGINEERING | 1 | 03/30/2026 |
| PAKNIA ENGINEERING & ARCHITECTURE, | 1 | 05/19/2026 |
| SDG ENGINEERING PC | 1 | 08/26/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01048429 ↗ | 33 UNION SQUARE MANHATTAN | Alteration | Permit Issued | 07/29/2024 | 09/23/2026 | Design THOMAS RAEL | GENERAL CONSTRUCTION WORK INCLUDING DEMO OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, FINISHES, DOORS, CEILINGS FLOORS 1-10 AS SHOWN ON PLA… |
| M00603579 ↗ | 78 READE STREET MANHATTAN | Alteration | Permit Issued | 03/14/2023 | 05/27/2026 | Design TSF ENGINEERING, PC | MECHANICAL WORK ON FLOORS CELLAR, 001 THRU 005 & ROOF AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS… |
| B00501348 ↗ | 447 FULTON STREET BROOKLYN | Alteration | Signed-off | 08/26/2022 | 05/21/2026 | Design SDG ENGINEERING PC Filer SDG ENGINEERING PC | New elevator shaft |
| B00468028 ↗ | 80 WILLOUGHBY STREET BROOKLYN | Alteration | Permit Issued | 04/16/2021 | 05/20/2026 | HEREWITH FILING GENERAL CONSTRUCTION WORK ON FLOORS 009,010 & ROOF AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | |
| M01018854 ↗ | 83 CHAMBERS STREET MANHATTAN | Alteration | Permit Issued | 05/07/2024 | 05/20/2026 | Design SDG ENGINEERING PC | STRUCTURAL WORK IN CONJUCTION WITH ALT-1 123700637 |
| M01018862 ↗ | 83 CHAMBERS STREET MANHATTAN | Alteration | Permit Issued | 05/17/2024 | 05/20/2026 | Design TSF ENGINEERING, PC | MECHANICAL WORK AND HVAC UNIT INSTALLATION IN CONJUCTION WITH ALT-1 APPLICATION 123700637 |
| M01018873 ↗ | 85 CHAMBERS STREET MANHATTAN | Alteration | Permit Issued | 05/07/2024 | 05/20/2026 | Design SDG ENGINEERING PC | STRUCTURAL WORK IN CONJUCTION WITH ALT-1 APPLICATION - 123700628 |
| B00466409 ↗ | 80 WILLOUGHBY STREET BROOKLYN | Alteration | Permit Issued | 04/02/2021 | 05/19/2026 | Design TSF ENGINEERING, PC | MECHANICAL WORK ON FLOORS CELLAR THRU ROOF AS INDICATED ON PLANS FILED HEREWITH. EXISTING KITCHEN EQUIPMENT UNDER 301107825 & KITCHEN VENTIL… |
| M01018875 ↗ | 85 CHAMBERS STREET MANHATTAN | Alteration | Permit Issued | 05/17/2024 | 05/19/2026 | Design TSF ENGINEERING, PC | MECHANICAL DUCT WORK AND UNIT INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| M01048510 ↗ | 33 UNION SQUARE MANHATTAN | Alteration | Permit Issued | 10/14/2024 | 05/19/2026 | Design SDG ENGINEERING PC | STRUCTURAL WORK RELATED TO ROOFTOP SUPPORT DUNNAGE AND FIRE ESCAPE BRIDGE FRAMING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICAT… |
| M01068652 ↗ | 33 UNION SQUARE MANHATTAN | Alteration | Permit Issued | 11/08/2024 | 05/19/2026 | Design TSF ENGINEERING, PC | MECHANICAL WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| M01371765 ↗ | 45 WEST 67 STREET MANHATTAN | Alteration | Permit Issued | 03/26/2026 | 05/19/2026 | Design NAZZARENO CALLIPO P.E. Owner THE BRODSKY ORGANIZATION | RENOVATION OF EXISTING FIRST FLOOR EATING AND DRINKING ESTABLISHMENT. WORK TO INCLUDE NON STRUCTURAL DEMOTION, PARTIAL CEILING REPLACEMENT, … |
| B00465673 ↗ | 447 FULTON STREET BROOKLYN | Alteration | Permit Issued | 02/17/2021 | 05/13/2026 | Removal of some of the partitions and ceilings | |
