← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The 510 Driggs Avenue Condominium
185 NORTH 8TH STREET · BIN 3426626
💬 Discuss this project
2020Year Built
6Stories
RMBuilding Class
M1-2/R6AZoning
98,078 sfGross Floor Area
73Units
LL97 CoveredRent Stabilized10 Active Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: Driggs Partners · 20,000 sf lot · 4.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBarry's, The Learning Experience30p · 4 filings · 20 docs
BulkheadTemporary pipe scaffold installation1p · 1 filing · 17 docs
Floor 6Temporary pipe scaffold installation21p · 2 filings · 20 docs
Floor 5Temporary pipe scaffold installation22p · 2 filings · 20 docs
Floor 4Temporary pipe scaffold installation21p · 2 filings · 20 docs
Floor 3Temporary pipe scaffold installation18p · 1 filing · 17 docs
Floor 2Perspire Sauna Studio68p · 4 filings · 20 docs
Floor 1Barry's, The Learning Experience +313p · 20 filings · 20 docs
CellarBarry's, The Learning Experience +113p · 10 filings · 20 docs
Sub-CellarThe Learning Experience, Perspire Sauna Studio3p · 3 filings · 20 docs
Site & exteriorBaker Health, Barry's43p · 10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hampshire Properties15807/08/2026
Driggs Partners3403/22/2026
Straford Properties1803/21/2026
510 Driggs Ave203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution1803/21/2026
Synergy Building Consultants503/21/2026
JM Zoning2203/21/2026
Ndkazalas Architecture603/21/2026
Custodio Consulting1203/21/2026
Peter Pizzimenti Architect503/21/2026
BMB Building Consulting403/21/2026
Louis Striar203/21/2026
Bridge Expediting1803/21/2026
D R Brown403/21/2026
PDG Building Consultants803/21/2026
Design Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ray BuildersScaffold1107/08/2026
Core Scaffold SystemsScaffold1107/08/2026
Sony DesignGeneral Contractor807/08/2026
Imperium Construction SE*General Contractor507/08/2026
Proto P & H ServicesPlumbing407/08/2026
Cocozza GroupGeneral Contractor407/08/2026
Four Star Air Con'd CoGeneral Contractor403/21/2026
Nion ElectricGeneral Contractor403/22/2026
Nion ElectricElectrical403/21/2026
Ecny Electrical ContractorsElectrical303/22/2026
Colgate EnterpriseScaffold307/08/2026
Medra Exhaust SystemsGeneral Contractor303/21/2026
A Plus PlumbingGeneral Contractor203/22/2026
LB General Contracting CoGeneral Contractor207/08/2026
N.Y. Sign ArtSign hanger207/08/2026
Unitech DesignSign hanger207/08/2026
All Pro Plumbing & HeatingFire Protection207/08/2026
Apn BuildersGeneral Contractor207/08/2026
Blue J ContractingGeneral Contractor207/08/2026
Five Town Neon Sign CoSign hanger107/08/2026
J. Caiazzo Plumbing & HeatingFire Protection107/08/2026
Neptune MechanicalPlumbing107/08/2026
All Pro Plumbing & HeatingPlumbing107/08/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
American Standard P&H CororpPlumbing107/08/2026
A Plus PlumbingPlumbing107/08/2026
Ariana ContractingFire Protection107/08/2026
A + SprinklerFire Protection107/08/2026
J. Caiazzo Plumbing & HeatingPlumbing107/08/2026
V Electric NYElectrical103/22/2026
Rite Way Construction GroupGeneral Contractor104/09/2026
TF ElectricalElectrical103/22/2026
Orbit SprinklerFire Protection107/08/2026
Sony DesignScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tan Engineering12911112/02/2025
Custodio Consulting1835311/11/2025
Stracar Special Inspectio229307/16/2025
Concrete Solutions Lab Co5344202/27/2025
New Age Engineering7746511/25/2024
HRF Services5616210/14/2024
Shahrish Shuvo Engineering8524110/10/2024
Domani Inspection Service843404/11/2024
Regional Testing394502/06/2024
Build-Tech Construction612111/17/2023
PSI Agency254108/25/2023
Assure Professional Engineering6962403/22/2023
AR-Tech Engineering6659208/20/2021
Building Lifecycle
All (300)Filed (49)Permit Issued (41)Signed Off (41)Violation (18)Inspection (41)Objection (80)Special Inspection (30)
08/24/2026
Violation issued (HPD, open)
C
07/05/2026
Violation issued (HPD, closed)
C
06/05/2026
Signed off — Alteration
Installation of 1 new gas meter in the Cellar, 5 new commercial cooking at 1st floor and associated gas piping. Gas originally approved under NB #320912857. No change in use, occupancy, or egress.
