Parochial school, yeshiva
Bais Yakov of Dkhal Adas Yereim
184 NOSTRAND AVENUE · BIN 3048591
💬 Discuss this project
2021Year Built
3Stories
W2Building Class
M1-2Zoning
71,075 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Parochial school, yeshiva · 21,481 sf lot · 3.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionEquipmentGeneral
Roof5p · 5 filings · 20 docs
Floor 31p · 1 filing · 17 docs
Floor 22p · 1 filing · 8 docs
Floor 11p · 1 filing · 7 docs
Cellar1p · 1 filing · 3 docs
Basement3p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B T GENERAL BUILDERS1003/22/2026
PREFERED GC GROUP INC803/22/2026
PREFERRED GC GROUP INC 1203/22/2026
GENERAL BUILDERS INC B T103/22/2026
VAN BARLUM CLOSURES INC.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES803/21/2026
JAY ARCHITECT ENGINEERING DPC303/21/2026
AE DESIGN SOLUTION1803/21/2026
BAC Developers Group703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTRAL SCAFFOLD & HOISTGeneral Contractor2007/08/2026
PREFERRED GC GROUP INCGeneral Contractor1007/08/2026
B T GENERAL BUILDERS INCGeneral Contractor603/22/2026
STAR ELECL CONTRACTORS C 003267General Contractor303/22/2026
STUDIO GALLOSGeneral Contractor203/22/2026
B T GENERAL BUILDERS INCGeneral Contractor107/08/2026
WAILOON WONGElectrical103/21/2026
TRISTATE FIRE SPRINK INCFire Protection107/08/2026
FRIED ELECTRIC CO.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECNICO SPECIAL INSPECTIO5939708/22/2022
AR-TECH ENGINEERING, P.C.6659201/21/2022
Building Lifecycle
All (213)Filed (30)Permit Issued (19)Signed Off (10)Violation (59)Inspection (5)Objection (60)Special Inspection (30)
09/11/2026
Filed — Alteration
OCCUPANT PROTECTION PLAN FILED IN CONJUNCTION WITH ALT CO B01143991-I1.
B01455822-I1
09/09/2026
Objection resolved — Addressed
09/09/2026
Objection resolved — Addressed
09/03/2026
Special inspection requirement — Final
09/02/2026
Objection raised — Fire_Protection
09/02/2026
Objection raised — Mechanical
09/02/2026
Objection raised — Structural
09/02/2026
Objection raised — Structural
09/02/2026
Objection raised — Other
09/02/2026
Objection raised — Structural
09/02/2026
Objection raised — Inspections
09/02/2026
Objection raised — Inspections
09/02/2026
Objection raised — Inspections
09/02/2026
Objection raised — Fire_Protection
09/02/2026
Objection raised — Fire_Protection
08/20/2026
Filed — No Work
B01446832-I1
08/18/2026
Objection raised — Q-1
08/17/2026
Filed — Alteration
OCCUPANT PROTECTION PLAN FILED IN CONJUNCTION WITH ALT CO B01143991-I1.
B01444708-I1
08/17/2026
Objection resolved — Resolved
08/17/2026
Special inspection requirement — Public Assembly Emergency Lighting
Md Istiaque Hasan
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/12/2026
Special inspection requirement — Final
07/29/2026
Objection resolved — Resolved
07/29/2026
Objection resolved — Resolved
07/29/2026
Objection resolved — Resolved
07/29/2026
Objection resolved — Resolved
07/29/2026
Objection resolved — Resolved
07/29/2026
Objection resolved — Resolved
03/25/2026
Objection resolved — Addressed
03/04/2026
Objection resolved — Addressed
02/18/2026
Objection raised — Scope
02/18/2026
Objection raised — Fire_Protection
02/18/2026
Objection raised — Fire_Protection
02/18/2026
Objection raised — Scope
02/04/2026
Filed — Alteration CO
STRUCTURE FILED IN CONJUNCTION WITH ALT CO JOB NUMBER B01143991-I1.