| M00506851 ↗ | 78 READE STREET MANHATTAN | Alteration | Permit Issued | 07/26/2021 | 04/02/2026 | Design COSTA ARCH & ENG LLP | herewith filing application for interior renovation of Apt.2D for work including minor demo and interior build-out of partitions. Plumbing a… |
| M00507022 ↗ | 78 READE STREET MANHATTAN | Alteration | Permit Issued | 05/04/2021 | 04/02/2026 | Design COSTA ARCH & ENG LLP | herewith filing application for interior renovation of Apt.2A with work to include Minor Demo and Build-Out of partitions. Plumbing and Mech… |
| M00507099 ↗ | 78 READE STREET MANHATTAN | Alteration | Permit Issued | 05/04/2021 | 04/02/2026 | Design COSTA ARCH & ENG LLP | herewith filing application for interior renovation of Apt.3A with work to include Minor Demo and Build-Out of partitions. Plumbing and Mech… |
| M00655284 ↗ | 78 READE STREET MANHATTAN | Alteration | Permit Issued | 04/18/2022 | 04/02/2026 | Design SDG ENGINEERING PC | HEREWITH FILING OF STRUCTURAL APPLICATION FOR DEMO WORK ON 1ST FLOOR, NEW FRAMING AND ADD NEW ROOF DUNAGE AS INDICATED ON PLANS FILED HEREWI… |
| M00507056 ↗ | 78 READE STREET MANHATTAN | Alteration | Permit Issued | 05/04/2021 | 04/01/2026 | Design COSTA ARCH & ENG LLP | herewith filing application for interior renovation of Apt.2B with work to include Minor Demo and Build-Out of partitions. Plumbing and Mech… |
| M00507079 ↗ | 78 READE STREET MANHATTAN | Alteration | Permit Issued | 05/04/2021 | 04/01/2026 | Design COSTA ARCH & ENG LLP | herewith filing application for interior renovation of Apt.2C with work to include Minor Demo and Build-Out of partitions. Plumbing and Mech… |
| M00507134 ↗ | 78 READE STREET MANHATTAN | Alteration | Permit Issued | 05/04/2021 | 04/01/2026 | Design COSTA ARCH & ENG LLP | herewith filing application for interior renovation of Apt.3D with work to include Minor Demo and Build-Out of partitions. |
| M00542013 ↗ | 78 READE STREET MANHATTAN | Alteration | Permit Issued | 08/18/2021 | 04/01/2026 | Design DAVID TURNER ARCHITECT PC | Modifications to interior partitions |
| M00655178 ↗ | 78 READE STREET MANHATTAN | Alteration | Permit Issued | 04/20/2022 | 04/01/2026 | Design PKSB ARCHITECTS, PC | HEREWITH FILING OF GENERAL CONSTRUCTION APPLICATION THAT INCLUDES GROUND FLOOR AND STOREFRONT DEMO AND NEW PARTIONS AS INDICATED ON PLANS FI… |
| B00850704 ↗ | 447 FULTON STREET BROOKLYN | Alteration | Permit Issued | 05/23/2023 | 03/02/2026 | Installation of new interior partitions at the second floor including new elevator lobby. No change to use or occupancy. | |
| 121937903BIS | 31 EAST 126 STREET MANHATTAN | — | ISSUED | 12/23/2015 | 12/29/2025 | — | PL |
| 100494617BIS | 38 WALKER STREET MANHATTAN | — | ISSUED | 06/08/2001 | 09/25/2025 | — | — |
| 100497375BIS | 166 DELANCEY STREET MANHATTAN | — | ISSUED | 09/22/1999 | 08/26/2025 | — | PL |
| 123700628BIS | 85 CHAMBERS STREET MANHATTAN | — | ISSUED | 08/19/2025 | 08/19/2025 | — | — |
| 123157341BIS | 65 SPRING STREET MANHATTAN | — | ISSUED | 04/17/2019 | 07/01/2025 | — | OT, PL |
| 123157350BIS | 65 SPRING STREET MANHATTAN | — | ISSUED | 04/18/2019 | 07/01/2025 | — | OT, PL |
| M01043961 ↗ | 166 DELANCEY STREET MANHATTAN | Alteration | Permit Issued | 05/02/2024 | 06/30/2025 | Design PAKNIA ENGINEERING, PC | Installation of 4 ton VRF system on roof and 2nd floor as per plans. Installation of 5 ton VRF system on roof and 6th floor and exhaust fan … |
