Roof10p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF NEW COMBINED SPRINKLER/STANDPIPE SYSTEM AND FIRE PUMP AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
17 documents · 2 drawing sheets
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. SIDEWALK SHED PARTIALLY INSTALLED IN THE ROADWAY. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
10 documents · 1 drawing sheet
INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE AS PER PLANS DURING NB CONSTRUCTION. FENCE PARTIALLY INSTALLED IN THE ROADWAY. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FENCE TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Bulkhead5p · 3 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanical
INSTALLATION OF NEW COMBINED SPRINKLER/STANDPIPE SYSTEM AND FIRE PUMP AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
17 documents · 1 drawing sheet
INSTALLATION OF NEW GAS-FIRED BOILER EQUIPMENT FOR NEW BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
12 documents · 3 drawing sheets
INSTALLATION OF TEMPORARY FIXED BEAM MULTI-POINT SUSPENDED SCAFFOLD PLATFORM WITH NO COUNTERWEIGHT AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
Floor 291 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Floor 281 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Floor 272 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 263p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF NEW COMBINED SPRINKLER/STANDPIPE SYSTEM AND FIRE PUMP AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
17 documents · 1 drawing sheet
INSTALLATION OF NEW GAS-FIRED BOILER EQUIPMENT FOR NEW BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
12 documents · 2 drawing sheets
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 254p · 4 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF NEW COMBINED SPRINKLER/STANDPIPE SYSTEM AND FIRE PUMP AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
17 documents · 2 drawing sheets
INSTALLATION OF NEW GAS-FIRED BOILER EQUIPMENT FOR NEW BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
12 documents · 2 drawing sheets
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 242p · 3 filings · 16 docs
MechanicalPlumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF NEW GAS-FIRED BOILER EQUIPMENT FOR NEW BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
12 documents · 2 drawing sheets
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 231p · 3 filings · 16 docs
Plumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF NEW GAS-FIRED BOILER EQUIPMENT FOR NEW BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
12 documents · 1 drawing sheet
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 222 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 212 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 202 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 192 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 181p · 3 filings · 16 docs
Plumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF NEW GAS-FIRED BOILER EQUIPMENT FOR NEW BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
12 documents · 1 drawing sheet
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 172 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 162 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 152 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 142 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 132 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 122 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 112 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 102p · 3 filings · 16 docs
MechanicalPlumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF NEW GAS-FIRED BOILER EQUIPMENT FOR NEW BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
12 documents · 2 drawing sheets
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 92 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 83p · 3 filings · 16 docs
MechanicalPlumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF NEW GAS-FIRED BOILER EQUIPMENT FOR NEW BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
12 documents · 3 drawing sheets
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 72p · 3 filings · 16 docs
MechanicalPlumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF NEW GAS-FIRED BOILER EQUIPMENT FOR NEW BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
12 documents · 2 drawing sheets
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 62 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 52 filings · 4 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 41p · 3 filings · 16 docs
Plumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF NEW GAS-FIRED BOILER EQUIPMENT FOR NEW BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
12 documents · 1 drawing sheet
INSTALLATION OF A TEMPORARY WALL BRACKET SYSTEM AS PER DRAWINGS. WALL BRACKET SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 35p · 5 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF NEW COMBINED SPRINKLER/STANDPIPE SYSTEM AND FIRE PUMP AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
17 documents · 1 drawing sheet
INSTALLATION OF NEW GAS-FIRED BOILER EQUIPMENT FOR NEW BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
12 documents · 3 drawing sheets
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 23p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF NEW COMBINED SPRINKLER/STANDPIPE SYSTEM AND FIRE PUMP AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
17 documents · 1 drawing sheet
INSTALLATION OF NEW GAS-FIRED BOILER EQUIPMENT FOR NEW BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
12 documents · 2 drawing sheets
USE OF TEMPORARY MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Floor 1Under Construction51p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
LADY M--MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED.
On file for this project
7 documents
LADY M--GENERAL CONSTRUCTION INCLUSIVE OF PARTITIONS INSTALLATION FOR CAFE BUILD-OUT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
LADY M--INSTALLATION OF PLUMBING FIXTURES AS PER PLANS FILED.
On file for this project
4 documents
Latest 3 of 8 filings on this floor.
Cellar13p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction
INSTALLATION OF INTERIOR NON-LOAD BEARING PARTITION AND DOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents
STRUCTURAL MODIFICATIONS TO SUPPORT NEW MECHANICAL UNITS, NEW RAISED FLOOR, NEW STAIR AND RAMPS, SUPPORT OF NEW VESTIBULES FOR INTERIOR TENANT IMPROVEMENTS (CAPITAL ONE) IN A NEWLY CONSTRUCTED MIXED-USE RESIDENTIAL BUILDING.
On file for this project
45 documents · 24 drawing sheets
INSTALLATION OF NEW COMBINED SPRINKLER/STANDPIPE SYSTEM AND FIRE PUMP AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
17 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Sub-Cellar3p · 2 filings · 20 docs
Fire ProtectionMechanical
INSTALLATION OF NEW COMBINED SPRINKLER/STANDPIPE SYSTEM AND FIRE PUMP AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
17 documents · 1 drawing sheet
INSTALLATION OF NEW GAS-FIRED BOILER EQUIPMENT FOR NEW BUILDING NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED IN CONJUNCTION WITH NB #: 121189301.
On file for this project
12 documents · 2 drawing sheets