B01143991-S4
11/06/2025
Objection resolved — Addressed
11/03/2025
Objection resolved — Addressed
10/31/2025
Objection resolved — Addressed
10/31/2025
Objection resolved — Addressed
10/31/2025
Objection resolved — Addressed
10/14/2025
Objection raised — Admin
10/14/2025
Objection raised — Fire_Protection
10/14/2025
Objection raised — Zoning
10/14/2025
Objection raised — Energy
10/01/2025
Filed — Alteration CO
STRUCTURE FILED IN CONJUNCTION WITH ALT CO JOB NUMBER B01143991-I1.
B01143991-S3
10/01/2025
Filed — Alteration CO
STRUCTURE FILED IN CONJUNCTION WITH ALT CO JOB NUMBER B01143991-I1.
B01143991-S2
10/01/2025
Objection raised — Energy
09/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
09/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
09/29/2025
Special inspection requirement — Maintenance information
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/29/2025
Special inspection requirement — Energy Code Compliance Inspections
09/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
09/24/2025
Violation issued (FDNY_NOV, closed)
09/16/2025
Filed — Alteration CO
STRUCTURE FILED IN CONJUNCTION WITH ALT CO JOB NUMBER B01143991-I1.
B01143991-S1
09/15/2025
Special inspection requirement — Structural Steel - Details
09/15/2025
Special inspection requirement — Concrete - Cast-In-Place
09/15/2025
Special inspection requirement — Structural Steel - High Strength Bolting
09/15/2025
Special inspection requirement — Structural Steel - Welding
Latest 60 of 213 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC09/23/2022
DOB NOWProtection and Mechanical MethodsSigned-offCENTRAL SCAFFOLD & HOIST07/27/2022
DOB NOWSupported ScaffoldSigned-offCENTRAL SCAFFOLD & HOIST05/19/2022
DOB NOWProtection and Mechanical MethodsSigned-offCENTRAL SCAFFOLD & HOIST05/19/2022
DOB NOWProtection and Mechanical MethodsSigned-offCENTRAL SCAFFOLD & HOIST05/18/2022
DOB NOWSidewalk ShedSigned-offCENTRAL SCAFFOLD & HOIST05/04/2022
DOB NOWCurb CutSigned-offB T GENERAL BUILDERS04/29/2022
DOB NOWConstruction FenceSigned-offPREFERRED GC GROUP INC03/25/2022
DOB NOWMechanical SystemsSigned-offB T GENERAL BUILDERS03/11/2022
DOB NOWStandpipeSigned-offTRISTATE FIRE SPRINK INC03/01/2022
DOB NOWProtection and Mechanical MethodsSigned-offCENTRAL SCAFFOLD & HOIST07/28/2021
DOB NOWProtection and Mechanical MethodsSigned-offCENTRAL SCAFFOLD & HOIST05/20/2021
DOB NOWSupported ScaffoldSigned-offCENTRAL SCAFFOLD & HOIST05/18/2021
DOB NOWProtection and Mechanical MethodsSigned-offCENTRAL SCAFFOLD & HOIST05/18/2021
DOB NOWSidewalk ShedSigned-offCENTRAL SCAFFOLD & HOIST05/05/2021
DOB NOWConstruction FenceSigned-offPREFERRED DESIGN GROUP03/25/2021
DOB NOWConstruction FenceSigned-offPREFERRED GC GROUP INC02/02/2021
DOB NOWConstruction FenceSigned-offPREFERRED GC GROUP INC10/14/2020
DOB NOWConstruction FenceSigned-offPREFERRED GC GROUP INC08/18/2020
BIS—ISSUEDB T GENERAL BUILDERS INC08/29/2022
BISPLISSUEDP.H. WORKS INC04/13/2022
BIS—ISSUEDB T GENERAL BUILDERS INC01/18/2022
BIS—ISSUEDB T GENERAL BUILDERS INC12/08/2021
BIS—ISSUEDPREFERRED GC GROUP INC11/15/2021
BIS—ISSUEDPREFERRED GC GROUP INC11/11/2021
BISPLISSUEDP.H. WORKS INC04/22/2021
BIS—ISSUEDPREFERRED GC GROUP INC11/13/2020
BIS—ISSUEDPREFERRED GC GROUP INC11/13/2020