| 123700637BIS | 83 CHAMBERS STREET MANHATTAN | — | ISSUED | 06/12/2025 | 06/12/2025 | — | — |
| 123725781BIS | 357 CANAL STREET MANHATTAN | — | ISSUED | 03/04/2021 | 06/03/2025 | — | OT |
| 100495359BIS | 357 CANAL STREET MANHATTAN | — | ISSUED | 11/17/1998 | 05/20/2025 | — | PL |
| M00661883 ↗ | 65 SPRING STREET MANHATTAN | Alteration | Permit Issued | 10/18/2022 | 05/13/2025 | Design SDG ENGINEERING PC | HEREWITH FILING OF STRUCTURAL WORK ON FLOORS 002 AND 003 IN RELATION TO ALT-1 APPLICATION M00662024-I1 AS INDICATED ON PLANS FILED HEREWIT… |
| M00662024 ↗ | 65 SPRING STREET MANHATTAN | Alteration CO | Permit Issued | 03/11/2022 | 05/13/2025 | Design SHALAT ARCHITECTS P.C. | ALT-1 APPLICATION FOR HORIZONTAL EXTENSION ON REAR YARD AT FIRST FLOOR INCLUDING A NEW EGRESS STAIR AND INTERIOR RENOVATION ON CEL, 001 AND … |
| M00725331 ↗ | 65 SPRING STREET MANHATTAN | Alteration | Signed-off | 05/16/2022 | 05/13/2025 | Design SDG ENGINEERING PC | HEREWITH FILING OF SOE APPLICATION IN CNJUCTIONS WITH ALT-1 APPLICATION - M00661614-I1 FOR INSTALLATION OF REQUIRED SHORING OF REAR YARD L… |
| M00795381 ↗ | 357 CANAL STREET MANHATTAN | Alteration | Signed-off | 04/17/2023 | 05/13/2025 | Design TSF ENGINEERING, PC | MECHANICAL WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| M00844083 ↗ | 357 CANAL STREET MANHATTAN | Alteration | Signed-off | 03/28/2023 | 05/13/2025 | Design SDG ENGINEERING PC | STRUCTURAL WORK RELATED TO ROOFTOP DUNNAGE AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPICATION |
| M00528980 ↗ | 147 SPRING STREET MANHATTAN | Alteration | Signed-off | 06/24/2022 | 05/12/2025 | Design SDG ENGINEERING PC Owner EDDIE | Filing herewith for the partial demolition and shoring work to install new elevator and stair from cellar to roof . Installation of CMU shaf… |
| 104715676BIS | 78 READE STREET MANHATTAN | — | ISSUED | 06/09/2009 | 04/10/2025 | — | PL |
| 123726352BIS | 65 SPRING STREET MANHATTAN | — | ISSUED | 01/10/2020 | 04/09/2025 | — | OT |
| 140976139BIS | 327 CANAL STREET MANHATTAN | — | ISSUED | 10/14/2021 | 04/09/2025 | — | OT |
| 340757372BIS | 80 WILLOUGHBY STREET BROOKLYN | — | ISSUED | 12/02/2020 | 04/09/2025 | — | — |
| M00661764 ↗ | 65 SPRING STREET MANHATTAN | Alteration | Signed-off | 10/13/2022 | 03/27/2025 | Design TSF ENGINEERING, PC | MECHANICAL WORK ON CELLAR, FLOORS 001 & 004, AND ROOF IN CONJUNCTION WITH ALT 1 JOB# M00662024 AS PER PLANS FILED HEREWITH. |
| 321941761BIS | 523 FULTON STREET BROOKLYN | — | ISSUED | 05/14/2019 | 11/26/2024 | — | OT |
| 322038479BIS | 523 FULTON STREET BROOKLYN | — | ISSUED | 04/27/2020 | 11/26/2024 | — | OT |
| M00918649 ↗ | 1571 3 AVENUE MANHATTAN | Alteration | Signed-off | 09/01/2023 | 09/27/2024 | Design HKC ENGINEERING P.C. Filer CONCEPT DESIGN GROUP | Modifications to the plumbing system as per plans new fixtures. No change in use egress and occupancy. |
| M00801051 ↗ | 408 BROADWAY MANHATTAN | Alteration | Permit Issued | 12/20/2022 | 08/07/2024 | Design DAVID TURNER ARCHITECT PC | Removal of drywal partitions, ceiling tiles and floor tiles to creat an open office. |