B01124608-S1
06/01/2026
Signed off — Alteration
INSTALLATION OF 3 CONDENSERS AT SETBACK/ROOF AND NEW KITCHEN EXHAUST FOR COMMERCIAL KITCHEN/EATING AND DRINKING ESTABLISHMENT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
B01132977-I1
05/20/2026
Signed off — Alteration
Installation of 1 new gas meter in the Cellar, 5 new commercial cooking at 1st floor and associated gas piping. Gas originally approved under NB #320912857. No change in use, occupancy, or egress.
B01124608-I1
05/15/2026
Signed off — Alteration
INSTALLATION OF 3 CONDENSERS AT SETBACK/ROOF AND NEW KITCHEN EXHAUST FOR COMMERCIAL KITCHEN/EATING AND DRINKING ESTABLISHMENT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
B01132977-S5
05/14/2026
Signed off — Alteration
Erect illuminated non advertising sign on wall. No change of use, egress or occupancy
B01195442-I1
05/11/2026
Violation issued (HPD, open)
A
05/07/2026
Signed off — Alteration
Erect illuminated non advertising D/F sign on wall. No change of use, egress or occupancy
B01195446-I1
05/05/2026
Signed off — Alteration
INSTALLATION OF 3 CONDENSERS AT SETBACK/ROOF AND NEW KITCHEN EXHAUST FOR COMMERCIAL KITCHEN/EATING AND DRINKING ESTABLISHMENT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
B01132977-S3
04/23/2026
Signed off — Alteration
INSTALLATION OF 3 CONDENSERS AT SETBACK/ROOF AND NEW KITCHEN EXHAUST FOR COMMERCIAL KITCHEN/EATING AND DRINKING ESTABLISHMENT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
B01132977-S1
04/23/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/08/2026
Special inspection requirement — Maintenance information
Roger Tan
04/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
04/08/2026
Special inspection requirement — Mechanical Systems
Roger Tan
04/08/2026
Special inspection requirement — Final
Roger Tan
04/08/2026
Special inspection requirement — Shutoff dampers
Roger Tan
04/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
04/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
03/30/2026
Objection resolved — Addressed
03/27/2026
Objection raised — Scope
03/03/2026
Signed off — Alteration
B01205122-I1
02/18/2026
Permit issued — Sign
B01205122-I1-SG
02/04/2026
Objection resolved — Addressed
01/15/2026
Signed off — Alteration
Installation on a black iron duct with 2 hour fire rated duct wrap, insulation only for commercial kitchen and hood exhaust. No change in use, occupancy or egress.
B01125458-I1
01/15/2026
Signed off — Alteration
Mechanical filing in conjunction with Tenant fit out of interior space
B00922218-S5
01/15/2026
Signed off — Alteration
Mechanical filing in conjunction with Tenant fit out of interior space
B00922218-S2
01/15/2026
Signed off — Alteration
Mechanical filing in conjunction with Tenant fit out of interior space
B00922218-S1
01/15/2026
Signed off — Alteration
Mechanical filing in conjunction with Tenant fit out of interior space
B00922218-I1
01/15/2026
Signed off — Alteration
Mechanical filing in conjunction with Tenant fit out of interior space
B00922218-S3
01/07/2026
Objection resolved — Addressed
01/06/2026
Signed off — Alteration
B00911343-I1
12/12/2025
Objection raised — Scope
12/12/2025
Objection raised — Mechanical
12/10/2025
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES ON THE FIRST FLOOR AND CELLAR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01143123-I1
12/09/2025
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01045158-I1
12/05/2025
Signed off — Alteration
Structural filing as per plans filed
B00945077-I1
12/02/2025
Filed — Alteration
INSTALLATION OF 3 CONDENSERS AT SETBACK/ROOF AND NEW KITCHEN EXHAUST FOR COMMERCIAL KITCHEN/EATING AND DRINKING ESTABLISHMENT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
B01132977-P1
11/19/2025
Violation issued (HPD, open)
I
11/18/2025
Signed off — Alteration
INSTALLATION OF 3 CONDENSERS AT SETBACK/ROOF AND NEW KITCHEN EXHAUST FOR COMMERCIAL KITCHEN/EATING AND DRINKING ESTABLISHMENT AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY FILED UNDER THIS APPLICATION.