BISEQISSUEDMR DEMOLITION INC06/05/2015
BIS—ISSUEDMR DEMOLITION INC11/25/2014
BISEQISSUEDMR DEMOLITION INC06/09/2014
BIS—ISSUEDMR DEMOLITION INC06/09/2014
BISPLISSUEDWAGNER ZIV PL & HTG03/09/2006
BISEQISSUEDA. OSTREICHER CONSTRUCTION CORP.02/01/2006
BISOTISSUEDA. OSTREICHER CONSTRUCTION CORP.02/01/2006
1 project · most recent 02/04/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/04/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUHY-EP336TSNU-A1 336,000 BTU · Vrf Outdoor ×2
PUHY-EP168TNU-A1 168,000 BTU · Vrf Outdoor ×1
PUHY-EP192TNU-A1 192,000 BTU · Vrf Outdoor ×1
PUHY-EP216TNU-A1 216,000 BTU · Vrf Outdoor ×1
Heating
Mitsubishi Electric PUHY-EP336TSNU-A1 378,000 BTU · Vrf Outdoor ×2
PUHY-EP168TNU-A1 188,000 BTU · Vrf Outdoor ×1
PUHY-EP192TNU-A1 215,000 BTU · Vrf Outdoor ×1
PUHY-EP216TNU-A1 243,000 BTU · Vrf Outdoor ×1
Ventilation
Trane OAB/REV5 2,750 CFM · Exhaust Fan ×2
OAB/REV6 3,850 CFM · Exhaust Fan ×1
1 project · most recent 02/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/04/2026——Gas, Water/Sanitary
6 projects · most recent 12/01/2025
General Wiring
FiledStatusContractorScope
12/01/2025Permit IssuedHIVOLTS ELECTRICAL INCGeneral Wiring
11/21/2022CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
10/28/2021CompleteFRIED ELECTRIC CO.—
07/23/2021CompleteSTAR ELEC'L CONTRACTORS C—
06/21/2021CompleteHIVOLTS ELECTRICAL INC—
05/06/2021CompleteV. VASS ELECTRIC CORP—
1 project · most recent 02/04/2026
Steel Concrete
FiledStatusContractorScope
02/04/2026——Steel, Concrete
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/16/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
11/16/2022Pass-Final SD - Up to 9 Requested FloorsPassView ↗
11/15/2022Pass-Final Boiler Equipment InspectionPassView ↗
11/10/2022Fail-Final SD - Up to 9 Requested FloorsFailView ↗
08/25/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
09/03/2026Final—progress
08/17/2026Public Assembly Emergency LightingMd Istiaque Hasanprogress
08/12/2026Final—progress
09/29/2025HVAC-R and service water heating equipment—energy_progress
09/29/2025HVAC-R and service water heating system controls—energy_progress
09/29/2025Maintenance information—energy_progress
09/29/2025Fire-Resistant Penetrations and Joints—special
09/29/2025Energy Code Compliance Inspections—progress
09/29/2025HVAC-R and service water piping design and insulation—energy_progress
09/15/2025Structural Steel - Details—special
09/15/2025Concrete - Cast-In-Place—special
09/15/2025Structural Steel - High Strength Bolting—special
09/15/2025Structural Steel - Welding—special
09/08/2025Final—progress
09/08/2025Designated Seismic System—special
11/19/2024Duct leakage testing, insulation and design—energy_progress
11/19/2024Fire-Resistant Penetrations and Joints—special
11/19/2024Energy Code Compliance Inspections—progress
11/19/2024Fire-Resistance Rated Construction—progress
11/19/2024Air barrier - visual inspection—energy_progress
11/19/2024Fenestration air leakage—energy_progress
11/19/2024Interior lighting power—energy_progress
11/19/2024Fenestration areas—energy_progress
11/19/2024Fenestration and door U-factor and product ratings—energy_progress
11/19/2024HVAC-R and service water piping design and insulation—energy_progress
Latest 25 of 44.