| M01036673 ↗ | 327 CANAL STREET MANHATTAN | Alteration | Signed-off | 05/03/2024 | 06/20/2024 | Design DAVID TURNER ARCHITECT PC | INTERIOR RENOVATION WORK AS SHOWN ON PLANS FILED HERWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| 102670281BIS | 801 AVENUE OF THE AMER MANHATTAN | — | ISSUED | 08/11/2000 | 05/10/2024 | — | PL |
| 100499408BIS | 40 LISPENARD STREET MANHATTAN | — | ISSUED | 02/17/2004 | 04/23/2024 | — | PL |
| B00330482 ↗ | 523 FULTON STREET BROOKLYN | Alteration | Signed-off | 05/06/2020 | 04/09/2024 | Structural work consisting of new elevator shaft, framing & reinforcement as per plans filed herewith. | |
| 100495340BIS | 359 CANAL STREET MANHATTAN | — | ISSUED | 03/02/2006 | 03/07/2024 | — | PL |
| 100497384BIS | 361 CANAL STREET MANHATTAN | — | ISSUED | 11/16/1998 | 03/01/2024 | — | PL |
| B00517817 ↗ | 453 FULTON STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 12/15/2021 | 02/23/2024 | FILING FOR THE REAPPORTIONMENT OF (3) EXISTING LOTS INTO 1 ZONING & 1 TAX LOT. ALTERATION OF EXISTING BUILDINGS FROM (2) 4 STORY W/CELLAR B… | |
| B00464412 ↗ | 80 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 03/31/2021 | 02/21/2024 | Design SDG ENGINEERING PC | STRUCTURAL WORK ON 10TH FLOOR & ROOF AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B00517861 ↗ | 453 FULTON STREET BROOKLYN | Alteration | Signed-off | 07/06/2023 | 02/20/2024 | Design TSF ENGINEERING, PC | INSTALLATION OF NEW HVAC SYSTEM THROUGHOUT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M00259770 ↗ | 359 CANAL STREET MANHATTAN | Alteration | Signed-off | 09/21/2020 | 02/20/2024 | Design DAVID TURNER ARCHITECT PC Filer 4444 PPPP CORP | New heating and cooling split system for second and fourth floor loft apartments |
| M00259876 ↗ | 361 CANAL STREET MANHATTAN | Alteration | Signed-off | 09/21/2020 | 02/20/2024 | Design DAVID TURNER ARCHITECT PC Filer 4444 PPPP CORP | New split system HVAC for 2nd and 4th floor loft apartments |
| M00886729 ↗ | 71 SPRING STREET MANHATTAN | Alteration | Signed-off | 07/27/2023 | 02/20/2024 | New interior renovation at 3rd floor | |
| M00886752 ↗ | 71 SPRING STREET MANHATTAN | Alteration | Signed-off | 08/28/2023 | 02/20/2024 | Design TSF ENGINEERING, PC | Application filed for mechanical work on 3rd floor in tenant space. No change to use, egress, or occupancy. |
| B08031932 ↗ | 210 JORALEMON STREET BROOKLYN | Alteration | Permit Issued | 11/30/2022 | 01/23/2024 | Design PKSB ARCHITECTS, PC | GENERAL CONSTRUCTION WORK RELATED TO INSTALLATION OF NEW ELEVATOR, SERVICING 1ST FLOOR & 2ND FLOOR RETAIL TENANT. NO CHANGE IN USE, EGRESS O… |
| M00796600 ↗ | 446 BROADWAY MANHATTAN | Alteration | Signed-off | 08/25/2022 | 10/30/2023 | Design AR Figueroa Architect LLC | PROPOSED INTERIOR RENOVATION TO 1ST FLR RETAIL STORE NORTH. SCOPE OF WORK DOES NOT REQUIRE CHANGE IN OCCUPANCY, EGRESS, OR USE. |
| M00908530 ↗ | 375 CANAL STREET MANHATTAN | Alteration | Signed-off | 08/07/2023 | 08/24/2023 | Design DAVID TURNER ARCHITECT PC | Construction of a pizza store. |
| M00878978 ↗ | 1643 2 AVENUE MANHATTAN | Alteration | Permit Issued | 05/30/2023 | 08/02/2023 | Design DAVID TURNER ARCHITECT PC | Modifications to existing restaurant |
