← Back
Adult care facility
Carnegie East House
1844 2 AVENUE · Name © OpenStreetMap contributors · BIN 1087822
💬 Discuss this project
2001Year Built
20Stories
I7Building Class
C2-8Zoning
102,750 sfGross Floor Area
104Units
LL97 CoveredRent Stabilized20 Open Violations ▸FISP: SWARMP
Adult care facility · Owner of record: HEALTH ADVOCATES FOROLDER PEOPLE HOUSING DEV FUND · 7,500 sf lot · 13.7 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 2 filings · 7 docs
Floor 19Under Construction9p · 2 filings · 12 docs
Floor 18
Floor 17
Floor 166p · 3 filings · 11 docs
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 3 docs
2 jobs · most recent 07/13/2026
Gas
FiledStatusContractorScope
07/13/2026Permit IssuedTHE METRO GROUP PLBG LLCGas
02/16/2023Permit IssuedMAXWELL PLUMB MECH. CORPGas
7 jobs · most recent 10/29/2025
General Wiring
FiledStatusContractorScope
10/29/2025CompleteHIGH QUALITY ELEC.OF NYC—
09/04/2025Permit IssuedJAM ELECTRICAL CORP—
04/12/2022Permit IssuedCOMMERCIAL ELECT CONT INCGeneral Wiring
09/11/2019Permit IssuedHIGH IMPACT ELECTRIC CORPGeneral Wiring
10/25/2018Permit IssuedRICHARD NEU—
06/06/2018Permit IssuedWEBSTAR ELECL CONTRS INCGeneral Wiring
05/09/2018Permit IssuedASKO ELEC CONST & MAIN INGeneral Wiring
2 jobs · most recent 09/03/2025
Suspended Scaffold Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/03/2025Signed-offKAY WATERPROOFING CORP.Suspended Scaffold
07/16/2025Permit IssuedKAY WATERPROOFING CORPTenant Protection Plan 72 Hour
1 job · most recent 09/03/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/03/2025Signed-offKAY WATERPROOFING CORP.Suspended Scaffold (SC)
Building Lifecycle
All (160)Filed (22)Permit Issued (20)Signed Off (13)Facade (FISP) (9)Violation (60)Inspection (13)Objection (4)Special Inspection (19)
07/22/2026
Permit issued — Boiler Equipment
M01411509-S1-BE
07/22/2026
Permit issued — Mechanical Systems
M01411509-S3-MS
07/22/2026
Permit issued — Plumbing
M01411509-S2-PL
07/21/2026
Permit issued — Boiler Equipment
M01411509-I1-BE
07/13/2026
Filed — Alteration
CONNECT (2) GAS-FIRED BOILERS TO EXISTING GAS PIPING. ALTERATIONS TO GAS PIPING TO CONNECT TO NEW GAS FIRED BOILER. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01411509-S2
07/13/2026
Filed — Alteration
CONNECT (2) GAS-FIRED BOILERS TO EXISTING GAS PIPING. ALTERATIONS TO GAS PIPING TO CONNECT TO NEW GAS FIRED BOILER. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01411509-S3
07/13/2026
Filed — Alteration
CONNECT (2) GAS-FIRED BOILERS TO EXISTING GAS PIPING. ALTERATIONS TO GAS PIPING TO CONNECT TO NEW GAS FIRED BOILER. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01411509-I1
07/13/2026
Filed — Alteration
CONNECT (2) GAS-FIRED BOILERS TO EXISTING GAS PIPING. ALTERATIONS TO GAS PIPING TO CONNECT TO NEW GAS FIRED BOILER. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01411509-S1
07/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
07/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
07/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
07/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
06/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
06/01/2026
Signed off — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIR AND INSPECTION.