▾Documents — 352 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch20
09/14/2026B01455822-I1Request digital key ↗
09/01/2026B00515817-I1Request digital key ↗
09/01/2026B00515817-P1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly5
08/29/2026B00765995-I1Request digital key ↗
08/28/2026B08009337-I1Request digital key ↗
08/21/2026B01446832-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Standpipe3
08/31/2026B00226226-P2Request digital key ↗
08/31/2026B00226226-P1Request digital key ↗
08/31/2026B00226226-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00138470-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00185740-I1Request digital key ↗
▸Applications & Permits60
▸BISPLAN / WORK APPROVAL APPLICATION47
02/26/2024320416867Open ↗
01/24/2024320416867Open ↗
12/11/2023320416867Open ↗
Showing 3 of 47 on file for this type
▸BISWORK PERMIT APPLICATION10
01/19/2022320416867Open ↗
12/15/2021320416867Open ↗
12/11/2021320416867Open ↗
Showing 3 of 10 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
03/26/2021340676824Open ↗
03/18/2021340676824Open ↗
05/14/2019340676824Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT1
11/02/2022320416867Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/06/2024320416867Open ↗
▸BISZONING DIAGRAM1
09/10/2019320416867Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/20/2026B01143991-I1Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/14/2026B01455822-I1Open ↗
09/02/2026B00138470-I1Open ↗
09/01/2026B00515817-P1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026B00652672-I1Open ↗
08/31/2026B00652581-P1Open ↗
08/31/2026B00652581-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B00786260-I1Open ↗
08/31/2026B00652581-P1Open ↗
08/29/2026B01446832-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/14/2019340676824Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING6
09/15/2022320416867Open ↗
06/21/2022320416867Open ↗
06/06/2022320416867Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/12/2024320416867Open ↗
11/01/2022320416867Open ↗
▸BISGAS CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISWATER CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/08/2022320416867Open ↗
▸BISELECTRIC CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSEWER CUT-OFF1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/08/2022320416867Open ↗
▸BISSPRINKLER SYSTEMS1
11/09/2022320416867Open ↗
▸Safety & Tenant Protection12
▸BISSTREET TREE CHECKLIST4
08/12/2024320416867Open ↗
03/18/2021340676824Open ↗
09/10/2019320416867Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE4
10/29/2020320416867Open ↗
Showing 1 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/29/2020320416867Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/19/2021340676824Open ↗
▸DOB NOWStreet Tree Checklist1
08/20/2026B01143991-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/14/2023320416867Open ↗
05/03/2021320416867Open ↗
01/19/2021320416867Open ↗
Showing 3 of 4 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
12/08/2022320416867Open ↗
▸BISINTERIOR LIGHTING POWER1
12/08/2022320416867Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/08/2022320416867Open ↗
▸BISFENESTRATION AREAS1
12/08/2022320416867Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/08/2022320416867Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/08/2022320416867Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY6
05/03/2021320416867Open ↗
01/19/2021320416867Open ↗
10/29/2020320416867Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
01/11/2021320416867Open ↗
01/07/2021320416867Open ↗
10/29/2020320416867Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
02/14/2023320416867Open ↗
10/29/2020320416867Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
05/11/2022320416867Open ↗
10/29/2020320416867Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
11/16/2022320416867Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
11/16/2022320416867Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/16/2022320416867Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/16/2022320416867Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/16/2022320416867Open ↗
▸BISMASONRY1
11/16/2022320416867Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
11/16/2022320416867Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/16/2022320416867Open ↗
▸Approvals, Objections & Sign-offs55
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter30
09/14/2026B01455822-I1Open ↗
09/02/2026B00138470-I1Open ↗
09/01/2026B00515817-P1Open ↗
Showing 3 of 30 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
01/24/2024320416867Open ↗
12/11/2023320416867Open ↗
12/08/2023320416867Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
05/03/2021320416867Open ↗
05/03/2021320416867Open ↗
01/19/2021320416867Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership8
▸BISPROJECT-SPECIFIC GL INSURANCE4
12/10/2021320416867Open ↗
10/29/2020320416867Open ↗
Showing 2 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT2
03/18/2021340676824Open ↗
Showing 1 of 2 on file for this type
▸Filing & Intake Forms44
▸BISADDITIONAL INFORMATION38
08/24/2023320416867Open ↗
08/24/2023320416867Open ↗
11/21/2022320416867Open ↗
Showing 3 of 38 on file for this type
▸BISEFILING COVER SHEET5
09/17/2015320416867Open ↗
09/17/2015320416867Open ↗
Showing 2 of 5 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/18/2021340676824Open ↗
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHUTOFF DAMPERS1
12/08/2022320416867Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/26/2021340676824Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
11/16/2022320416867Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
11/16/2022320416867Open ↗
▸BISMAINTENANCE INFORMATION1
12/08/2022320416867Open ↗
▸DOB NOWProperty Ownership Certification1
08/20/2026B01143991-I1Open ↗