| B00759209 ↗ | 503 FULTON STREET BROOKLYN | Alteration | Signed-off | 06/27/2022 | 06/21/2023 | Design T. LAPORTA ARCHITECT | ALTERATION TO REMOVE EXISTING GYPSUM WALL PARTITION FOR EXISTING TENANT AND REPLACE WITH GLASS PARTITION. NO CHANGE IN OCCUPANCY, USE OR EGR… |
| M00748432 ↗ | 1627 BROADWAY MANHATTAN | Alteration | Permit Issued | 06/06/2022 | 05/17/2023 | Design DAVID TURNER ARCHITECT PC | Removal of nonbearing partitions in retail space |
| 121014204BIS | 449 BROADWAY MANHATTAN | — | ISSUED | 02/20/2013 | 05/11/2023 | — | PL |
| 321596714BIS | 461 FULTON STREET BROOKLYN | — | ISSUED | 04/21/2021 | 05/11/2023 | — | — |
| 322000794BIS | 885 FLATBUSH AVENUE BROOKLYN | — | ISSUED | 10/23/2019 | 05/11/2023 | — | OT |
| 322018311BIS | 885 FLATBUSH AVENUE BROOKLYN | — | ISSUED | 03/03/2020 | 05/11/2023 | — | OT |
| 140939117BIS | 1627 BROADWAY MANHATTAN | — | ISSUED | 03/21/2022 | 05/04/2023 | — | OT |
| B00538679 ↗ | 453 FULTON STREET BROOKLYN | Alteration | Signed-off | 01/05/2023 | 03/29/2023 | Design SDG ENGINEERING PC | INSTALL NEW 1ST FLOOR AND ROOF FRAMING IN CONJUNCTION WITH RENOVATION OF 1-STORY BLDG. |
| M00694702 ↗ | 296 CANAL STREET MANHATTAN | Alteration | Signed-off | 01/16/2023 | 03/29/2023 | Design TSF ENGINEERING, PC Filer CDEM,CORP | Filing for the legalization of 6 HVAC UNITS and steel dunnage repair on Roof. No change to use, occupancy, or egress. |
| B00457585 ↗ | 80 WILLOUGHBY STREET BROOKLYN | Alteration | Signed-off | 01/26/2021 | 03/13/2023 | PLANS HEREWITH FILED FOR MINOR PARTITION CHANGES ON FLOORS CELLAR THROUGH 8 ONLY, AND MODIFICATION OF TOILET ROOM TO BE HANDICAPPED ACCESSIB… | |
| B00506765 ↗ | 184 JORALEMON STREET BROOKLYN | Alteration | Signed-off | 06/14/2021 | 03/13/2023 | FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | |
| B08018603 ↗ | 187 OXFORD STREET BROOKLYN | Alteration CO | Permit Issued | 10/28/2022 | 02/28/2023 | Design DAVID TURNER ARCHITECT PC | Removal of basement kitchen as required to convert a two family house into a single family house. |
| M00743811 ↗ | 34 HOWARD STREET MANHATTAN | Alteration | Signed-off | 06/16/2022 | 01/10/2023 | INTERIOR RENOVATION OF EXISTING SECOND FLOOR COMMERCIAL TENANT SPACE AS PER PLANS. THERE IS NO INCREASE IN SIZE OR CHANGE IN USE, OCCUPANCY … | |
| 322020077BIS | 523 FULTON STREET BROOKLYN | — | ISSUED | 05/22/2020 | 10/31/2022 | — | — |
| B08020505 ↗ | 7901 6 AVENUE BROOKLYN | Alteration | Signed-off | 10/17/2022 | 10/27/2022 | Design GAMILL ENGINEERING, P.C Owner G.N.T MECHANICAL LLC Filer GAMILL ENGINEERING, PC | REMOVE NON-LOADBEARING PARTITIONS AND INFILL DOOR OPENINGS TO CHANGE FROM FROM 5 COMERCIAL UNITS TO 3 COMMERCIAL UNITS ON THE FIRST FLOOR. F… |
| B00594980 ↗ | 453 FULTON STREET BROOKLYN | Alteration | Signed-off | 10/13/2021 | 09/21/2022 | REMOVAL OF NON-LOAD BEARING PARTITIONS, FLOORING, CEILING, AND FINISHES ON ALL FLOORS. PROVIDE FALL PROTECTION AT STAIR OPENINGS. NO CHANG… | |
| B00594998 ↗ | 455 FULTON STREET BROOKLYN | Alteration | Signed-off | 10/13/2021 | 09/21/2022 | REMOVAL OF NON-LOAD BEARING PARTITIONS, FLOORING, CEILING, AND FINISHES ON ALL FLOORS. PROVIDE FALL PROTECTION AT STAIR OPENINGS PER OSHA R… | |