M01278199-I1
05/21/2026
Signed off — Alteration
M01293775-I1
05/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/03/2026
Signed off — Alteration
CAP AND REMOVAL OF TWO SPRINKLER HEADS, INSTALLATION OF TWO NEW SPRINKLER HEADS AS PER PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
M01292939-S2
03/31/2026
Signed off — Alteration
CAP AND REMOVAL OF TWO SPRINKLER HEADS, INSTALLATION OF TWO NEW SPRINKLER HEADS AS PER PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
M01292939-I1
03/25/2026
Signed off — Alteration
CAP AND REMOVAL OF TWO SPRINKLER HEADS, INSTALLATION OF TWO NEW SPRINKLER HEADS AS PER PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
M01292939-S1
02/18/2026
Permit issued — General Construction
M01295879-I1-GC
02/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/09/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/26/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/04/2025
Filed — Alteration
M01295879-I1
10/31/2025
Permit issued — Sprinklers
M01292939-S2-EW-SP
10/31/2025
Permit issued — Plumbing
M01292939-S1-PL
10/30/2025
Permit issued — General Construction
M01292939-I1-GC
10/24/2025
Permit issued — Sidewalk Shed
M01293775-I1-SH
10/23/2025
Filed — Alteration
M01293775-I1
10/23/2025
Filed — Alteration
CAP AND REMOVAL OF TWO SPRINKLER HEADS, INSTALLATION OF TWO NEW SPRINKLER HEADS AS PER PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
M01292939-S2
10/23/2025
Filed — Alteration
CAP AND REMOVAL OF TWO SPRINKLER HEADS, INSTALLATION OF TWO NEW SPRINKLER HEADS AS PER PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
M01292939-I1
10/23/2025
Filed — Alteration
CAP AND REMOVAL OF TWO SPRINKLER HEADS, INSTALLATION OF TWO NEW SPRINKLER HEADS AS PER PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
M01292939-S1
10/21/2025
Permit issued — General Construction
M01235360-I1-GC
10/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
Max Lee
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
09/09/2025
Permit issued — Suspended Scaffold
M01278199-I1-SC
09/08/2025
Objection resolved — Addressed
09/05/2025
Objection raised — Admin
09/03/2025
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIR AND INSPECTION.
M01278199-I1
07/16/2025
Filed — Alteration
Facade repairs. No change in egress, use or occupancy.
M01235360-I1
07/16/2025
Special inspection requirement — Masonry
Jennifer Sze
06/03/2025
Special inspection requirement — Final
Jennifer Sze
06/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
Jennifer Sze
04/17/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
11/06/2023
Signed off — Alteration
M00875705-I1
11/03/2023
Signed off — Alteration
Filing herewith drawings indicating Interior renovation on 1st Floor (Lobby). No change in use, egress or occupancy.
M00827214-I1
10/26/2023
Filed — Alteration
Filing herewith drawings indicating Interior renovation on 1st Floor (Lobby). No change in use, egress or occupancy.
M00827214-P1
10/26/2023
Special inspection requirement — Final
EBRAHIM MIANDOABI
10/24/2023
Signed off — Alteration
Temporary installation of a plywood fence.
M00862618-I1
07/07/2023
Permit issued — Structural
M00875705-I1-ST
06/13/2023
Filed — Alteration
M00875705-I1
05/17/2023
Permit issued — Plumbing
M08047465-I1-PL
04/27/2023
Permit issued — Construction Fence
M00862618-I1-FN
04/25/2023
Filed — Alteration
Temporary installation of a plywood fence.
M00862618-I1
04/11/2023
Cycle 9 facade report submitted
Latest 60 of 160 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CARNEGIE EAST HOUSE HDFC INC.5409/13/2026
KINGS GROUP NY504/09/2026
LE BLEU NAIL & SPA INC503/22/2026
HEALTH ADVOCATES FOROLDER PEOPLE HOUSING DEV FUND1503/22/2026
GOTHAM CONSTRUCTIN INC603/22/2026
GOTHEM CONST INC103/22/2026
GOTHOM CONST. INC.103/22/2026
SAVEN 1850 ESTATES103/22/2026
CARNEGIE EAST HOUSE HOUSING303/21/2026
HEALTH ADVCT FOR OLDER PPL HDFC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AGE ENGINEERING PLLC407/13/2026
ANTHONY NICHOLAS111/04/2025
LORING CONSULTING ENGINEERS, INC.610/23/2025
S&J Engineers PLLC110/23/2025
SOCOTEC, INC.107/16/2025
GREGORY RALPH, ARCHITECT310/26/2023
ONE HERMITAGE106/13/2023
BRAD E. COHEN, PE202/16/2023
STAVROS I. MALLIAROS, P.E., P.C.110/25/2018
WKS INC.106/01/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC1203/21/2026
CONVERSANO ASSOCIATES, INC.303/21/2026
EMPIRE CITY CONSULTANTS, INC.803/21/2026
KMA DESIGNS LLC203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
BAY RESTORATION203/21/2026
INDESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LAWRENCE J. LEVINEFire Protection703/21/2026
SENTINEL BUILDERS, LLCGeneral Contractor607/08/2026
GANNON CONTRACTING LLCGeneral Contractor304/09/2026
THE METRO GROUP PLBG LLCPlumbing307/23/2026
PAR PLUMBING CO., INCPlumbing207/08/2026
BAY RESTORATION CORPGeneral Contractor203/21/2026
KAY WATERPROOFING CORPGeneral Contractor104/09/2026
KINGS GROUP NY CORPGeneral Contractor104/09/2026
THE METRO GROUP, INCGeneral Contractor107/23/2026
MAXWELL PLUMB MECH. CORPPlumbing107/08/2026
HIGH QUALITY ELEC.OF NYCElectrical103/22/2026
UNITECH DESIGNScaffold107/08/2026
LEONID ARLYUKElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
WEBSTAR ELECL CONTRS INCElectrical103/22/2026
ABCO-PEERLESS SPRKLR CORPFire Protection107/08/2026
PAR FIRE PROTECTION LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746407/13/2026
JACK GREEN ASSOCIATES422111/04/2025
PROJECT TACTICAL SOLUTION5859410/23/2025
GEORGE J. XERAKIAS, PE1658109/03/2025
SOCOTEC, INC.301107/16/2025
ROYAL CONSTRUCTION P.E. S462106/13/2023
BRAD E. COHEN, PE434202/16/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedTHE METRO GROUP PLBG LLC07/22/2026
DOB NOWMechanical SystemsPermit IssuedTHE METRO GROUP, INC07/22/2026
DOB NOWPlumbingPermit IssuedTHE METRO GROUP PLBG LLC07/22/2026
DOB NOWBoiler EquipmentPermit IssuedTHE METRO GROUP PLBG LLC07/21/2026
DOB NOWGeneral ConstructionPermit IssuedSENTINEL BUILDERS, LLC02/18/2026
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE10/31/2025
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC10/31/2025
DOB NOWGeneral ConstructionSigned-offGANNON CONTRACTING LLC10/30/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP10/24/2025
DOB NOWGeneral ConstructionPermit IssuedKAY WATERPROOFING CORP10/21/2025
DOB NOWSuspended ScaffoldSigned-offKAY WATERPROOFING CORP.09/09/2025
DOB NOWStructuralSigned-offSENTINEL BUILDERS, LLC07/07/2023
DOB NOWPlumbingPermit IssuedMAXWELL PLUMB MECH. CORP05/17/2023
DOB NOWConstruction FenceSigned-offSENTINEL BUILDERS, LLC04/27/2023
DOB NOWGeneral ConstructionSigned-offSENTINEL BUILDERS, LLC04/05/2023
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC05/04/2022
DOB NOWSprinklersSigned-offABCO-PEERLESS SPRKLR CORP03/31/2022
DOB NOWGeneral ConstructionSigned-offGANNON CONTRACTING LLC02/22/2022
DOB NOWSidewalk ShedSigned-offBAY RESTORATION CORP10/30/2018
DOB NOWSignSigned-offUNITECH DESIGN INC07/06/2018
BISPLISSUEDC.R.U. MECHAN & HEAT INC11/27/2018
BISSPISSUEDMETFLOW FIRE CONTROL LLC05/23/2018
BISPLISSUEDTOP DOG PLBG & HTG CORP05/21/2018
BISOTISSUEDLUXURY HOME IMPROVEMENT05/07/2018
BISOTISSUEDCARRICKMORE P&D LLC12/04/2014
BISOTISSUEDCARRICKMORE P&D LLC12/04/2014
BISOTISSUEDSKYLINE RESTORATION INC03/28/2013
BISEQISSUEDEVEREST SCAFFOLDING INC03/19/2013
BISOTISSUEDTS AWNING & SIGN CORP08/21/2009
BISOTISSUEDNORTH AMERICAN CLEANING06/15/2009
BISPLISSUEDMCMANUS MECH MAINT P&H INC06/15/2009
BISPLISSUEDARISTA PLBG & HTG CORP01/30/2009
BISMHISSUEDMETRIC CONTRACTING CORP12/23/2008
BISMHISSUEDDIERKS HEATING CO INC04/28/2005
BISMHISSUEDGRC CORPORATION12/15/2003
BISEQISSUEDGOTHAM CONSTRUCTION12/03/2003
BIS—ISSUEDGOTHAM CONSTRUCTION12/03/2003
BISSPISSUEDDNA PLUMBING CONTR. INC11/21/2003
BISSPISSUEDSTELLMAR PLBG & MECH CORP10/09/2003
BISPLISSUEDSTELLMAR PLBG & MECH.CORP10/09/2003
+ 30 more permits on file
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
06/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/09/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/18/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/16/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/20/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
07/13/2026HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
07/13/2026HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
07/13/2026Tenant Protection Plan ComplianceStephen Shishkospecial
07/13/2026HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
06/05/2026Tenant Protection Plan ComplianceStephen Shishkospecial
10/02/2025Tenant Protection Plan ComplianceMax Leespecial
10/01/2025Fire-Resistant Penetrations and JointsMax Leespecial
07/16/2025MasonryJennifer Szespecial
06/03/2025FinalJennifer Szeprogress
06/03/2025Tenant Protection Plan ComplianceJennifer Szespecial
10/26/2023FinalEBRAHIM MIANDOABIprogress
02/16/2023HVAC-R and service water heating equipmentBrad Cohenenergy_progress
01/24/2023Tenant Protection Plan ComplianceBrad Cohenspecial
11/30/2022Maintenance informationBrad Cohenenergy_progress
11/30/2022HVAC-R and service water piping design and insulationBrad Cohenenergy_progress
11/30/2022HVAC-R and service water heating system controlsBrad Cohenenergy_progress
11/30/2022Energy Code Compliance InspectionsBrad Cohenprogress
10/25/2018FinalSTAVROS MALLIAROSprogress
05/29/2018FinalKO SHEK WONGprogress
▾Documents — 180 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
09/06/2026M00048393-I1Request digital key ↗
09/06/2026M00092495-I1Request digital key ↗
09/03/2026M00600912-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits28
▸BISWORK PERMIT APPLICATION14
11/28/2018123458800Open ↗
05/24/2018123458800Open ↗
05/21/2018123458800Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION13
07/19/2018123458800Open ↗
07/03/2018123458800Open ↗
06/28/2018123458800Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/30/2009110406196Open ↗
▸Seals & Professional Certifications56
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/03/2026M00600912-I1Open ↗
09/03/2026M00600890-I1Open ↗
08/31/2026M08050768-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
12/19/2018123458800Open ↗
12/19/2018123458800Open ↗
07/31/2018123458800Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026M01411509-S1Open ↗
08/29/2026M00827214-I1Open ↗
08/25/2026M00048393-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M01411509-S1Open ↗
09/01/2026M01411509-S2Open ↗
08/28/2026M01292939-S1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/04/2018123458800Open ↗
04/07/2010110429386Open ↗
12/09/2008110406196Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/04/2018123458800Open ↗
03/19/2013140063222Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/19/2013140063222Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/09/2008110406196Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/19/2013140063222Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
07/19/2018123458800Open ↗
07/03/2018123458800Open ↗
06/28/2018123458800Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
12/16/2009110429386Open ↗
11/24/2009110429386Open ↗
09/01/2009110429386Open ↗
▸BISSCHEDULE B - PLUMBING2
01/07/2009110429386Open ↗
12/09/2008110406196Open ↗
▸BISSIGN HANGER CERTIFICATE1
08/21/2009120118327Open ↗
▸Safety & Tenant Protection2
▸BISST-1: Street Tree Checklist1
12/09/2008110406196Open ↗
▸BISTenant Protection Plan and Notes1
05/04/2018123458800Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/30/2026M00875705-I1Open ↗
08/21/2026M01295879-I1Open ↗
08/13/2026M00827214-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
02/14/2013121524065Open ↗
07/27/2009120118327Open ↗
05/07/2009110429386Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/16/2014122101545Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/09/2008110406196Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
12/19/2018123458800Open ↗
12/19/2018123458800Open ↗
06/28/2018123458800Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
12/19/2018123458800Open ↗
05/22/2013121524065Open ↗
▸BISTR8: Energy Code Progress Inspections1
11/12/2014122101545Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/19/2013140063222Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
12/19/2018123458800Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
12/19/2018123458800Open ↗
08/17/2016122101545Open ↗
04/17/2014140063222Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/31/2026M08050768-I1Open ↗
08/30/2026M00875705-I1Open ↗
08/13/2026M08047465-I1Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
02/14/2013121524065Open ↗
01/07/2009110429386Open ↗
12/09/2008110406196Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/07/2010110429386Open ↗
▸BISSUPERSEDING LETTER1
11/28/2018123458800Open ↗
▸BISCCD1-Construction Code Determination1
08/23/2013121524065Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
12/19/2018123458800Open ↗
05/04/2018123458800Open ↗
08/17/2016122101545Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET7
05/04/2018123458800Open ↗
09/16/2014122101545Open ↗
09/16/2014122101545Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM3
12/19/2018123458800Open ↗
07/03/2018123458800Open ↗
06/14/2018123458800Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/19/2013140063222Open ↗
▸BISADDITIONAL INFORMATION1
06/28/2018123458800Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
12/19/2018123458800Open ↗
12/19/2018123458800Open ↗
01/07/2009110429386Open ↗
▸BISSupporting Document: Fee Exempt1
05/04/2010110429386Open ↗
▸DOB NOWCalculations1
08/13/2026M01278199-I1Open ↗
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation1
08/13/2026M00048393-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01278199-I1Open ↗