B01132977-S2
11/18/2025
Signed off — Alteration
Modify existing plumbing per plans.
B00911335-I1
11/18/2025
Signed off — Alteration
B00911353-I1
11/12/2025
Signed off — Alteration
Interior fit out per plans
B00911302-I1
11/12/2025
Violation issued (ECB, closed)
Construction
11/12/2025
Violation issued (ECB, closed)
Construction
11/11/2025
Filed — Alteration
INSTALLATION OF HVAC EQUIPMENT ON THE FIRST FLOOR AND ROOF AS PER PLANS FILED. NO CHANGE TO USE EGRESS OR OCCUPANCY.
B01143102-P1
10/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
TEOFILO INFANTE
10/16/2025
Special inspection requirement — Energy Code Compliance Inspections
TEOFILO INFANTE
10/16/2025
Special inspection requirement — Interior lighting power
TEOFILO INFANTE
10/16/2025
Special inspection requirement — Lighting controls
TEOFILO INFANTE
10/16/2025
Special inspection requirement — Final
NASSIR ALMUKHTAR
10/10/2025
Filed — Alteration
Interior fit out per plans
B00911302-P2
10/08/2025
Special inspection requirement — Interior lighting power
TEOFILO INFANTE
10/08/2025
Special inspection requirement — Final
NASSIR ALMUKHTAR
10/08/2025
Special inspection requirement — Lighting controls
TEOFILO INFANTE
10/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
TEOFILO INFANTE
10/08/2025
Special inspection requirement — Energy Code Compliance Inspections
TEOFILO INFANTE
09/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offEnrico Passaro02/18/2026
DOB NOWStructuralSigned-offImperium Construction SE*06/10/2025
DOB NOWSignSigned-offUnitech Design05/21/2025
DOB NOWPlumbingSigned-offNeptune Mechanical04/10/2025
DOB NOWMechanical SystemsSigned-offRite Way Construction Group04/08/2025
DOB NOWMechanical SystemsSigned-offFour Star Air Cond Co04/04/2025
DOB NOWSignSigned-offSkanska Building04/03/2025
DOB NOWSignSigned-offSkanska Building04/03/2025
DOB NOWSignSigned-offUnitech Design03/18/2025
DOB NOWStructuralSigned-offApn Builders03/11/2025
DOB NOWGeneral ConstructionSigned-offBlue J Contracting02/24/2025
DOB NOWGeneral ConstructionSigned-offApn Builders01/15/2025
DOB NOWSprinklersSigned-offAll Pro Plumbing & Heating01/14/2025
DOB NOWSprinklersSigned-offAmerican Standard P&H Cororp01/13/2025
DOB NOWMechanical SystemsSigned-offMedra Exhaust Systems01/13/2025
DOB NOWMechanical SystemsSigned-offFour Star Air Cond Co01/09/2025
DOB NOWSprinklersSigned-offA + Sprinkler01/07/2025
DOB NOWGeneral ConstructionSigned-offImperium Construction SE*12/13/2024
DOB NOWPlumbingSigned-offA Plus Plumbing12/13/2024
DOB NOWMechanical SystemsSigned-offImperium Construction SE*12/13/2024
DOB NOWPlumbingSigned-offProto P & H Services12/12/2024
DOB NOWPlumbingSigned-offProto P & H Services12/10/2024
DOB NOWPlumbingSigned-offProto P & H Services09/09/2024
DOB NOWSprinklersSigned-offAriana Contracting07/12/2024
DOB NOWConstruction FenceSigned-offSony Design05/14/2024
DOB NOWSprinklersSigned-offOrbit Sprinkler04/30/2024
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating04/30/2024
DOB NOWGeneral ConstructionSigned-offLB General Contracting Co04/22/2024
DOB NOWMechanical SystemsSigned-offLB General Contracting Co04/18/2024
DOB NOWStructuralSigned-offSony Design04/04/2024