| M00736871 ↗ | 327 CANAL STREET MANHATTAN | Alteration | Signed-off | 07/25/2022 | 09/16/2022 | Design DAVID TURNER ARCHITECT PC | New HVAC units and ductwork throughout building. |
| 321431134BIS | 560 STATE STREET BROOKLYN | — | ISSUED | 07/09/2020 | 08/18/2022 | — | EQ, MH, OT, PL |
| B00721632 ↗ | 395 JAY STREET BROOKLYN | Alteration | Signed-off | 05/17/2022 | 07/14/2022 | Application is filed for the erection of a temporary construction fence for the replacement of an existing storefront assembly. No change to… | |
| B00691653 ↗ | 395 JAY STREET BROOKLYN | Alteration | Signed-off | 05/12/2022 | 06/27/2022 | EXISTING PARTIAL STOREFRONT TO BE REMOVED AND REPLACED WITH NEW AT SAME LOCATION. CLOSURE OF PORTIONS OF EXISTING PARTY WALL WITH ADJACENT B… | |
| M00736726 ↗ | 375 CANAL STREET MANHATTAN | Alteration | Permit Issued | 06/06/2022 | 06/15/2022 | Design DAVID TURNER ARCHITECT PC | Combination of 2 retail spaces into a single retail space |
| B00343039 ↗ | 461 FULTON STREET BROOKLYN | Alteration | Signed-off | 05/20/2020 | 06/14/2022 | Design H & O ENGINEERING, DPC | PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00601487 ↗ | 734 BROADWAY MANHATTAN | Alteration | Signed-off | 11/24/2021 | 05/19/2022 | Design TPG ARCHITECTURE, LLP | INTERIOR RENOVATION ON CELLAR AND 1ST FLOOR AS INDICATED ON PLANS |
| 321598909BIS | 100 WILLOUGHBY STREET BROOKLYN | — | ISSUED | 02/14/2022 | 02/14/2022 | — | — |
| B00644074 ↗ | 560 STATE STREET BROOKLYN | Alteration | Signed-off | 12/13/2021 | 02/07/2022 | Owner 557 ATLANTIC OWNERS LLC | APPLICATION FILED TO OBTAIN CERTIFICATES OF COMPLIANCE FOR EXISTING CONDENSING UNITS FOR EXISTING MIXED USE BUILDING.. ALL WORK PERFORMED U… |
| 102322504BIS | 799 AVENUE OF THE AMER MANHATTAN | — | ISSUED | 05/02/2001 | 02/01/2022 | — | PL |
| 123185383BIS | 734 BROADWAY MANHATTAN | — | ISSUED | 03/13/2018 | 11/01/2021 | — | EQ, PL |
| M00450799 ↗ | 71 SPRING STREET MANHATTAN | Alteration | Signed-off | 08/09/2021 | 10/08/2021 | APPLICATION IS FILED FOR EQUIPMENT USE PERMITS FOR NEW MECHANICAL UNITS AT 4TH FLOOR, 5TH FLOOR AND ROOF LEVEL AS PER PLANS, NO CHANGE IN EX… | |
| 123755007BIS | 325 CANAL STREET MANHATTAN | — | ISSUED | 06/28/2019 | 09/01/2021 | — | OT |
| M00535208 ↗ | 398 BLEECKER STREET MANHATTAN | Alteration | Signed-off | 06/29/2021 | 08/05/2021 | Design DAVID TURNER ARCHITECT PC Owner MACK EDGE MGMT LLC | Renovation of apartment 1-E on the first floor |
| 123874003BIS | 65 SPRING STREET MANHATTAN | — | ISSUED | 08/13/2020 | 07/14/2021 | — | OT |
| B00290601 ↗ | 461 FULTON STREET BROOKLYN | Alteration | Signed-off | 03/03/2020 | 04/19/2021 | Design FISKAA ENGINEERING | INSTALLATION OF NEW MECHANICAL SYSTEM IN CONJUNCTION WITH NEW BUILDING 321596714 ON CELLAR, 001, 002 & ROOF AS PER PLANS FILED HEREWITH. |
| B00343014 ↗ | 461 FULTON STREET BROOKLYN | Alteration | Permit Issued | 05/20/2020 | 04/19/2021 | Design H & O ENGINEERING, DPC | PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B00343025 ↗ | 461 FULTON STREET BROOKLYN | Alteration | Permit Issued | 05/20/2020 | 04/19/2021 | Design H & O ENGINEERING, DPC | PROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |