| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01413655 ↗ | 437 EAST 9 STREET MANHATTAN | Alteration | Permit Issued | 06/22/2026 | 09/15/2026 | Design KUSHNER STUDIOS Owner Canvas Filer KUSHNER STUDIOS | INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE (UG VI) INCLUDING THE REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS & NEW FLOOR & W… |
| M01360981 ↗ | 480 7 AVENUE MANHATTAN | Alteration | Permit Issued | 03/04/2026 | 08/14/2026 | Design WINTON GROUP ARCHITECTURE Filer TATIANA ZHELUDKOVA | Proposed new plumbing fixtures in an existing 4-story commercial building |
| B01372578 ↗ | 96 SOUTH PORTLAND AVE BROOKLYN | Alteration | Permit Issued | 03/20/2026 | 08/11/2026 | Design WINTON GROUP ARCHITECTURE Filer TATIANA ZHELUDKOVA | PROPOSED AND MODIFICATION OF EXISTING PLUMBING FIXTURES IN COMMERCIAL SPACE ON THE 1ST FLOOR, U.G.-VI |
| M01393974 ↗ | 80 EAST END AVENUE MANHATTAN | Alteration | Permit Issued | 05/12/2026 | 07/31/2026 | Design A2 ARCHITECT, PC Filer J.A. EXPEDITING, LLC | INTERIOR COMBINATION OF APARTMENTS 10F AND 10G ON THE 10TH FLOOR AS PER TPPN 3/97. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| Q01164624 ↗ | 688 WOODWARD AVENUE QUEENS | New Building | Permit Issued | 03/06/2025 | 06/04/2026 | Design Z & T ENGINEERING, P.C. | UNDERPINNING FOR NEW COMMERCIAL BUILDING. |
| Q01366383 ↗ | 688 WOODWARD AVENUE QUEENS | Alteration | Permit Issued | 03/03/2026 | 06/04/2026 | Design Z & T ENGINEERING, P.C. | Using heelblocks. raker to support the existing exterior wall. |
| Name | Projects together | Most recent |
|---|---|---|
| THREAD COLLECTIVE | 3 | 04/22/2026 |
| ARNOLD MONTAG ARCHITECT AM/PM DESI | 2 | 05/05/2025 |
| WINTON GROUP ARCHITECTURE | 2 | 07/10/2026 |
| Z & T ENGINEERING, P.C. | 2 | 04/22/2026 |
| A2 ARCHITECT, PC | 1 | 05/12/2026 |
| EMTEC CONSULTANTS | 1 | 08/25/2023 |
| GREEN SOLUTIONS ENGINEERING & ENERG | 1 | 04/22/2026 |
| KUSHNER STUDIOS | 1 | 08/07/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| AMERIPRO INTERIORS INC | 2 | 07/10/2026 |
| GREGG NY PLUMBING, INC | 2 | 07/30/2025 |
| ALMA PLBG SPRINKLER INC | 1 | 07/10/2026 |
| S V PLBG & HTG INC | 1 | 03/20/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Canvas | 1 | 08/07/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| DEMOWORKS EXPEDITING, INC. | 2 | 05/05/2025 |
| NEXUS CONSULTING NYC, INC | 2 | 04/22/2026 |
| TATIANA ZHELUDKOVA | 2 | 07/10/2026 |
| J.A. EXPEDITING, LLC | 1 | 05/12/2026 |
| KUSHNER STUDIOS | 1 | 08/07/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01413655 ↗ | 437 EAST 9 STREET MANHATTAN | Alteration | Permit Issued | 06/22/2026 | 09/15/2026 | Design KUSHNER STUDIOS Owner Canvas Filer KUSHNER STUDIOS | INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE (UG VI) INCLUDING THE REMOVAL & INSTALLATION OF NON-LOAD BEARING PARTITIONS & NEW FLOOR & W… |
| M01360981 ↗ | 480 7 AVENUE MANHATTAN | Alteration | Permit Issued | 03/04/2026 | 08/14/2026 | Design WINTON GROUP ARCHITECTURE Filer TATIANA ZHELUDKOVA | Proposed new plumbing fixtures in an existing 4-story commercial building |
| B01372578 ↗ | 96 SOUTH PORTLAND AVE BROOKLYN | Alteration | Permit Issued | 03/20/2026 | 08/11/2026 | Design WINTON GROUP ARCHITECTURE Filer TATIANA ZHELUDKOVA | PROPOSED AND MODIFICATION OF EXISTING PLUMBING FIXTURES IN COMMERCIAL SPACE ON THE 1ST FLOOR, U.G.-VI |
| M01393974 ↗ | 80 EAST END AVENUE MANHATTAN | Alteration | Permit Issued | 05/12/2026 | 07/31/2026 | Design A2 ARCHITECT, PC Filer J.A. EXPEDITING, LLC | INTERIOR COMBINATION OF APARTMENTS 10F AND 10G ON THE 10TH FLOOR AS PER TPPN 3/97. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| Q01164624 ↗ | 688 WOODWARD AVENUE QUEENS | New Building | Permit Issued | 03/06/2025 | 06/04/2026 | Design Z & T ENGINEERING, P.C. | UNDERPINNING FOR NEW COMMERCIAL BUILDING. |
| Q01366383 ↗ | 688 WOODWARD AVENUE QUEENS | Alteration | Permit Issued | 03/03/2026 | 06/04/2026 | Design Z & T ENGINEERING, P.C. | Using heelblocks. raker to support the existing exterior wall. |
| Q01179873 ↗ | 688 WOODWARD AVENUE QUEENS | Alteration | Signed-off | 02/13/2025 | 04/01/2026 | Temporary construction fence filed in conjunction with demolition Q01145359 | |
| B01261515 ↗ | 1599A PACIFIC STREET BROOKLYN | Alteration | Permit Issued | 07/30/2025 | 10/14/2025 | Design THREAD COLLECTIVE | Plumbing work for a 2-family building. No change in use, egrees, or occupancy. |
| B00911353 ↗ | 510 DRIGGS AVENUE BROOKLYN | Alteration | Signed-off | 08/25/2023 | 04/08/2025 | Design EMTEC CONSULTANTS | MODIFY EXISTING DUCTWORK AND PIPING PER PLANS |
| Q01145359 ↗ | 688 WOODWARD AVENUE QUEENS | Full Demolition | Signed-off | 11/27/2024 | 03/26/2025 | Full demolition of house | |
| B01156038 ↗ | 1597 PACIFIC STREET BROOKLYN | Alteration | Permit Issued | 01/06/2025 | 01/30/2025 | Design THREAD COLLECTIVE | PLUMBING MODIFICATIONS TO 2-FAMILY HOME AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Building | Filings | Most Recent |
|---|---|---|
| 437 EAST 9 STREET ↗ | 2 | 09/16/2026 |
| 96 SOUTH PORTLAND AVE ↗ | 1 | 08/12/2026 |
| 480 7 AVENUE ↗ | 1 | 08/12/2026 |
| 80 EAST END AVENUE ↗ | 1 | 08/01/2026 |
| 688 WOODWARD AVENUE ↗ | 13 | 07/08/2026 |
| 1597 PACIFIC STREET ↗ | 1 | 07/08/2026 |
| 688 WOODWARD AVENUE ↗ | 5 | 07/08/2026 |
| 510 DRIGGS AVENUE ↗ | 1 | 04/09/2026 |
| 1599A PACIFIC STREET ↗ | 3 | 03/21/2026 |