DOB NOWMechanical SystemsSigned-offSony Design04/03/2024
DOB NOWPlumbingSigned-offProto P & H Services03/26/2024
DOB NOWGeneral ConstructionSigned-offSony Design03/12/2024
DOB NOWStructuralSigned-offSony Design03/07/2024
DOB NOWSprinklersSigned-offAll Pro Plumbing & Heating12/19/2023
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating11/09/2023
DOB NOWGeneral ConstructionSigned-offBlue J Contracting10/23/2023
DOB NOWSprinklersSigned-offAnthony Caiazzo04/05/2023
DOB NOWPlumbingSigned-offJ. Caiazzo Plumbing & Heating02/17/2023
DOB NOWMechanical SystemsSigned-offCocozza Group02/15/2023
+ 50 more permits on file
3 projects · most recent 12/02/2025
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/02/2025Signed-offFour Star Air Con'd CoHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PURY-EP120TNU-A1 120,000 BTU · Vrf Outdoor ×2
PURY-EP144TNU-A1 144,000 BTU · Vrf Outdoor ×2
Ventilation
Econ-Air EA2-D.250-20D 3,020 CFM · Makeup Air ×2
USB130DD-RM 5,200 CFM ×2
11/11/2025Signed-offImperium Construction SE*Heating and Air Conditioning Systems
Heat / Cool
Trane TUHYE0963AN41AN 96,000 BTU · Condensing Unit ×15
TURYE1923AN41AN 192,000 BTU · Condensing Unit ×5
02/06/2024Signed-offSony DesignAir Conditioning Systems
Cooling
Mitsubishi Electric TURYE384BN40AN 32 tons · Condensing Unit ×1
3 projects · most recent 12/02/2025
Sprinkler System
FiledStatusContractorScope
12/02/2025——76 heads
02/06/2024Signed-offAriana ContractingSprinkler System
———13 heads
4 projects · most recent 12/02/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/02/2025Signed-offNeptune Mechanical—
05/13/2025Signed-offProto P & H ServicesGas
02/06/2024Signed-offProto P & H ServicesWater/Sanitary
———Gas, Water/Sanitary
23 projects · most recent 10/27/2025
General Wiring Lighting
FiledStatusContractorScope
10/27/2025CompleteTF ElectricalGeneral Wiring
10/27/2025CompleteTF ElectricalGeneral Wiring
05/30/2025CompleteSpectrum on Broadway-Electric—
05/30/2025CompleteSpectrum on Broadway-Electric—
05/15/2025CompleteAtmos Electric Svce—
04/02/2025CompleteTM Select ElectricGeneral Wiring
03/19/2025CompleteAtmos Electric Svce—
03/19/2025CompleteAtmos Electric Svce—
01/06/2025CompleteNion ElectricGeneral Wiring
12/13/2024CompleteV Electric NYGeneral Wiring
05/02/2024CompleteP & Z ElectricGeneral Wiring
03/06/2024CompleteHivolts ElectricalGeneral Wiring
02/01/2024CompleteOhr Chodosh Electrical Cont IGeneral Wiring
12/07/2023CompleteElectrical Charges—
03/02/2023CompleteY.S. ElectricGeneral Wiring, Lighting
2 projects · most recent 12/02/2025
Steel Concrete
FiledStatusContractorScope
12/02/2025Signed-offNeptune MechanicalSteel
02/06/2024Signed-offProto P & H ServicesConcrete
▾Field Inspections (DOB CAP) — 41
DateTypeResultReport
04/23/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/25/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2025Pass-Final Sign Permit InspectionPassView ↗
06/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/06/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/09/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/24/2025Pass-Final Sign Permit InspectionPassView ↗
04/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 41.
▾Special Inspection Requirements (DOB NOW) — 144
DateRequirementInspectorRole
04/08/2026Mechanical SystemsRoger Tanspecial
04/08/2026Shutoff dampersRoger Tanenergy_progress
04/08/2026HVAC-R and service water piping design and insulationRoger Tanenergy_progress
04/08/2026Maintenance informationRoger Tanenergy_progress
04/08/2026HVAC-R and service water heating system controlsRoger Tanenergy_progress
04/08/2026FinalRoger Tanprogress
04/08/2026HVAC-R and service water heating equipmentRoger Tanenergy_progress
10/16/2025FinalNASSIR ALMUKHTARprogress
10/16/2025Interior lighting powerTEOFILO INFANTEenergy_progress
10/16/2025Lighting controlsTEOFILO INFANTEenergy_progress
10/16/2025Energy Code Compliance InspectionsTEOFILO INFANTEprogress
10/16/2025Fire-Resistance Rated ConstructionTEOFILO INFANTEprogress
10/08/2025Interior lighting powerTEOFILO INFANTEenergy_progress
10/08/2025Fire-Resistance Rated ConstructionTEOFILO INFANTEprogress
10/08/2025FinalNASSIR ALMUKHTARprogress
10/08/2025Energy Code Compliance InspectionsTEOFILO INFANTEprogress
10/08/2025Lighting controlsTEOFILO INFANTEenergy_progress
09/15/2025Tenant Protection Plan Compliance—special
07/16/2025Sprinkler SystemsMIRO Stracarspecial
07/16/2025Tenant Protection Plan ComplianceStephen Shishkospecial
07/10/2025Tenant Protection Plan ComplianceStephen Shishkospecial
06/26/2025Mechanical SystemsAnthony Casermaspecial
06/26/2025HVAC-R and service water piping design and insulationAnthony Casermaenergy_progress
06/26/2025HVAC-R and service water heating system controlsAnthony Casermaenergy_progress
06/26/2025Energy Code Compliance InspectionsAnthony Casermaprogress
Latest 25 of 144.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Learning ExperienceEducationCellar, Floor 1
Project B01225206 Alteration · LOC Issued · 05/20/2025
Project B00922218 Alteration · LOC Issued · 08/29/2023
Baker HealthMedical / Healthcare—
Project B01205122 Alteration · LOC Issued · 04/22/2025
Barry'sFitness / RecreationCellar, Floor 1, Roof
Project B01195442 Alteration · LOC Issued · 03/31/2025
Project B01143088 Alteration · LOC Issued · 11/25/2024
Project B01143102 Alteration · Permit Entire · 11/25/2024
Project B01143123 Alteration · LOC Issued · 11/25/2024
Project B01143147 Alteration · LOC Issued · 11/25/2024
Project B01143177 Alteration · LOC Issued · 11/25/2024
Impact KitchenRestaurant / Food ServiceFloor 1
Project B01185920 Alteration · LOC Issued · 03/18/2025
Perspire Sauna StudioFitness / RecreationCellar, Floors 1, 2
Project B01018617 Alteration · LOC Issued · 04/11/2024
Boris & HortonRestaurant / Food ServiceFloor 1
Project B08042595 Alteration · LOC Issued · 12/23/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 643 on file (BIS + DOB NOW)
▸Plans & Drawings62
▸DOB NOWPlans/Sketch50
09/02/2026B00099226-I1Request digital key ↗
08/28/2026B08042595-I1Request digital key ↗
08/28/2026B00795522-I1Request digital key ↗
Showing 3 of 50 on file for this type
▸DOB NOWPlans/Sketch - Protection of Mechanical Methods4
09/01/2026B00464292-I1Request digital key ↗
09/01/2026B00462920-I1Request digital key ↗
09/01/2026B00462920-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold4
09/01/2026B00459924-I1Request digital key ↗
09/01/2026B00459924-P1Request digital key ↗
09/01/2026B00459924-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/01/2026B00453776-I1Request digital key ↗
09/01/2026B00453776-P1Request digital key ↗
09/01/2026B00453776-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/01/2026B00465184-I1Request digital key ↗
▸Applications & Permits85
▸BISPLAN / WORK APPROVAL APPLICATION54
05/20/2025320912857Open ↗
02/12/2025320912857Open ↗
02/05/2025320912857Open ↗
Showing 3 of 54 on file for this type
▸BISWORK PERMIT APPLICATION28
01/05/2023320912857Open ↗
12/29/2022320912857Open ↗
07/09/2022320912857Open ↗
Showing 3 of 28 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/25/2022320912857Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISADDRESS: NEW HOUSE NUMBER APPROVED3
12/20/2021321600889Open ↗
Showing 1 of 3 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
12/20/2021321600889Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
12/20/2021321600889Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
12/20/2021321600889Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications180
▸DOB NOWDPL-1: Design Professional Seal & Signature63
09/02/2026B00099226-I1Open ↗
09/01/2026B00464292-I1Open ↗
09/01/2026B00464292-P1Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWProgress Inspector Seal & Signature48
10/03/2026B01018617-S2Open ↗
10/03/2026B01018617-S2Open ↗
09/29/2026B00459924-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature44
10/03/2026B01018617-S2Open ↗
09/28/2026B01143177-I1Open ↗
09/28/2026B01143177-I1Open ↗
Showing 3 of 44 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
10/18/2022320912857Open ↗
03/17/2021320912857Open ↗
Showing 2 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
05/18/2021340811599Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
01/27/2021340803768Open ↗
01/26/2021340803660Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
01/27/2021340803768Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/27/2021340803768Open ↗
01/26/2021340803660Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING9
10/03/2022340612901Open ↗
09/30/2022320912857Open ↗
09/23/2022340612901Open ↗
Showing 3 of 9 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
03/08/2023321776011Open ↗
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
10/12/2022320912857Open ↗
▸BISSPRINKLER SYSTEMS1
09/28/2022340612901Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/01/2024320912857Open ↗
▸Safety & Tenant Protection47
▸DOB NOWHPD-1: Anti-Harassment Area Checklist38
09/01/2026B00462920-I1Open ↗
09/01/2026B00462920-P1Open ↗
09/01/2026B00459924-P1Open ↗
Showing 3 of 38 on file for this type
▸BISSTREET TREE CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISANTI-HARASSMENT CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
05/01/2023321775717Open ↗
03/30/2022320912857Open ↗
▸BISSTREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos21
▸DOB NOWOER: Notice to Proceed8
09/01/2026B00459924-P2Open ↗
09/01/2026B00459924-P1Open ↗
09/01/2026B00459924-P3Open ↗
Showing 3 of 8 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION7
06/29/2023340619343Open ↗
05/01/2023321775717Open ↗
03/08/2023321776011Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED5
05/18/2021340811599Open ↗
01/27/2021340803768Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/01/2023321775717Open ↗
09/19/2022320912857Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFENESTRATION AREAS1
09/28/2022320912857Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
09/28/2022320912857Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
09/28/2022320912857Open ↗
▸Inspections & Test Reports70
▸BISTECHNICAL REPORT: RESPONSIBILITY19
05/01/2023321775717Open ↗
10/13/2022320912857Open ↗
03/18/2022340803768Open ↗
Showing 3 of 19 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT13
06/07/2021320912857Open ↗
06/07/2021320912857Open ↗
Showing 2 of 13 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER11
05/19/2023321775717Open ↗
05/19/2023321775717Open ↗
05/19/2023321775717Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX10
05/19/2023321775717Open ↗
09/16/2021320912857Open ↗
09/16/2021320912857Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWHydrant Flow Test Letter3
08/26/2026B00922218-S4Open ↗
Showing 1 of 3 on file for this type
▸BISCONCRETE - CAST-IN-PLACE2
05/01/2023321775717Open ↗
09/28/2022320912857Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
05/01/2023321775717Open ↗
09/28/2022320912857Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
05/01/2023321775717Open ↗
09/28/2022320912857Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/28/2022320912857Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
09/28/2022320912857Open ↗
▸BISMASONRY1
09/28/2022320912857Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
09/28/2022320912857Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
09/28/2022320912857Open ↗
▸BISPOST-INSTALLED ANCHORS1
09/28/2022320912857Open ↗
▸BISDEEP FOUNDATIONS / PILES1
08/29/2022320912857Open ↗
▸BISMECHANICAL SYSTEMS1
09/28/2022320912857Open ↗
▸Approvals, Objections & Sign-offs31
▸BISSCHEDULE A - OCCUPANCY / USE12
05/20/2025320912857Open ↗
02/12/2025320912857Open ↗
02/05/2025320912857Open ↗
Showing 3 of 12 on file for this type
▸BISSUPERSEDING LETTER9
11/17/2021320912857Open ↗
11/17/2021320912857Open ↗
11/17/2021320912857Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/14/2023321776011Open ↗
01/12/2023340803660Open ↗
01/10/2023340803508Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
12/20/2021321600889Open ↗
12/20/2021321600889Open ↗
12/20/2021321600889Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT5
05/18/2021340811599Open ↗
Showing 1 of 5 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
07/09/2022320912857Open ↗
01/13/2022320912857Open ↗
Showing 2 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
05/01/2023321775717Open ↗
03/08/2023321776011Open ↗
01/05/2023340803508Open ↗
▸Filing & Intake Forms57
▸BISADDITIONAL INFORMATION34
09/25/2025320912857Open ↗
01/10/2025320912857Open ↗
02/01/2024320912857Open ↗
Showing 3 of 34 on file for this type
▸BISBOROUGH INTAKE FORM9
01/05/2023320912857Open ↗
12/29/2022320912857Open ↗
01/13/2022320912857Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
05/18/2021340811599Open ↗
01/27/2021340803768Open ↗
Showing 2 of 6 on file for this type
▸Other Documents12
▸BISPLOT DIAGRAM4
12/20/2021321600889Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWHydraulic Calculations3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type